1NEC Computers International
Activity report for year 2000
Manufacturing Unit Notebooks and Servers
JP CABRERA, MUNS Manager, 03/01/2001
2NEC Computers International
MUNS Production Chart
B ab in V eron iq u eA ss is tan t M an ag er P rod u c tion
P 4 7 7 9
M elin M ich e lS tock In ven to ry
P 7 1 4 2
C ed ric L iauJé ré m ie B ru n
C P U s tock roomP 7 1 8 3
A n ton y B ou d au dO fficeP 4 9 8 0
S té p h an e C og n o la toR ece ivin g L ead
P 7 0 6 9
G u illau m e Q u em en erJé rô m e G u ed on
S tock L ead sP 7 0 7 4
P h ilip p e M E S L E TW areh ou se S u p erviso r
P 7 1 3 7
A la in B u reauP rek its /A ccessories
P 4 8 5 7
R é m y L ecom teK itt in gP 7 0 6 7
Jean -M arc P A L M IE RS h ift L ead s
P 5 0 9 7
E tien n e A L L A IR ES ervers S u p erviso r
P 5 0 6 6
B ru n o L erou xY H am on G . L ep ag e
S h ift L ead sP 5 0 9 6
B en o it H eriteauN oteb ooks ac tin g as su p erviso r
P 5 0 9 8
F ran ck M an seauS ervers O L R
P 4 0 1 5
B ern ard S au vag e tN o teb ooks O L R
P 7 0 1 4
D an ie l M artinF A , M eth od s
P 7 2 9 3
F ré d é ric B en o itF A ,IS O ,M eth od s
P 4 6 3 1
M an u fac tu rin g Tech n ic ian s
Jean -P ie rre C A B R E R AM an u fac tu rin g M an ag er
P 7 1 5 0
3NEC Computers International
Our Team Values
• Polyvalence, Flexibility, Motivation, Involvement• Autonomy, Professional integrity, Enthusiasm• Presenteism, Punctuality• Rigor, Method, Serious, Pro Activity• Dexterity, Rapidity, Agility, Reactivity• Competence, Knowledge, Confidence, Reliability• Communication, Respect for others, Welcome• Frankness, Team work, Competition• Innovation, Quality, Energy, Customer facing
4NEC Computers International
Global process
CustomersBrandsNEC
PBELLBULL
US
Marketing
Engineering
Maintenance
Industrial Engineering
Production Planning
Material PlanningQuality
Order Adminsales
Purchasing
Human Resources & Facilities Receiving
Assembly
Kitting
Stockrooms
Burn-in & Preload
On Line Repair
Packing
Shipping
5NEC Computers International
Production for Year 2K
• 113511 notebooks– 20000 in December 2K (25000 in full year 1998)– average of 25 units per manufacturing order
• 14282 servers– 15 models, racks and tower– 10 new product introductions– 2 units per manufacturing order (ATO)
• 140000 accessories – for servers, notebooks and desktops
• 10,5 M$ of stocks, 17500$ adjustment ie 0,0016%
6NEC Computers International
Quality internal audit Y2K
• Servers ( 30/03/2000) : Satisfaction : 95%– Remarks :
• FA & security instruction not written : done
• Notebooks (18/12/2000) : Satisfaction : 85%– Remarks and status :
• procedure is not up to date : in progress• torque of screw drivers not calibrated : tool must be
replaced, 19KF, Investment proposal to be done• ESD rules not respected : verify that everybody
conforms the ESD rules• working instruction list not up to date : in progress
7NEC Computers International
BUDGET Y2K :
• Stockroom :– Actual (November) : 474729$– Budget : 427719$
• Servers :– Actual : 402213$– Budget : 641095$
• Notebooks :– Actual : 771892$– Budget :611998$
8NEC Computers International
Investments Y2K :
• Stockroom :– Increase stockroom capacity in order to shorten
the servers lead time : shelves + receiving– Amount = 48630$
• Notebooks :– Increase production capacity from 600/day to
900/day in order to achieve the target for end of the year : new layout + 6 trolleys for preload
– Amount = 138000$
9NEC Computers International
METHODS :
• Quality measurement on the lines : – Acceptable Quality Level : cosmetics & docs– On Line Repair ratios
• KAIZEN : the processes are always improved by the operators, in brainstorming meetings, controlled by leads or supervisors,
• Progress group at receiving• Weekly meeting for OLR Quality improvement• Daily meeting for business & material management• New operators:2 days training + 3 (practice servers)
10NEC Computers International
Capacity calculation : on Wednesday, 11:00
Capacity requiredby order admin
Material availability
Capacity calculationparameters =
number of working hours or number of people
Wednesday, 12:00Mail : working hours & capacity for the following week
11NEC Computers International
METHODS : 5S or Housekeeping
• Quality can only grow in a clean workshop• Seiri = to throw away useless things• Seiton = everything at its place• Seiso = to clean• Seiketsu= to be methodical, organized• Shitsuke= to learn rigor
12NEC Computers International
METHODS : New product Introduction
ProductsFCS datesroadmaps
Marketing
Engineering
Production:operator training,
quality,routing times,
efficiency,productivity,
practice1 unit forFA test
FA team :assembly method
working instructionstest process
Materialplanning
PurchasingProductionplanning
MOs
Tests &support
13NEC Computers International
Mission for the server production team
• To produce servers • with Excellence in quality, • delivered in time to the customer, • and with respect of the budgeted costs.
