1 Proposed Results Management Framework for 2010-2012 K. Cleaver, AP/PMD for CRMT, 7 April 2009 Management Response: Joint Evaluation of the ARD Policies and Operations in Africa of AfDB and IFAD Kevin Cleaver Assistant President PMD

1 Proposed Results Management Framework for 2010-2012 K. Cleaver, AP/PMD for CRMT, 7 April 2009 Management Response: Joint Evaluation of the ARD Policies

Embed Size (px)

Citation preview

Page 1: 1 Proposed Results Management Framework for 2010-2012 K. Cleaver, AP/PMD for CRMT, 7 April 2009 Management Response: Joint Evaluation of the ARD Policies

1

Proposed Results Management Framework for 2010-2012

K. Cleaver, AP/PMD for CRMT, 7 April 2009

Management Response:Joint Evaluation of the ARD Policies and Operations in Africa of AfDB and IFAD

Kevin Cleaver

Assistant President PMD

Page 2: 1 Proposed Results Management Framework for 2010-2012 K. Cleaver, AP/PMD for CRMT, 7 April 2009 Management Response: Joint Evaluation of the ARD Policies

2

Presentation Layout

This presentation is divided into 5 parts:

1. Introduction

2. Filling the sector policy gap

3. Improving performance of the lenders

4. Improving performance of the borrowers

5. Building purposeful partnerships

Page 3: 1 Proposed Results Management Framework for 2010-2012 K. Cleaver, AP/PMD for CRMT, 7 April 2009 Management Response: Joint Evaluation of the ARD Policies

3

1. Introduction Appreciation to the Bank’s OPEV and IFAD’s OE for a good

job done

The evaluation therefore is relevant

Management endorses, to a very large extent, the conclusions and recommendations contained in the report

Page 4: 1 Proposed Results Management Framework for 2010-2012 K. Cleaver, AP/PMD for CRMT, 7 April 2009 Management Response: Joint Evaluation of the ARD Policies

4

2. Filling the sector policy gap and support to CAADP

The Bank and the Fund managements affirm their support to CAADP’s four policy pillars and country-led CAADP processes

Using projects as platform for learning, IFAD will share its knowledge with concerned governments

IFAD’s projects fall under CAADP pillars:

Pillar 3 – Increasing food supply and reducing hunger Pillar 1 - Extending the area under sustainable land management

and reliable water control systems Pillar 2 - improving rural infrastructure and trade-related capacities

for market access; and

Pillar 4 - agricultural research and technology adoption

Page 5: 1 Proposed Results Management Framework for 2010-2012 K. Cleaver, AP/PMD for CRMT, 7 April 2009 Management Response: Joint Evaluation of the ARD Policies

5

2. Filling the sector policy gap and support to CAADP (cont’d)

The Bank and Fund would like to work closely with: the African Union/CAADP, and

the Regional Economic Commissions, with the AU taking the lead role

IFAD, using its Private Sector Development Strategy will: engage in policy dialogue to promote an enabling policy and institutional

environment for local private‑sector development

support local private‑sector development in rural areas through its investment operations, and

establish partnerships with the private sector to leverage additional investment and knowledge

IFAD will at least maintain the share of Africa to total lending and grants. It would mean significant increase in absolute volume of IFAD’s assistance given overall increase in IFAD’s resources.

Page 6: 1 Proposed Results Management Framework for 2010-2012 K. Cleaver, AP/PMD for CRMT, 7 April 2009 Management Response: Joint Evaluation of the ARD Policies

6

3. Improving performance of the Lender: Current Status

IFAD’s overall project performance is at 72%, compared to AfDB’s 60% and World Bank’s 60%

Also important to note that:IFAD’s performance is lower in Africa vis-à-vis the

rest of the world

Page 7: 1 Proposed Results Management Framework for 2010-2012 K. Cleaver, AP/PMD for CRMT, 7 April 2009 Management Response: Joint Evaluation of the ARD Policies

7

3. Improving performance of the Lender: Changed Operating model

IFAD’s operating model has changed, with followings as main elements : IFAD has increased the ratio of directly supervised project from

5% 3 years ago to 90% now design processes have been adjusted with new

design/QE/guidelines With RB-COSOPs, country strategies are becoming more

closely aligned with country policy priorities IFAD have introduced an arms-length quality assurance system IFAD suffered in the past for not having direct supervision and

country presence

Page 8: 1 Proposed Results Management Framework for 2010-2012 K. Cleaver, AP/PMD for CRMT, 7 April 2009 Management Response: Joint Evaluation of the ARD Policies

8

Improvements are evident in context analysis, lesson learning, and focus on poverty outcomes

More emphasis on management for results

Focus is an enhancing implementation readiness at entry

On country presence, IFAD has: started recruiting country staff directly on selective basis increase its country offices to 30 by end 2010 undertake a self-assessment of CP in late 2010 prepare a policy on country presence in 2011

