23
1 COLLEGE COLLEGE OF ENVIRONMENTAL DESIGN OF ENVIRONMENTAL DESIGN MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University of Petroleum and Minerals Dhahran – Saudi Arabia

1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

Embed Size (px)

Citation preview

Page 1: 1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

1C

OL

LE

GE

CO

LL

EG

E O

F E

NV

IRO

NM

EN

TA

L D

ES

IGN

OF

EN

VIR

ON

ME

NT

AL

DE

SIG

N

MAINTENANCE EFFICIENCY THROUGH

DIRECT LABOR OR MAINTENANCE CONTRACTS

BY

Al-Hammad, A., and Al-Otaibi, G.

College of Environmental DesignKing Fahd University of Petroleum and Minerals

Dhahran – Saudi Arabia

Page 2: 1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

2C

OL

LE

GE

CO

LL

EG

E O

F E

NV

IRO

NM

EN

TA

L D

ES

IGN

OF

EN

VIR

ON

ME

NT

AL

DE

SIG

NCONTENTS

INTRODUCTIONINTRODUCTION

OBJECTIVESOBJECTIVES

METHODOLOGYMETHODOLOGY

DIRECT LABORDIRECT LABOR

CONTRACTCONTRACT

FACTORS INFLUNENCING CHOICEFACTORS INFLUNENCING CHOICE

STUDY SURVEYSTUDY SURVEY

RESULTS OF THE STUDYRESULTS OF THE STUDY

CONCLUSIONSCONCLUSIONS

Page 3: 1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

3C

OL

LE

GE

CO

LL

EG

E O

F E

NV

IRO

NM

EN

TA

L D

ES

IGN

OF

EN

VIR

ON

ME

NT

AL

DE

SIG

NINTRODUCTION

Nowadays, many maintenance managers are Nowadays, many maintenance managers are challenged to manage their maintenance activities challenged to manage their maintenance activities with limited resources including direct labor. with limited resources including direct labor.

Under certain conditions maintenance managers Under certain conditions maintenance managers may choice to hire a maintenance contractor. may choice to hire a maintenance contractor.

Based on their experience, maintenance managers Based on their experience, maintenance managers do differ in their policy of when and at what level do differ in their policy of when and at what level they recruit maintenance contractorsthey recruit maintenance contractors

Page 4: 1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

4C

OL

LE

GE

CO

LL

EG

E O

F E

NV

IRO

NM

EN

TA

L D

ES

IGN

OF

EN

VIR

ON

ME

NT

AL

DE

SIG

NINTRODUCTION (continued)

In order to make a proper decision in making a chose In order to make a proper decision in making a chose between direct labor or a contract, the advantages and between direct labor or a contract, the advantages and disadvantages as well as the factors influencing the disadvantages as well as the factors influencing the chose between the two options must be identified and chose between the two options must be identified and assessed.assessed.

Literature has identified these issues but none Literature has identified these issues but none indicated their assessment and ranking. indicated their assessment and ranking.

Page 5: 1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

5C

OL

LE

GE

CO

LL

EG

E O

F E

NV

IRO

NM

EN

TA

L D

ES

IGN

OF

EN

VIR

ON

ME

NT

AL

DE

SIG

NOBJECTIVES OF THE STUDY

To assess, from the view points of the To assess, from the view points of the maintenance managers, the advantages and maintenance managers, the advantages and disadvantages of direct labor versus maintenance disadvantages of direct labor versus maintenance contractors and the criteria that are needed to contractors and the criteria that are needed to make a choice between the two options or make a choice between the two options or combined.combined.

Page 6: 1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

6C

OL

LE

GE

CO

LL

EG

E O

F E

NV

IRO

NM

EN

TA

L D

ES

IGN

OF

EN

VIR

ON

ME

NT

AL

DE

SIG

NRESEARCH METHODOLOGY

The study was carried out in two phases:The study was carried out in two phases:

The first phase included a literature search and The first phase included a literature search and interviews. It help in the identification of the factorsinterviews. It help in the identification of the factors

In the second phase a questionnaire was developed In the second phase a questionnaire was developed using the aforementioned factors and then a using the aforementioned factors and then a survey was conducted to assess the relative survey was conducted to assess the relative importance of those factors. importance of those factors.

The data gathered from the survey was analyzed The data gathered from the survey was analyzed statistically .statistically .

