Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
GENERAL NOTES
DRAWING NUMBER
DATE
REVISION
ISSUE
SCALE
DRAWN BY
STEVEN ADAMSTHE SCOTS COLLEGE
SEARS
Consult with ALL relevant authorities prior to commencing worksDO NOT scale. All dimensions are nominal + should be confirmed on site prior to commencementObtain setting out information from architect PRIOR to commencmentBring discrepencies to the immediate attention of the ArchitectIf unsure of any aspect of the works seek instruction from the Architect before proceedingAll drawings must be read in conjunction with the council consent, specification, schedules, site notes + instructions issued by the ArchitectThis material / work is protected by Copyright
ADDRESS
29-53 Victoria RdBellevue Hill, NSW
DRAWING TITLE
PROJECT
CLIENT
-
-
-
-
-
-
-
MAJOR ALTERATIONS + ADDITIONS TOTHE STEVENSON LIBRARY [SSD 8922]
JC, CF, JW, ZW
CONSULTANTSTPQSQuantity Surveyors
BBCPlanning Consultant
ACVMechanical Engineer
Code PerformanceAccessibility Consultant
PBEStructural Engineer
BCGBCA Consultant
JCLHydraulic Engineer
Riley MacFire Consultant
MCDFire Engineer
UMEAElectrical Engineer
BCGBCA Consultant
Beveridge WilliamsSurveyors
JUNE 2018
S1
1:500 @ A3
PROPOSED SITE +LANDSCAPE PLAN
SSD1.02/17-200
60.3
4
60.7
9
61.1
361
.30
61.5
8
61.5
761
.65
61.7
5
61.2
861
.21
61.3
3
61.4
7
61.6
061
.83
61.6
6
61.6961.71
61.8
362
.01
62.3
8 63.2
3
63.1
262.1
2
61.8
4
4PAV
62.3
8
62.3
962
.29
62.2
9
62.3
4
62.4
8
62.6
7
63.2
3
62.9
8
62.4
362
.09
61.8
8
62.2
7
21EC
62.2
9
62.4
7
62.1
9
20EC
61.0
3
61.0
3
61.0
365.1
6
65.6
664
.17
64.1
7
61.4
7
61.1
161.0661.20
61.4
2
61.4
7
61.5
5
61.5
761
.58
61.5
6
61.4
660
.98
60.9
7 60.8
9
60.9
6
61.0
4
60.2
460.4
3
60.4
860
.23
54.7
7
54.38
61.5
461.5
0
61.5
3 61.5
2
61.0
9IN
V61
.57
TOG
61.64INV
60.7
2IN
V
61.1
9
61.2
061
.25
TOG
61.2
2
61.7
1SV
1FH
55.1
7TW
54.7
5
54.7
7
65.7
6DS
61.4
1DS
61.7
3D
S
61.5
7D
S
54.1
2D
S
61.74FLR
61.1
8FL
R65.6
7BA
LC
64.2
1
64.2
0BAL
C
68.6
4TG
65.4
6TG
68.6
1
21G
UT
63.51TG
68.6
568
.62
TG
65.4
8TG
65.4
9
68.6
7TG
72.0
4 TG
65.7
3TG
68.6
0TG
68.8
5TG
68.8
3TG
68.6
1
57.0
5TG
60.0
7TG
71.9
9
71.9
571
.08
RO
OF
72.0
072
.01
68.1
9R
IG
64.5
6
2RIG
65.9
7R
IG
72.0
1R
IG
72.0
0R
IG
71.9
7R
IG
71.0
7
RO
OF
71.9
7R
IG
71.1
0R
OO
F
72.9
5R
IG74
.04
74.0
4R
IG71
.97
71.1
7
72.0
1RIG
71.1
9
RO
OF
RIG
71.0
7RO
OF
71.18
ROOF 72.0
3RIG
72.0
