1 | Program Name or Ancillary Text eere.energy.gov Water Power Peer Review Schneider Linear hydroEngine™ (SLH) Timing Belt Powertrain PI: Abe Schneider Natel Energy, Inc. [email protected] 510-342-5269 November, 2011 FY 11 CH FOA Topic 1.1 Sustainable Small Hydropower, Innovative System Testing

1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Schneider Linear hydroEngine ™ (SLH) Timing Belt Powertrain PI: Abe Schneider

Embed Size (px)

Citation preview

Page 1: 1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Schneider Linear hydroEngine ™ (SLH) Timing Belt Powertrain PI: Abe Schneider

1 | Program Name or Ancillary Text eere.energy.gov

Water Power Peer Review

Schneider Linear hydroEngine™ (SLH) Timing Belt Powertrain

PI: Abe SchneiderNatel Energy, [email protected] November, 2011FY 11 CH FOA Topic 1.1 Sustainable Small Hydropower, Innovative System Testing

Page 2: 1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Schneider Linear hydroEngine ™ (SLH) Timing Belt Powertrain PI: Abe Schneider

2 | Wind and Water Power Program eere.energy.gov

Purpose, Objectives, & Integration

Project Purpose: – Develop a new high performance powertrain for the SLH utilizing a carbon-fiber

reinforced timing belt

Relation to program objectives:– Development of an enabling technology for efficient and low cost small hydropower

that can be quickly and efficiently deployed in low head/low flow existing waterways and constructed waterways.

– Creation of advanced SLH powertrain manufacturing methods and production of longterm mechanical performance test data, thus advancing the industry’s expertise in engineering, design, installation, and performance evaluation of low-head hydropower technology.

– Reduction of LCOE from low-head and constructed waterway projects built with hydroEngines™ to less than $0.07 per kWh.

Page 3: 1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Schneider Linear hydroEngine ™ (SLH) Timing Belt Powertrain PI: Abe Schneider

3 | Wind and Water Power Program eere.energy.gov

Technical Approach

1. Complete design and testing of belt-type SLH powertrain components at 50 kW- and 500 kW-scales.– Component testing allows for cost effective, rapid iteration through prototypes; finite element modeling can help reduce

required number of physical prototypes. High-torque dynamometer endurance tests will enable evaluation of tooth/sprocket wear and effects of environmental conditions.

2. Phase I, System Endurance Testing: Integrate v1 belt/blade attachment design into small-scale (50 kW) SLH model and conduct long-duration laboratory testing, across a full range of potential operating scenarios.– Ensure technology meets performance specifications and performs as designed before full-scale commercial development.

3. Phase II, System Endurance Testing: Integrate v2 belt/blade attachment design into a 50 kW SLH model, and conduct long-duration laboratory testing.– Integrate lessons-learned from Phase I

testing; ensure improved technology meets performance specifications and performs as designed before full-scale commercial development.

Instron testing of belt coupon

Endurance testing setup at Alden

Page 4: 1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Schneider Linear hydroEngine ™ (SLH) Timing Belt Powertrain PI: Abe Schneider

4 | Wind and Water Power Program eere.energy.gov

Technical Approach

4. Design-For-Manufacture, both 50 kW and 500 kW scaleEnsure manufacturability of powertrain solution, minimizing cost while maintaining performance; prepare powertrain for commercialization.

5. Calculate LCOE of SLH, as a consequence of new belt powertrain.–Timing belt powertrain will substantially alter the mechanical architecture (and thus, capital cost structure) of the hydroEngine™, as well as change its operation and maintenance profile. Historic LCOE models must be updated accordingly.

Page 5: 1 | Program Name or Ancillary Texteere.energy.gov Water Power Peer Review Schneider Linear hydroEngine ™ (SLH) Timing Belt Powertrain PI: Abe Schneider

5 | Wind and Water Power Program eere.energy.gov

Plan, Schedule, & Budget

Schedule:• Initiation date: Project awarded September, 2011 (project initiation will occur after

contract negotiations are completed) • Planned completion date: Project completion expected in 2012 (subject to final

contract negotiations)

Year Project Objective Activities

2011“v1” belt attachmentrecommendation

Component design & testing, both SLH10 & SLH100 scale.

“v1” belt attachment recommendation Dynamometer, fatigue tests

2012

Phase I: endurance testingInstall, commission, conduct tests, inspect, generate “v2” design recommendation.

Phase II: endurance testingRedesign as necessary, modify lab-model SLH10, reinstall, run endurance tests & inspections.

Design-for-manufacturingImprove design based upon DFM exercise.

LCOE update Update LCOE calculations

Prepare delivery of SLH100 (500 kW scale) belt prototype to irrigation district pilot customers.

Budget: • DOE anticipates awarding approximately $300k for this project, with an awardee cost

share of approximately $153k (subject to final contract negotiations)