– This must be done with well trained people, in respect of the working conditions and environment, and continuously searching for improvement of the process.
15NEC Computers International
Process for servers
KittingAssembly
10 work stations45 mn (Average)
Burn-In180 entry pointsEntry = 6 hoursHigh = 12 hoursOn Line
Repair
Quality
Packing1 work station
Nationalizationkits
Stockroom
Shipping
Max Capacity :300/day/3 shifts
16NEC Computers International
Objectives and results for servers
• Quality : – On Line repair, Objective : 6.7 % current : 6.8%
– Non conform products– Process issues– assembly errors
– DOA, Objective 1 % , current : 0.1%
• Lead times : Objective : 4 days from order placed to FOB – current lead time : 10 days (average)– production cycle time : 3 days (average)
• Costs : – productivity : Objective :4/day/operator, current 3,35
17NEC Computers International
Production cycle for servers
• J = order is placed in SOPSYS• J+1 = MO is planned at J+2• J+2 = production, pretest, burn-in, • J+3 = delivery to shipping
18NEC Computers International
QUALITY Y2K : Servers
% OLR SERVER
0,00%
2,00%
4,00%
6,00%
8,00%
10,00%
12,00%
Process
Assembly
Suppliers
Goal
19NEC Computers International
QUALITY Y2K : Servers
%QUALITY OUTGOING SERVER
0,00%
1,00%
2,00%
3,00%
4,00%
5,00%
6,00%
7,00%
8,00%
1999
janv-0
0
févr-
00
mars
-00
avr-
00
mai-00
juin
-00
juil-
00
août-
00
sept-
00
oct-
00
nov-0
0
déc-0
0
20NEC Computers International
QUALITY Y2K : Servers
RMA (12 month rolling)
0,00%
0,50%
1,00%
1,50%
2,00%% other (12 month)
% NDF(12 month)
% Failed(12 month)
goal
21NEC Computers International
Manpower Y2K : ServersEffectif par semaine, SERVEURS
0
5
10
15
20
25
30
35
40
45
Semain
e 1
Semain
e 3
Semain
e 5
Semain
e 7
Semain
e 9
Semain
e 11
Semain
e 13
Semain
e 15
Semain
e 17
Semain
e 19
Semain
e 21
Semain
e 23
Semain
e 25
Semain
e 27
Semain
e 29
Semain
e 31
Semain
e 33
Semain
e 35
Semain
e 37
Semain
e 39
Semain
e 41
Semain
e 43
Semain
e 45
Semain
e 47
Semain
e 49
Semain
e 51
Semaine
CD
I C
DD
TE
MP
S
INT
CDD
CDI
JP CABRERA21/12/2000
22NEC Computers International
Productivity Y2K : ServersProductivité
0
4
8
12
16
20
24
28
32
36
40
UNITS/DAY/OPERATOR Nbre de personnes présentesobjectif Polynomial (UNITS/DAY/OPERATOR)
23NEC Computers International
Efficiency Y2K : ServersEfficience Assemblage Serveurs
0
50
100
150
200
0
20
40
60
80
100
120
Efficience heures perdues Heures non productives Polynomial (Efficience)
24NEC Computers International
Mission for the notebooks production team
• To produce notebooks • with Excellence in quality, • delivered in time to the customer, • and with respect of the budgeted costs.
– This must be done with well trained people, in respect of the working conditions and environment, and continuously searching for improvement of the process.
