PRESENTATION TO PORTFOLIO COMMITTEE ON TRANSPORT
22 MAY 2002
NATIONAL DEPARTMENT OF TRANSPORT
2
CONTENT OF PRESENTATION
Implementation of the NLTTA Minibus-taxi recapitalisation
3
CONTENT OF PRESENTATION
Implementation of the NLTTA
4
IMPLEMENTATION OF NLTTA
Legislation Institutional reform Minibus-taxi process Restructuring of the bus industry Transport planning Information systems Transport law enforcement
5
IMPLEMENTATION OF NLTTA
Legislation
6
NDOT Proclamation to bring Part 7 of NLTTA (Transport planning) into effect on 1 June 2002 – currently being Gazetted
NLTSF done, to be discussed later in presentation
Regulations and requirements for PLTFs and CTPRs consulted intensively, drafts published in Gazette, appropriate comments accommodated, approved by State Law Advisors and will be published after proclamation on effecting Part 7
Dates recommended for finalisation of PLTFs and CTPRs = 31 December 2002
LEGISLATION
7
NDOT
LEGISLATION
CAPACITY BUILDING
– Program developed to capacity provincial/local politicians and officials
– Program will commence end of June 2002
– Busy appointing service providers to develop a comprehensive training program for transport planning
8
EASTERN CAPE Province has put a tender out to appoint consultations to draft provincial legislation
Busy with public participation with the Provincial Portfolio Committee
LEGISLATION
9
EASTERN CAPE GAUTENG
Part 3 replaced by Gauteng Public Passenger Road Transport Act, 2001 (Not yet in operation – busy with regulations)
LEGISLATION
10
EASTERN CAPE GAUTENG FREE STATE
Free State Interim Passenger Transport Act, 1998 in place
Professional team identified and will be appointed soon to bring provincial legislation in line with NLTTA
No major discrepancies
Be Legal regulations published on 23 March 2001
LEGISLATION
11
EASTERN CAPE GAUTENG FREE STATE MPUMALANGA
Tender out for the drafting of provincial legislation
Busy on public participation process with Provincial Portfolio Committee
LEGISLATION
12
EASTERN CAPE GAUTENG FREE STATE MPUMALANGA NORTHERN
CAPE
Provincial Bill awaiting approval of Premier
Taxi regulations have been advertised for public comment
LEGISLATION
13
EASTERN CAPE GAUTENG FREE STATE MPUMALANGA NORTHERN
CAPE NORTH WEST
First draft of replacement legislation drafted
Regulations for taxi legalisation process have been finalised
LEGISLATION
14
EASTERN CAPE GAUTENG FREE STATE MPUMALANGA NORTHERN
CAPE NORTH WEST KWAZULU NATAL
Currently considering legislation which could possibly finalised by September 2002
Taxi regulations are in place
LEGISLATION
15
EASTERN CAPE GAUTENG FREE STATE MPUMALANGA NORTHERN
CAPE NORTH WEST KWAZULU NATAL LIMPOPO
Northern Province Interim Passenger Transport Act
Taxi regulations already in place
LEGISLATION
16
EASTERN CAPE GAUTENG FREE STATE MPUMALANGA NORTHERN
CAPE NORTH WEST KWAZULU NATAL LIMPOPO WESTERN CAPE
Draft provincial legislation prepared for comment
Taxi regulations already in place
LEGISLATION
17
IMPLEMENTATION OF NLTTA
Legislation Institutional reform
18
NDOT Establishment of the TAT in the process of being finalised
INSTITUTIONAL REFORM
19
EASTERN CAPE Operating Licensing Boards: In the process of changing the current Permit Board to OLBs
Impartial registrar: Not yet appointed
TAs: Investigation in 2 district councils on the go with a view to establishing TAs
INSTITUTIONAL REFORM
20
EASTERN CAPE GAUTENG
Operating Licensing Boards:
Already established
Impartial registrar: Acting registrar in place – later in May 2002 to appoint new registrar
TAs: Not yet established
INSTITUTIONAL REFORM
21
EASTERN CAPE GAUTENG FREE STATE
Operating Licensing Boards:The name of the Board will be changed in the near future. Don’t envisage the replacement of members, might add one member
Impartial registrar: Acting registrar but can be regarded as impartial. Currently discussion a permanent appointment
TAs: Not been identified yet
INSTITUTIONAL REFORM
22
EASTERN CAPE GAUTENG FREE STATE MPUMALANGA
Operating Licensing Boards: Appointed as from 1 April 2001
Impartial registrar: Post advertised
TAs: Not identified yet
INSTITUTIONAL REFORM
23
EASTERN CAPE GAUTENG FREE STATE MPUMALANGA NORTHERN
CAPE
INSTITUTIONAL REFORM
Operating Licensing Boards: Appointed
Impartial registrar: Appointed
TAs: Studies done in 2 areas
24
EASTERN CAPE GAUTENG FREE STATE MPUMALANGA NORTHERN
CAPE NORTH WEST
Operating Licensing Boards:A single Board has been appointed and is functional
Impartial registrar: ?
