LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 1 – INTRODUCTION
1
1 INTRODUCTION
1.1 Background
M/s. Indian Oil Corporation Ltd is an Indian state-owned oil and gas corporation
with its headquarters in New Delhi. IOCL has set up LPG bottling plant i.e. Tirunelveli
Bottling Plant with a LPG bottling capacity of 1,20,000 MTPA at SIPCOT Industrial
Growth Centre, Gangaikondan village in Tirunelveli District of Tamil Nadu State.
The bulk LPG storage & bottling facility (Indane LPG bottling plant) comprises LPG
storage of 1800 MT and LPG throughput of 1,20,000 MTPA through 2 LPG Filling
carousels and is located at B37/pt to B43/pt, B50/pt, B51/pt, C30 to C41 in SIPCOT
Industrial Growth Centre, Gangaikondan Village, Tirunelveli Taluk & District Tamil Nadu.
M/s Indian Oil Corporation Limited at above location has been established after
obtained Consent to establish under water and Air Acts from TNPCB vide consent
order No. 6045 & 5985 dated 18.09.2012 (Annexure II). Consent to Operate was
obtained vide consent order No. 23108 & 19145 dated 07.04.2015 (Annexure III) and
not yet commissioned/operated as Environmental Clearance was not yet obtained. So,
the project has been notified under violation as per the Ministry of Environmental Forest
and Climate Change Notification, 14-15 march 2017. IOCL has applied for post facto
Environmental Clearance for the bulk LPG storage & bottling facility from Ministry of
Environment, Forest & Climate Change (MOEF&CC) on 23rd January 2018. The proposal
was discussed in 6th Expert Appraisal Committee (Industry-2) (Violation) meeting held
during 19-20th April, 2018 and the ToR was granted on 21st May 2018.
The EIA Report was prepared with a detailed study on assessment of Ecological
damage, remediation plan, natural and community resource management plan on the
basis of the TOR issued by MoEF&CC vide letter number F. No. 23-86/2018-IA.III (V)
(Annexure I)
1.2 IDENTIFICATION OF THE PROJECT
LPG will be transported through bullet trucks from M/s Indian Oil Petronas Pvt.
Ltd. to the B ulk LPG storage & bottling facility. The bottling plant has a storage
capacity of 1800 MT (3 x 600MT) installed as mounded facilities. The bottling plant
will be operated as storage of LPG & packing facility for LPG into 5kg, 14.2kg, 19kg &
47.5kg cylinders. No by-products / additional products will be generated /
manufactured during the operations. The bottling capacity of IOCL Tirunelveli Plant
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 1 – INTRODUCTION
2
will be 1,20,000 MTPA with two LPG cylinder filling carousels each having 24 filling
points within the plant.
1.3 IDENTIFICATION OF THE PROJECT PROPONENT
IOCL is the world's 137th largest corporation, according to the Fortune Global 500 list,
and the largest public corporation in India when ranked by revenue. IOCL is the
highest ranked. Indian company in the latest Fortune ‘Global 500’ listings, ranked at
the 137th position in 2018. IOCL is one of the seven Maharatna status companies of
India. No.1 Trading Company among the national Oil Companies in the Asia Pacific
region.
1.4 BRIEF DESCRIPTION OF THE PROJECT
1.4.1 Nature, Location & Size of the Project
IOCL’s Indane Bottling Plant located at S.F Nos. B37/pt to B43/pt, B50/pt, B51/pt,
C30 to C41, C24/pt to C27/pt at SIPCOT Industrial Growth Centre, Gangaikondan
village, Tirunelveli Taluk & District, Tamil Nadu. LPG will store bulk LPG in mounded
bullets (3 x 600 MT storage capacity). The bottling capacity of LPG plant is 1, 20,000
MTPA.
1.4.2 Need for the Project and Its Importance
There is an urgent requirement of setting up a new LPG bottling plant in the state of
Tamil Nadu to meet the increasing LPG demand. Presently, there is no IOCL bottling
plant in down south of Madurai, i.e. in the districts of Tirunelveli, Tuticorin, and
Kanyakumari. In order to overcome this problem, a bottling plant is very much
necessary to be established in Tirunelveli to cater to the customers in the above
districts so that there would not be a shortfall in supplies and customers will not
suffer for LPG refills on any account.
The bulk LPG storage & bottling facility will be feeding LPG cylinders not only to
Tirunelveli District, but also other to neighbouring districts namely, Tuticorin,
Kanyakumari, Virudunagar in Tamil Nadu and Trivandrum, Kerala State. The LPG
bottling plant will reduce the gap in demand and supply of LPG.
1.5 SITE CHARACTERISTICS
1.5.1 Location
The Google Earth image showing the project site is given in Figure 1.1. The location
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 1 – INTRODUCTION
3
of project site is represented in the Figure 1.2.
Figure 1-1 Google Image of the Project Site
Figure 1-2 Map Showing the Location of the Project site
1.5.2 Connectivity
The project site is well connected by road and rail network. The project site is
located adjacent to NH 7 which connects Varanasi & Kanyakumari. Gangaikondan
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 1 – INTRODUCTION
4
Railway Station is located at the distance of 4 km (E). Tuticorin Airport is located at
the distance of 33.55km (SW). The map showing the road network around the site is
given in Figure 1.3.
