Upload
others
View
1
Download
0
Embed Size (px)
Citation preview
1. RM wastage during the month - see 1
RM WIP is provided , this + backflush can help in generating Waste reports
2. energy consumption (cost/kw of mseb and diesel and cost/kg of material injected) - see 2
Other expectations / points of discussion:
11. what QC reports are available?
12. what graphs are available?