1R
IG71
.17
RO
OF
73.1
5R
IG
72.0
2RIG
70.0
0R
IG
61.5
6
54.5
8
61.0
1
61.0
1
61.1
0
61.3
6
61.0
7
61.0
560
.95
62.9
9TW
62.9
8TW
61.7
1TW
61.4
5TW
61.1
0TW
60.7
5TW 60
.40
TW59
.65
TW
63.3
0TW
62.8
3TW
62.8
2TW
63.3
1TW
63.3
0TW
62.8
1TW62.82TW63.30TW
63.30TW62.83TW
62.84TW
62.8
4TW
63.3
0TW
62.5
6TW
62.5
7TW
63.0
6 TW
65.2
9TW
62.5
5TW
69.7
8TW
69.7
8TW
60.94
60.48
60.8
761.05
60.8
7
60.5
260
.41
73.1
5TC
62.39
62.7
0
61.80TK
61.8
1TK
61.8
2TK
61.7
8
55.83
54.94
56.41
56.47
56.53
56.43
59.52
56.12
72.71
64.79
59.74 VE
RA
ND
AH
STA
IRS
67.67 GUTTER LEVEL
67.70 GUTTER LEVEL
70.53 RIDGE LEVEL
RIDGE67.63 GUTTER70.66 RIDGE LEVEL
DIN
ING
HA
LL
RAMPSTEPS
ROCKFACE
BOTTOM
73.75 RIDGE LEVEL
67.67 TGOF
RETAINING
CONCRETE
70.54 RIDGE LEVEL
67.80 GUTTER LEVEL
STEPS
STEPS
STEP
S
70.54 RIDGE LEVEL
COURTYARD
STEPS
STEPS
WALL
BRICKWALL
BRICK
FENCE
BRICK
FENCE
BRICK
FENCE
GARDEN
BRICK
RETAINING
WALL
61.85
61.82
61.8
1
60.93
60.2
8
VE
RA
ND
AH
67.4
1 G
UTT
ER
LE
VE
L
STEP
S
LANDING
CONCRETE
STA
IRS
SINGLE STOREY
STO
NE
RET
AIN
ING
WAL
L
STEPS
WALL
STONE RETAINING
STONE
WALL
AND
GARDEN
STAI
RS
STEP
S
STAI
RS
CENTENARYCAIRN
STEPS
STEPS
STONE
WALL
PATH STAIRS
STEPS
STAIRS
GARDEN
47.31
57.30
53.83
53.8
7
53.88
53.87
53.87
53.8
6
61.99
59.58
66.89
57.4
0
57.4157.45
56.32
57.26
57.30
58.88
58.90
57.32
57.30
55.34
55.34
57.19
57.23
56.69
56.74
56.7256.70
56.98
56.66
56.68 56.69
55.41
53.92
54.05
54.05
54.05
54.09
54.08
54.03 54.03
62.0
0
61.96
UG
UG
UG
UG
TWO-STOREYLIFT
CONCRETE PATH
TW
TW
TILE
GARDEN
BW
TILE
BW
BW
STO
NE
RETAI
NING
WALL
THREE & FOUR STOREY
BRICK BUILDING
AMPH
ITH
EATR
E
LIBRARY BUILDING
VERANDAH (AT GROUND LEVEL)
& GYMNASIUM
BASKETBALL COURT
CONCRETE
PATH
VICTORIA
CONCRETE
AREAAREACOLONNADE
COLONNADE
PAVE
D
DRIVEWAY
FOOTPATH
FOOTPATH
CONCRETE
SCHOOL"
"MIDDLE
FIELDS
PLAYING
COVERED
ABO
VE
WAL
KWAY
BRIC
K
PAVI
NG
STAIRS
STAIRS
BRICK
PAVIN
G
(ABT 18H)
PINE
(ABT 8H)
FIG
(ABT 15H)
PALM
(ABT 5H)
TREE
(ABT 16H)FIGTREES (ABT 15H)
(ABT 9H)
BRUSH BOX
(ABT 12H)
FIG
(ABT 4H)
TREE
(ABT 5H)
PALM
(ABT 8H)
PALMSTWO STOREY
D.P. 2 3 1 7 1 3
GARDE
N
CONCRETE
47.2547.23
STEPS
58.79
57.2
7
57.28
PAVING
PATH
57.42BW
PAVING
TILE
PAVING
56.33TW57.56TW
RETAINING
WALL
BRICK
54.2656.34TW
61.07
56.76
61.16
50.25
56.36
54.33
CONCRETE
STAIRS
53.15
FOOTPATH
CONCRETE
CONCRETE
53.1
2
53.1
1
53.0
7
53.3
6
53.5
3
53.3
1
53.2
8
53.8
0
53.6
854.4
2
54.7
5
56.3