1.5.3 Environmental Settings
The area of the Bottling Plant is around 42 Acres. The topography and land use of the
project site and its surroundings area covering 10 km radius are given in Figures 1.4 &
1.5 respectively. Environmental settings are presented in Table 1.1.
Figure 1-3 Map Showing the Connectivity around the Project Site
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 1 – INTRODUCTION
5
Figure 1-4 SOI Top sheet (5 km & 10 km Surrounding Project Site)
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 1 – INTRODUCTION
6
Table 1-1 Environmental Settings of the Project Site
S. No. Particulars Details
1 Latitude 8°49'50.10"N
2 Longitude 77°44'41.27"E
3 Site Elevation above MSL 60 m
4 Topography Plain
5 Present land use at the site Industrial
6 Nearest highway National Highway 7 – 850m (SE)
7 Nearest railway station Gangaikondan Railway Station –
4km (E)
8 Nearest airport Tuticorin Airport – 33.55 km (SW)
9 Nearest town / city Tirunelveli city – 13km (S)
10 Water body Tamirabarani river – 5.9km (SSE)
Gangaikondan kulam – 3.8km (ENE)
Indira kulam – 7km (NE)
Mannur pond – 11.3km (W)
Nainarkulam lake – 11.2km (SSW)
11 Nearest Port Tuticorin Port – 46km (ESE)
12 Hills / valleys Nil in 15km radius
13 Archaeologically important
Places
Nil in 15km radius
14 National parks / Wildlife Sanctuaries / Eco sensitive zones as per Wild Life Protection Act, 1972
Gangaikondan spotted deer Sanctuary - 0.92km (E)
15 Reserved / Protected Forests Thalaiyuthu RF – 919m (W)
Melpattam RF – 6.6km (S) 16 Seismicity Zone II according to the Indian
Standard Seismic Zoning Map
17 Defence Installations Nil in 15km radius
1.6 APPROACH METHODOLOGY
The primary objective of the EIA study is to internalize and integrate the
environmental concerns / aspects and mitigation measures due to the LPG bottling
plant.
The EIA study for the LPG bottling plant has been carried out with the following
objectives:
Collection of baseline attributes in study area. The EIA will cover one season
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 1 – INTRODUCTION
7
baseline environmental data, as per the guidelines of MoEF&CC. The scope
includes collection of baseline data to identify the various environmental
parameters such as air, water, soil, noise levels, socio - economic factors, land
use factors, the status of the flora - fauna and wildlife in the adjoining areas of
the project site.
Identification, prediction, evaluation & mitigation of biophysical, social & other
relevant effects of development on the environment during the operational phase
of the LPG plant using mathematical / simulation models as per applicable Indian
law.
Preparation of risk assessment & emergency preparedness / disaster
management plan for the project.
Preparation of Environmental Management Plan (EMP) to be adopted for
mitigation of the anticipated adverse impacts of the LPG Plant during operational
phase.
Delineation of the post project environmental quality monitoring program as
per the requirements of the regulatory authorities.
1.6.1 Study Period
For preparation of EIA report of the LPG bottling plant, the data was collected
during the season (February 2018 to April 2018) from the study area. The micro
climatic parameters were recorded using automatic weather station for the study
period. Wind speed, wind direction and relative humidity were recorded on hourly
basis. Minimum & maximum temperatures were also recorded during the study
period.
1.7 NEED FOR EIA
As per EIA Notification S.O. No 1533 issued on 14th September, 2006 and its
subsequent amendments the project is falling under Schedule 6(b) – Isolated storage &
handling of hazardous chemicals and ‘Category A’. Gangaikondan Spotted Deer
Sanctuary is located within 5 Km, of project site and attracts General Conditions,
Hence this project requires Environmental Clearance from MoEF&CC. Accordingly,
the EIA Report has been prepared based on the Terms of Reference (As per the
Violation Notification S.O.804 (E) dated 14.03.2017) issued by MOEF&CC on 21st May
2018.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 1 – INTRODUCTION
8
1.8 SCOPE & METHODOLOGY
1.8.1 Scope of EIA study
An area of 10 km radius from the LPG bottling plant has been considered as the general
study area for conducting detailed studies / baseline data generation. 10 Km radius
map of the study area on Google earth and survey of India toposheet are shown in
Figure 1.1 and Figure 1.4, respectively.
The scope of the EIA study is as follows:
• To undertake environmental monitoring so as to establish the baseline
environmental status of the environmental components
• To identify pollution loads due to various activities
• To evaluate the predicted impacts on the various environmental attributes in the
study area by using widely accepted environmental impact assessment
methodologies.
• To prepare an Environmental Management Plan (EMP) outlining the
measures for improving the environmental quality and for environmentally
sustainable development.
• To prepare post project monitoring plan to monitor the changes in the
environmental quality after the implementation of the project.
