HI S3.2 Pressurization SAIC-A-2023
3.3 SATR-A-2010SAIC-A-2024Inspection of Leaks H1H1
W1 W12.1 Verification & Visual Inspection of Testing Equipment & Test Medium
SAIC-A-2008SAIC-A-2009
See RemarksVerify and Inspect completeness of Piping and/or Equipment System to be tested.
3.1 Verify with the use of the P&ID.H1
CONTRACTOR/SUBCONTRACTORWBS/BI/JO/NO.
SAUDI ARAMCO
RH1
MATERIAL RECEIVING
SAUDI ARAMCO ID/PID REV 1 - 5/18/05 (Standards Cutoff - August 2004)
Leak Test: A pressure test to ensure tightness of flanged and threaded joints at the test pressure. It is normally conducted before initial start-up and after T&Is.
RH1
DISCIPLINE:
REMARKS
MECHANICAL- NDE
2.0
QUALITYPROCEDURE
1.0
Leak Testing Procedure
DOCUMENT REVIEW
SAIC-A-2005
PROJECT PHASE &Activity Code TASK / ACTIVITY
CNTRCTR
QUALITY RECORD
INSPECTION RESPONSIBILITYASSIGNMENTS
sample Review of Documents
W1
If the Main Contractor delegates the assigned responsibility to the Subcontractor, then the Main Contractor will have the same degree of responsibility as assigned to Saudi Aramco.
R2
Sample Hold Point for QC Inspection or Test
100% Review of DocumentsW2
H1
100% Witness Inspection/Test
100% Hold Point for QC Inspection or Test
4
5
R1
H2
Hold: QA/QC organization shall be notified of the timing of inspection or test in advance. Inspection or test shall not be carried out without the QA/QC organization representative in attendance.
Sample Review and Approval of DocumentsSample Witness Inspection/Test
LEGEND
100% Review and Approval of Documents
SurveillanceS
3
1
2
The first three incidents of each Inspection or testing activity listed require 100 % participation by Saudi Aramco Site Inspection Personnel. After this period, Saudi Aramco Inspection may adjust the levels of Saudi Aramco participation based upon the Contractor’s performance.
Surveillance: QA/QC organization to monitor work in progress without notice from Construction Organization
Witness: QA/QC organization shall be notified of the timing of Inspection or test in advance. However, the inspection or test shall be performed as scheduled if the QA/QC organization representative is not present.
RH1
RH2
GENERAL NOTES
APPROVED DATE
25-May-05LEAK TESTING (per SAES-A-004) SAUDI ARAMCO TYPICAL INSPECTION PLAN SATIP No.
SATIP-A-004-05
3.0 APPLICATION
PROJECT TITLE:
ITEM NO.
1.1
H1