Page 7: 1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

7C

OL

LE

GE

CO

LL

EG

E O

F E

NV

IRO

NM

EN

TA

L D

ES

IGN

OF

EN

VIR

ON

ME

NT

AL

DE

SIG

NDirect Labor

Based on a literature review and a pilot study of interviews Based on a literature review and a pilot study of interviews with maintenance managers, the advantages and with maintenance managers, the advantages and disadvantages of direct labor can be outlined as follows:disadvantages of direct labor can be outlined as follows:

(a)(a) Advantages of Direct LaborAdvantages of Direct Labor

1.1. Full Control of the Allocation of WorkFull Control of the Allocation of Work

2.2. Direct Labor Familiar with WorkDirect Labor Familiar with Work

3.3. Better Cost ControlBetter Cost Control

4.4. Better Control of QualityBetter Control of Quality

5.5. No Delay in ExecutionNo Delay in Execution

5.5. More Control on Security RiskMore Control on Security Risk

Page 8: 1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

8C

OL

LE

GE

CO

LL

EG

E O

F E

NV

IRO

NM

EN

TA

L D

ES

IGN

OF

EN

VIR

ON

ME

NT

AL

DE

SIG

NDirect Labor ( Continued)

  

(b)(b) Disadvantages of Direct LaborDisadvantages of Direct Labor

  

1.1. Lack of Skilled LaborLack of Skilled Labor

2.2. It is More ExpensiveIt is More Expensive

3.3. Hard to Recall People in Emergency CaseHard to Recall People in Emergency Case

  

  

Page 9: 1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

9C

OL

LE

GE

CO

LL

EG

E O

F E

NV

IRO

NM

EN

TA

L D

ES

IGN

OF

EN

VIR

ON

ME

NT

AL

DE

SIG

NCONTRACT

Based on a literature review and a pilot study of interviews Based on a literature review and a pilot study of interviews with maintenance managers, the advantages and with maintenance managers, the advantages and disadvantages of the contract can be summarized as disadvantages of the contract can be summarized as follows:follows:

(a)(a) Contract AdvantagesContract Advantages

1.1. Providing Skilled LaborProviding Skilled Labor

2.2. Increasing Productivity of MaintenanceIncreasing Productivity of Maintenance

3.3. Less Investment in support EquipmentLess Investment in support Equipment

4.4. Less Management ProblemsLess Management Problems

5.5. Choice of Changing ContractorChoice of Changing Contractor

6.6. Control ManpowerControl Manpower

Page 10: 1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

10C

OL

LE

GE

CO

LL

EG

E O

F E

NV

IRO

NM

EN

TA

L D

ES

IGN

OF

EN

VIR

ON

ME

NT

AL

DE

SIG

NCONTRACT ( Continued )

  

  

(b)(b) Contract DisadvantagesContract Disadvantages

  

1.1. It is ExpensiveIt is Expensive

2.2. More Supervision requiredMore Supervision required

3.3. Tendering Procedures Delay WorkTendering Procedures Delay Work

  

Page 11: 1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

11C

OL

LE

GE

CO

LL

EG

E O

F E

NV

IRO

NM

EN

TA

L D

ES

IGN

OF

EN

VIR

ON

ME

NT

AL

DE

SIG

NFactors Influencing Choice

The factors, which influence the choice between direct The factors, which influence the choice between direct labor and contractor, may be identified as follows:labor and contractor, may be identified as follows:

1.1. Nature of WorkNature of Work

2.2. Volume of WorkVolume of Work

2.2. Response timeResponse time

Emergency work Emergency work

Urgent workUrgent work

Normal workNormal work

4.4. Location Location 

5.5. Quality Quality 

6.6. Market conditions Market conditions

Page 12: 1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

12C

OL

LE

GE

CO

LL

EG

E O

F E

NV

IRO

NM

EN

TA

L D

ES

IGN

OF

EN

VIR

ON

ME

NT

AL

DE

SIG

NSTUDY SURVEY

Considering the above mentioned factors, a Considering the above mentioned factors, a survey of a randomly selected sample of 30 survey of a randomly selected sample of 30 professional maintenance managers in Saudi professional maintenance managers in Saudi Arabia was carried out to measure their Arabia was carried out to measure their assessment of the relative importance of each of assessment of the relative importance of each of the above factors.the above factors.

