1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

Embed Size (px)

Citation preview

Page 1: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

1

PROCUREMENT POLICY, DELEGATION OF

FINANCIAL POWERS & TENDERING

PROCEDURE IN ORDNANCE FACTORIES

Page 2: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

2

PROCUREMENT POLICY IN ORDNANCE FACTORIES

• TO PROCURE WORK, MATERIAL, SERVICES

• OF THE SPECIFIED QUALITY

• WITHIN THE SPECIFIED TIME

• AT THE MOST COMPETITIVE PRICES

• IN A FAIR, JUST & TRANSPARENT MANNER

• RESPONSIBLITY AND ACCOUNTABILITY

Page 3: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

3

DELEGATION OF FINANCIAL POWERS

• New Management Strategy

• Decentralization of decision making process

to increase efficiency and effective

utilization of resources by actual operators

• Responsibility and accountability

Page 4: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

LEVEL-I LEVEL-II LEVEL-III LEVEL-IVCIVIL GM AGM    

CAPITAL CIVIL WORKS FOR PRODUCTION BUILDINGS

5 CRORE 1 CRORE    

CAPITAL CIVIL WORKS FOR NON PRODUCTION BUILDINGS

1 CRORE NIL    

CAPITAL CIVIL WORKS FOR AMENITY BUILDINGS AND RESIDENTIAL ACCOMODATION

1 CRORE NIL    

REVENUE CIVIL WORKS 0.5 CRORE 0.1 CRORE    

PERIODICAL SERVICES FULL 1 CRORE    

P&M        

Procurement, modification and/or re-conditioning of P & M through LTE/OTE under RR and NC

25 CRORE 1 CROREFull – for purchase from DGS&D under Rate/ Running contract

   

Procurement, modification and /or re- conditioning of P&M on single tender/ resultant single tender or proprietary items under RR and NC.

1 CRORE NIL    

STORES        

Procurement of stores against LTE/OTE or Rate / Running contract placed by DGS&D or OFB or from M/S Rosoboronexport, Russia.

20 CRORE 5 CRORE 1 CRORE 10 LAKHS

Procurement of Stores (i) Of proprietary articles on single tender, (ii) From single known source, (iii) Where resultant single acceptable offer is received against LTE/OTE

1 CRORE 50 LAKHS    

Procurement of stores against ab-initio single tender.

5 LAKHS NIL    

Placement of Development orders. 5 LAKHS NIL    

Direct Purchase of Steel & Alloys from Public Sector

FULL 5 CRORE 1 CRORE 10 LAKHS

4

Page 5: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

5

The Basics• Capital Procurement:

•Expenditure with the objective of increasing assets

• Primarily bears first charge for first construction

• Costing more than Rs 10 lakhs and with a life of 7 years as per GFR.

• Procurement procedure documented in DPP, Guidelines for Procurement of

P&M in Ordnance Factories etc.

• Revenue Procurement:•All subsequent charges for production, maintenance and working expenses

• For items and equipments to maintain and operate already sanctioned

assets

• Procurement procedure documented in DPM, OFB procurement manual

Page 6: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

6

ACCEPTANCE OF NECESSITYAssessment of physical requirement of resources with

respect to targets fixed and budget availability

• Purchase of stores must be made

• in the most economical manner

• in accordance with definite requirements

• Stores should not be purchased in small quantities.

• Stores should not be purchased much in advance of actual

requirements which will result in locking up of capital

• Elements:

• Vetting of estimated requirements / SHIS

• Vetting of estimated cost

• Mode of tendering and source of procurement

• Availability of funds and head of account.

Page 7: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

7

ACCEPTANCE OF NECESSITY..contd• For scaled items utmost care to be taken to incorporate:

• Available stock• outstanding dues/supplies• Past consumption patterns• average life of equipment and spares• Clubbing of requirements

• For one time purchase for projects or capital equipments• Actual requirement usage• Rate of return• Obsolescence factor• Confirmation to latest technology and specifications

Page 8: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

8

ACCEPTANCE OF NECESSITY..contd• Estimated cost is the most important element of AON. • Basis of estimation:

• L.P.P.• Budgetary quotations from established / registered vendors,• Assessed cost by specialist officer, in case of non-standard giving an objective cost break-up, etc.

