20
1 problem solved www.gel.com Serving the Power Industry

1 Serving the Power Industry problem solvedhps.ne.uiuc.edu/rets-remp/PastWorkshops/2010/4 GEL... · 20 Serving the Power Industry problem solved EQUIPMENT PERFORMANCE PARAMETERS Carbon

  • Upload
    others

  • View
    1

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 1 Serving the Power Industry problem solvedhps.ne.uiuc.edu/rets-remp/PastWorkshops/2010/4 GEL... · 20 Serving the Power Industry problem solved EQUIPMENT PERFORMANCE PARAMETERS Carbon

1

problem solvedwww.gel.com Serving the Power Industry

Page 2: 1 Serving the Power Industry problem solvedhps.ne.uiuc.edu/rets-remp/PastWorkshops/2010/4 GEL... · 20 Serving the Power Industry problem solved EQUIPMENT PERFORMANCE PARAMETERS Carbon

2

problem solvedwww.gel.com Serving the Power Industry

14C COMPOUNDS OF INTEREST

Organic Carbon Gases – primary form for PWRs14CH4 and other hydrocarbons

Inorganic Carbon Gases – primary form for BWRs14CO2, 14CO not formed in appreciable quantities

Particulate CarbonCarbonate, bicarbonate, incorporated in debris

Page 3: 1 Serving the Power Industry problem solvedhps.ne.uiuc.edu/rets-remp/PastWorkshops/2010/4 GEL... · 20 Serving the Power Industry problem solved EQUIPMENT PERFORMANCE PARAMETERS Carbon

3

problem solvedwww.gel.com Serving the Power Industry

SAMPLE MATRICES

AirPotentially high moistureLimited oxygen at some locations% levels of hydrogen at some locations14C activities can vary by factor of 106 between locationsWide range of gas flow rates and pressure at sample locations

Page 4: 1 Serving the Power Industry problem solvedhps.ne.uiuc.edu/rets-remp/PastWorkshops/2010/4 GEL... · 20 Serving the Power Industry problem solved EQUIPMENT PERFORMANCE PARAMETERS Carbon

4

problem solvedwww.gel.com Serving the Power Industry

ANALYTICAL PROTOCOL REQUIREMENTS

Differentiate between organic, inorganic, and particulate 14CAccommodate wide range of sample activitiesSeparate 14C from other interferencesHandle flammable, low oxygen atmospheresEmploy practical sample times and gas volumes

Page 5: 1 Serving the Power Industry problem solvedhps.ne.uiuc.edu/rets-remp/PastWorkshops/2010/4 GEL... · 20 Serving the Power Industry problem solved EQUIPMENT PERFORMANCE PARAMETERS Carbon

5

problem solvedwww.gel.com Serving the Power Industry

ANALYTICAL PROTOCOL REQUIREMENTS

Accommodate differences in sample flow, sample pressureAdaptable to differences in process interface hardwareEmploy hardware that can be reliably and conveniently transported to and returned from facilities

Page 6: 1 Serving the Power Industry problem solvedhps.ne.uiuc.edu/rets-remp/PastWorkshops/2010/4 GEL... · 20 Serving the Power Industry problem solved EQUIPMENT PERFORMANCE PARAMETERS Carbon

6

problem solvedwww.gel.com Serving the Power Industry

PRIOR STUDIES

Thompson – 1978Combustion/mol sieve/cryo-trap/LSC

Kunz – 1985Combustion/Ascarite/cryo-trap/gas proportional counter

IAEA – 2004Review including combustion/NaOH soln/LSC

Magnusson – 2008Combustion/NaOH soln/LSC

Page 7: 1 Serving the Power Industry problem solvedhps.ne.uiuc.edu/rets-remp/PastWorkshops/2010/4 GEL... · 20 Serving the Power Industry problem solved EQUIPMENT PERFORMANCE PARAMETERS Carbon

7

problem solvedwww.gel.com Serving the Power Industry

SAMPLE COLLECTION SYSTEM

Page 8: 1 Serving the Power Industry problem solvedhps.ne.uiuc.edu/rets-remp/PastWorkshops/2010/4 GEL... · 20 Serving the Power Industry problem solved EQUIPMENT PERFORMANCE PARAMETERS Carbon

8

problem solvedwww.gel.com Serving the Power Industry

CHEMICAL REACTIONS

CO2 AdsorptionCO2 + 2NaOH Na2CO3 + H2ONa2CO3 + CO2 + H2O 2NaHCO3

CO2 DesorptionNaHCO3 + HNO3 NaNO3 + H2CO3

H2CO3 H2O + CO2

Page 9: 1 Serving the Power Industry problem solvedhps.ne.uiuc.edu/rets-remp/PastWorkshops/2010/4 GEL... · 20 Serving the Power Industry problem solved EQUIPMENT PERFORMANCE PARAMETERS Carbon

9

problem solvedwww.gel.com Serving the Power Industry

CHEMICAL REACTIONS

CombustionCH4 + 2O2 CO2 + 2H2O

Page 10: 1 Serving the Power Industry problem solvedhps.ne.uiuc.edu/rets-remp/PastWorkshops/2010/4 GEL... · 20 Serving the Power Industry problem solved EQUIPMENT PERFORMANCE PARAMETERS Carbon

10

problem solvedwww.gel.com Serving the Power Industry

METHANE COMBUSTION EFFICIENCY 2 LPM

0

10

20

30

40

50

60

70

0 200 400 600 800 1000 1200

Temperature F

Met

hane

Con

cent

ratio

n pp

mv

Page 11: 1 Serving the Power Industry problem solvedhps.ne.uiuc.edu/rets-remp/PastWorkshops/2010/4 GEL... · 20 Serving the Power Industry problem solved EQUIPMENT PERFORMANCE PARAMETERS Carbon

