1 Onsite Status Itaru Nakagawa RIKEN/RBRC. 2 Schedule

Embed Size (px)

DESCRIPTION

3 Optical Fiber Connection Completed by Seiko & Yoshi

Citation preview

1 Onsite Status Itaru Nakagawa RIKEN/RBRC 2 Schedule 3 Optical Fiber Connection Completed by Seiko & Yoshi 4 Fiber Chain Test Completed chain test for data cables. Found 5 dead trunk cables. (Seiko, Yudai, Ray) Arranged repair work with ITD tech on next Thursday (Sept.10). Beam Clock (BCLK) cable test is now underway. (Seiko, Ray) 5 LV Power Last week Present Completed terminal block connections Megapack will be installed today Remote control will be tested next Voltage measurement and adjusting MegaPack Power Supply frank 6 LV Distribution Modules 5 + spare cards to be produced (~1 month) Required Total 16 Available11 Missing5 LV distributer Beam Clock (BCLK) Fanout 50 more optical drivers to be Delivered. 7 OASys Maintenance Camera/power dead? Bad power connector FIXED! Signal cable swapped Confirmed Powers are back (Yoshi, Yudai) 8 OASys Camera Magnet Effect Tested with permanent magnet. Less than 30 micro meters moved. (Yoshi, Yudai) Try to get magnetic field probe to measure B field of the permanent magnet. Thermocouple Install in South Completed Sensor assembly Ready to run cables. (Seiko) 9 Station-1 Status Octant-7 Chassis Mount Done (Mike Lenz) Pluming Work Done (Mike Lenz) Installing Boards Cable connections/finalize cabling (Jimmy) 10 Grounding Chassis St-2&3 Completed Grounding Chassis. (Yudai, Ray) Systematic modifications to original grounding scheme. (originally somewhat random configuration. ) Additional ground cable between chassis and chamber will be tested 11 Pedestal Measurement (South, St-2) Ref. Jan.2009 Last week (incomplete grounding) oct1 oct6 oct3 oct4 oct5 oct2 oct7 oct8 Plane-1Plane-2Plane-3Plane-4Plane-5Plane-6 12 Pedestal Measurement (South, St-2) Ref. Dec.8,2008 After grounding completed. 13 Pedestal Measurement (South, St-3) Ref. Dec.8,2008 After grounding completed. Replaced Cathode Read Out Card (CROC) by LANL group 14 Pedestal Measurement (South, St-1) Ref. Dec.8,2008 15 Pedestal Measurement (North,St1) Ref: April.28, 2009 Larger noise by factor of 1.5 ~ 2 since power shutdown in Aug.20 16 Pedestal Measurement (North,St2) Ref: April.28, 2009 17 Pedestal Measurement (North,St3) Ref: April.28, 2009 18 Issues 1.Weak cooling water pressure. No flow in top of octants. FEE operation/functions? To be modified next Tuesday by CAD techs. 2.John Ts Dedication on PAD chamber until next Wednesday + Mike Lenz on vacation 1 week of no progress in pluming. 3.DCM error&busy MuTR.S standalone (St-1&St-3). No data taking after power shutdown. 4.Short of LV distribution modules Rental from North. Arrangement necessary. 19 To complete Infrastructure Finish Cabling (Friday) Run MuTR.S standalone Optical Tray install for trunk cable loop. Patch bay install at platform. Trunk cable connection. Fiber connections. PatchBay(rackroom) - PatchBay (Platform) - Chassis Chain test Repair dead cables. LV Megapack Install (Frank) Connection to Terminal Block (Frank) end of this week LV measurement & tune Chassis Station-1, Oct-7 Mount (Mike) Finish grounding St-2&St-3 Plumming (John+Mike) 20 Welcome Naruya & Junichi 21 Plan for next week Make MuTR.S standalone running (Itaru) Test St-2&3 chassis-chamber ground cable (Yoshi+Ray) LV measurement and tune (Seiko+Ray) ADTX-FEE cable installation to St-1 (Yoshi+Itaru) Daily calibration and analysis (Seiko+Ray) Pedestal analysis code development (Seiko+Ray) Board QA (Naruya+Junichi) OASys temperature, humidity correlation study (Naruya+Junichi) 22 Backup 23 4th Week September South OASys camera alignment Miscabling Check South camera 24, 26 Diagnose Camera 18 Thermocouple install to South Develop noise chart program Develop Cathode cable miscabling checker OASys temperature measurement and correlation North arm Station-3, Octant-1 noise hunt Norm arm noise issue FCI connector debugger (soldering?) Rack room Setup MRG and cabling Run LL1 Cable Run DCMIF-DCM cable