    Structure:

    Dimensions: Min. interior length = 3.0 m Min. interior width = 3.0 m Min. interior height = 2.9m

    The ideal interior dimensions of the shelter are: 3.0 x 3.0 x 2.9m (length x width x height)

    There will be one type of shelter used either for ALCATEL or MOTOROLA equipment as the mentioned below layout.

    Shelter layout for BTS site

  • BTS Site Description

    Shelter

    Page 3 of 9

    Other specifications:

    . Connections of shelters elements to be by mechanical

    2. Metallic elements of the shelter should be protected against

    3. The shelters main structure should be mechanically fixed to the

    4. pun galvanized or stainless

    5. Bolts and screws with diameter equal 10 mm or less shall be

    6. For green field sites, the shelter main structure should be

    7. In case the shelter is factory assembled, it should contain

    1assembly. Site welding is not recommended.

    corrosion by galvanization or should be of the non-corrodible type (Aluminum or stainless steel).

    supporting structure or foundation. Bolts, nuts and washers shall be ssteel in order not to lose their protection while tightened (BS 4604).

    stainless steel.

    elevated from ground (30 cm minimum). The use of concrete plots is recommended with fixations by resin anchors.

    localized lifting points reinforced in a way not to deteriorate its integrity during transportation and handling.

    Floor

    Load

    The floor must be able to support a uniformly distributed load of

    1350kg/m2, a concentrated force of 350kg as per BS 6399 and a punching of 30kg/cm2.

  • BTS Site Description

    Shelter

    Page 4 of 9

    Electrical resistance

    The floor coat must be of conductive, anti static, homogeneous,

    Vinyl sheets must always be installed using a conductive adhesive

    ny cutting in floor coat or damages also bad welded joints or air

    single layer, vinyl sheets or tiles 60 cm x 60 cm, at least 2 mm thickness. All seams joints are to be heat welded.

    over copper strips. The copper mesh should be made of leaf copper strips 30 mm x 0.16 mm and should be spaced about 100 cm apart. Aballoons won't be accepted.

    able entries

    The electric connection can pass through the floor. The

    C

    penetrations must be properly sealed against dust and water done in flameproof and vermin proof material.

    Walls

    Constitution

    Thickness of the walls: 8cm sandwich walls (2 x metal plate +

    Wall panel frames should insure total water tightness.

    e use of silicon joints for panels waterproofing induces

    A drainage system should exist at the base of the vertical

    Panels shall be connected using a cam-lock system with

    insulation polyurethane). The metal part of the sandwich wall must be treated against corrosion.

    Thperiodic maintenance; hence, it should be avoided and replaced by compressed joints whenever possible.

    panels. It should be able of recuperate eventual water leakage and guide it to the outside.

    aluminum or stainless steel corner profiles mechanically

  • BTS Site Description

    Shelter

    Page 5 of 9

    fixed (rivets, interlocking system, etc)

    Panels should be reinforced by embedded plywood at places

    Paint applied on panel surfaces should be easily maintained,

    where localized efforts exist (such as fixation of equipments).

    scratch proof and dust preventing. Bright colors are recommended.

    Cable entries

    In the case of side connection:

    Upper cable entry: This reservation is for coaxial cables

    Lower cable entry: for electricity, grounding.

    Other penetration entries: two 80mm for split air-conditioning.

    All penetrations must be good sealed.

    A PVC tube shall protect the power supply cable along with the

    (feeders), on two opposite sides.

    grounding. The power supply cables and the grounding cable should be separated in the proximity of the shelter. The separation makes an easier access for later interventions on the grounding cables.

    NOTE: For the shelters installed on the sites with generator power supply an inlet must be foreseen in order to plug in an emergency mobile power generator if the generator power supply is not working.

  • BTS Site Description

    Shelter

    Page 6 of 9

    Roof

    Only one roof will be used with min. slope of 1%, the floor must be able to support a passage of a person. The panels shall be tongued, grooved and connected using a camlock system. The roof should be watertight and should evacuate all water (no water stagnation).

    A self-protected APP modified bitumen water proofing

    membrane with composite polyester reinforcement will be applied on the upper surface of the roof.

    Door One leaf door composition identical to that of the walls, and opening to outside. The bottom of the door must be 5-8cm above the floor level.

    Door Labels

    Other specifications of the door to be noted: 3 hinges stainless steel

    The door shall have a fixed, flexible & uninterrupted neoprene black joint profile fitted all around the inside of the door.

    The door lock sit material has to be durable and non-corrodible.

    The door should be opening able from inside at any moment

    without the use of a key.

  • BTS Site Description

    Shelter

    Page 7 of 9

    Outdoor access of Lever handle type, stainless steel or powder

    coated

    A threshold will be placed to make the door tight, if necessary,

    A door blocking system allowing to open the door leaf maximum

    120 will be installed.

    External type door

    All door accessories should be of the non-corrodible type. The use of stainless steel products is recommended.

    Door must be tight to avoid a penetration of water or dust into the shelter. Peripheral door joints should be permanently compressed for that purpose.

    An aluminum profile should be placed maximum. 100 mm above

    the door (external face) in order to improve water tightness with extension of 100 mm from each side; this profile should have a minimum width of 150 mm.

    Lock The presence system of a master key is a must. Temporary

    locks are forbidden.

    Support of the shelter

    The support of the shelter can be made up of (according to a consultant report): Reinforced concrete slab, or Reinforced concrete beams, or Frame constituted of galvanized steel I beams.

    For green field, it should be raised above the existing support (30-cm minimum) on concrete plots.

  • BTS Site Description

    Shelter

    Page 8 of 9

    RADIO ROOM The conditions for the radio room are similar to them of the shelter.

    Walls and ceiling

    The walls and the ceiling must be clean, dry and free of dust. Two or three layers of regular quality white paint will be applied if necessary.

    In case the radio room roof is open to the outside, a waterproof membrane with water evacuation. In additional, a thermal isolation should be applied.

    All partitions in contact with the outside air should be insulated.

    Cable entries

    The cable entries will be drilled or cut with appropriate tools.

    The accessible openings must be protected because of potential intruding risks.

    Door The conditions for the radio room door are similar to those of the

    shelter

    A firebreak door will be installed only in the buildings where there is a high risk of fire in order to be in conjunction with the building fire regulations.

    Fire Compartment

    The room should form an independent fire compartment totally

    separated from the rest of the building by fire rated walls and ceilings and fire rated doors. (The fire rating depends on the type of hazards in the building but in no case can be less than 1 hour for walls and ceilings and hour for doors).

    Penetrations should also be fire rated. For sensitive configurations, MobiNils Technical Department

    can require automatic fire suppression.

  • BTS Site Description

    Shelter

    Page 9 of 9

    OTHER SITE ITEMS

    Upon a request of the MobiNil representative some other items may be added on the sites.

    A ladder of 100 cm to be supplied inside each shelter.

    A key box of 30 x 30 cm will be installed beside GEDP.

    A ladder must be installed if requested. It is recommended to

    provide a ladder if different levels shall be accessible with the minimum difference of 0.3m between them. The specifications of the ladder are similar to the one of the towers.

    Handrails of 1.1m high must be installed if the height of falling

    exceeds 1.0m.

    In the proximity of the poles supporting MW antennas the handrails

    may be required to avoid free passage of persons in the bearing zone of the MW beam.

    Every shelter should be equipped with a portable fire extinguisher. This equipment is to be periodically maintained.

    Access steps should be placed in front of the shelter door with the following characteristics:

    - Max height: 20 cm. - Minimum width: 28 cm. - Minimum length: 90 cm.

    Either concrete or heavy-duty steel can be used