"On PD-->SNuMI-->PP2-->NoVA transition" {VS}
Bob Zwaska
Accelerator Physics Department Meeting
Jan. 10, 2007
≠≠
2
Yes: More changes• Proton Plan 2 is being absorbed into the NOvA project
May retain the name “Proton Plan 2”
• PP2 work is being carved up (next slide)
• Hopefully, schedule will not be significantly affected by the
merger
• Budget looks comparable to existing plans
• “SNuMI” still refers to inclusion of the Accumulator in the chain
Not part of NOvA – a little off the radar screen
3
Pieces of PP2• Booster work goes to Proton Plan (1)
Not very much
• Civil work goes to GPPAlways need more service buildings and
penetrations
• Everything else goes into NOvASplit between construction (MIE) and R&D or
operating costsMIE is the price tag of interest: $240-245M (TEC?)
4
Organization• Nancy becomes Associate Project Manager
There is already a deputy
• PP2 becomes two Level 2s in the NOvA WBSLevel 1s split along the R&D/Ops vs. constructionNancy and Elaine in charge of the PP2 L2sDon’t think there are any level 1 managers
• All documentation needs to be merged with NOvA and brought to Project standards
• Hopefully, it is all the same at lower levels\No technical changes
5
NOvA
1.0 NON-MIE Accelerator & NuMI Beamline Upgrades
Nancy & ElaineBob & Rob
1.1 Far Site & Building R&D
1.2 Scintillator 1.3 Fiber
1.0.1 Recycler Upgrades
Paul Derwent
1.0.2 Main Injector Upgrades
Ioanis Kourbanis
1.4… 1.10 Project Management
1.0.3 NuMI UpgradesMichael Martens
Kamran Vaziri (RSC)
1.04 Beam PhysicsRobert Zwaska
6
NOvA
2.0 MIE Accelerator & NuMI Beamline Upgrades
Nancy & ElaineBob & Rob
2.1 Far Site & Building R&D
2.2 Scintillator 2.3 Fiber
2.0.1 Recycler Upgrades
Paul Derwent
2.0.2 Main Injector Upgrades
Ioanis Kourbanis
2.4… 2.10 Project Management
2.0.3 NuMI UpgradesMichael Martens
Kamran Vaziri (RSC)
7
Staying on Schedule• PP2 (then SNuMI) DR in Nov. will substitute
for CD-1 reviewRequires some cleanup of documentation (mostly
done)
• Then, many more reviews
• Still plan to do first round of installs in Oct., 2009 (or whenever available)
8
NOvA/PP2 Merger
9
Plan Ahead• After a lot of initial worry, PP2 looks to be fine
Extra headaches, as usual
Few serious changes to project
• Still need to do a lot of workWill use division resources
Physicists are (again) asked to get involved• No cost to project – by some accounting
• “SNuMI” will have to be something completely separate