Avoided Emissions from Peat Swamp Forest Management and Central Forest Spine Ecological Connectivity in South East Pahang, Malaysia 1. Proposal for NAMA Facility

1. Proposal for NAMA Facility - NRE. National... · 1. Proposal for NAMA Facility . ... Kelantan 623,849 498,437 119,836 618,273 99.11 ... UPEN Pahang Pahang Forestry Department

Embed Size (px)

Citation preview

Page 1: 1. Proposal for NAMA Facility - NRE. National... · 1. Proposal for NAMA Facility . ... Kelantan 623,849 498,437 119,836 618,273 99.11 ... UPEN Pahang Pahang Forestry Department

Avoided Emissions from Peat Swamp Forest Management and Central Forest Spine Ecological

Connectivity in South East Pahang, Malaysia

1. Proposal for NAMA Facility

Page 2: 1. Proposal for NAMA Facility - NRE. National... · 1. Proposal for NAMA Facility . ... Kelantan 623,849 498,437 119,836 618,273 99.11 ... UPEN Pahang Pahang Forestry Department

BACKGROUND ON CFS PROJECT

• The Central Forest Spine (CFS) will link up 4 major forest complexes in

Peninsular Malaysia with a network of ecological or green corridors to

create one contiguous, forested wildlife sanctuary.

• CFS was conceptualized in 2005 under the 1st National Physical

Plan (NPP)

• The CFS Master Plan was tabled jointly by Ministry of Natural Resources

and Environment (NRE) and the Ministry of Housing and Local

Government in 2011 to the Cabinet.

• 10th Malaysia Plan : efforts to protect biodiversity and habitats will be

strengthened with the implementation of the Central Forest Spine.

• UNDP and MNRE conceptualized this IC-CFS project in 2011

Page 3: 1. Proposal for NAMA Facility - NRE. National... · 1. Proposal for NAMA Facility . ... Kelantan 623,849 498,437 119,836 618,273 99.11 ... UPEN Pahang Pahang Forestry Department

INSTITUTIONAL FRAMEWORK

NATIONAL POLICY

Majlis Perancang Fizikal Negara (MPFN)

Setiausaha: JPBD Semenanjung Malaysia

National Land Council (MTN) National Biodiversity Council (MBN)

Setiausaha: NRE

PLANNING IMPLEMENTATION PROGRAM

Ecological Corridor Master Plan CFS

KPKT dan JPBD

CFS Programme Impllementation

NRE and relevant agencies

IMPLEMENTATION

National Steering Committee Central Forest Spine Chair: KSU, NRE

Jawatankuasa Teknikal Nasional Pelaksanaan Central Forest Spine

Pengerusi: Ketua Pengarah JPSM

Jawatankuasa Teknikal Negeri Pelaksanaan Central Forest Spine

Pengerusi: Setiausaha Kerajaan Negeri

Page 4: 1. Proposal for NAMA Facility - NRE. National... · 1. Proposal for NAMA Facility . ... Kelantan 623,849 498,437 119,836 618,273 99.11 ... UPEN Pahang Pahang Forestry Department

State Total Area of

PRF by States*

Production Forest

Protection Forest

Total Percentage

Johor 441,251 186,453 71,390 257,843 58.43

Kedah 342,813 218,532 37,407 255,939 74.66

Kelantan 623,849 498,437 119,836 618,273 99.11

Negeri Sembilan 155,909 105,277 50,632 155,909 100.00

Pahang 1,562,496 1,010,798 355,786 1,366,584 87.46

Perak 881,900 404,623 469,313 873,936 99.10

Selangor 241,568 104,397 107,550 211,947 87.74

Terengganu 544,118 422,890 81,657 504,547 92.73

Total Area of PRF (8 States) 4,793,904 ha Total Area of PRF in CFS 4,244,978 ha Total of Forest Area in CFS 5,300,000 ha Percentage Area of PRF in CFS 80.09 %

Notes: * Source (JPSM Annual Report Year 2010) ** Source – Calculation by Geoformatic Section of JPSM

Page 5: 1. Proposal for NAMA Facility - NRE. National... · 1. Proposal for NAMA Facility . ... Kelantan 623,849 498,437 119,836 618,273 99.11 ... UPEN Pahang Pahang Forestry Department
Page 6: 1. Proposal for NAMA Facility - NRE. National... · 1. Proposal for NAMA Facility . ... Kelantan 623,849 498,437 119,836 618,273 99.11 ... UPEN Pahang Pahang Forestry Department

