15
1 Node 2.0

1 Node 2.0. 2 NODE 2.0 Introduction and Background –Dennis Burling Current and Future –Bill Rensmith Technical Talk –Mike Reich

Embed Size (px)

Citation preview

Page 1: 1 Node 2.0. 2 NODE 2.0 Introduction and Background –Dennis Burling Current and Future –Bill Rensmith Technical Talk –Mike Reich

1

Node 2.0

Page 2: 1 Node 2.0. 2 NODE 2.0 Introduction and Background –Dennis Burling Current and Future –Bill Rensmith Technical Talk –Mike Reich

2

NODE 2.0

• Introduction and Background– Dennis Burling

• Current and Future– Bill Rensmith

• Technical Talk– Mike Reich

Page 3: 1 Node 2.0. 2 NODE 2.0 Introduction and Background –Dennis Burling Current and Future –Bill Rensmith Technical Talk –Mike Reich

3

The Journey

• 1998 – Information Management Work Group (IMWG) formed

• October 2000 – Network Blueprint– Defined the Node as:

• A participant’s single, managed point of interaction between trading partners.

• The collection of specific technical and policy components that a participating member will manage for providing and receiving information via the Network.

Page 4: 1 Node 2.0. 2 NODE 2.0 Introduction and Background –Dennis Burling Current and Future –Bill Rensmith Technical Talk –Mike Reich

4

The Journey – How do we get there?

Page 5: 1 Node 2.0. 2 NODE 2.0 Introduction and Background –Dennis Burling Current and Future –Bill Rensmith Technical Talk –Mike Reich

5

The Journey

2001 & 2002 - Alpha and Beta node projects conducted

Page 6: 1 Node 2.0. 2 NODE 2.0 Introduction and Background –Dennis Burling Current and Future –Bill Rensmith Technical Talk –Mike Reich

6

The Journey

February 2002 – Network Implementation Plan approved– The dynamic nature of Network

development requires this Plan to be flexible and allow for the development and improvement of Network technologies

– The technical options for Node development will continue to expand as vendors release new products

Page 7: 1 Node 2.0. 2 NODE 2.0 Introduction and Background –Dennis Burling Current and Future –Bill Rensmith Technical Talk –Mike Reich

7

The Journey

Fall 2002 – Node 1.0 project is completed– Modifications to 1.0 documentation and

release of Node 1.1 documentation

Page 8: 1 Node 2.0. 2 NODE 2.0 Introduction and Background –Dennis Burling Current and Future –Bill Rensmith Technical Talk –Mike Reich

8

The Journey

• Late 2002 – first node in production with CDX

• Early 2003 – A few more 1.1 nodes in production

• Late summer 2006 – NTG work group starts discussing Node 2.0

Page 9: 1 Node 2.0. 2 NODE 2.0 Introduction and Background –Dennis Burling Current and Future –Bill Rensmith Technical Talk –Mike Reich

9

The Journey

• Winter 2006 – NTG provides report to NOB for

consideration of Node 2.0 evaluation– NOB agrees to proposed Node 2.0

evaluation and time line

• April 2007 – User’s Conference briefing– 49 state nodes, 4 tribal nodes

Page 10: 1 Node 2.0. 2 NODE 2.0 Introduction and Background –Dennis Burling Current and Future –Bill Rensmith Technical Talk –Mike Reich

10

Why Node 2.0?

• Is Node 1.1 broken? – This is not about design changes or flaws to the

architecture.

• Node 1.1 technologies are being de-supported. – Vendor support for our 1.1 technologies is

decreasing– Expect decreasing support to continue– Difficult to support and maintain our existing

technology– Possible increasing costs of operation

Page 11: 1 Node 2.0. 2 NODE 2.0 Introduction and Background –Dennis Burling Current and Future –Bill Rensmith Technical Talk –Mike Reich

11

Why Node 2.0?

Opportunity • A vision and expectation of complex

flows by 2010 that will receive and publish information. – Cost to change now should be relatively low – Opportunity to integrate innovative applications into the

Node configuration.

• Upgrading the Node configuration now should be easier than later when more complex exchanges become available.

• Funding, maximize the number of grant cycles to support Partner adoption/migration of Node 2.0.

Page 12: 1 Node 2.0. 2 NODE 2.0 Introduction and Background –Dennis Burling Current and Future –Bill Rensmith Technical Talk –Mike Reich

12

Node 2.0

• Keeping a single EN WSDL with about 80% of the 1.1 features.

• Firming up the infrastructure to prepare for:– Publishing and complex exchanges– Signatory requirements

• Building in dual endpoints in each Node 2.0 configuration to ensure Node 1.1 can still operate on the network for all current uses during implementation.

Page 13: 1 Node 2.0. 2 NODE 2.0 Introduction and Background –Dennis Burling Current and Future –Bill Rensmith Technical Talk –Mike Reich

13

Node 2.0 Timeline

• May NOB/NTG check-in– Complete draft Node 2.0 changes – Complete Rollout Plan– Complete Testing plan

• June-August: – Unit and Process Testing

• Mid August: – Specification freeze and distribution to Node 2.0 developers

• September: – Final CDX/Vendor Node testing – Final NTG/NOB decision point: go/no go with rollout

• November: – Distribution/Availability of Node 2.0’s and Protocol/Specification. – Grant Guidance Out

• Winter 07: – User Test Bed Available: Early adopter implementations– Grant Process

• Spring 08: – Grant Award Notifications – Building 2.0 Nodes

Page 14: 1 Node 2.0. 2 NODE 2.0 Introduction and Background –Dennis Burling Current and Future –Bill Rensmith Technical Talk –Mike Reich

14

Proposed Rollout Goals

• Node 1.1 continuing support – CDX will support Node 1.1 for 18 months from rollout of 2.0

• Node-in-a-box – a complete installable Node solution– Plug-ins– Submit– Query/Solicit

• Node 2.0 implementation support

• Emphasis on ensuring everybody has access to “entry” level Node that makes publishing easy

• Implement a full service test bed for Node 2.0

• Three vendor created ‘Gold Standard’ nodes, which are ‘plug-n-play’, including the next version CDX node.

Page 15: 1 Node 2.0. 2 NODE 2.0 Introduction and Background –Dennis Burling Current and Future –Bill Rensmith Technical Talk –Mike Reich

15

Grant Money

The work group has discussed different options for funding the Node 2.0 implementation.

Due to the importance of an implementation of this magnitude, we are strongly recommending Node 2.0 implementation be included in the 2008 Grant Guidance.