TAs: Bojanala has been earmarked as pilot – will commence on 1 April 2002
INSTITUTIONAL REFORM
25
EASTERN CAPE GAUTENG FREE STATE MPUMALANGA NORTHERN
CAPE NORTH WEST KWAZULU NATAL
INSTITUTIONAL REFORM
Operating Licensing Boards:
Established
Impartial registrar: Position advertised
TAs: Busy with studies in Ethekweni and Msunduzi
26
EASTERN CAPE GAUTENG FREE STATE MPUMALANGA NORTHERN
CAPE NORTH WEST KWAZULU NATAL LIMPOPO
Operating Licensing Boards:
One single Board, but new Board to be appointed soon. Advertised, closed and evaluated
Impartial registrar: Yes
TAs: Not yet, but Polokwane might establish a TA during current financial year
INSTITUTIONAL REFORM
27
EASTERN CAPE GAUTENG FREE STATE MPUMALANGA NORTHERN
CAPE NORTH WEST KWAZULU NATAL LIMPOPO WESTERN CAPE
Operating Licensing Boards:
Calling for nominations – Feb 2002 & Members to be appointed in May 02
Impartial registrar: Appointed in 2000
TAs: Draft founding agreement drawn up and Cape Town project will be revived
INSTITUTIONAL REFORM
28
IMPLEMENTATION OF NLTTA
Legislation Institutional reform Minibus-taxi process
29
NDOT Minibus-taxi recapitalisation will be addressed at the end of the presentation
MINIBUS-TAXI PROCESS
30
AssocOperators
EASTERN CAPE 98 14 103 GAUTENG 221 34 894 FREE STATE 78 14 000 MPUMALANGA 76 5 498 NORTHERN CAPE 21 539 NORTH WEST KWAZULU NATAL 251 14 775 LIMPOPO 118 WESTERN CAPE 150 6 278
MINIBUS-TAXI PROCESS REGISTRATION
31
APPLICATIONS GRANTED
EASTERN CAPE 3 816 2 316 GAUTENG 6 597 0 FREE STATE 2 000 1 071 MPUMALANGA 2 656 1 441 NORTHERN CAPE 93 89 NORTH WEST 2 243 1 536 KWAZULU NATAL 804 LIMPOPO 25 WESTERN CAPE 1 642 830
MINIBUS-TAXI PROCESS SPECIAL LEGALISATION PROCESS
32
APPLICATIONS GRANTED
EASTERN CAPE Not yet finalised GAUTENG 4 728 455 FREE STATE 1 100 546 MPUMALANGA 2 097 1599 NORTHERN CAPE 14 3 NORTH WEST 425 359 KWAZULU NATAL LIMPOPO 1 800 WESTERN CAPE 1 921 1 525
MINIBUS-TAXI PROCESS BE LEGAL
33
EASTERN CAPE lifted GAUTENG lifted FREE STATE still in place MPUMALANGA - NORTHERN CAPE lifted NORTH WEST still in place KWAZULU NATAL LIMPOPO - WESTERN CAPE no moratorium
MINIBUS-TAXI PROCESS MORATORIUM
34
IMPLEMENTATION OF NLTTA
Legislation Institutional reform Minibus-taxi process Restructuring of the bus industry
35
EASTERN CAPE 1 GAUTENG 7 FREE STATE 0 MPUMALANGA 9 NORTHERN CAPE 1 NORTH WEST 8 KWAZULU NATAL 2 LIMPOPO 16 WESTERN CAPE 1
BUSINTERIM CONTRACTS
36
EASTERN CAPE 0 GAUTENG 26 FREE STATE 2 MPUMALANGA 0 NORTHERN CAPE 1 NORTH WEST 0 KWAZULU NATAL 38 LIMPOPO 1 WESTERN CAPE 0
BUS TENDERED CONTRACTS
37
BUS NEGOTIATED CONTRACTS
EASTERN CAPE 0 GAUTENG 0 FREE STATE 0 MPUMALANGA 1 in process NORTHERN CAPE 0 NORTH WEST All in process (NWS) KWAZULU NATAL 1 in process (Durban
Transport) LIMPOPO 3 WESTERN CAPE in process
38
IMPLEMENTATION OF NLTTA
Legislation Institutional reform Minibus-taxi process Restructuring of the bus industry Transport planning
39
NDOT Draft NLTSF done, intensive consultation done, will be submitted to MINCOM on 10 June 2002 for approval and will be published in the Gazette
Next step: to finalise regulations and requirements for OLS, Ratplans, PTPs and ITPs