4
54.7
1
54.5
6
54.7
2
54.7
5
54.8
2
54.9
0
54.1
9
54.2
4
53.2
2
53.2
3
53.7
2
54.1
6
53.8
2
53.9
7
54.2
4
54.3
7
53.8
8
54.8
0
54.7
8
57.6
0
57.6
1
54.4
4
54.3
9
54.1
9
56.3
5
53.00
54.00
47.2
547.29
47.3
2
47.2
0
58.65
57.6
9
60.97
58.6
8
59.6
3
60.5
0
62.6
062
.36
62.0
4
61.5
3
61.6
1
61.7
7
61.8
0
63.93
63.3
6
62.27
62.55
63.0
5
63.2
0
63.2
0
62.62
62.9
8
62.6
8
62.0
3
62.10
61.36
58.9
6
59.4
6
58.81 57.70
58.6458.75
59.61
61.93
61.4
7
62.17
61.43
59.5260.77
60.0
4
57.7
2
60.5
0
59.15
59.0
3
62.1
8
63.8
562
.80
62.5
5
64.0
6
63.9
363.0
9
61.3
6
60.9
4
59.1
0
60.1
9
59.1
6
61.1
7
60.8
6
60.2
7
60.3
2
59.0
7
61.6
9
59.0
459
.51
61.4
9
61.0
7
60.8
4
61.0
0
61.3
461
.28
59.7
4
59.6
6
60.5
3
59.6
2
59.6
3
59.80
59.7
6
59.8
3
60.98
60.8
2
60.8
3
60.8
4
60.8
9
59.83
67.5
7
60.5
2
59.4
0
61.3
2
60.8
5
59.5
6
59.7
3
59.5
8
59.7
0
59.7
4
59.7
2
59.4
1
58.1
8
54.7
6
59.9
059.3
6
58.2371.39
54.8
7
60.3
7
58.2
358
.20
54.9
8
59.4
9
59.4
9
58.1
5
59.4
9
57.1
8
54.7
5
67.6
8
67.6
1
54.8
3
58.1
8
54.8
4
61.3
7
56.5
561
.82
61.8
5
62.7
1
73.7
556
.35
61.8
961.8
462
.69
73.7
4
61.9
3
54.73
67.6
455
.81
54.8
8
ASTRO
TURF
MATTING
50.44 FLOOR
47.35 FLOOR
46.83 FLOOR50.4
6 FL
OO
R
57.21 TG
58.21 RR
CONCRETE
STAIRS
57.11 FLOOR
57.87 FLOOR
TWO
STO
REY
BRIC
K B
UIL
DIN
G
"WAR
MEM
OR
IAL
CH
APEL
"
RET
AIN
ING
WAL
L
TW
TW
WALL
LAWN
TWO - FOUR STOREY
LAWN
FOUR STOREY
UPPER WALL
AWNING
FLO
OR
CONCRETEPAVING
LAWN
TILED ANDBRICK PAVING
STEPS
TILED ANDBRICK PAVING
64.05 FLOOR
56.00 FLOOR
59.73 FLOOR
62.72 FLOOR
FLO
OR
TWO STOREY
64.04 FLOOR
56.38
UG
KIOSK
ELECTRICITY
PALM
RAMP
RAM
P
ROCK
CROSSING
VEHICLE
TK
TK
TK
TK
TK
TK
TK
EDGEOFCONCRETE
EDGE
PAVING
GOALPOSTS
(ABT 15H)
PALM
193.815
358° 35' 00"
341° 39' 3
0" 65.570
1
TW
COVEREDAREA
(C)
(ABT 4H)PINE
54.6
354
.50
53.9454.69 54.7
5
54.6
3
54.5
7 TO
G
54.7
354
.57
54.3
8
54.0
5 TO
G
53.20 TOG
53.1
4 TO
G
53.06 TOG
52.73 TOG
TOGTOG
INVERT
INV
TOG
53.5
2
INVE
RT
53.63 INVERT0.150 Ø53.55 INVERT0.225 Ø
53.2
2 IN
VERT
53.25 INVERT0.225 Ø
52.2
8 IN
VERT
0.22
5 Ø
PIT
53.6
0 IN
VERT
0.22
5 Ø
PIT
PIT
53.6
5 IN
VERT
56.
114
U/S
54.
078
FLR
53.
886
54.
076
FLR
54.
714
LAN
DIN
G F
LR 5
4.07
7
52.
953
FLR
FLR
52.
969
FLR
53.
076
THREE STOREY
56.
147
FLR
56.
146
CAR
PET
56.
138
FLR
RAI
SED
PO
DIU
M 5
6.73
2
56.
136
FLR
56.
129
FLR
56.
155
FLR
56.
145
CAR
PET
56.
003
NEW
CO
NC
RET
E
56.
178
FLR
56.
159
FLR
56.
