1
Long Term Monitoring
JPSS Algorithm Team
Presented byDate
2
OUTLINE
• Products (1 slide)
• Algorithm Cal/Val Timeline (1 slide)
• Monitoring Methods/Strategies (1-2 slides)
• Monitoring Tools (4-5 slides)
• Resources (1 slide)
• Further Enhancements and Schedules (1-2 slides)
• Summary (1 slide)
Products
• Provide a list of products and their specifications (spatial and temporal resolution, coverage).
3
Algorithm Cal/Val Timeline
• Four Phases of Cal/Val:1. Pre-Launch; all time prior to launch – Algorithm verification, sensor
testing, and validation preparation2. Early Orbit Check-out (EOC) – System Calibration & Characterization3. Intensive Cal/Val (ICV) – Algorithm Calibration & Validation4. Long-Term Monitoring (LTM); through life of sensors after ICV
(Validated) – Sensor Stability & Data Product Quality monitoring
• Algorithm Cal/Val Timeline
4
LTMPre_Launch EOC ICVLaun
ch
Beta Provisional Validated
Monitoring Methods/Strategies
• Highlight/summarize monitoring methods/strategy of your products
• Identify monitoring tools that are needed and being developed
5
Monitoring Tools
• Describe and illustrate the monitoring tools that your team have or are developing
• Address the following:– Capabilities (in their final state)– Web-based/offline applications– Data Source, where/how these are obtained– Visualization software tools used for monitoring– Product performance measures– NRT monitoring capabilities
6
• What computer resource are you using?• Dependencies on data input• Risk related to monitoring & mitigation• External contributors
7
Resources
• Planned further improvements/enhancements• Planned LTM activities / milestones
8
Further Enhancements and Schedules
9
Summary