1.8.2 Methodology for EIA Study
To assess the baseline status of environment, monitoring locations were selected,
keeping in mind the micro-meteorology, season and existing sources of pollution in
the area. Different environmental attributes for their various parameters were
monitored and analyzed during the study period (February 2018 to April 2018).
Secondary data collected from different Govt., Semi-Govt. Agencies and other agencies
were compiled, interpreted and presented. The scope of the study also includes a
detailed characterization of various environmental components like air, noise, water,
meteorology soil, ecology (flora & fauna) and socio- economic conditions within an
area of 10 km radius around the LPG bottling plant.
1.9 SITE SELECTION
The IOCL constructed LPG bottling plant in SIPCOT Industrial Growth Centre,
Gangaikondan Village, Tirunelveli District of Tamil Nadu state, which is located in
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 1 – INTRODUCTION
9
the industrial area. Gangaikondan spotted deer sanctuary is within 5km radius of
the Project site and there is no other national parks and bird sanctuaries within 10
km radius of the LPG plant.
1.9.1 Air Environment
Ambient air quality data within 10 km radius were collected during the study period.
Taking into account micro- meteorological conditions, sampling sites were identified.
Fugitive emissions in the work zone environment and storage area were
monitored. The project is not expected to increase atmospheric concentration of
gases & will not result in heat islands. In this bottling plant, no chemical process is
involved. It will involve, receipt, Storage and bottling of LPG. This LPG from bullets
will be subsequently filled to LPG cylinders.
Seven ambient air quality monitoring stations were selected within the study area, one
monitoring station at LPG plant site and six monitoring stations located around the
LPG plant. The parameters selected for ambient air quality monitoring are respirable
particulate matter (PM10 & PM2.5), sulphur dioxide (SO2) and nitrogen dioxide (NO2),
hydro carbon (HC), volatile organic compounds (VOCs), all the parameters were
monitored on 24 hour cycle
1.9.2 Water Environment
Information on water resources was collected during the study period. The critical
parameters of prime importance were selected and analyzed under physical and
chemical (inorganic and organic), aspects. Ground and surface water samples were
collected from different locations.
Approximately 4 KLD of water is required for domestic and sanitation purposes. There
will not be any diversion of water from other users due to LPG plant. Rain water
harvesting facilities has been provided to collect the annual rainfall. Storm water
is connected to the rainwater harvesting system. Plumbing has been done in such a way
that waste water is used for gardening at the plant.
1.9.3 Noise Environment
Noise pollution may cause an adverse effect on human beings and associated
environment including land, domestic animals, wild life and natural ecological systems.
Hence, noise level surveys were carried out at LPG plant site and at different
locations within the study area around the project. The measurements were taken
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 1 – INTRODUCTION
10
at LPG plant boundaries, residential places like villages and noise sensitive areas
like schools, hospitals etc.
The physical description of sound concerns to its loudness as a function of frequency.
Sound pressure levels (SPL’s) are measured in decibels on the A-weighted scale, dB
(A), where the A-weighting scheme accounts for the sensitivities of the human ear over
the audio spectrum.
1.9.4 Land and Soil Environment
The studies were undertaken to characterize and describe the land environment and
various components in terms of land use and cropping patterns, physico-chemical
properties of soils etc. Soil samples were collected and analyzed.
The silent features around the LPG bottling plant site are given below (site key plan
enclosed):
• Total plot area is 42 Acres of which greenbelt has been developed in 13.86
Acres
• There is no likely impact of the activity on the existing facilities adjacent to the site,
such as open spaces, community facilities, details of the existing land use,
disturbance to the local ecology.
• There will not be any land disturbance resulting in erosion, subsidence &
instability.
• This project will not involve alteration of natural drainage systems.
• Based on the contour of the site, it will involve removal of top soil and cutting and
filling based on the facilities requirement and drainage scheme, which has done at
the detailed engineering stage. Excavated soil were not transported outside and
are utilized within the site.
• There are no wet lands around the site and only industries are mainly located
in the vicinity.
1.9.5 Biological Environment
The study of biological environmental was based on physical observations of the
species in the study area. The Functional Area Expert and supporting team visited the
area and collected the data on flora and fauna, forestry and wildlife, as well as the
avian scenario of the project study area.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 1 – INTRODUCTION
11
1.9.6 Socio-economic Environment
Compilation and collection of requisite type of socio-economic environment data were
undertaken, such as, demographic pattern, population density per sq.km and economic
status, educational facilities, medical facilities, health status transport and
communication, entertainment etc. Socio-economic data were collected from villages
falling within a radius of 10 km of the study area also.
1.9.7 Likely Impacts on the Environment
The LPG plant of IOCL involving the storage and filling of LPG cylinders, can directly
or indirectly affect the environment, so the following environmental dimensions have
been studied in detail to analyze the resulting impact on environment as a whole:
• Air Environment
• Noise Environment
• Water Environment
• Land Environment
• Biological Environment
• Socio Economic Environment
The assessment of above environmental impacts have been carried out and discussed
in the subsequent chapters of EIA Report. Accordingly, various safeguards have been
suggested to ensure that the potential impacts are mitigated and conform to the
prescribed limits.