151
FLR
71.9
7R
IG71
.07
RO
OF
61.87
61.13
61.18
61.7061.63
61.48
63.04
61.48
63.03
61.15
61.67
62.89
62.84
62.89
63.00
62.90
63.06
63.00
63.02
62.94
62.91
62.84
62.81
63.02
63.0465.15
65.07
62.88
63.33
63.22
64.88
64.88
63.92
63.9865.25
127°
13'
30"
9.0
25
161° 39' 3
0" 89.620
WIRE
CONCRETE
GARDEN
WALL
RAM
P
STONE
TK
TK
TK
TK
CONCRETE
KERB
GU
TTER
PALMS
(ABT 10H)
PALMS
(ABT 10H)
PALMS
(ABT 10H)
RETAINING
WALL
RETAINING
GARDEN
GARDEN
PAVING
TILED
PAVING
TILED
GAR
DEN
OPEN AT GROUND
FLOOR
TW
TW
TW
PAVED CO
NC
RET
E
PATH
BRICK WALL
BRICK WALL
WALKWAY
ABOVE
STATUE
GRATE
STOPVALVE
GRATE
CONCRETE
UAC
UAC
UAC
UAC
RAMP
METALLID
TG
TGCONCRETE
RIG
RIG R
IG
RIG
RIG
RO
OF
PAVED
STE
PS
ASTRO TURF GARDEN
BALC
TG
STA
IRS
STE
PS
APPROX POSITIONNOT VISIBLE TO SURVEY
76.12RIG
TOW
ER
METALLID
CONCRETECONCRETE
TW
GARDENS
&
BALCONY ABOVE
SINGLE STOREYBALCONY ABOVE
71.9
7R
IG
FIREHYDRANTHYDRANT
FLAGPOLE
BENC
HMAR
K 'C
'
NAIL
IN C
ONC
RETE
LAN
DING
RL 5
4.68
1
BENC
HMAR
K
NAIL
IN W
ALL
RL 5
3.51
2
BUIL
DERS
BEN
CHM
ARK
NAIL
IN W
ALL
RL 5
7.58
BENC
HMAR
K 'A
'
NAIL
IN C
ONC
RETE
RL 5
5.92
2
i ii iii iv v
A
B
C
D
E
F
A
i ii
A
BB
CC
A
B
B
Proposed Site + Landscape PlanScale: 1:5001
Upgrade fire hydrant as necessary, reconnect to + maintain exg fire hydrant systemForm slot in wall for overland flow pathProvide upgraded supply from recently replaced main
switchboard maintaining existing CB
Reconnect SW to existing discharge / OSD system
Reconnect SW discharge from Aspinall House
No hob in replacement balustrade foroverland flow path
FALL
FALL
FALL
FALL
RL 59.70
RL 59.60
RL 59.45
RL 59.50
RL 59.45
x
RL 59.53
RL 59.61
RL 59.75
RL 58.30
RL 58.16
RL 58.08
RL 58.255
RL 58.255
RL 58.32
Regrade courtyard falls to hydraulicengineers requirements
Reinstate paving
Reinstate oval + turf where construction compound dismantled
Reinstate turf
Reinstate garden bed
1
2
3
4
5
11
12
13
14
15
16
17
10
18
6 7 8 9
i ii iii iv v
A
B
C
D
E
F
A
i ii
A
BB
CC
A
B
B
RL 54.99
OVAL
COLONADE
BLACK WATCH CAFE
SPRINKLER PUMP
Line drain Retractable screen
1900 x 2300 clr WC circulation space
Refurbish studentammenities
Proposed Ground Floor Plan RL 54.99Scale: 1:2001
M
UAWC
AM
AF
EXIT
EXIT
EXIT
EXIT
EXIT
HYDRANT
EDB
900 x 900 clr circulation space
Hydrant riser fed by existing hydrant valve along Victoria Rd.
Connect new sewer line
Exg sewer line
LIBRARY PLANT + EQUIPMENT SPACE
CHANGE ROOM
SHOWERS
Connext to middleschool sewer system -
refer hydraulicschematic
Relocate SW pits
Relocate SW pits
Exg SW from Aspinal House
Exg hydrant line re-routed into shoring cavity
Doors on sensor or hold open
Doors on sensor or hold open
Redirect existingsubmains to approxlocation and extend
submains cables to SWroom via junction box
Reuse + reconfigureexg cold water, gas +
fire hose reel supply
Replacement services riser to contain: sanitary plumbing stack, cold water / fire hose reel + fire hydrant
RL: 54.75
RISER RISER
AC
ID
H
Existing piling
New piling
Refurbish exg stair +upgrade to comply
with AS1428.1-2009
Refurbish exg changerooms
MEC
H P
LAN
T
Access to shoringcavity
Elec services run inshoring via cable tray
2hr fire compartment wall
AP
EXIT
2FD
2FD
STORE
2FD
EXIT
Handrail + balustrade to AS1428.1 + BCA D2.6
900
SHO
RIN
GC
AV
ITY
2FD
2FD
EDB lined + smoke sealedto BCA D2.7
New continuous piling
Exit to outside via shoring cavity
120/120/120 FRL load bearing walls
1.0
All columns 120/-/- FRL typical
MECH'LPLANT
SENIOR DINING ROOM
STUDENT INFORMATION POINT
2FD2FD
2FD
Exg concrete path
Exg concrete path
10000 8000
10000
3000
90022
000
1700
16700
34990
1600
GENERAL NOTES
DRAWING NUMBER
DATE
REVISION
ISSUE
SCALE
DRAWN BY
STEVEN ADAMSTHE SCOTS COLLEGE
SEARS