26NEC Computers International
Process for notebooks
KittingAssembly
12 work stations10 mn (Average)
Pretest/Preload192 entry points
3,5 hoursOn LineRepair
Quality
Packing
Nationalizationkits
Stockroom
Shipping
Max Capacity :900/day/3 shifts
27NEC Computers International
Objectives and results for notebooks
• Quality : – On Line repair, Objective : 2.7 % current : 2.7%
– Non conform products– Process issues– assembly errors
– DOA, Objective 2 % , current : 1%
• Lead times : Objective : 3 days from order placed to FOB – current lead time : 10 days (average)– production cycle time : 3 days (average)
• Costs : – productivity : Objective :4/day/operator, current 3
28NEC Computers International
Production cycle for notebooks
• J = order is placed in SOPSYS• J+1 = MO is planned at J+2• J+2 = production, pretest, preload, • J+3 = delivery to shipping
29NEC Computers International
QUALITY Y2K Notebooks
% OLR NOTEBOOK
0,00%0,50%1,00%1,50%2,00%2,50%3,00%3,50%4,00%4,50%5,00%
1998
1999
janv
-00
févr
-00
mar
s-00
avr-
00
mai
-00
juin
-00
juil-
00
août
-00
sept
-00
oct-
00
nov-
00
déc-
00
Process
Assembly
Suppliers
Goal
30NEC Computers International
QUALITY Y2K : Notebooks
% OUTGOING QUALITY CHECK NOTEBOOK
0,00%
0,20%
0,40%
0,60%
0,80%
1,00%
1,20%
1,40%
1,60%
1,80%
2,00%
1998
1999
janv-0
0
févr-
00
mars
-00
avr-
00
mai-00
juin
-00
juil-
00
août-
00
sept-
00
oct-
00
nov-0
0
déc-0
0
31NEC Computers International
QUALITY Y2K : Notebooks
% OLR NOTEBOOK
0,00%0,50%1,00%1,50%2,00%2,50%3,00%3,50%4,00%4,50%5,00%
1998
1999
janv
-00
févr
-00
mar
s-00
avr-
00
mai
-00
juin
-00
juil-
00
août
-00
sept
-00
oct-0
0
nov-
00
déc-
00
Process
Assembly
Suppliers
Goal
% OUTGOING QUALITY CHECK NOTEBOOK
0,00%0,20%0,40%0,60%0,80%1,00%1,20%1,40%1,60%1,80%2,00%
1998
1999
janv
-00
févr
-00
mar
s-00
avr-
00
mai
-00
juin
-00
juil-
00
août
-00
sept
-00
oct-0
0
nov-
00
déc-
00
RMA (ARR) repartition
0,00
0,50
1,00
1,50
2,00
2,50
3,00
1999
janv
-00
févr
-00
mar
s-00
avr-
00
mai
-00
juin
-00
juil-
00
août
-00
sept
-00
oct-0
0
nov-
00
déc-
00
other
NDF
Failed
goal
32NEC Computers International
Manpower Y2K : NotebooksEffectif par semaine, NOTEBOOKS
0
10
20
30
40
50
60
70
Semain
e 1
Semain
e 3
Semain
e 5
Semain
e 7
Semain
e 9
Semain
e 11
Semain
e 13
Semain
e 15
Semain
e 17
Semain
e 19
Semain
e 21
Semain
e 23
Semain
e 25
Semain
e 27
Semain
e 29
Semain
e 31
Semain
e 33
Semain
e 35
Semain
e 37
Semain
e 39
Semain
e 41
Semain
e 43
Semain
e 45
Semain
e 47
Semain
e 49
Semain
e 51
Semaines
CD
I C
DD
TE
MP
S
INT
CDD
CDI
JP CABRERA21/12/2000
33NEC Computers International
Mission for the warehouse team
• To receive and stock each component • with Excellence in inventory accuracy, • delivered in time to the productions or to the
other warehouses, • and with respect of the budgeted costs.
– This must be done with well trained people, in respect of the working conditions and environment, and continuously searching for improvement of the process.