3. Improving performance of the Lender: Changed operating model (cont’d)

Page 9: 1 Proposed Results Management Framework for 2010-2012 K. Cleaver, AP/PMD for CRMT, 7 April 2009 Management Response: Joint Evaluation of the ARD Policies

9

3. Improving performance of the Lender: Changed operating model (cont’d)

IFAD is making effort to finance simpler, more tightly focused projects such as by using value-chain frameworks

IFAD is committed to improve its development effectiveness in fragile states by: adopting a flexible approach to its programme and project design,

including longer involvement in country projects strong focus on building the capacity of the community and

government institutions

We will capture lessons from past and ongoing projects and country programmes for enhancing operational knowledge and share them with in-country stakeholders

Page 10: 1 Proposed Results Management Framework for 2010-2012 K. Cleaver, AP/PMD for CRMT, 7 April 2009 Management Response: Joint Evaluation of the ARD Policies

10

Overall, IFAD has no comparative advantage on macro or sectoral analytical work

On policies, political will plays a more important role that the knowledge on policies

IFAD is partnering with other IFIs and UN agencies and bilaterals in Africa (WB, GEF), and also sharing the experiences of the projects that have been successful in sustainable management of natural resources

IFAD, either directly or through partnerships, will undertake policy and analytic work on a very selective basis. IFAD has already given a large grant to IFPRI

3. Improving performance of the Lender: Policy and analytic work

Page 11: 1 Proposed Results Management Framework for 2010-2012 K. Cleaver, AP/PMD for CRMT, 7 April 2009 Management Response: Joint Evaluation of the ARD Policies

11

Given the lack of comparative advantage in engaging directly in policy and analytical work, IFAD: Will be very selective in its policy work, and

Emphasize working with partners (e.g. IFPRI)

Africa divisions have started engaging in knowledge-sharing.

Staff rotation is an organization-wide issue and will be tackled as part of human resource reform programme

PBAS is both performance and need-based and thus allocates proportionally higher resources to low income countries. Allows additional allocation for post-conflict countries

3. Improving performance: Implementation of IFAD-specific recommendations

Page 12: 1 Proposed Results Management Framework for 2010-2012 K. Cleaver, AP/PMD for CRMT, 7 April 2009 Management Response: Joint Evaluation of the ARD Policies

12

Both IFAD and AfDB will increase their support to Governments, in response to their demand: to undertake capacity needs assessments in the ARD sector,

including diagnostic assessments

provide substantial support for capacity building and institutional development.

In the case of IFAD: gender mainstreaming is taking place

Overall, gender performance is improving, including for Africa

The need for a gender policy is accepted, following evaluation

4. Improving performance of the Borrower

Page 13: 1 Proposed Results Management Framework for 2010-2012 K. Cleaver, AP/PMD for CRMT, 7 April 2009 Management Response: Joint Evaluation of the ARD Policies

13

5. Building purposeful partnerships

IFAD and AfDB will maintain and deepen their current bilateral partnership, based on the 2008 MoU by: setting a limited number of clear, strategic regional priorities backed by a clear action plan and adequate resources.

IFAD and AfDB will review the current MoU and prepare the necessary addendum, review 2010 performance, and prepare and execute annual partnership plans

Both institutions agree to take forward their partnership within the wider partnership around CAADP, and in support of CAADP, at the regional level.

In principle: Bank will finance rural infrastructures, and IFAD will focus on capacity building for Agricultural Sectors

Institutions

Page 14: 1 Proposed Results Management Framework for 2010-2012 K. Cleaver, AP/PMD for CRMT, 7 April 2009 Management Response: Joint Evaluation of the ARD Policies

14

5. Building purposeful partnerships: Results matrix

KEY INDICATOR2008-2009 ACTIONS

(BASELINE) 2010 TARGET

1. CO-FINANCING

1.1. Joint project identification, design and approval.

4 countries 5 countries

1.2. Amount cofinanced Total US$170 Millions

(UA 111 Millions)

increase by a minimum of 15 per cent

2. SUPERVISION

2.1. No of joint supervision missions undertaken

3 missions Jointly supervise all cofinanced operations starting in 2010 (six operations.)

Page 15: 1 Proposed Results Management Framework for 2010-2012 K. Cleaver, AP/PMD for CRMT, 7 April 2009 Management Response: Joint Evaluation of the ARD Policies

15

5. Building purposeful partnerships: Results matrix (cont’d)

KEY OUTPUTS AND INDICATOR

2008-2009 ACTIONS (BASELINE) 2010 TARGET

4. CORPORATE KNOWLEDGE SHARING AND INNOVATION

4.1. partnership coordinator

None A coordinator to be appointed in 2010. IFAD to provide logistics support in Rome.

4.2 Share information broadly on a regular basis

Collaborate in the advocacy

Appoint focal points to regularly exchange information

4.3. Staff exchange programme

None Undertake a staff exchange programme starting in 2010 for 1-to-2-year deployment periods