Program For Results Financing

OP/BP 9.00

Agi Kiss WB Safeguards Training WorkshopAlmaty, December 2012

Page 2: 1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012

2

Principles and Core Elements of PforR

Help governments improve the design and implementation of their programs using program systems

WB works with Borrower institutions to strengthen capacity and improve performance of systems over time

Directly link achievement of results to disbursement of WB funds

Promote transparency and accountability in Government programs

Page 3: 1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012

3

How it Works

Define the PforR Program:

• Tied to a Government program (new or ongoing)• sector-wide , sub-sector or multi-sectoral; national, sub-

national or location-specific; new or ongoing; entire or “time slice”

• boundaries of the PforR Program establish the scope of WB assessments

Define the PforRProgram’s development objectives• Develop PforR Program “Results Framework” with clear

linkage to objectives of Gov’t program Identify activities included within PforR Program

• PforR operation might not include all activities in the Govt’s program

Page 4: 1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012

4

How it Works (cont.)

WB Task Team assesses: (i) the Government program and proposed PforR Program and (ii) its management systems as they exist and operate within the boundaries of PforR Program

WB Team prepares 3 Assessment reports: • Technical assessment: strategic relevance, technical

soundness, institutional quality, implementation capacity, expenditure framework/effectiveness of expenditures

• Fiduciary systems assessment: (procurement, financial management/accounting

• Environmental and social systems assessment

Page 5: 1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012

5

How it Works (cont.)

Assessment Reports cover:• Key risks (within the respective areas) for Program not

achieving desired results • Recommended actions for managing risks, strengthening

institutions, improving systems performance• Assessment of “complaints mechanism” for each system

The 3 Reports feed into 1 “Integrated Risk Assessment “ Tool for WB Management to:• accept, modify or reject the proposed PforR Program

operation; • monitor evolution of Program’s risks during implementation

Page 6: 1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012

6

How it Works (cont.)

WB and Borrower agree on a Program Action Plan• based on outcome of the 3 Assessments• actions for improving technical aspects, strengthening

institutions, improving systems• selective (limited number), feasible, realistic in timeframe• Implementation may be financed as integral part of the

PforR Program or separate Technical Assistance project Progress is tracked by WB and Borrower based on

specific “Disbursement Linked Indicators”• WB Task Team also monitors performance of systems,

implementation of Program, Action Plan, evolution of risks, status/functioning of “complaints mechanisms,” all based on the initial Assessment Reports

Page 7: 1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012

7

Basic Principle: Exclusion and Screening for Environmental and Social Risks

PforR financial instrument does not support programs or activities that could cause significant harm to the environment or which could have significant adverse social consequences (e.g. power plants, major transport infrastructure, investments in extractive industries, commercial logging).

All PforR operation proposals should be screened for such adverse impacts at an early stage

If such activities are likely to occur within the program as defined, they should be excluded from PforR support or, if included be subjected to investment lending (i.e., Safeguard Policies).

For the remaining PforR Program activities which are not excluded as above…

Page 8: 1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012

8

Environmental and Social Systems Assessment

Safeguard Policies per se do not apply to PforR Program operations• OP/BP 9.00 (Program for Results Financing) sets out core

principles similar in substance to those set out in the SG policies for standard investment lending

• Follows a risk management approach (matching process requirements to Program context; assessing adequacy of Borrower systems in relation to nature/significance of Program risks

Interim Guidance Note for E & S Systems Assessment provides details on the core principles and “key planning elements” which echo the substance of the Safeguard Policies but without

the specific process requirements – what to achieve, not how to do it

Page 9: 1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012

9

From Interim Guidance Note – Example 1

Core PrincipleEnv. & Social management

procedures designed to promote sustainability in project design, avoid/minimize/mitigate adverse impacts, promote informed decision-making relating to the program’s environmental and social effects

Key Planning ElementsProgram procedures: Operate within an adequate

legal and regulatory framework; Incorporate environmental and

social assessment good practice (e.g. early screening of potential impacts, consideration of alternatives, assessment of cumulative and trans-boundary effects, clear articulation of institutional responsibilities, responsiveness and accountability through stakeholder consultation, etc.)

Absent: specific requirements for preparation of EIA/EMP; classification into Category A/B/C

Page 10: 1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012

10

Example 2

Core Principle

Land acquisition and loss of access to natural resources are managed in a way that avoids or minimizes displacement, and affected people are assisted in improving, or at least restoring, their livelihoods and living standards

Key Planning ElementsThe Program to be supported: Avoids or minimizes land

acquisition and related adverse impacts;

Identifies and addresses impacts due to land acquisition or loss of access to natural resources, including those affecting people who lack legal rights to the land/resources;

Provides compensation sufficient to purchase replacement assets of equal value, prior to taking of land or restriction of access;

Provides supplementary livelihood restoration measures …. Etc.

Absent: requirement for a Resettlement Policy Plan or Resettlement Actio n Plan

Page 11: 1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012

11

Example 3

Core PrincipleEnv. & Social Management

procedures designed to protect public and worker safety associated with: (a) construction and/or operation of facilities; (b) exposure to toxic chemicals, hazardous wastes, other dangerous materials; (c) reconstruction or rehabilitation of infrastructure located in hazard prone areas

Key Planning Elements Promotes community , individual,

worker safety through safe design, construction, operation & maintenance of physical infrastructure…;

Promotes the use of recognized good practice in production, management, transport & disposal of hazardous materials…;

Promotes the use of Integrated Pest Management practices… etc.

Combines and expands principles of several Safeguard Policies

Page 12: 1 Program For Results Financing OP/BP 9.00 Agi Kiss WB Safeguards Training Workshop Almaty, December 2012

12

Example 4

Core Principles

Avoid exacerbating social conflict, especially in fragile states, post-conflict areas, or areas subject to territorial disputes

Key Planning Elements

Considers conflict risks, including distributional inequity and cultural sensitivities

Greatly broadens scope of attention on social protection and well-being, beyond Safeguard Policies on involuntary resettlement and indigenous peoples