35NEC Computers International
Process for warehouse
Office :following up
of MOs
DocksReceiving
Prod.Planning
Max Capacity :900 notebooks or 50 MOs/day/3 shifts+ 300 servers or 100 Mos/day/3 shifts
+ 50 Mos for accessories
Mass Stockroom
Goods
Shuttles
Picking Stockroom
Protected Stockroom
Pickingwarehousemen
Prekitpreparation
Production
Manufacturing Orders
& picking listsInventory
Resupply
36NEC Computers International
Manpower Y2K : WarehouseEffectif par semaine, STOCK
0
5
10
15
20
25
30
35
Semain
e 1
Semain
e 3
Semain
e 5
Semain
e 7
Semain
e 9
Semain
e 11
Semain
e 13
Semain
e 15
Semain
e 17
Semain
e 19
Semain
e 21
Semain
e 23
Semain
e 25
Semain
e 27
Semain
e 29
Semain
e 31
Semain
e 33
Semain
e 35
Semain
e 37
Semain
e 39
Semain
e 41
Semain
e 43
Semain
e 45
Semain
e 47
Semain
e 49
Semain
e 51
Semaine
CD
I C
DD
TE
MP
S
INT
CDD
CDI
JP CABRERA21/12/2000
37NEC Computers International
Valeur ajustement
-1.387,92 -382,84 -720,90 -546,53
0,00
-3.011,60
61,48
-4.123,44
-7.788,69
326,54-1.068,71
-2.347,63
1.829,222.283,62
-1.764,44
672,460,00
-1.795,00 -1.413,66
-11.104,25
4.026,84
-7.190,33
19.198,78
-15000
-10000
-5000
0
5000
10000
15000
20000
25000
Fév
rier
Mars
Avril
Mai
Juin
Juillet
Août
Septe
mbr
e
Octo
bre
Novem
bre
Décem
bre
Janvie
r
Fév
rier
Mars
Avril
Mai
Juin
Juillet
Aout
Septe
mbr
e
Octo
bre
Novem
bre
Décem
bre
Inventory Adjustments Y2K
1999 2000
Transfer from St Sylvain
38NEC Computers International
Efficiency Y2K : picking & delivery to production
Efficience semaine
128%
120%
123%
122%
108%111%
115%
112%
110%
117%
109%
114%
100%
110%
113%
108%
114%
104%
130%
119%
109%
136%
113%
109%
119%
124%120%
112%
121%
123%
129%
117%
91%
110%
128%
151%
139%
102%
107%
99%98%
108%
134%
146%
134%
139%
115%116%
127%
119%
111%
143%
135%
129%
132%
134%
117%
117%
116%
126%
107%
143%
127%132%
126%
96%
99%
108%
138%
125%
117%
97%
102%
121%
98%
86%
98%
85%
101%
74%
85%
83%
90%
0%
20%
40%
60%
80%
100%
120%
140%
160%
Nouveau calcul d'éff iciencesuite au gain de productivité en 99
39NEC Computers International
Weakness and axes of improvement
• Global : • supply chain : forecasts accuracy, bids not taken in
account, specific components with low volumes => suppliers not flexible
• dependence of engineering on Boxborough• production planning : launch of production with
components arriving the same day => shortages• too many temporary people => low skills level
• Stockroom :• not enough space on the docks and shelves• no software for picking list nor MO grouping
40NEC Computers International
Weakness and axes of improvement
• Notebooks:• Quality management must be improved by 10 points• Floor and walls to be repaired
• Servers : • Packing becomes very hard because of the weight of
servers : a handling tool has to be developed, in progress
• Not enough light on the line : budgeted, IP to be done
• both Nb & Sv: • compressed air screw drivers : budgeted for 2001• On Line working instructions : budgeted for 2001
41NEC Computers International
Training : proposal for 2001Cost Center Name Training Heading Date Cost Total Training Cost Total Cost center
3500 Babin V Anglais individuel 6.500 F 6.500 F3500 Babin V Finance 3.200 F 9.700 F 9.700 F3530 Guedon J Anglais classique 1.850 F 11.550 F3530 Quemener J Anglais classique 1.850 F 13.400 F3530 Cognolato S Anglais classique 1.850 F 15.250 F3530 Meslet P L' Entretien Annuel d'activité 1.300 F 16.550 F3530 Guedon J Douane + Transport 0 F 16.550 F3530 Quemener J Douane + Transport 0 F 16.550 F3530 Cognolato S Douane + Transport 0 F 16.550 F3530 Cabrera J Douane + Transport 0 F 16.550 F3530 3 pers Outlook 0 F 16.550 F 6.850 F9373 Taconne. A réseau 5.000 F 21.550 F9373 Allaire. E Anglais classique 1.850 F 23.400 F9373 Benoit. F Anglais classique 1.850 F 25.250 F9373 Juret. A Anglais classique 1.850 F 27.100 F9373 Leger. C Anglais classique 1.850 F 28.950 F9373 Pilard. J Anglais classique 1.850 F 30.800 F9373 Cabrera J Anglais individuel 8.000 F 38.800 F9373 Palmier JM Construire, Animer et gérer son équipe 2.100 F 40.900 F9373 Lecomte R Construire, Animer et gérer son équipe 2.100 F 43.000 F9373 Allaire. E L' Entretien Annuel d'activité 1.300 F 44.300 F9373 Cabrera J Manager un centre de responsabilité 44.000 F 88.300 F 71.750 F9383 Heriteau B Anglais classique 1.850 F 90.150 F9383 Leroux B Anglais classique 1.850 F 92.000 F9383 Martin D Gestion de temps 1.400 F 93.400 F9383 Heriteau B Perfectionnement gérer son équipe 715 F 94.115 F9383 Leroux B Perfectionnement gérer son équipe 715 F 94.830 F9383 Sauvaget B Certification Multiplatforme 16.500 F 111.330 F9383 Geffard P L' Entretien Annuel d'activité 1.300 F 112.630 F
3530-9373-9383 6 pers Formation Secouriste 0 F 112.630 F9373-9383 8 pers Technique Servers 0 F 112.630 F 24.330 F