• Informal enquiries with vendors should be avoided• Estimated cost is often inflated and prepared in perfunctory manner, escalating at a uniform rate without assessing market trends which results in an acceptance and payment of higher prices.• Budgetary provision / availability of funds and head of account are to be clearly assessed during acceptance of necessity.• Mode of tendering, as also sources of procurement i.e. from trade or P.S.U.s or from import, to be clearly decided at this stage.

Page 9: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

9

Tendering Modes• PAC

• Items/equipments that are proprietary products of

manufacturer: specifications not available to others to

manufacture

• PAC issued to OEM by user

• PAC valid for one year from date of issue.

• Single Tender Enquiry:

• Invitation to one firm

• For non PAC items can be resorted to on grounds of

urgency, operations and technical requirements

• Reasons must be recorded

• Reasonableness of rates must be determined

Page 10: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

10

Tendering modes..contd Limited tender enquiry• To be adopted when estimated value of procurement is below Rs 10 lakhs and sources of supply arewell known; new source unlikely• List of credible suppliers; competition to be encouraged• Web based publicity• Sufficient time to be allowed to vendors to quote

Open tender enquiry• Preferred mode for common use items of generic or commercial specifications, adopted when estimated value of procurement is above Rs 10 lakhs• Wide publicity through advertising media, internet• Four weeks allowed for submission of bids.

Page 11: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

11

Vendor Selection• Selection and registration of firms/suppliers and their evaluation

must be clear and transparent.

• Users required maintain a list of approved vendors / contractors

• Prequalification necessary to bring competent contractors into

competition with technical & financial capability required for the

particular procurement. To be done on the basis of :

• Experience and past performance on similar contracts

• Capabilities with respect to personnel, equipment and

manufacturing facilities

• Financial standing through latest I.T.C.C., Annual report

(balance sheet and P & L account) of last three years.

Page 12: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

12

Vendor Selection..contd• PQ evaluation criteria must be incorporated in the bid documents in

clear and unambiguous terms

• Prepare the PQ criteria specific to the requirement of the work.

• Evaluate the bids exactly as per the notified criteria.

Page 13: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

13

Specification/QRs

•Detailed QRs for the item to be procured should indicate

• Material composition

• Physical and performance parameters

• Tolerances if any

• Manufacturing processes where applicable

• Test schedule

• Preservation and packing

• QRs must be finalized before tendering.

• No waiver or modification of QRs allowed after issue of TE.

Page 14: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

14

Bid system• Single bid or two bid (for T/P, IT and communications systems,

turn key projects)

• Two bid system: techno-commercial and price bids are called

separately.

• The techno-commercial bid contains all terms and conditions

including commercial terms except price.

• Technical bids will be evaluated by T.E.C.

• Price bids of only technically acceptable offers are to be opened

to ensure an objective evaluation of tenders.

• Single stage two bid system is followed in MOD and widely

prevalent, being most transparent.

• In case of two-stage two bid system, price/commercial bids are

called from only technically acceptable vendors after technical

evaluation.

Page 15: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

15

Preparation of tender documents

Stipulate all prevailing standard conditions, Govt.policies:

• Eligibility : registration with DGQA, OFB etc

• Clarifications on bidding documents:

• Amendment to bidding documents: can be done before date

of submission of bids

• Bid validity: 90 days for single bid and 120 days for two bid

tender

• Late bids

• Modification and withdrawal of bids: can be done before

deadline for submission of bids

• Clarification of bids: no change in price or substance

permitted

• Agents of supplier: one agent cannot represent two suppliers

Page 16: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

16

Preparation of tender documents..contd

Stipulate all prevailing standard conditions, Govt.policies:

• Preliminary examination: Completeness of bid and

substantially responsive bids

• Evaluation of substantially responsive bids: On basis of prices

offered

• Award criteria: Meeting all technical and commercial

conditions and lowest

Page 17: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

17

Preparation of tender documents..contd Special conditions:

• Delivery schedule and place: Clear and unambiguous

• Payment terms and paying authority

• Security Deposit: @ 10% (max) of the total value of each

contract within 20 days of the receipt of acceptance of tender.

• Liquidated damage: recoverable @ 0.5% of value of

undelivered goods for each week or part thereof, not exceeding

10% of the outstanding contract/supply value

• Earnest Money Deposit: @ 3 % of the estimated value of the

tender and may not exceed 5 %. EMD forfeited, if the tenderer

withdraws or amends, impairs or derogates from the tender in

any respect within the period of validity of his tender.