1.9.8 Environmental Management Plan (EMP)
The project will involve storage of Bulk LPG, filling and supplying of LPG Cylinders.
The EIA study will suggest measures to mitigate adverse environmental impacts
from project operations. Mitigation or enhancement measures will be recommended
for various environmental components, wherever considered necessary. EMP will
describe pollution control measures for air, water and noise, ecology as well as
management of solid wastes, if any.
Environmental Management Plan will also reviews the adequacy of various pollution
control measures envisaged in mitigating various environmental impacts identified.
EMP has been prepared describing administrative aspects of ensuring that
mitigative measures are implemented and their effectiveness is monitored.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 1 – INTRODUCTION
12
1.9.9 Risk Analysis and Disaster Management Plan
Risk is defined as the unwanted consequences of a particular activity in relation
to the likelihood that this may occur. Risk Analysis thus comprises of two variables,
magnitude of consequences and the probability of occurrence of accident. The DMP
followed by Risk Analysis from LPG bottling plant has been prepared, which will help
in identifying the vulnerable points and possible hazards. For meeting the
emergencies caused by major accidents, planning response strategies are termed as
Disaster Management Plans (DMPs). Risk analysis and disaster management plant
have been prepared and incorporated in EIA Report.
1.10 STRUCTURE OF EIA REPORT
The generic structure of the Environmental Impact Assessment (EIA) study for
LPG bottling plant is as follows,
Executive Summary in the beginning
Chapter 1: Introduction
Chapter 2: Project Description
Chapter 3: Description of the environment – present scenario of the land,
soil, air, meteorology, water, noise, biology and socio - economic environment
Chapter 4: Anticipated environmental impacts and its mitigation measures
Chapter 5: Alternative Analysis
Chapter 6: Environmental Monitoring Plan
Chapter 7: Risk Assessment
Chapter 8: Disaster Management Plan
Chapter 9: Project Benefits
Chapter 10: Environmental Management Plan
Chapter 11: Ecological damage, remediation plan and natural & community
resource augmentation plan
Chapter 12: Disclosure of Consultant
CAPACITY EXPANSION OF IOCL TIRUNELVELI TOP PLANT
CHAPTER 2 – PROJECT DESCRIPTION
13
2 PROJECT DESCRIPTION
2.1 INTRODUCTION
IOCL has set up the Bulk LPG Storage & Bottling Facility plant at SIPCOT Industrial
Growth Centre near Gangaikondan village in Tirunelveli district. The plant will
function primarily as LPG receipt, storage & bottling unit for filling into domestic
and industrial cylinders. The plant will store LPG in 3 mounded bullets of 600 MT
capacity each and total LPG bottling throughput will be 1,20,000 MTPA. The bottling
throughput will be achieved by installing two LPG cylinder filling carousels each
having 24 filling machines within the plant.
2.2 LAND REQUIREMENT
The total area occupied by bulk LPG storage & bottling facility is approximately 42
Acres and has been leased to M/s Indian Oil Corporation Ltd. The LPG plant
layout is represented in Figure 2.1.
The land use break-up is given in Table 2.1.
Table 2-1 Land Use Breakup
S. No. Land use parameter Area
1. Plant building area 1.73 Acres
2. Non-plant building area 2.26 Acres
3. LPG Storage area 0.8 Acres
4. Truck Parking Area 6.7 Acres
5. Driveway & pathway area 1.48 Acres
6. Future expansion area 8 Acres
7. Green belt development area 13.86 Acres
8. Open area 7.17 Acres
9. Total Area 42 Acres
CAPACITY EXPANSION OF IOCL TIRUNELVELI TOP PLANT
CHAPTER 2 – PROJECT DESCRIPTION
14
Figure 2-1 Site Layout Plan
CAPACITY EXPANSION OF IOCL TIRUNELVELI TOP PLANT
CHAPTER 2 – PROJECT DESCRIPTION
15
2.3 MAGNITUDE OF OPERATION
The bulk LPG storage & bottling facility has a consented LPG bottling throughput of
1,20,000 MTPA and bulk LPG storage capacity is total 1800 MT (3 mounded
bullets x 600MT capacity). LPG throughput details are given in Table 2.2.
Table 2.2: LPG Throughput
Bulk LPG storage facility
LPG bottling throughput
3 x 600 MT (mounded bullets) 1,20,000 MTPA
Prior to commencing construction activities IOCL have obtained Consent to
Establish from Tamil Nadu Pollution Control Board (TNPCB) vide Consent Order
No. 6045 & 5985 dated. 18.09.2012 (enclosed as Annexure II). Subsequently IOCL
obtained Consent to Operate from TNPCB vide Consent Order No. 23108 &
19145 dated 07.04.2015 and valid upto 31.03.2016 (enclosed as Annexure III).
M/s IOCL have also obtained Petroleum & Explosives Safety Organization (PESO)
License for the mentioned quantity of LPG storage (enclosed as Annexure IV) and
NOC from Tamil Nadu Fire & Rescue Services, Tirunelveli Circle (enclosed as
Annexure V). Now applied for EC to commence the operation of the plant.