Page 13: 1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

13C

OL

LE

GE

CO

LL

EG

E O

F E

NV

IRO

NM

EN

TA

L D

ES

IGN

OF

EN

VIR

ON

ME

NT

AL

DE

SIG

NRESULTS OF THE SURVEY

Based on the response of the survey, an Based on the response of the survey, an importance index was calculated to reflect the level importance index was calculated to reflect the level of importance of these factors. This index was of importance of these factors. This index was calculated as follows:calculated as follows:

  Importance Index (i)Importance Index (i) = = %1004

4

0

4

0 xx

xa

ii

iii

Page 14: 1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

14C

OL

LE

GE

CO

LL

EG

E O

F E

NV

IRO

NM

EN

TA

L D

ES

IGN

OF

EN

VIR

ON

ME

NT

AL

DE

SIG

NANALYSIS OF DATA

Tables 1,2, and 3 show the importance index of all Tables 1,2, and 3 show the importance index of all factors related to direct labor or a contract as well as the factors related to direct labor or a contract as well as the factors influencing the chose according to the evaluation factors influencing the chose according to the evaluation of the professional maintenance managers. of the professional maintenance managers.

The importance indices were grouped to reflect the The importance indices were grouped to reflect the respondents rating as follows:respondents rating as follows:

Extremely importantExtremely important 80 < I 80 < I << 100 100

ImportantImportant 40 < I 40 < I << 60 60

Somewhat importantSomewhat important 20 < I 20 < I << 40 40

Not applicableNot applicable 0 < I 0 < I << 20 20

Page 15: 1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

15C

OL

LE

GE

CO

LL

EG

E O

F E

NV

IRO

NM

EN

TA

L D

ES

IGN

OF

EN

VIR

ON

ME

NT

AL

DE

SIG

N Extremely Very Somehow Severity

Important Important Important Important N/A Index Rank

1. Full control of work 9 19 4 0 1 76.51 1

2. Direct labor familiar with work 8 11 10 2 1 68.93 5

3. Better cost control 9 12 10 2 0  71.20  2 

4. No delay in execution 4  12  12  2  3  59.08  6 

5. Better control of quality  7  15 5  3  3  69.15  4 

6. More control on security risk 11  11  7  1  6  69.69  3 

1. Lack of skilled labor 10  7  6  4  6  58.32  1 

2. More expensive  5 13  5  3  8  52.93  2 

3. Hard to recall people in emergency

case 4  10  7  3  9  47.72  3 

4 3

A. Advantages

B. Disadvantages

02 1

Table 1: Result of the survey for Director Labor

Page 16: 1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

16C

OL

LE

GE

CO

LL

EG

E O

F E

NV

IRO

NM

EN

TA

L D

ES

IGN

OF

EN

VIR

ON

ME

NT

AL

DE

SIG

NTable 2: Result of the survey for Contracts

Extremely Very Somehow Severity

Important Important Important Important N/A Index Rank

1. Skilled Labor 13 13 5 2 0 78.02 1

2. Increased productivity 7 18 5 1 2 70.45 2

3. Less investment in support

equipment

4. Less management problem 2 16 6 8 1 57.57 4

5. Choice of change contractor 5 9 10 6 2 57.02 5

6. Control on manpower 11 6 9 4 1 67.73 3

1. Quality not easy to control 3 7 10 9 3 48.43 4

2. Required more supervision 5 8 5 6 4 53.56 2

3. It is expensive 4 11 6 5 3 56.88 1

4. Tendering procedures delay work 3 9 7 8 3 50.87 3

2 11 14 1 3 56.45 6

4 3

A. Advantages

B. Disadvantages

02 1

Page 17: 1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

17C

OL

LE

GE

CO

LL

EG

E O

F E

NV

IRO

NM

EN

TA

L D

ES

IGN

OF

EN

VIR

ON

ME

NT

AL

DE

SIG

NTable 3: Result of the survey for Factors Influencing Chose

Extremely Very Somehow Severity

Important Important Important Important N/A Index Rank

1. Nature of Worka. Work required conventional craft

skills is joined with direct labor

b. specialist work is let to outside

contractors

2. Volume of Worka. Peak workloads is let to contractor

b. Short number of operative will lead

to contractor

3. Response timea. In emergency cases, contractor will

respond better

4. Locationa. Remote area normally give to

contractor

5. Qualitya. Direct labor will be joined to high

standard

6. Market Conditiona. Market condition effect

4 3 2 1 0

6 13 8 2 3 63.28 1

3 13 7 5 2 58.33 4

4 14 2 7 4 55.64 5

1 12 6 7 5 47.57 7

7 5 5 13 2 51.56 6

