9
RUWAIS HOUSING COMPLEX EXPANSION PHASE III NEW INTERNATIONAL SCHOOL AT RUWAIS PROJECT No. 6054 AGREEMENT No. 116054C1 METHOD STATEMENT FOR FORM WORK Ref. No. : MS- 6054– 011 REV. No. 00 Date : 21.05.2014 Page 1 of 7 ABU DHABI NATIONAL OIL COMPANY ADNOC! RUWAIS HOUSING COMPLEX EXPANSION PHASE III NEW INTERNATIONAL SCHOOL AT RUWAIS PROJECT No. 6054 METHOD STATEMENT FOR FORM WORK MAIN CNTRACTR:  NATINA! "!DING AND A!-M# I! !!C.  

1 - MS-6054-011 form work

Embed Size (px)

Citation preview

8/12/2019 1 - MS-6054-011 form work

http://slidepdf.com/reader/full/1-ms-6054-011-form-work 1/9

RUWAIS HOUSING COMPLEX EXPANSION PHASE III

NEW INTERNATIONAL SCHOOL AT RUWAIS

PROJECT No. 6054

AGREEMENT No.

116054C1

METHOD STATEMENT FOR 

FORM WORK

Ref. No. : MS- 6054– 011REV. No. 00

Date : 21.05.2014

Page 1 of 7

ABU DHABI NATIONAL OIL COMPANY

ADNOC!

RUWAIS HOUSING COMPLEX EXPANSION PHASE III

NEW INTERNATIONAL SCHOOL AT RUWAIS

PROJECT No. 6054

METHOD STATEMENT FOR 

FORM WORK

MAIN CNTRACTR:

 NATINA! "!DING AND A!-M#I! !!C.

 

8/12/2019 1 - MS-6054-011 form work

http://slidepdf.com/reader/full/1-ms-6054-011-form-work 2/9

8/12/2019 1 - MS-6054-011 form work

http://slidepdf.com/reader/full/1-ms-6054-011-form-work 3/9

RUWAIS HOUSING COMPLEX EXPANSION PHASE III

NEW INTERNATIONAL SCHOOL AT RUWAIS

PROJECT No. 6054

AGREEMENT No.

116054C1

METHOD STATEMENT FOR 

FORM WORK

Ref. No. : MS- 6054– 011REV. No. 00

Date : 21.05.2014

Page $ of 7

 

TABLE OF CONTENTS

1. PURPOSE

#. SCOPE

$. REFERENCES

4. DEFINITIONS AND ABBRE"IATIONS

5. RESPONSIBILITIES

6. MATERIALS

%. E&UIPMENT ' TOOLS

(. SAFETY AND HEALTH

). PROCEDURE

10.ATTACHMENTS

1.0 PRP!"#

This method statement defines the type of 'or( to be carried out to ensure that aoperations involved in the form 'or(s for concrete 'or(s are carried out in accordance 'it

MAIN CNTRACTR:

 NATINA! "!DING AND A!-M#I! !!C.

8/12/2019 1 - MS-6054-011 form work

http://slidepdf.com/reader/full/1-ms-6054-011-form-work 4/9

8/12/2019 1 - MS-6054-011 form work

http://slidepdf.com/reader/full/1-ms-6054-011-form-work 5/9

RUWAIS HOUSING COMPLEX EXPANSION PHASE III

NEW INTERNATIONAL SCHOOL AT RUWAIS

PROJECT No. 6054

AGREEMENT No.

116054C1

METHOD STATEMENT FOR 

FORM WORK

Ref. No. : MS- 6054– 011REV. No. 00

Date : 21.05.2014

Page 5 of 7

#. RA3 Ris( Assessment

#.2 9%3 9ritish %tandard

#. A%T$ American %ociety of Testing and $aterials

 /.0 R#"P!N"+B++,+#"

". 4ro7ect $anager is responsible for overall management of the 7ob 'ith =uality and safety as perapproved shop dra'ing and method statement.

".2 Construction $anager!4ro7ect ,ngineer shall arrange all materials: e=uipment: safety related items @

manpo'er @ direct the %ite ,ngineer @ Foreman to resort appropriate action for the smooth e)ecutionof the 'or(s.

". %ite ,ngineer shall ensure that all 'or(s are carried out according to approved shop dra'ings. *eshall direct the surveyor for the settings out lines @ levels in concurrence from the Construction$anager!%enior Civil ,ngineer.

".# ;A!;C ,ngineer shall ensure that e)ecution of 'or(s are complying 'ith approved method statement:specifications: approved shop dra'ings and ensure &TR are submitted based on &T4 re=uirements.

"." %ite %urveyor to ensure that the 'or( cre' is familiar 'ith the safety re=uirement of this activity.

".< %afety ,ngineer shall be responsible for safe 'or(ing environment @ conditions. Coordinate 'ith %ite

,ngineer to identify potential haards before 'or(s and advise methods of safe 'or(ing from ne'developments.

".8 $,4 Coordinator ,ngineer shall be responsible for proper e)ecution of $,4 'or(s involved before:during and after the 'or(s.