Consult with ALL relevant authorities prior to commencing worksDO NOT scale. All dimensions are nominal + should be confirmed on site prior to commencementObtain setting out information from architect PRIOR to commencmentBring discrepencies to the immediate attention of the ArchitectIf unsure of any aspect of the works seek instruction from the Architect before proceedingAll drawings must be read in conjunction with the council consent, specification, schedules, site notes + instructions issued by the ArchitectThis material / work is protected by Copyright
ADDRESS
29-53 Victoria RdBellevue Hill, NSW
DRAWING TITLE
PROJECT
CLIENT
-
-
-
-
-
-
-
MAJOR ALTERATIONS + ADDITIONS TOTHE STEVENSON LIBRARY [SSD 8922]
JC, CF, JW, ZW
CONSULTANTSTPQSQuantity Surveyors
BBCPlanning Consultant
ACVMechanical Engineer
Code PerformanceAccessibility Consultant
PBEStructural Engineer
BCGBCA Consultant
JCLHydraulic Engineer
Riley MacFire Consultant
MCDFire Engineer
UMEAElectrical Engineer
BCGBCA Consultant
Beveridge WilliamsSurveyors
JULY 2018
S2
1:200 @ A3
PROPOSED GROUNDFLOOR PLAN
SSD1.02/17-201
LEGEND
Exg floor area
Exg structure
Additional floor area
New masonry - 120/120/120 FRL construction of load bearing walls
Render / Sandstone capping
New concrete
Fire hyrdrant
1hr fire door set
2hr fire door set
HYD
1FD
2FD
Entry matt
Wet area
GENERAL NOTES
DRAWING NUMBER
DATE
REVISION
ISSUE
SCALE
DRAWN BY
STEVEN ADAMSTHE SCOTS COLLEGE
SEARS
Consult with ALL relevant authorities prior to commencing worksDO NOT scale. All dimensions are nominal + should be confirmed on site prior to commencementObtain setting out information from architect PRIOR to commencmentBring discrepencies to the immediate attention of the ArchitectIf unsure of any aspect of the works seek instruction from the Architect before proceedingAll drawings must be read in conjunction with the council consent, specification, schedules, site notes + instructions issued by the ArchitectThis material / work is protected by Copyright
ADDRESS
29-53 Victoria RdBellevue Hill, NSW
DRAWING TITLE
PROJECT
CLIENT
-
-
-
-
-
-
-
MAJOR ALTERATIONS + ADDITIONS TOTHE STEVENSON LIBRARY [SSD 8922]
JC, CF, JW, ZW
CONSULTANTSTPQSQuantity Surveyors
BBCPlanning Consultant
ACVMechanical Engineer
Code PerformanceAccessibility Consultant
PBEStructural Engineer
BCGBCA Consultant
JCLHydraulic Engineer
Riley MacFire Consultant
MCDFire Engineer
UMEAElectrical Engineer
BCGBCA Consultant
Beveridge WilliamsSurveyors
JULY 2018
S2
1:200 @ A3
PROPOSED FIRST FLOOR PLAN
SSD1.02/17-202
20
21
22
11
12
13
14
15
16
17
10
18
82524 9
23
19
i ii iii iv v
A
B
C
D
E
F
A
i ii
A
BB
CC
A
B
B
MAIN SWITCHROOM
SPORTS CENTRE
ENTRY
RL: 58.35
RECEPTION +SERVICE POINT
TERRACE
PARAPET RL: 59.83
Proposed First Floor Plan RL 58.38Scale: 1:2001
RL: 58.38
PLATFORM LIFT
UAWCAM
AF
RL: 57.18
EXIT
EXIT
HYDRANT
AC
ID
FRL 120/120/120
Replace exg services duct - to contain: Fire hydrant riser, FHR, cold water + sanitary stack plumbing
RL: 58.00
RL: 59.07RISERRISER
FIP
To conform with BCA E3.6
Elec feed from shoring cavity below -lined + smoke sealed to BCA D2.7
18R @ 18017T @ 300
17R @ 17816T @ 300
RL: 58.38
Cable tray from GF into switch room
Line drain
M
H
AP
2hr fire compartment wall
Ceilings to provide fire separation to Dining Hall over
Ceilings to provide fire seperation toDining Hall over
EXIT
2FD2FD
2FD
2FD
2FD
900
SHO
RIN
GC
AV
ITY
New continuous piles
2FD
EXIT
Adjust exg steps
Adjust exg retaining wall
Balustrade to comply with D2.16
Contrasting nosing + steps
Stair + handrail toAS1428.1 + D2.16
Stair + handrail to AS1428.1 + D2.16
Lift to comply with AS 1735 Part 12
Adjust exg steps
-/110/30 ext grade fire door set
RL 59.45
RL 59.45RL 59.53
RL 59.61
RL 59.75
RL 58.30
RL 58.16
RL 58.08
RL 58.255
RL 58.255
RL 58.32
Cut out slab for new stair flight
RESEARCH
STUDENT CONSULTING +COUNSELLING SUITE