2 8 3 14 5 40.62 8

6 13 4 5 4 59.37 2

5 13 5 4 4 58.86 3

Page 18: 1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

18C

OL

LE

GE

CO

LL

EG

E O

F E

NV

IRO

NM

EN

TA

L D

ES

IGN

OF

EN

VIR

ON

ME

NT

AL

DE

SIG

NCONCLUSIONS

Based on the result of this study and as shown in Tables Based on the result of this study and as shown in Tables 1,2, and 3, the following can be concluded:1,2, and 3, the following can be concluded:

The major advantages of direct labor were evaluated as The major advantages of direct labor were evaluated as follows:follows:

1.1.                Providing full control of workProviding full control of work

2.2.                Providing better cost controlProviding better cost control

3.3.                Providing more control on security riskProviding more control on security risk

4.4.                Providing better control of qualityProviding better control of quality

5.5.                Direct labor familiar with workDirect labor familiar with work

  

Page 19: 1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

19C

OL

LE

GE

CO

LL

EG

E O

F E

NV

IRO

NM

EN

TA

L D

ES

IGN

OF

EN

VIR

ON

ME

NT

AL

DE

SIG

NCONCLUSIONS (continued )

The major disadvantages of direct labor were evaluated as The major disadvantages of direct labor were evaluated as follows:follows:

1.1.                Lack of skilled laborLack of skilled labor

2.2.                It is more expensiveIt is more expensive

3.3.                Hard to recall people in emergency casesHard to recall people in emergency cases

  

Page 20: 1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

20C

OL

LE

GE

CO

LL

EG

E O

F E

NV

IRO

NM

EN

TA

L D

ES

IGN

OF

EN

VIR

ON

ME

NT

AL

DE

SIG

NCONCLUSIONS (continued )

The major advantages of contract were evaluated as The major advantages of contract were evaluated as follows:follows:

1.1.                  Availability of skilled laborAvailability of skilled labor

2.2.                  It increases the productivityIt increases the productivity

3.3.                  Flexibility in controlling manpowerFlexibility in controlling manpower

4.4.                  less management problemsless management problems

5.5.                  Choice of change contractorChoice of change contractor

66..                  Less investment in support equipmentLess investment in support equipment

  

Page 21: 1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

21C

OL

LE

GE

CO

LL

EG

E O

F E

NV

IRO

NM

EN

TA

L D

ES

IGN

OF

EN

VIR

ON

ME

NT

AL

DE

SIG

NCONCLUSIONS (continued )

  

The major disadvantages of contract were evaluated as The major disadvantages of contract were evaluated as follows:follows:

1.1.                It is expensiveIt is expensive

2.2.                Required more supervisionRequired more supervision

3.3.                Tendering procedures will delay workTendering procedures will delay work

4.4.                Quality is not easy to control Quality is not easy to control 

Page 22: 1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

22C

OL

LE

GE

CO

LL

EG

E O

F E

NV

IRO

NM

EN

TA

L D

ES

IGN

OF

EN

VIR

ON

ME

NT

AL

DE

SIG

NCONCLUSIONS (continued )

The major factors influencing choice were evaluated as The major factors influencing choice were evaluated as follows:follows:

1.1.          Work requires conventional craft skills in joined with Work requires conventional craft skills in joined with direct labordirect labor

2.2. Direct labor will be joined to high standard of Direct labor will be joined to high standard of maintenancemaintenance

3.3.          Market condition effectMarket condition effect

4.4.          Specialist workSpecialist work

5.5.          Peak work loadsPeak work loads

6.6.          In emergency cases, contractor will respond betterIn emergency cases, contractor will respond better

Page 23: 1 MAINTENANCE EFFICIENCY THROUGH DIRECT LABOR OR MAINTENANCE CONTRACTS BY Al-Hammad, A., and Al-Otaibi, G. College of Environmental Design King Fahd University

23C

OL

LE

GE

CO

LL

EG

E O

F E

NV

IRO

NM

EN

TA

L D

ES

IGN

OF

EN

VIR

ON

ME

NT

AL

DE

SIG

N

THANK YOUTHANK YOU