GEF

RMKe10

REDD+ Funds

NAMA Facility and/or

REDD+ Funds

Page 7: 1. Proposal for NAMA Facility - NRE. National... · 1. Proposal for NAMA Facility . ... Kelantan 623,849 498,437 119,836 618,273 99.11 ... UPEN Pahang Pahang Forestry Department

PROPOSED ACTIVITIES in CFS

1. Development of state level action plan (Pahang, Johor, Kelantan & Terengganu)

2. Policy initiatives:

a) Maintain forest reserves; and

b) Review State Structure & Local Plans to incorporate ecological corridors.

3. Land use management practices:

a) Enhancement of carbon stocks in encroached oil palm areas

b) Adopt sustainable agricultural practices for plantation neighbouring the corridors and forest reserves.

c) Adopt RSPO and obtain certification

d) Limit expansion of existing village settlements within the corridor through income diversification.

4. Fire management plan:

a) Fire risk zoning;

b) Fire danger rating (temporal);

c) Fire protection, prevention and management measures

5. Capacity enhancement among communities and relevant authorities.

Page 8: 1. Proposal for NAMA Facility - NRE. National... · 1. Proposal for NAMA Facility . ... Kelantan 623,849 498,437 119,836 618,273 99.11 ... UPEN Pahang Pahang Forestry Department

NAMA FACILITY PROPOSAL

• the most ambitious ecological conservation initiatives in Malaysia.

• contribute toward mitigation of GHG emissions

• improve management and enhance ecological connectivity

• Pahang State Natural Resources Conservation Trust Fund, a long-term financing mechanism, will be established within the framework of National Natural Resources Conservation Trust Fund.

• Result-based financing to support long-term management of peat swamp forests.

Page 9: 1. Proposal for NAMA Facility - NRE. National... · 1. Proposal for NAMA Facility . ... Kelantan 623,849 498,437 119,836 618,273 99.11 ... UPEN Pahang Pahang Forestry Department

Features of the Fund

• Result based finance

• Set of criteria for result based finance to ensure efficiency and transparency

• Smart partnerships among stakeholders operating in the South East Pahang landscape.

• Blueprint for replication by other State governments

Page 10: 1. Proposal for NAMA Facility - NRE. National... · 1. Proposal for NAMA Facility . ... Kelantan 623,849 498,437 119,836 618,273 99.11 ... UPEN Pahang Pahang Forestry Department

Financial Component

• Output A: Pahang State Natural Resources Conservation Trust Fund is established to support management of natural forests in South East Pahang

Establish the Pahang State Natural Resources

Conservation Trust Fund within the framework of National Natural Resources Conservation Trust Fund, incorporating the long-term need of peat swamp forests management.

Develop a strategic approach to foster partnerships with the private sector, including creation of mechanisms

Page 11: 1. Proposal for NAMA Facility - NRE. National... · 1. Proposal for NAMA Facility . ... Kelantan 623,849 498,437 119,836 618,273 99.11 ... UPEN Pahang Pahang Forestry Department

Financial Component

• Output B: Result-based finance instrument is developed to support long-term implementation of peat swamp forests management

Determine approaches for reporting results as measurable

and verifiable emission reductions and/or enhancements of removal by sinks.

Identify financing sources and establish result-based finance system to support long-term management of peat swamp forest.

Set up a management committee to oversee the implementation of actions.

Page 12: 1. Proposal for NAMA Facility - NRE. National... · 1. Proposal for NAMA Facility . ... Kelantan 623,849 498,437 119,836 618,273 99.11 ... UPEN Pahang Pahang Forestry Department

Financial Component

• Output C: Policy approaches are established to mainstream long-term implementation into national and state agendas.

Mainstream management of peat swamp forest in South East Pahang into Pahang State green economy agenda in consistent with the national green growth initiative proposed Eleventh Malaysia Plan 2016-2020.

Integrate actions for peat swamp forest management into State sectoral and cross-sectoral plans and programmes.

Page 13: 1. Proposal for NAMA Facility - NRE. National... · 1. Proposal for NAMA Facility . ... Kelantan 623,849 498,437 119,836 618,273 99.11 ... UPEN Pahang Pahang Forestry Department

Technical Component

• Output D: Integrated Peatland Management Plan for South East Pahang is developed and implemented.

Outline peatland management strategies and fire management

programme for leading organisations integrating inter-agency coordination.

Design monitoring and evaluation strategies for peatland management.

Implement the peatland management strategies, fire management programme and monitoring and evaluation strategies.

Establish demonstration sites for peat land conservation and agriculture best management practices.

Initiate co-management programmes with plantation companies and local communities.

Page 14: 1. Proposal for NAMA Facility - NRE. National... · 1. Proposal for NAMA Facility . ... Kelantan 623,849 498,437 119,836 618,273 99.11 ... UPEN Pahang Pahang Forestry Department

Technical Component

• Output E: Important corridors are secured to enhance ecological connectivity under the CFS initiative

Facilitate incorporation of peat swamp forest

management and primary and secondary ecological corridors in Central Forest Spine into Statutory Land Use Plans.

Provide support for necessary CFS-related furniture along targeted corridors.

Page 15: 1. Proposal for NAMA Facility - NRE. National... · 1. Proposal for NAMA Facility . ... Kelantan 623,849 498,437 119,836 618,273 99.11 ... UPEN Pahang Pahang Forestry Department

Technical Component

Output F: The capacity of relevant authorities and local communities with regards to co-management of peatland is enhanced.

• Develop technical skills of the Forestry Department, Wildlife Department and other relevant government agencies on best management practices, peatland ecology, wildlife corridors and public participation/co-management.

• Implement training programmes for local/indigenous community members as honorary wardens/enforcement officers.

Page 16: 1. Proposal for NAMA Facility - NRE. National... · 1. Proposal for NAMA Facility . ... Kelantan 623,849 498,437 119,836 618,273 99.11 ... UPEN Pahang Pahang Forestry Department

Mitigation Potential

• Reducing deforestation rate through Sustainable Management of Forest of about 12 MT CO2 in the short to medium term,

• Enhanced carbon sequestration in the long-term.

Page 17: 1. Proposal for NAMA Facility - NRE. National... · 1. Proposal for NAMA Facility . ... Kelantan 623,849 498,437 119,836 618,273 99.11 ... UPEN Pahang Pahang Forestry Department

Implementation Arrangement

Implementing Partners

UPEN Pahang

Pahang Forestry Department

Ministry of Natural Resources & Environment (BBP)

Forestry Department Peninsular Malaysia

GIZ Delivery

Organisation

Project Steering Committee

Project Management Unit

Project Management

& Support Staffs

Other agencies

Page 18: 1. Proposal for NAMA Facility - NRE. National... · 1. Proposal for NAMA Facility . ... Kelantan 623,849 498,437 119,836 618,273 99.11 ... UPEN Pahang Pahang Forestry Department

Financing Mechanism

Pahang State Natural Resources

Conservation Trust Fund

Pahang State Natural Resources

Conservation Trust Fund

During Project Implementation

Post-Project Stage

National Natural

Resources Conservation

Trust Fund

State Government Contribution

Private Sector

Engagement

NAMA Facility Support

Result-Based Finance

Arrangement

Result-Based Finance System

National Natural

Resources Conservation

Trust Fund

State Government Contribution

Private Sector

Commitment

Inte

rnat

ion

al

Fin

anci

ng

Do

me

stic

Re

sou

rce

s

Mainstreaming into Pahang State green economy agenda

Integration into Pahang State sectoral and cross-sectoral plans & programmes

NAMA Support Project Activities

Page 19: 1. Proposal for NAMA Facility - NRE. National... · 1. Proposal for NAMA Facility . ... Kelantan 623,849 498,437 119,836 618,273 99.11 ... UPEN Pahang Pahang Forestry Department

Acknowledgement

• LECB Project

• JPSM

• BBP

• ERE Consulting

• PASPI

Page 20: 1. Proposal for NAMA Facility - NRE. National... · 1. Proposal for NAMA Facility . ... Kelantan 623,849 498,437 119,836 618,273 99.11 ... UPEN Pahang Pahang Forestry Department

INDICATIVE BUDGET

LINKAGES COST (RM MILLION)

PL 2 – Lesong FR – Resak 104

PL 4 – Bukit Ibam FR – Sg. Marong / Lesong FR

162

PL 5 – Ibam FR – Kedondong FR

194

PL 6 – Bera FR – Ibam FR 24

TOTAL 484