CAREERS
INFORMALMEETING POINT
Supercapacitor
10000
4500
8000
10000
3000
900
4500
2200
0
17001600
16700
34990
LEGEND
Exg floor area
Exg structure
Additional floor area
New masonry - 120/120/120 FRL construction of load bearing walls
Render / Sandstone capping
New concrete
Fire hyrdrant
1hr fire door set
2hr fire door set
HYD
1FD
2FD
Entry matt
Wet area
GENERAL NOTES
DRAWING NUMBER
DATE
REVISION
ISSUE
SCALE
DRAWN BY
STEVEN ADAMSTHE SCOTS COLLEGE
SEARS
Consult with ALL relevant authorities prior to commencing worksDO NOT scale. All dimensions are nominal + should be confirmed on site prior to commencementObtain setting out information from architect PRIOR to commencmentBring discrepencies to the immediate attention of the ArchitectIf unsure of any aspect of the works seek instruction from the Architect before proceedingAll drawings must be read in conjunction with the council consent, specification, schedules, site notes + instructions issued by the ArchitectThis material / work is protected by Copyright
ADDRESS
29-53 Victoria RdBellevue Hill, NSW
DRAWING TITLE
PROJECT
CLIENT
-
-
-
-
-
-
-
MAJOR ALTERATIONS + ADDITIONS TOTHE STEVENSON LIBRARY [SSD 8922]
JC, CF, JW, ZW
CONSULTANTSTPQSQuantity Surveyors
BBCPlanning Consultant
ACVMechanical Engineer
Code PerformanceAccessibility Consultant
PBEStructural Engineer
BCGBCA Consultant
JCLHydraulic Engineer
Riley MacFire Consultant
MCDFire Engineer
UMEAElectrical Engineer
BCGBCA Consultant
Beveridge WilliamsSurveyors
JULY 2018
S2
1:200 @ A3
PROPOSED SECOND FLOOR PLAN
SSD1.02/17-203
37
38
39
40
41
42
43
29
30
31
32
33
34
35
28
36
264645 27
44
12345678910
191817161514131211 20 21
1
1
12
13
14
15
7
8
9
10
11
2
3456
i ii iii iv v
A
B
C
D
E
F
A
i ii
A
BB
CC
A
B
B
GRAND HALL
EXISTINGDINING ROOM
10000
CL
4500
8000
10000
3000
900
4500
Proposed Second Floor Plan RL 61.57Scale: 1:2001
FS1
FS2
EXIT
AM
AF
UAWCEXITEXIT
EXISTINGKITCHEN
CLICK AND COLLECT
EDB
2200
0
17001600
16700
AC
ID
Replace exg services duct - to contain: Fire hydrant riser, FHR, cold water + sanitary stack plumbing
M
H
AP
RL: 61.57
RISER RISER
Re-route exg hydrant line toshoring cavity below
34990
ASPINALHOUSE
RL: 61.00RL: 61.45
RL: 61.00
RL: 59.07
RL: 58.00
Door on electromagnetichold open
Lined + smoke sealed asper BCA D2.7
HYD1FD
2FD
New rated door with withvision panel
Fire stair dischargeconnect to exg verandah
EXG
VER
AN
DA
H
COURTYARD
Adjust existing steps
Adjust existing steps + path
Leaf to provide 900 clear
1FD
UP
1.0
Min
5.0
m
Min 4.0m
Infill
THEATRETTE PRESENTATION SPACE
INFORMAL MEETING POINT
LEGEND
Exg floor area
Exg structure
Additional floor area
New masonry - 120/120/120 FRL construction of load bearing wallsRender / Sandstone capping
Fire hyrdrant
1hr fire door set
2hr fire door set
HYD
1FD
2FD
Entry matt
Wet area
GENERAL NOTES
DRAWING NUMBER
DATE
REVISION
ISSUE
SCALE
DRAWN BY
STEVEN ADAMSTHE SCOTS COLLEGE
SEARS
Consult with ALL relevant authorities prior to commencing worksDO NOT scale. All dimensions are nominal + should be confirmed on site prior to commencementObtain setting out information from architect PRIOR to commencmentBring discrepencies to the immediate attention of the ArchitectIf unsure of any aspect of the works seek instruction from the Architect before proceedingAll drawings must be read in conjunction with the council consent, specification, schedules, site notes + instructions issued by the ArchitectThis material / work is protected by Copyright
ADDRESS
29-53 Victoria RdBellevue Hill, NSW
DRAWING TITLE
PROJECT
CLIENT
-
-
-
-
-
-
-
MAJOR ALTERATIONS + ADDITIONS TOTHE STEVENSON LIBRARY [SSD 8922]
JC, CF, JW, ZW
CONSULTANTSTPQSQuantity Surveyors
BBCPlanning Consultant
ACVMechanical Engineer
Code PerformanceAccessibility Consultant