11

problem solvedwww.gel.com Serving the Power Industry

CO2 ADSORPTION EFFICIENCY 1LPM

0

50

100

150

200

250

300

350

400

450

0 50 100 150 200 250 300 350 400

Minutes

CO

2 C

once

ntra

tion

ppm

v

Page 12: 1 Serving the Power Industry problem solvedhps.ne.uiuc.edu/rets-remp/PastWorkshops/2010/4 GEL... · 20 Serving the Power Industry problem solved EQUIPMENT PERFORMANCE PARAMETERS Carbon

12

problem solvedwww.gel.com Serving the Power Industry

14C LABORATORY DISTILLATION APPARATUS

Air Flow Inlet

To Vacuum

Condenser

Digestion Flask: Solid Sorbent

Tritium Trap (HCl)

CO2 trap

Page 13: 1 Serving the Power Industry problem solvedhps.ne.uiuc.edu/rets-remp/PastWorkshops/2010/4 GEL... · 20 Serving the Power Industry problem solved EQUIPMENT PERFORMANCE PARAMETERS Carbon

13

problem solvedwww.gel.com Serving the Power Industry

VALIDATION OF SAMPLE ANALYSIS PROTOCOL

Method Blank0.042 pCi/L (4.2 x10-11 uCi/ml)Based on a 2 hour sample at 300 ml/min gas sample flow rate

LCS95.1 +/- 3% for spike equivalent to 2.0 pCi/L (2x10-9 uCi/ml) (total volume sampled=3.6 x104ml)

Page 14: 1 Serving the Power Industry problem solvedhps.ne.uiuc.edu/rets-remp/PastWorkshops/2010/4 GEL... · 20 Serving the Power Industry problem solved EQUIPMENT PERFORMANCE PARAMETERS Carbon

14

problem solvedwww.gel.com Serving the Power Industry

VALIDATION OF SAMPLE COLLECTION AND ANALYSIS PROTOCOL

14C

14C

14C

Page 15: 1 Serving the Power Industry problem solvedhps.ne.uiuc.edu/rets-remp/PastWorkshops/2010/4 GEL... · 20 Serving the Power Industry problem solved EQUIPMENT PERFORMANCE PARAMETERS Carbon

15

problem solvedwww.gel.com Serving the Power Industry

VALIDATION OF SAMPLE COLLECTION AND ANALYSIS PROTOCOL

71.71 99%71.71 97%71.71 92%71.71 94%71.71 95%71.71 91%71.71 96%71.71 96%71.71 98%71.71 91%

Average 95%

Nominal(pCi/sample)

LCS Recovery%

LCS(spiked into flask w/ascarite)

Page 16: 1 Serving the Power Industry problem solvedhps.ne.uiuc.edu/rets-remp/PastWorkshops/2010/4 GEL... · 20 Serving the Power Industry problem solved EQUIPMENT PERFORMANCE PARAMETERS Carbon

16

problem solvedwww.gel.com Serving the Power Industry

VALIDATION OF SAMPLE COLLECTION AND ANALYSIS PROTOCOL

10486.49 83%10486.49 85%10486.49 82%

71.71 85%71.71 85%71.71 85%717.08 90%

Average 86%

Nominal(pCi/sample)

LCS Recovery%

Wet DigestionWet Digestion of standard to produce 14CO2

in sample gas stream

71.71 99%71.71 91%71.71 94%717.08 92%717.08 91%

Average 93%

Wet Digestion of standard followed by combustion to produce 14CO2 in sample gas

stream

Wet Digestion/Combustion

Nominal(pCi/sample)

LCS Recovery%

Page 17: 1 Serving the Power Industry problem solvedhps.ne.uiuc.edu/rets-remp/PastWorkshops/2010/4 GEL... · 20 Serving the Power Industry problem solved EQUIPMENT PERFORMANCE PARAMETERS Carbon

17

problem solvedwww.gel.com Serving the Power Industry

SAMPLE COLLECTION HARDWARE

Page 18: 1 Serving the Power Industry problem solvedhps.ne.uiuc.edu/rets-remp/PastWorkshops/2010/4 GEL... · 20 Serving the Power Industry problem solved EQUIPMENT PERFORMANCE PARAMETERS Carbon

18

problem solvedwww.gel.com Serving the Power Industry

SAMPLE COLLECTION HARDWARE

Page 19: 1 Serving the Power Industry problem solvedhps.ne.uiuc.edu/rets-remp/PastWorkshops/2010/4 GEL... · 20 Serving the Power Industry problem solved EQUIPMENT PERFORMANCE PARAMETERS Carbon

19

problem solvedwww.gel.com Serving the Power Industry

EQUIPMENT AND SAMPLE SHIPPING

Sample box – limited quantity radioactive materialSample tubes – contain sodium hydroxide (a hazardous material), excepted quantity

Page 20: 1 Serving the Power Industry problem solvedhps.ne.uiuc.edu/rets-remp/PastWorkshops/2010/4 GEL... · 20 Serving the Power Industry problem solved EQUIPMENT PERFORMANCE PARAMETERS Carbon

20

problem solvedwww.gel.com Serving the Power Industry

EQUIPMENT PERFORMANCE PARAMETERS

Carbon to CO2 Conversion Efficiency>95%CO2 Capture Efficiency>95%14C Measurement Range (to Date) <7x10-11 to 5x10-3 uCi/mlSample Rate (typical, other sample rates can be used) 0.1 - 3 liters per minutePower Requirements120V 20 ampSample Collection Interface uses an interface adaptor that can appropriately extract sample gas from plant systems under a wide range of plant gas flow and pressure conditions