17
1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China

1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China

Embed Size (px)

Citation preview

Page 1: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China

1

July-05-2013

GEM R&D Activity in USTC

Yi Zhou

University of Science & Technology of China

Page 2: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China

2

Outline

The NS2 Self-stretching Technique

The 30cm×30cm GEM of USTC

Page 3: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China

3

The self-stretching technique

Readout PCB

Readout PCB

GEMs

GEMs

Drift

Drift

NS1 is relaying on the elastic properties of the periphery frame

The screw is pushing the frame before the stretching.

The screw is pulling out the console

Detector Base

Detector Base

NS1

NS2

L. Franconi, A. Marinov, R. De Oliveira Status of no-stretch no-spacer GEM assembly

Page 4: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China

4

The advantages of NS2

The whole construct progress is driving the screws, it is very easy and very fast, so that we can assemble a detector in 2 hours;

All the GEM foils are self-stretched, the detector doesn’t need support frames anymore. It means that there is no dead area inside the detector, no glue aging and gas flow problems anymore;

All the screws can be released and tightened again, so that any part of the detector is replaceable, it means that the cost of the GEM project can be greatly decreased;

Page 5: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China

5

3D model of NS2 GEM

Page 6: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China

6

10M

RGEM1

RGEM2

RGEM3

10M

10M

10M

100k Drift

dI=2mm

dT2=2mm

dT1=2mm

dD=3mm

HV 100k100k100k100k100k

2.2nF2.2nF2.2nF2.2nF

Connection of HV divider & filter

RD=1M

RGEM1=0.55M

RT1=1M

RGEM2=0.5M

RT2=1M

RGEM3=0.45M

RI=1M

Low Pass Filter

Page 7: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China

7

The temperature of the dividers

HV=4500V

Page 8: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China

8

Inefficiency estimate

LCR Meter

Capacity of 10cm×10cm GEM foil: ~4.5nF

After each discharge, the GEM sector need recharge, if the protected resistor is 10MΩ, the recharge time is about:

T = 4.5nF × 10MΩ ≈ 45ms this 45ms charging time causes

the inefficiency.

If we require the inefficiency < 1%, we need P×Φ×S×T < 1% , we have:

Here: P: the discharge probability; Φ: the flux of the beam; S: the area of a GEM sector; T: the recharge time(~45ms)

%1SP

T

Page 9: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China

9

Foil assemblage

Page 10: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China

10

Gas tight test

Page 11: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China

11

Detector assemblage

Page 12: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China

12

HV discharge problem & solution

Page 13: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China

13

GEM system

Page 14: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China

14

Signal of 30cm×30cm GEM from Rui

Page 15: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China

15

We need the Cu-target X-ray tube

Page 16: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China

16

Ultrasonic bath for detector clean

Page 17: 1 July-05-2013 GEM R&D Activity in USTC Yi Zhou University of Science & Technology of China

17

Summary & near future work

System calibration for gain measurement; uniformity test for gain and energy resolution;

Setup the clean system;

The NS2 self-stretching technique is a very efficient way for the GEM detector construction; The HV part on the GEM detector should be sealed;

Summary:

Near future work: