Project NexusApproach to modelling costs and benefits

Cesar Coelho

Ofgem

Project Nexus UNC Workgroup15 May 2012

Page 2: 1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012

2

Agenda

• Overall approach to analysis and modelling

• Steps for conducting analysis

• Take-up scenarios

• Costs and benefits

• Competition and distributional impacts

Page 3: 1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012

3

Where we are

• Project Nexus (PN) has the potential to deliver significant benefits for consumers

• At PNAG in March, Ofgem offered to help support the workgroup’s analysis

• We have developed an approach for modelling the costs and benefits of PN for discussion today

• We also intend to facilitate discussion on consumer issues

Ofgem’s role

Page 4: 1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012

4

Overall approach• Standard approach to cost benefit

• NPV modelling costs and benefits

– Decision on time horizon

– Discounting

• Uncertainty

– Scenario-specific uncertainty (e.g. specific to PN implementation)

– Universal uncertainty (e.g. Magnitude of energy prices)

• Approach to questions: simplify so these do not need to reflect the detail of the modelling

High-level principles

TIME

NP

V

Page 5: 1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012

5

Steps for conducting the analysis

Establish potential take-up scenarios

Estimate benefits, quantify where possible

Compare Nexus implementation with counterfactual scenarios

Assess any impacts on competition, distribution of costs & benefits

High-level principles

Establish how industry costs would change according to the level of take up

Page 6: 1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012

6

Step 1 – Take-up scenarios

• Take-up scenarios drive:

– Costs

– Benefits

– Impacts on competition

• Define:

– Implementation scenario

– Range of counterfactual scenarios

Page 7: 1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012

7

Step 1 – Take-up scenarios – Settlements

TIME

Counterfactual: Maximum plausible take-up of DM settlement without Nexus implementation (LSP) 3

Counterfactual: Minimum plausible take-up of DM settlement without Nexus implementation (LSP)

SETT

LEM

ENT

PRO

DU

CTS

– TA

KE U

P

100%

0%

3 1

2

4

3

33

Settlements implemented: Maximum plausible take-up of daily settlement products

Settlements implemented: Minimum plausible take-up of daily settlement products

Page 8: 1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012

8

Step 1 – Take-up scenarios – Settlements time reference

TIMEMilestone for framing stakeholder questions – Post-implementation

SETT

LEM

ENT

PRO

DU

CTS

– TA

KE U

P

100%

0%

3

Time to be used as reference to frame questions:

•Need to understand current take-up (DM/NDM)•Post implementation assumption: Daily meter data is available•Post-2020

3

33

Milestone for framing stakeholder questions – Pre-implementation (central agent)

Page 9: 1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012

9

TIME

3

Milestone for framing stakeholder questions – Post-implementation

SETT

LEM

ENT

PRO

DU

CTS

– TA

KE U

P

100%

0%

3 1

2

4

3

33

Milestone for framing stakeholder questions – Pre-implementation

Step 1 – Take-up scenarios – Settlements questions

Question:

•Assuming that it is possible to access daily meter reads, what are minimum and maximum likely take-up scenarios for each settlements product (at milestone XX)?

Bottom up + top down approach:

•Ask the group for a common view•Ask individual stakeholders for view across their portfolio, weight by portfolio size

Page 10: 1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012

10

Step 1 – Take-up scenarios – AQ, MPR frequency

TIME

2

Milestone for framing stakeholder questions – Post-implementation

Rolli

ng A

Q –

TAK

E U

P

100%

0%

3 1

3

Rolling AQ/MPR implemented: Maximum plausible take-up

Rolling AQ/MPR implemented: Minimum plausible take-up

Time to be used as reference to frame questions:

•Post implementation assumption: Daily meter data is available•Post-2020

Page 11: 1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012

11

Step 1 – Take-up scenarios – AQ, MPR frequency questions

TIME

2

Rolli

ng A

Q –

TAK

E U

P

100%

0%

3 1

3

Question:

•Assuming that it is possible to access daily meter reads, what percentage of your portfolio would update the AQ/be reconciled on a monthly, quarterly, six monthly, annual basis (at milestone XX)?Bottom up + top down approach:

•Ask the group for a common view•Ask individual stakeholders for view across their portfolio, weight by portfolio size

For discussion:

•Frequency intervals•Counterfactual

Page 12: 1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012

12

Step 2 – A framework for costs – Applying a cost curve

Take-up100%

AG

GR

EG

AT

E C

OS

T

t Today’s level of DM-settlement take-up

Increased take-up of DM settlement over time

TIME

NP

V

Page 13: 1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012

13

Step 2 – A framework for costs – Question on costs (1)

13

1

Take-up100%

AG

GR

EG

AT

E C

OS

T

2

Cost at maximum plausible take-up, post-implementation

3

Cost at maximum plausible take-up, counterfactual

x x

Question:

•What would your costs be to meet the take-up of DM settlement at (1), (2), (3) and at (4)?

Cost at minimum plausible take-up, post-implementation

4

Cost at minimum plausible take-up, counterfactual

xx

Page 14: 1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012

14

Step 2 – A framework for costs – Question on costs (2)

14

1

Take-up100%

AG

GR

EG

AT

E C

OS

T

2

3

x x

Question:

•Are there levels of take-up that would require you to make capital investment? If so, at what level of take up do these bite?•How much additional capital investment is required?

4

xx

5

Additional detail on upgrade points and costs

Page 15: 1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012

15

Step 2 – A framework for costs – Sensitivity analysis

15

1

Take-up100%

AG

GR

EG

AT

E C

OS

T

2

3

x x

4

xx

5

Sensitivities

Page 16: 1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012

16

Potential benefits• Accurate allocation of energy costs:

– Lower balancing/settlements costs

– Suppliers’ costs more accurately reflect customer usage

• Other benefits

– Long term gas purchasing gains

– Identify and reduce unallocated units

– Efficiencies/cost savings

• Network benefits from Nexus

– More accurate allocation of network costs

– Better network planning

– More accurate reporting of losses

Step 3 – Assessing benefits

Page 17: 1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012

17

Step 4 – Comparing costs and benefits (1)

TIME

TIME

TIME

TIME

• Compare implementation costs and benefits...

... with counterfactual scenarios and sensitivity testing.

Page 18: 1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012

18

TIME

PN Implemented

NPV

Net cost

Net benefit

Hurdle test

Sensitivity testing

High-level approach

•Quantitative modelling gets you so far•Test is what then has to be delivered by non-quantified benefits to go ahead•Apply this methodology to each counterfactual scenario / sensitivity

Could derive from qualitative benefits

Step 4 – Comparing costs and benefits (2)

Page 19: 1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012

19

Competitive and distributional impacts

• Need to assess impacts on competitive position of market participants

• Quantify distributional effects / improvements in allocation

– Allocation of charges

– Charges effectively paid – reconciliation

– Effects of meter reads submission on allocation and reconciliation

Step 5 – Distributional effects

Page 20: 1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012

20

Different rules for different segments

• NDM SSP– Allocation based on annual AQ– No reconciliation– Meter reads do not affect reconciliation; only affect AQ on an

annual basis

• NDM LSP– Allocation based on annual AQ– Reconciliation once a meter read is submitted– Meter reads used for reconciliation; only affect AQ on an annual

basis

Step 5 – Distributional effects – Market segments

Page 21: 1 Project Nexus Approach to modelling costs and benefits Cesar Coelho Ofgem Project Nexus UNC Workgroup 15 May 2012

21

Approach

• 2 sources for inaccuracy if daily meter reads are not used– allocation– reconciliation

• Bottom-up approach (zero-sum game between providers, but possibly not between segments of customers)– Assume error for allocation– Assume error for reconciliation– Possibility for using different profiles for errors