HI S 3.2 Pressurization SAIC-A-2023 3.3 SATR-A-2010 SAIC-A-2024 Inspection of Leaks H1 H1 W1 W1 2.1 Verification & Visual Inspection of Testing Equipment & Test Medium SAIC-A-2008 SAIC-A-2009 See Remarks Verify and Inspect completeness of Piping and/or Equipment System to be tested. 3.1 Verify with the use of the P&ID. H1 CONTRACTOR/SUBCONTRACTOR WBS/BI/JO/NO. SAUDI ARAMCO RH1 MATERIAL RECEIVING SAUDI ARAMCO ID/PID REV 1 - 5/18/05 (Standards Cutoff - August 2004) Leak Test: A pressure test to ensure tightness of flanged and threaded joints at the test pressure. It is normally conducted before initial start-up and after T&Is. RH1 DISCIPLINE: REMARKS MECHANICAL- NDE 2.0 QUALITY PROCEDURE 1.0 Leak Testing Procedure DOCUMENT REVIEW SAIC-A-2005 PROJECT PHASE & Activity Code TASK / ACTIVITY CNTRCTR QUALITY RECORD INSPECTION RESPONSIBILITY ASSIGNMENTS sample Review of Documents W1 If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco. R2 Sample Hold Point for QC Inspection or Test 100% Review of Documents W2 H1 100% Witness Inspection/Test 100% Hold Point for QC Inspection or Test 4 5 R1 H2 Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance. Sample Review and Approval of Documents Sample Witness Inspection/Test LEGEND 100% Review and Approval of Documents Surveillance S 3 1 2 The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels of Saudi Aramco participation based upon the Contractor’s performance. Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative is not present. RH1 RH2 GENERAL NOTES APPROVED DATE 25-May-05 LEAK TESTING (per SAES-A-004) SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No. SATIP-A-004-05 3.0 APPLICATION PROJECT TITLE: ITEM NO. 1.1 H1 Page 1 of 1

1 SATIP-A-004-05 Leak Testing Per SAES-A-004 -Rev1

Embed Size (px)

DESCRIPTION

kl

Citation preview

Page 1: 1 SATIP-A-004-05 Leak Testing Per SAES-A-004 -Rev1

HI S3.2 Pressurization SAIC-A-2023

3.3 SATR-A-2010SAIC-A-2024Inspection of Leaks H1H1

W1 W12.1 Verification & Visual Inspection of Testing Equipment & Test Medium

SAIC-A-2008SAIC-A-2009

See RemarksVerify and Inspect completeness of Piping and/or Equipment System to be tested.

3.1 Verify with the use of the P&ID.H1

CONTRACTOR/SUBCONTRACTORWBS/BI/JO/NO.

SAUDI ARAMCO

RH1

MATERIAL RECEIVING

SAUDI ARAMCO ID/PID REV 1 - 5/18/05 (Standards Cutoff - August 2004)

Leak Test: A pressure test to ensure tightness of flanged and threaded joints at the test pressure. It is normally conducted before initial start-up and after T&Is.

RH1

DISCIPLINE:

REMARKS

MECHANICAL- NDE

2.0

QUALITYPROCEDURE

1.0

Leak Testing Procedure

DOCUMENT REVIEW

SAIC-A-2005

PROJECT PHASE &Activity Code TASK / ACTIVITY

CNTRCTR

QUALITY RECORD

INSPECTION RESPONSIBILITYASSIGNMENTS

sample Review of Documents

W1

If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.

R2

Sample Hold Point for QC Inspection or Test

100% Review of DocumentsW2

H1

100% Witness Inspection/Test

100% Hold Point for QC Inspection or Test

4

5

R1

H2

Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.

Sample Review and Approval of DocumentsSample Witness Inspection/Test

LEGEND

100% Review and Approval of Documents

SurveillanceS

3

1

2

The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels of Saudi Aramco participation based upon the Contractor’s performance.

Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization

Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative is not present.

RH1

RH2

GENERAL NOTES

APPROVED DATE

25-May-05LEAK TESTING (per SAES-A-004) SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No.

SATIP-A-004-05

3.0 APPLICATION

PROJECT TITLE:

ITEM NO.

1.1

H1