2.4 DESCRIPTION OF PROCESS
The bulk LPG storage & bottling facility at SIPCOT Gangaikondan village is operated
by IOCL. The plant will function primarily as LPG receipt, storage & bottling unit
for filling into various size cylinders. The plant operations are categorized as,
1. Receipt of LPG
a. Transfer of LPG from M/s Indian Oil Petronas Pvt. Ltd. (M/s IPPL)
through bullet trucks
b. Truck unloading
c. LPG transfer to storage bullets
d. Storage of LPG in bullets
2. Receipt of Empty LPG Cylinders & Segregation
3. a. Bottling
i. Pumping of LPG to filling shed
ii. Bottling of LPG cylinders
iii. Quality check on filled cylinders
b. Loading into Trucks
4. Dispatch
a. Loading of filled cylinders in trucks
CAPACITY EXPANSION OF IOCL TIRUNELVELI TOP PLANT
CHAPTER 2 – PROJECT DESCRIPTION
16
b. Supply & distribution to consumers through Authorized Vendors
I. Receipt of Product
LPG dosed with mercaptan will be received from M/s IPPL through bullet trucks.
There are 8 nos of Tank Lorry Decantation (TLD) Bays for the purpose of unloading
of bullet trucks and LPG will be stored in mounded vessels (3 x 600MT storage
capacity).
II. Receipt of Empty LPG Cylinders & Segregation
Empty LPG cylinders will be received from vendor trucks & faulty cylinders will be
segregated at the point of receipt and diverted towards valve refitting section.
III a. Bottling
LPG from storage bullets will be pumped to LPG filling shed (2 carousels having 24
filling machines each). Cylinder bottling will be the primary process to be carried
out. After filling, each cylinder is subjected to quality check for LPG leaks.
IV. Dispatch
Filled cylinders will be loaded into respective Authorized Vendor trucks and
dispatched. Cylinders that are damaged are stored separately and subsequently
sold as scrap metal (after cutting) to authorized scrap dealers.
The process flow chart for LPG filling is shown in Figure 2.2.
Figure 2-2 Process Flow Chart
CAPACITY EXPANSION OF IOCL TIRUNELVELI TOP PLANT
CHAPTER 2 – PROJECT DESCRIPTION
17
2.5 RAW MATERIAL REQUIREMENTS
LPG for the bottling plant will be received from M/s IPPL through bullet trucks.
The mass balance for the bottling capacity has been detailed in Table 2.3:
Table 2-2 Mass Balance for LPG Bottling Throughput
Flow Rate (cum/hr)
Hours of operation
(day-1)
LPG bottling (Tons/day)
Number of Days working (per month)
Total throughput
(MTPA)
85 8 374 26 1,20,000
2.6 INFRASTRUCTURE AT THE FACILITY
The lists of equipments present at the bottling Plant are as given in Table 2.4:
Table 2-3 List of Equipments / Facilities & Number
S. No Equipment Total Number Capacity
1 LPG Pumps 2 85 cum/hr
2 LPG Compressors 2 3.85 cum/min
3 Screw Air Compressors 2 500 cum/hr
4 Mounded Bullets 3x600 MT 1800 MT
5 DG Set-1 1 750 kVA
6 DG Set-2 1 250 kVA
7
Automatic Filling Type Carousal
2 24 Point 1600-
1800 Cycle/hr
8 Fire Engines 3 615 cum/hr
9 Jockey Pumps 2 10 cum/hr
10 Loading Arms 8 -
11 Air Dryer 1 540 Nm3/hr
12 Evacuation Compressor 1 165 Nm3/hr
13 Evacuation Vessel 2 1 cum
14 Valve Changing Without Evacuation 2 -
15 Air Receiver-1 1 1.5 cum
16 Air Receiver-2 1 0.5 cum
17 Security Air Compressor 2 -
2.6.1 Description of Mounded Bullets
The mounded storage of LPG has proved to be safer compared to above ground
storage vessels since it provides intrinsically passive and safe environment and
eliminates the possibility of Boiling Liquid Expanding Vapour Explosion (BLEVE). The
Cover of the mound protects the vessel from fire engulfment, radiation from a fire in
CAPACITY EXPANSION OF IOCL TIRUNELVELI TOP PLANT
CHAPTER 2 – PROJECT DESCRIPTION
18
close proximity and acts of sabotage or vandalism. The area of land required to locate
a mounded system is minimal compared to conventional storage. Excavation up to a
depth of 0.75 m is done for construction of mounded bullet foundation (below FGL).
Cathodic protection through sacrificial anode method has been provided for all the
three bullets to prevent them from corrosion. The Photographs of mounded bullets are
as shown in Figure 2.3 and Figure 2.4.