• Fall clause

Page 18: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

18

Preparation of tender documents..contd Special conditions:

•Risk and expense purchase: Supplier liable to pay additional

amount as compared to original contracted amount. Difficult to

enforce.

•Option Clause and repeat order: Right to vary quantities at

same rates and terms within delivery period: Increase/decrease

upto 100% of quantity specified provided there is no downward

clause.

• Force majeure: Need not be included in TE

• Price Variation Clause: when included items and formula on

which the price variation is based should be clearly spelt out

indicating the base price of the raw materials, etc., on which

variation is to be allowed

• Arbitration: Must indicate provisions for appointing arbitrator.

Page 19: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

19

Tender Invitation and Receipt• Prefer open tendering as far as possible• In case limited tenders are resorted to, prepare a panel of contractors/ vendors in a transparent way.•Ensure adequate & wide publicity: Upload NIT & tender document on web-site, even in case of limited tenders.• Conduct pre-bid meeting

• to bring clarity regarding sprit of various provisions • to bring necessary modifications , if required.

• Make suitable arrangement for receipt of sealed tenders at scheduled date and time through conspicuously located tender boxes.•For bulky tender documents, keep provision in tender documents, for submission of bids by hand to designated officials

Page 20: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

20

Tender Opening• Tenders to be opened by Tender opening Committee in presence

of firms or their authorized representative at particular date and time, specified in T.E.

• Each tender to be numbered serially, initialed and dated on first page. Prices, important terms and conditions etc. should be encircled and initialed by tender opening officers / committee.

• Each page of the tender should also be initialed with date and particularly, alterations in tenders made by the firms, to be initialed.

• In two bid system, only technical bids to be opened first. Sealed commercial bids should be initialed by BOO

• Late tenders, delayed tender offers not to be considered at all. • Board of Officers should not be connected with procurement

activities at particular date and time specified in the tender enquiry.

Page 21: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

21

Tender Evaluation• Technical evaluation:

– Whenever a two bid system is followed

– Evaluation by a Technical Evaluation Committee- IFA not part of it

– To ascertain conformity of technical bid with technical specifications sought

– To bring all bidders on a level playing field in qualitative requirement

– Report to be submitted to CFA for approval.

• Commercial evaluation:

– Evaluation by a Tender Purchase Committee- IFA a part of it

– Comprises of Users, technical member, CFA rep and IFA

– PNC/TPC shall maintain a self-speaking record of its work in chronological manner.

– Minutes are to be page numbered and signed

– Issues to be seen:

• Duties and taxes

• Delivery period and delivery compliance

• All inclusive cost on delivery.

Page 22: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

22

Negotiations• Negotiations should be held in rare and exceptional circumstances

where rates are not found reasonable.

• Negotiations with LI/ techno-commercially acceptable vendor only:

– When there is inadequate competition in LTE.

– Wide variation between quotes of L1 and L 2 and others

– Wide variation between estimated cost and tendered cost.

– In case of proprietary items procured on single tender where

reasonability of rates cannot be justified.

– Where all tenders/firms quoting one make but different prices

and terms and conditions

Page 23: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

23

Negotiations..contd• CVC guidelines:

– Post tender negotiations are banned with immediate effect except with L1

– There should not be any negotiations. Exceptions will be only in the case of proprietary items or in items with limited source of supply. Counter offers tantamount to negotiations.

– When the quantity to be ordered is much more than what L-1 alone can supply, the quantity order may be distributed in such a manner that it is fair, transparent and equitable.

Page 24: 1 PROCUREMENT POLICY, DELEGATION OF FINANCIAL POWERS & TENDERING PROCEDURE IN ORDNANCE FACTORIES

24

Tender Evaluation and Award of WorkConcern areas:

• Evaluate tenders exactly as per notified criteria

• Timely decision within validity period

• Comply with instructions/guidelines of CVC on negotiations

• Ensure that conditions/specifications are not relaxed in favour of vendor to whom work

is being awarded.

• Ensure that L1 is not ignored on flimsy ground.

• Ensure that supply order is placed within justified rates

• Incorporate all standard terms and conditions, rates, denominations and specifications

as per TPC’s decision.

• Do not deviate materially from any tender enquiry condition

• Match agreement with the tender document, properly document, sign and seal

• Ensure acceptance of contract/supply order by vendor.