Upload
egbert-garrison
View
217
Download
0
Tags:
Embed Size (px)
Citation preview
1
Napa River/Napa Creek Flood Protection Projectand Consolidated Remedial Action Area
Consolidated RemedialAction Area
SF BayDowntownNapa
Hwy 29 Bridge
~ 7 miles
Tulocay Creek
Gasser Property
Figure 1
3
Nord Vineyard
N
2
Consolidated Remedial
Action Area
• Four petroleum release sites
• Former bulk fuel oil storage
• Large (>100,000-gal.) above-ground tanks adjacent the Napa River
• Within footprint of Napa River Flood Protection Project
Napa R
iver
Former Basalt Rock Co.(Dillingham Const.)
Former PhillipsOil Terminal
(Texaco, Phillips)
Former Basalt Rock Co.(Dillingham Const.)
Former North BayOil Terminal
(Chevron, Bay CitiesOil Marketers
Limit of FloodProtection Project
Terrace
Phase 1 Area
Phase 2 Area
Figure 2
4
Nord Vineyard
3
NapaRiver
GroundSurface
Above-Ground andUnderground Tanks atBulk Fuel Terminals
Marsh Plain andFlood Plain Terraces
Petroleum Pollution
WaterTable
Figure 3
Cross-section showing a conceptual view of pollution in the consolidated area
5