Figure 2-3 Photograph of Mounded Bullet
Figure 2-4 Photograph of Mounded Bullet from Side
CAPACITY EXPANSION OF IOCL TIRUNELVELI TOP PLANT
CHAPTER 2 – PROJECT DESCRIPTION
19
2.7 POWER REQUIREMENT
The power requirement for LPG bottling plant operations is 450 kVA, which will
be sourced from TNEB. The D.G sets will be used to meet the power requirement
during grid power failure. Details of DG sets are given in Table 2.5:
Table 2-4 Details of D.G sets
S. No. Capacity Number Fuel used Stack height (m) Stack dia (in)
1 750 1 HSD BS IV
13.5 12
2 250 1 HSD BS IV 6
2.8 MANPOWER REQUIREMENT
The total manpower requirement is 75 persons as given in Table 2.6 which
includes the following:
Table 2-5 Manpower Requirements
S. No. Grade Number
1. Officers 6
2. Workmen (Blue Collar) 9
3. Contract Labourers 40
4. Security 15
5. Electrical personnel 5
Total 75
2.9 WATER REQUIREMENT
Total water requirement for the LPG plant is 4 KLD, which will be sourced through
SIPCOT Industrial Growth Centre, Gangaikondan village. The permission letter is
enclosed as Annexure VI. Water balance table & diagram for the LPG bottling
plant are given in Table 2.7 and Figure 2.5, respectively:
Table 2-6 Water Balance Table
S.
No.
Domestic water requirement
(KLD)
Industrial water
requirement (KLD) Domestic sewage
generation (KLD)
Wastewater from
process /
cylinder washing
(KLD)*
Cylinder washing
1 3 1 2.4 0.8
Total 4 3.2
* Note – Wastewater generated from cylinder washing will be primarily dirty water with suspended
solids. After sedimentation, this water will be reused for cylinder washing. There will be no process
/ trade effluent generated during operations.
CAPACITY EXPANSION OF IOCL TIRUNELVELI TOP PLANT
CHAPTER 2 – PROJECT DESCRIPTION
20
Figure 2-5 Water Balance Chart
2.10 POLLUTION CONTROL MEASURES
No emissions will be generated during the operations as the entire bottling process
will be carried out through close circuit piping from storage area to filling shed.
The only point sources of emissions will D.G sets & Fire Engines, which will be
operated intermittently.
D.G sets & Fire Engines have been fitted with stacks of adequate height to disperse
the pollutants. Details on air pollution control equipment details are as given in bellow.
Table 2-7 Details on Air Pollution Control Equipment
S.
No. Source of emission
Control
measure
Material of
construction
Top
diameter
Height
above
GL (m)
1 750 kVA D.G set &
250 kVA D.G set
Stack height as
per CPCB
guidelines
MS Pipe 12” & 6” 13.5
2 Fire engines (3 nos.)
Stack height as
per CPCB
guidelines
MS Pipe 6” 11
2.11 WASTEWATER GENERATION
From the bottling plant, 2.4 KLD sewage will be generated, which will be disposed
through septic tanks & soak pits having dimensions 2 m x 1.5 m x 1.5 m. Washing
water generated from cylinder washing will be diverted to sedimentation traps and
clarified waste water will be reused for cylinder washing. The dimension of the sump is
2m x 1.5m x 1.5m.
CAPACITY EXPANSION OF IOCL TIRUNELVELI TOP PLANT
CHAPTER 2 – PROJECT DESCRIPTION
21
2.12 SOLID WASTE GENERATION & DISPOSAL
No industrial solid waste will be generated during the bottling process. Damaged
cylinders will be segregated & stored on site prior to disposal as metal scrap. Used
oil generated as hazardous waste from D.G set operation will be disposed to TNPCB
Authorized Used Oil Recyclers.
2.13 DETAILS ON FIRE PROTECTION SYSTEM AND SAFETY MEASURES
The leakage of LPG is monitored through gas monitoring sensors (GMS) that has
been installed at strategic points inside the plant premises. At present there are
35 Nos GMS sensors that have been installed, which is connected to a PC in the control
room for monitoring the leak levels. The sensors will give initial alarm at 20% lower
explosive limit (LEL) and continuous alarm at 60% LEL so that the leakage can be
controlled before the concentration of LPG reaches its LEL. Fire water storage tanks
(3 x 2500 KLD) are shown in Figure 2.6.
Figure 2-6 Fire Water Storage Tanks (3 x 2500 KLD)
The records will be analyzed on daily basis by the concerned officer and faults will
be rectified on immediate basis. All the persons working inside the LPG plant
premises will be mandated to wear protection devices such as safety shoes and safety
helmets in order to protect them from fatal injuries. Safety week is p l a n n e d t o
b e celebrated every year to create awareness among persons in order to develop a
CAPACITY EXPANSION OF IOCL TIRUNELVELI TOP PLANT
CHAPTER 2 – PROJECT DESCRIPTION
22
good culture. To monitor the health of people working in plant a doctor will also be
appointed who visits the plant three times a week and free checkups will be carried
out for all the persons in the plant. The list of fire protection equipments is shown in
Table 2.9 and fire hydrant layout is shown in Figure 2.7.
Table 2-8 List of Fire Protection Equipments
S.
No Description
Requirement
as per OISD
Availability
at site
1.