PLANNING
“Map”of transport plans
Current Public Transport Record All planning authorities
Public Transport Plan At request of MEC -
public transport only
Operating License Strategy All planning authorities
Integrated Transport Plan At request of MEC - includes all aspects
transport
Rationalisation Plan Planning authorities with
subsidised public transport
Submit to Minister
Submit to Minister / MEC
with certain aspects for
approval
Subsequent ones contain
brief summary of plans
Pro
vin
cial
Lan
d T
ran
spo
rt
Fra
mew
ork
Initially as a guide for planning authorities in
Province
Inte
gra
ted
Dev
elo
pm
ent
Pla
n
National Land Transport Strategic FrameworkNational Land Transport Strategic Framework
41
NLTSF
Maps out land transport direction for ensuing 5 years (2002-2007), and guides land transport planning nationwide
Strategies – not policies or detailed implementation proposals
42
NLTSF
Should inform, and link in with:
– Annual Business Plan– Annual Budget and MTEF– Activities of Agencies– Activities of other Govt. Departments– Activities of other Spheres of Government– Activities of other Stakeholders in Transport
43
CONSULTATION wrt NLTSF
Informal interaction with agencies and industry
Workshops with provincial and municipal officials in each of the nine provinces
National workshop for all stakeholders on 19th March 2002
MINCOM on 10th June 2002
44
CONTENT OF DRAFT NLTSF
Policies
Strategies– public transport– land use restructuring– Roads– cross-border road transport– freight transport– traffic safety and enforcement– transport for persons with disabilities
45
CONTENT OF DRAFT NLTSF
Strategies (cont)– transport and the environment– tourism and transport– integration of transport planning– Conflict-resolution mechanisms
KPI’s
46
NDOT
PLANNING FOCUS AREAS
PLANNING
TSHWANE MUNICIPAL COUNCIL (G)
OR TAMBO DISTRICT COUNCIL (EC)
BOTHLABELA CROSS BORDER MUNICIPALITY (MPL/LIM)
KGALAGADI CROSS BORDER MUNICIPALITY (NW & NC)
RICHARDS BAY/ EMPANGENI-AREA (KZN)
47
EASTERN CAPE
PLANNING
Final draft of Provincial Land Transport Framework completed and with MEC for consideration
48
EASTERN CAPE GAUTENG
Provincial Land Transport Framework completed – to be updated after publication of final regulations and NLTSF
PLANNING
49
EASTERN CAPE GAUTENG FREE STATE
PLANNING
Have not commenced with the compilation of the Provincial Land Transport Framework
50
EASTERN CAPE GAUTENG FREE STATE MPUMALANGA
PLANNING
First round of consultations on Provincial Land Transport Framework done, to be completed by June 2002
51
EASTERN CAPE GAUTENG FREE STATE MPUMALANGA NORTHERN
CAPE
Busy with Provincial Land Transport Framework
PLANNING
52
EASTERN CAPE GAUTENG FREE STATE MPUMALANGA NORTHERN
CAPE NORTH WEST
PLANNING
Started with Provincial Land Transport Framework on 1 April 2002
53
EASTERN CAPE GAUTENG FREE STATE MPUMALANGA NORTHERN
CAPE NORTH WEST KWAZULU NATAL
PLTF in process Will commence with CPTR and
OLS in current financial year
PLANNING
54
EASTERN CAPE GAUTENG FREE STATE MPUMALANGA NORTHERN
CAPE NORTH WEST KWAZULU NATAL LIMPOPO
Will commence after final regulations have been published
PLANNING
55