PBEStructural Engineer
BCGBCA Consultant
JCLHydraulic Engineer
Riley MacFire Consultant
MCDFire Engineer
UMEAElectrical Engineer
BCGBCA Consultant
Beveridge WilliamsSurveyors
JULY 2018
S2
1:200 @ A3
PROPOSED THIRD FLOORPLAN
SSD1.02/17-204
31
32
33
34
35
36
37
38
2223242526
41
42
29 3043 44
39
40
78910
191817161514131211 20 21
16
1718
19
10
11
12
13
14
15
20
21
22
23
25
24
78
9
56
i ii iii iv v
A
B
C
D
E
F
A
i ii
A
BB
CC
A
B
B
LIBRARY
Proposed Third Floor Plan RL 65.275Scale: 1:2001
EXIT
WWD WWDWWD
FS1
FS2
EXIT
M
F
UAWC
AC
ID
M
H
AP
VOID
VOID
VOID
RISER
RISER
RISER
ASPINALHOUSE
HYD
1FD
1.01FD
Balustrade D2.16
All columns 120/-/- FRL typical at all levels
Lined + smoke sealed asper BCA D2.7
WWD
Make good roof oververandah below
SENIOR STUDY SPACE
LIBRARIAN
READING ROOM READING ROOM LEARNING COMMONS
10000
4500
8000
10000
3000
900
4500
2200
0
17001600
16700
34990
LEGEND
Exg floor area
Exg structure
Additional floor area
New masonry - 120/120/120 FRL construction of load bearing walls
Render / Sandstone capping
Fire hyrdrant
1hr fire door set
2hr fire door set
HYD
1FD
2FD
Copper roofing
Wet area
GENERAL NOTES
DRAWING NUMBER
DATE
REVISION
ISSUE
SCALE
DRAWN BY
STEVEN ADAMSTHE SCOTS COLLEGE
SEARS
Consult with ALL relevant authorities prior to commencing worksDO NOT scale. All dimensions are nominal + should be confirmed on site prior to commencementObtain setting out information from architect PRIOR to commencmentBring discrepencies to the immediate attention of the ArchitectIf unsure of any aspect of the works seek instruction from the Architect before proceedingAll drawings must be read in conjunction with the council consent, specification, schedules, site notes + instructions issued by the ArchitectThis material / work is protected by Copyright
ADDRESS
29-53 Victoria RdBellevue Hill, NSW
DRAWING TITLE
PROJECT
CLIENT
-
-
-
-
-
-
-
MAJOR ALTERATIONS + ADDITIONS TOTHE STEVENSON LIBRARY [SSD 8922]
JC, CF, JW, ZW
CONSULTANTSTPQSQuantity Surveyors
BBCPlanning Consultant
ACVMechanical Engineer
Code PerformanceAccessibility Consultant
PBEStructural Engineer
BCGBCA Consultant
JCLHydraulic Engineer
Riley MacFire Consultant
MCDFire Engineer
UMEAElectrical Engineer
BCGBCA Consultant
Beveridge WilliamsSurveyors
JULY 2018
S2
1:200 @ A3
PROPOSED FOURTH FLOOR PLAN
SSD1.02/17-205
32
50
49
48
47
51
52
53
54
55
35
36
37
38
39
40 33 34 35 36 37
40 39 38
29
30
31
32
3334
56
57
58
59
60
61
454665 66
62
63
64
41
i ii iii iv v
A
B
C
D
E
F
A
i ii
A
BB
CC
A
B
B
FUTURESPHEREACTIVITY BASED LEARNING
Proposed Fourth Floor Plan RL 67.95Scale: 1:2001
EXIT
WWD WWDWWD
FS1
FS2
EXIT
UAWC
RISER RISER
VOID
VOID
VOID
RISER
WWD WWD
RISERSTUDENT
STUDENTWC
AC
ID
M
H
AP
Lined + smoke sealed as per BCA D2.7
Drop down concertina smoke curtain -part of alternate fire engineering
solution
HYDFD1
Interconnecting open stair subject tofire engineering assessment - all levels
HYD
FD1
1.0
Handrail / balustrade configured toensure minimum tread 250mm - All
levels
Spiral stair part of alternate fireengineering solutions - all levels
Balustrade to BCA D2.16
120/120/120 FRL services shaft
Fire stair subject to fire engineering assessment - all levels
Balustrade to BCA D2.16
Bay window atrium - subject to fireengineering assessment, all levels
10000
4500
8000
10000
3000
4500
2200
0
17001600
16700
34990
LEGEND
Exg floor area
Exg structure
Additional floor area
New masonry - 120/120/120 FRL construction of load bearing walls
Render / Sandstone capping
Fire hyrdrant
1hr fire door set
2hr fire door set
HYD
1FD
2FD
Wet area
GENERAL NOTES
DRAWING NUMBER
DATE
REVISION
ISSUE
SCALE
DRAWN BY
STEVEN ADAMSTHE SCOTS COLLEGE
SEARS