Portable 10 kg DCP Fire Extinguishers LPG storage vessel (2 per vessel)+water
drain
7 7
LPG cylinder shed (2 per 200 Sqm) 64 64
LPG pump house (2 per 50 Sqm) 10 10
T.L.D (1 per bay) 8 8
Other pump houses (FPH & ACH) 2 2
Office 2 2
Canteen 3 3
Total 10
1
101
2.
4.5 kg CO2 Fire Extinguishers
PMCC(2 per 100 m2) 4 4
DG room 2 2
HT room 2 2
Transformer room 2 2
Battery Room 2 2
S&D and Control Room 2 2
Fire trolley 1 1
Total
3.
Sand bucket with stand in PMCC 1 1
Sand bucket with stand in DG room 1 1
Sand bucket with stand in HT yard 1 1
Total 3 3
4
100% spare CO2 cartridge-200g 10
1
101
100% spare CO2 cartridge-2kg 5 5
50% Min. spare DCP bags-10kg DCP 50
5
510
50% Min. spare DCP bags-75kg DCP 18
8
190
5
75 KG DCP Fire Extinguishers
Filling Shed 1 1
LPG Pump House 1 1
Mounded storage Bullet 1 1
TLD 1 1
CAPACITY EXPANSION OF IOCL TIRUNELVELI TOP PLANT
CHAPTER 2 – PROJECT DESCRIPTION
23
Evacuation area 1 1
Total 5 5
6. Trolley with suitable first-aid Fire Preventive
Accessories
1
1
7
Reinforced Rubber-lined hoses 63 mm 52 52
50% spare hoses 13 17
Total 65 69
8
Jet Nozzles 26 26
Jet Nozzles in stores 2 2
Spare jet nozzles with branch pipes 2 2
Spare fog nozzles 2 2
Spare universal nozzles 2 2
Spare water curtain nozzles 2 2
Spare spray nozzles 2 2
Multipurpose nozzles 2 2
9 Safety Helmets 15 15
10 Hose Boxes (Alternative hydrant points) 26 26
11 Stretcher with blankets 2 2
12 First Aid Boxes 5 3
13 Rubber Hand Gloves (Electrical) 2 pairs 2 pairs
14 Low temp. rubber hand gloves (LPG) 4 pairs 4 Pairs
15 Low temp. protective clothing (LPG) 2
sets
Nil
16 Explosimeter 2 2
17 Fire Proximity Suit 1 1
18 Resuscitator 2 2
19 Red & Green Flags 2
sets
2 sets
20 Self-Containing Breathing Apparatus 1 1
21 Water Jet Blanket 2 2
22 Hand operated siren 8 8
23 FLP torches 4 4
24 ETB 6 6
25 MCP 10 10
26 GMS 35 35
CAPACITY EXPANSION OF IOCL TIRUNELVELI TOP PLANT
CHAPTER 2 – PROJECT DESCRIPTION
24
Figure 2-7 Fire Hydrant Layout
CAPACITY EXPANSION OF IOCL TIRUNELVELI TOP PLANT
CHAPTER 2 – PROJECT DESCRIPTION
25
2.14 RAINWATER & STORM WATER DRAINAGE NETWORK
Rain water harvesting system for Tirunelveli LPG project has been designed to utilize
the under-ground water system sustainably. Keeping in mind the depleting water
table in the region, storm water drains has been engineered in such a way that rain
water can be collected into two rain water harvesting tanks placed at strategic
locations so that underground water can be recharged.
Sizes of rain water harvesting tanks are 2 X 4 m with depth of 5 m and have been filled
with brick bats to collect the water in case of heavy rain. Since much of the plant area
including Truck parking area has been covered with RCC roads and bitumen roads,
drains have been maintained to collect the storm water & rain water and using the
natural slope of plant, waters will be collected to rain water harvesting tank. The total
cost of rain water harvesting system is Rs.25.0 Lacs, excluding the cost of drains. The
storm water layout is shown in the following Figure 2.8.
Figure 2-8 Rainwater Harvesting Tanks
CAPACITY EXPANSION OF IOCL TIRUNELVELI TOP PLANT
CHAPTER 2 – PROJECT DESCRIPTION
26
Figure 2-9 Storm Water Layout
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 2 – PROJECT DESCRIPTION
27
2.15 PROJECT COST
The cost for setting up the LPG Bottling Plant at SIPCOT, Gangaikondan village is estimated
as Rs. 78.58 Crores.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
28
3 DESCRIPTION OF ENVIRONMENT
3.1 INTRODUCTION
The baseline environmental studies have been conducted to determine the existing
status of various environmental attributes viz., climate and atmospheric conditions,
air, water, noise, soil, hydro geological, land use pattern, ecological and socio-
economic environment, prior to commence the bulk LPG storage & bottling facility.
This study would help to undertake corrective mitigation measures for protection of
the environment on account of any change deviation of attributes due to activities of
the LPG plant site.