.0 &ateria23

. aminated 4ly 'ood >mm

2. -hite 'ood

. Nails

#. %huttering clamp

". Tie Rods

<. %caffolding Bac(

MAIN CNTRACTR:

 NATINA! "!DING AND A!-M#I! !!C.

8/12/2019 1 - MS-6054-011 form work

http://slidepdf.com/reader/full/1-ms-6054-011-form-work 6/9

RUWAIS HOUSING COMPLEX EXPANSION PHASE III

NEW INTERNATIONAL SCHOOL AT RUWAIS

PROJECT No. 6054

AGREEMENT No.

116054C1

METHOD STATEMENT FOR 

FORM WORK

Ref. No. : MS- 6054– 011REV. No. 00

Date : 21.05.2014

Page 6 of 7

4.0 #5+P&#N," 6 ,!!

• %a' machine.

• Cranes.

• enerator.

•  Air Compressor.

• *and tools:*and sa' :-ire cutter:brush.

• ine dory!%tring

• $easuring Tape

• Tamper 

• %panners

• Torch.

7.0 "A%#,8 6 9#A,9

%afety of the personnel and properties is to be given prime importance and all the 'or(to be carried out 'ithout causing any accidents or property damage. Form 'or(sinvolve follo'ing activities3

%torage Transportation of forms

Fabrication and fi)ing

Removing of form 'or(s

 Ade=uate access and egress should be provided to the site for 'or(. All the personnelshould 'ear basic personnel protective e=uipments. All the e=uipments tools beingused for the form 'or( should be in good condition and maintained. All the personnel'ill be provided 'ith tool bo) tal( on the procedures to e)ecute the 'or( safely.Necessary ris( assessment of the activities is reflected in the enclosed ris( assessment

).0 PROCEDURE*

•  All material delivered to site shall be visually inspected for straightness: finish and defects prior to use.

• %etting out shall be done by the surveyor prior to proceeding 'ith form 'or(s.

• ,ach type of form 'or( for the raft: column: beam and slab shall be erected as per approved shop

dra'ings.

MAIN CNTRACTR:

 NATINA! "!DING AND A!-M#I! !!C.

8/12/2019 1 - MS-6054-011 form work

http://slidepdf.com/reader/full/1-ms-6054-011-form-work 7/9

RUWAIS HOUSING COMPLEX EXPANSION PHASE III

NEW INTERNATIONAL SCHOOL AT RUWAIS

PROJECT No. 6054

AGREEMENT No.

116054C1

METHOD STATEMENT FOR 

FORM WORK

Ref. No. : MS- 6054– 011REV. No. 00

Date : 21.05.2014

Page 7 of 7

• 4rior to use form 'or( and supporting timber shall be chec(ed for damage: surface condition and 'arping

• $aterial shall be protected as necessary from the elements during transportation and storage.

• 6esign calculation for slab system shall be performed and submitted to company for approval.

• Certified and 'ell trained manpo'er shall be deployed for all types of form 'or( erection.

• &nspection shall be done by the supplier!third party prior to proceeding.

• Certificate shall be obtained from supplier for safe 'or(ing load and stability to submit to company.

• Care shall be ta(en to ensure that any form 'or( system is installed and supported correctly 'hen applied

on site conditions may vary. Disual inspection shall be carried out by the construction manager use for

each element to ensure support provided is ade=uate for actual site condition. ,very leg of scaffolding

should be chec(ed for tightness: rigidity and proper bracing both 'ays.

• ,nsure that erected form 'or( is 'atertight to avoid any slurry lea(age.

• ,nsure that sleeves and openings for all the $,4 services are provided as per approved shop dra'ings.

• Form 'or( shall be chec(ed for the alignment: verticality and levelling prior to proceeding 'ith concrete

pouring.

• Necessary 'or(ing platform shall be provided 'ith handrail and tie.

&TR shall be raised for the company inspection and approvals before proceeding to concrete pouring.• %tri(ing of form 'or( shall be in accordance 'ith the specification section 0003 Cast in 4lace Concrete 5

%ection 2. form 'or(.

10.0 A,,AC9&#N,"3

0.  ;uality Control 4rocedure E;C45<0"#50.

0.2  &nspection and Test 4lan E&T45<0"#50

0.  Chec( ist EF$5<0"#50

0.# Ris( Assessment ERA5<0"#50

 

MAIN CNTRACTR:

 NATINA! "!DING AND A!-M#I! !!C.

8/12/2019 1 - MS-6054-011 form work

http://slidepdf.com/reader/full/1-ms-6054-011-form-work 8/9

8/12/2019 1 - MS-6054-011 form work

http://slidepdf.com/reader/full/1-ms-6054-011-form-work 9/9

RUWAIS HOUSING COMPLEX EXPANSION PHASE III

NEW INTERNATIONAL SCHOOL AT RUWAIS

PROJECT No. 6054

AGREEMENT No.

116054C1

METHOD STATEMENT FOR 

FORM WORK

Ref. No. : MS- 6054– 011REV. No. 00

Date : 21.05.2014

Page & of 7

MAIN CNTRACTR:

 NATINA! "!DING AND A!-M#I! !!C.