Consult with ALL relevant authorities prior to commencing worksDO NOT scale. All dimensions are nominal + should be confirmed on site prior to commencementObtain setting out information from architect PRIOR to commencmentBring discrepencies to the immediate attention of the ArchitectIf unsure of any aspect of the works seek instruction from the Architect before proceedingAll drawings must be read in conjunction with the council consent, specification, schedules, site notes + instructions issued by the ArchitectThis material / work is protected by Copyright
ADDRESS
29-53 Victoria RdBellevue Hill, NSW
DRAWING TITLE
PROJECT
CLIENT
-
-
-
-
-
-
-
MAJOR ALTERATIONS + ADDITIONS TOTHE STEVENSON LIBRARY [SSD 8922]
JC, CF, JW, ZW
CONSULTANTSTPQSQuantity Surveyors
BBCPlanning Consultant
ACVMechanical Engineer
Code PerformanceAccessibility Consultant
PBEStructural Engineer
BCGBCA Consultant
JCLHydraulic Engineer
Riley MacFire Consultant
MCDFire Engineer
UMEAElectrical Engineer
BCGBCA Consultant
Beveridge WilliamsSurveyors
JULY 2018
S2
1:200 @ A3
PROPOSED FIFTH FLOOR PLAN
SSD1.02/17-206
36
37
38
39
4041
42
43
44
45
46
47
4849
5017
55
54
53
52
51
50
49484746
i ii iii iv v
A
B
C
D
E
F
A
i ii
A
BB
CC
A
B
B
Proposed Fifth Floor Plan RL 71.05Scale: 1:2001
FOUNDERS ROOM
TERRACE70.90
71.05
BALUSTRADE RL 72.15
69
68
70
71
72
73
74
FIRE
PLA
CE
71.35
EXIT
EXIT
72.15
PARAPET 71.35
71.35
WWD WWD
O/A
ROOFACCESS
UAWC
FS1
FS2
LOW HEAD CLEARANCE
RIDGE OVER
LOW
HEA
D C
LEA
RAN
CE
RID
GE
OV
ER
VOID
VOID
DP
DP
DP
DP DP DP
DP DP
DP
70.90
DP
Drop down concertina smoke curtain - part ofalternate fire engineered solution
Riser extends exg duct containing FH, FHR / CW + sanitary stack
EDB
EVENTSUPPORT
1FD
HYD
DP
DP
DP DP
HYD
1FD
2FD
WWD
DPDP
MEETING + CONFERENCESPACE
M
F
BMS
10000
4500
8000
10000
3000
2200
0
34990
4600
2600
4580
LEGEND
New flooring
Wet area
Timber frame
New masonry - 120/120/120 FRL construction of load bearing wallsRender / Sandstone capping
Roof leadwork
Fire hyrdrant
1hr fire door set
2hr fire door set
HYD
1FD
2FD
Welsh slate roof
GENERAL NOTES
DRAWING NUMBER
DATE
REVISION
ISSUE
SCALE
DRAWN BY
STEVEN ADAMSTHE SCOTS COLLEGE
SEARS
Consult with ALL relevant authorities prior to commencing worksDO NOT scale. All dimensions are nominal + should be confirmed on site prior to commencementObtain setting out information from architect PRIOR to commencmentBring discrepencies to the immediate attention of the ArchitectIf unsure of any aspect of the works seek instruction from the Architect before proceedingAll drawings must be read in conjunction with the council consent, specification, schedules, site notes + instructions issued by the ArchitectThis material / work is protected by Copyright
ADDRESS
29-53 Victoria RdBellevue Hill, NSW
DRAWING TITLE
PROJECT
CLIENT
-
-
-
-
-
-
-
MAJOR ALTERATIONS + ADDITIONS TOTHE STEVENSON LIBRARY [SSD 8922]
JC, CF, JW, ZW
CONSULTANTSTPQSQuantity Surveyors
BBCPlanning Consultant
ACVMechanical Engineer
Code PerformanceAccessibility Consultant
PBEStructural Engineer
BCGBCA Consultant
JCLHydraulic Engineer
Riley MacFire Consultant
MCDFire Engineer
UMEAElectrical Engineer
BCGBCA Consultant
Beveridge WilliamsSurveyors
JUNE 2018
S1
1:200 @ A3
PROPOSED ROOF PLAN
SSD1.02/17-207
i ii iii iv v
A
B
C
D
E
F
A
i ii
A
BB
CC
A
B
B
Proposed Roof Plan RL 75.25Scale: 1:2001
TERRACE
RR 75.25
73.30
70.90
RL 75.25
80.818
PARAPET 71.35
77.65
RR 75.25MECHANICAL
PLANT
72.15
Roof access hatch - fire rated
Roof deck fire rated
Copper finial (lightening protection)
Roof over fire two way stair fire rated
Copper finial (lightening protection)
Roof above fire stair two way fire rated
DP DP
DP
DP
DP
DP DP
RL 77.75
HYD
EDB
HW PMP
CHILLER
10000
4500
8000
10000
3000
2200
0
34990
LONE PIPERKEEP
LEGEND
Sandstone capping
Fire hyrdrantHYD
Lead flashing
Photo voltaic [slate] roof tile
Standing seam copper
Paving