EASTERN CAPE GAUTENG FREE STATE MPUMALANGA NORTHERN
CAPE NORTH WEST KWAZULU NATAL LIMPOPO WESTERN CAPE
PLANNING
Started the drafting of the Provincial Land Transport Framework
56
IMPLEMENTATION OF NLTTA
Legislation Institutional reform Minibus-taxi process Restructuring of the bus industry Transport planning Information systems
57
INFORMATION SYSTEM
EASTERN CAPE GAUTENG FREE STATE MPUMALANGA NORTHERN CAPE NORTH WEST KWAZULU NATAL
LIMPOPO WESTERN CAPE
LTPS, RMS2K (RAS) SUMS LTPS, RAS, SUMS+ PUBLIC
TRANSPORT INFO SYSTEM RAS, LTPS, SUMS, GIS being
developed RAS, SUMS, LTPS RAS, SUMS, LTPS RAS, SUMS, LTPS RAS, SUMS, LTPS, Provincial Public
Transport GIS System (PTMIS)
RAS, SUMS , LTPS RAS, SUMS , LTPS
58
IMPLEMENTATION OF NLTTA
Legislation Institutional reform Minibus-taxi process Restructuring of the bus industry Transport planning Information systems Transport law enforcement
59
ENFORCEMENT
EASTERN CAPE GAUTENG FREE STATE MPUMALANGA NORTHERN CAPE NORTH WEST KWAZULU NATAL LIMPOPO WESTERN CAPE
329 Traffic Officers 410 Officers 5 Officers 7 Officers 0 ? In process of preparing All Traffic Officers 45
60
CONTENT OF PRESENTATION
Implementation of the NLTTA
Minibus-taxi recapitalisation
61
TAXI RECAPITALISATION PROCESS
NEW TAXI VEHICLE (NTV) & ELECTRONIC MANAGEMENT SYSTEM (EMS)
ROLLING OUT OF MINIBUS TAXI RECAP
62
TAXI RECAPITALISATION PROCESS
STEERING COMMITTEE– NDOT– DTI– NATIONAL TREASURY– DME
63
DTI READY TO START BAFO PROCESS WITH SHORTLISTED BIDDERS
SANTACO PROBLEMS WITH EMS PROVISION
TAXI RECAPITALISATION PROCESSEMS
64
This stage allows for both the project and the bidders to:
– clarify outstanding issues & address critical issues– deal with areas where the proposals do not comply with the
specifications– allow for modifications in light of any developments since the
submission of the proposals and– to address uncanvassed issues relating to contractual
requirements and arrangements in the event of ultimate selection as a preferred bidder.
TAXI RECAPITALISATION PROCESSBAFO
65
NEGOTIATING TEAM
– DTI (Chairperson)– National Treasury– National Department of Transport– Department of Minerals and Energy– Office for Persons with Special Needs in the of the Presidency
TAXI RECAPITALISATION PROCESSEMS
66
TAXI RECAPITALISATION PROCESSEMS
Various meetings and consultation
SANTACO, Government and Reserve Bank
Meetings with 5 Ministers
MINCOM
MINCOM & SANTACO
67
TAXI RECAPITALISATION NTV
BUSINESS PROCESS (Flow diagram)
– FORMALISATION
– REGULATION Conversion to operating licenses Registration with SARS
– RECAPITALISATION EMS/NTV Scrapping allowance NTV hand over
68
TAXI RECAPITALISATION INFRASTRUCTURE REQUIREMENTS
Estimated costs of:
- Upgrading current taxi facilities to an acceptable level R424.2M
- Geometric modifications of taxi ranks: R 49.8M
- Provision of EMS infrastructure at taxi ranks R 42.6M
- Provision of infrastructure for users with special needs R 40.3 M
R556.9M
69
TAXI RECAPITALISATION NTV/EMS
WAY FORWARD
– UNLOCK THE DEAD LOCK BETWEEN SANTACO AND GOVERNMENT AND START WITH ROLL OUT PROCESS
– IMPLEMENT RELATED BUSINESS PROCESSES
– CAPACITY BUILDING
70
THANK YOU