31
1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660 [email protected]

1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

Embed Size (px)

DESCRIPTION

3 M RWST PI PI PI ICS Pump 1B ICS Pump 1A M M M M M M M CI-1001A CI-1001B ICS-201 ICS-202 From Refuel Canal To SI From RHR Hx From RHR Hx ICS-2B ICS-2A ICS-5A ICS-6A ICS-6B ICS-5B Restricting Orifice PI Containment RHR-400B RHR-400A Additive Standpipe Additive Pump Additive Tank Filter LI LI LI PI PI Valves in Question FI FI ICS-200B ICS-200A ICS-210B ICS-210A ICS-7A ICS-7B ICS-102 Gasket Repair

Citation preview

Page 1: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

1

Regulatory Experience With Preconditioning

ISTOG Winter Meeting Orlando FloridaJanuary 24, 2008Tim SmithDominion Energy [email protected]

Page 2: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

2

What Happened?

• Quarterly Containment Spray pump and Valve Test was scheduled following corrective maintenance on a non-IST component.

• NRC Resident Inspector questioned Control Room staff on preconditioning related to the use of IST components for tagout boundaries for component corrective maintenance.

Page 3: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

3

M

RWST

PI11174

PI11175

PI41317-

01

ICS Pump1B

ICS Pump 1A

M

M

M

M

M M

M

CI-1001A

CI-1001B

ICS-201

ICS-202

From Refuel Canal

To SI

From RHR Hx

From RHR Hx

ICS-2B

ICS-2AICS-5A

ICS-6A

ICS-6B

ICS-5B

Restricting Orifice

PI41317-

02

Containment

RHR-400B

RHR-400A

AdditiveStandpipe

AdditivePump

AdditiveTank

FilterLI

41311-03

LI18010

LI18009

PI11415

PI11429

Valves in Question

FI41340

FI41341

ICS-200B

ICS-200A

ICS-210B

ICS-210A

ICS-

7A

ICS-

7BICS-102 Gasket Repair

Page 4: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

4

Initial Response

• IST Owner Contacted and replied that since the valves were closed they were preconditioned.

• Condition Report generated.

• IST Owner discussed issue with NRC Resident.

Page 5: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

5

First Discussion

• Provided Inspector Part 9900 and NUREG 1482

• Informed Inspector I couldn’t speak for work control procedures

• Didn’t Mention Program Definition

Page 6: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

6

Part 9900 Technical GuidanceMaintenance - Preconditioning of Structures, Systems, And Components Before Determining Operability

Preconditioning – The alteration, variation, manipulation, or adjustment of the physical condition of an SSC before Technical Specification surveillance or ASME Code testing.

Page 7: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

7

Part 9900 Technical Guidance

Acceptable Preconditioning – The alteration, variation, manipulation, or adjustment of the physical condition of an SSC before Technical Specification surveillance or ASME Code testing for the purpose of protecting personnel or equipment or to meet the manufacturer’s recommendations.

Page 8: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

8

Part 9900 Technical Guidance

Unacceptable Preconditioning - The alteration, variation, manipulation, or adjustment of the physical condition of an SSC before Technical Specification surveillance or ASME Code testing that will alter one or more of an SSC’s operational parameters which results in acceptable test results.

Page 9: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

9

Part 9900 Technical Guidance

Unacceptable Preconditioning – Could mask the actual as found condition of

the SSC and possibly result in an inability to verify the operability of the SSC.

Could make it difficult to determine whether the SSC would perform its intended function during an event in which the SSC might be needed.

Page 10: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

10

Part 9900 Technical Guidance• Does the practice performed ensure that

the SSC will meet testing acceptance criteria?

• Would the SSC have failed the surveillance without the preconditioning?

Page 11: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

11

Part 9900 Technical Guidance• Does the practice bypass or mask the as-

found condition? • Is preventive maintenance routinely

performed just before the testing? • Is the preventive maintenance performed

only for scheduling convenience?

Page 12: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

12

Operability Determination

• Compared historical stroke times• Answered five questions from NRC

Inspection Manual Part 9900 to document preconditioning was acceptable

Page 13: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

13

Inspector Feedback

• Any IST Procedural Controls?• Work Management Procedural Controls?• How can you justify acceptability of

preconditioning after the fact?

Page 14: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

14

NUREG 1482 Para. 3.5.4

• “the staff considers unacceptable preconditioning of pumps and valves in the IST program to include such activities as …(2) Operation of a pump or valve shortly before a test, if such operation could be avoided through plant procedures with personnel and plant safety maintained.”

Page 15: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

15

KPS “OLD” Program Definition

• Preconditioning – The act of exercising or placing a component in service for the purpose of enhancing the results of an inservice test. The act of preconditioning could mask a degrading condition that may otherwise be detected when testing a component in the “as found” condition.

Page 16: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

16

KPS “Old” Program Definition (Cont.)

• The exercising of a component when required by an Operations Procedure for system reconfiguration shall not constitute or be considered as preconditioning. It is an expectation to perform tests in the “as found” condition but not a Code requirement except for relief valves. Activities, which may be considered as preconditioning, should be justified.

Page 17: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

17

Subsequent Discussions

• Plant Manager initially agreed that what occurred sounded like preconditioning

• Industry Response (ISTOG) provided data to the contrary. None of the responses (approximately 20) considered preconditioning in tagging evolutions

Page 18: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

18

Subsequent Discussions

• Senior Resident presented to Plant Management that IST “Didn’t care about preconditioning because it isn’t a Code requirement.”

• Provided Junior Resident information from 2002 Pump and Valve Symposium

• Seabrook Resident “Contacted”

Page 19: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

19

Subsequent Discussions

• It became apparent that the KPS response to the original concern was not done correctly.

• Each piece of the puzzle was presented to the Resident by one group or individual at a time. This led to more questions and misunderstandings.

• A more unified approach including all work groups may have prevented violation.

Page 20: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

20

Subsequent Discussions

• Potential Work Planning Procedure ViolationInvolved Discussion with Work Week Coordinators and Supervisor/ManagerResulted in the conclusion that no procedural violation occurred

Page 21: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

21

Inadequate Procedure Violation

“The inspectors determined, following review of plant procedures, interviews with plant management, and a review of NRC guidance on preconditioning, that plant procedures were not adequate to support proper consideration of preconditioning.

Page 22: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

22

Inadequate Procedure Violation

These procedures did not discuss or provide a definition for acceptable versus unacceptable preconditioning, did not provide guidance on the scope of components which should be included in such consideration, and did not identify which personnel were responsible for the consideration of potential preconditioning.

Page 23: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

23

Inadequate Procedure Violation

Therefore, the inspectors determined that, due to inadequate procedures, adequate consideration of preconditioning of ICS-202 and ICS-2B during maintenance activities was not given before the surveillance procedure that tested these valves was conducted”

Page 24: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

24

Corrective Actions

• Revised definition of preconditioning in IST Program to match Part 9900 Guidance

• “Benchmarked” Seabrook’s Preconditioning Procedural Guidance

• Revised work management procedures• Added IST Program Technical Position

Page 25: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

25

“As Found”

The physical state of a component after a period of normal service without repairs or adjustments that could affect its operation. Normal service includes component operation when required by an operating procedure or non-routine operation of the component to establish required system conditions for corrective maintenance activities.

Page 26: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

26

Corrective Actions

• Key is to document potential concerns in work planning documents and/or procedures

• Raise Awareness to ensure everyone has a similar understanding

Page 27: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

27

Continuing Evaluation

• Reviewing SchedulingTypically maintenance items performed early in work week and surveillances performed late in work week. This results in many preconditioning concerns/questions.Reversing schedule should minimize preconditioning concerns.

Page 28: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

28

Do Over???

• NRC 95002 Inspection Team Questioned EDG Test SequenceFire Protection Trip Test performed prior to Quarterly “slow” start test that timed an IST cooling water valve.

Page 29: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

29

Do Over???

• 2001 Evaluation of test sequence “Missed the Mark”

• Requested meeting with Senior Resident to better understand concern

• Senior Resident Informed 95002 team that sequence was “Acceptable Preconditioning” based upon difference in periodicity of tests

Page 30: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

30

Do Over???

• NRC Senior Resident Informed KPS that we may have a “Risk” violation based upon excessive unavailability time caused by test sequence

• Recommended evaluating merging of tests• Will monitor our evaluation/response

Page 31: 1 Regulatory Experience With Preconditioning ISTOG Winter Meeting Orlando Florida January 24, 2008 Tim Smith Dominion Energy Kewaunee 920-388-8660

31

Questions?

• Does ISTOG want to pursue submittal of position to EPRI?

• Has anyone has similar experiences?• Is there value in distributing as INPO OE?