3.2 SCOPE OF BASELINE STUDY
An area, covering a 10 km radius distance from the project site is considered as the
study area for the purpose of the baseline studies. Primary data on water, air, land,
flora, fauna & socio- economic data were collected by a team of functional area
experts. Secondary data was collected from various departments of state/central
government organizations, semi- government. Table 3.1 gives various
environmental attributes considered for formulating environmental baseline and
Table 3.2 gives the frequency and monitoring methodology for various
environmental attributes.
Table 3-1 Environmental Attributes
S. No.
Attribute
Parameter
Source of Data
1 Climatology & Meteorology
Wind speed, wind direction, relative humidity, rainfall and temperature
Indian Meteorological Department and Site specific information
2 Water Quality Physical and chemical parameters
Monitored Data (Surface water – 2 locations and ground water- 5 locations)
3 Ambient Air Quality
PM10, PM2.5, SO2, NO2, NH3, VOC, O3, CO, Pb, Benzene, Benzo(a) Pyrene, Arsenic and Nickel
Monitored Data (7 locations)
4 Noise levels Noise levels in dB (A) Monitored Data (6 locations)
5 Ecology Existing terrestrial flora and fauna within the study area
Field survey and Secondary Sources
6 Geology Geological history Secondary sources
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
29
7 Soil Soil types and samples analysed for physical and chemical parameters.
Analysis of soil samples at five locations
8 Socio- economic aspects
Socio-economic characteristics of the affected area
Based on field survey and data collected from secondary sources
9 Land Use Trend of land use change for different categories
Secondary data
Table 3-2 Frequency and Monitoring Methodology
Attributes Sampling Measurement
Method Remarks
Network Frequency
A. Meteorology
Wind Speed, Wind direction, Relative humidity, Rainfall and Temperature
Project site
Continuous for 3 months
Weather monitor with data base
A. Air Environment
Particulate Matter
(PM10)
Requisite locations in the project influence area
24 hourly- twice a week for 3 months in non- monsoon season
Gravimetric (High- Volume with Cyclone)
As per CPCB standards under 18th November 2009 notification for National Ambient Air Quality Standards (NAAQS)
Particulate Matter
(PM2.5) Gravimetric (High- Volume with Cyclone)
Sulphur Dioxide (SO2) EPA Modified West & Gaeke method
Nitrogen Dioxide (NO2)
Arsenite Modified Jacob & Hochheiser
Total Volatile Organic Compounds (TVOC)
--
EPA Method TO - 17
Hydrocarbon -- IS 5182: Part 12: 1991
Benzene (C6H6) 24 hourly- twice a week for 3 months in non monsoon
IS 5182: Part 11: 2006
Benzo (a) Pyrene (BaP)
IS 5182: Part 12: 1991
Lead (Pb) IS 5182 Part 22: 2004
Arsenic (As) IS 5182 Part 22: 2004
Nickel (Ni) IS 5182 Part 22: 2004
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
30
Ammonia (NH3) season Indophenols blue
method
Ozone (O3) KI Absorption Method
Carbon Monoxide Gas Analyser (NDIR)
B. Noise
Hourly Equivalent
Noise Levels
Requisite
locations
in the
projec
t influence
area
Once Instrument : Noise
level meter
IS 4954 : 1968
C. Water
Parameters for water
quality: pH,
temperature,
turbidity, total
hHardness, total
alkalinity, chloride,
sulphate, nitrate,
fluoride, sodium,
potassium,
electrica
l conductivity,
ammonical
nitrogen
, nitrate-nitrogen
Total
phosphorus, BOD,
COD, calcium,
magnesium, total
dissolved solids,
total suspended
solids
Set of
samples
at
requisite
locations
for ground
an
d surface
water
Once
Samples for water
quality collected and
analyzed as per IS :
2488 (Part 1-5)
methods for sampling
and testing of
Industrial
E f f l u e n t s and
Standard Methods for
examination of water
and wastewater
analysis published by
American Public
Health Association.
D. Land Environment
Parameter for soil
quality: pH, texture,
electrical
conductivity, organic
matter, nitrogen,
phosphate, sodium,
calcium, potassium
and magnesium.
Requisite
soil
samples be
collected as
per BIS
specificatio
n within
project
influence
area
Once
season in
Collected and analyzed
as per soil analysis
reference book,
M.L.Jackson
E. Biological Environment
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
31
Terrestrial & Aquatic
Flora and Fauna
Requisite
locations
in the
projec
t influence
area
Once
season in
Collected and analyzed
as per IUCN Red
Data book.
3.3 RAINFALL & CLIMATE
The district receives the rain under the influence of both southwest and northeast
monsoons. The northeast monsoon chiefly contributes to the rainfall in the district.
Rainfall data from IMD stations over the period 1901-2000 were utilized and a perusal
of the data shows that the normal annual rainfall over the district is 879 mm. It is
the maximum around Senkottai, Sankarankoil and all along the coast and it
decreases towards inland. The areas around Ambasamudram, Tirunelveli and
Kadayanallur receive minimum rainfall.
The district enjoys a sub-tropical climate. The period from May to June is generally
hot and dry. The weather is pleasant during the period from December to January.
The relative humidity is on an average between 51 and 74%. The mean minimum
temperature is 21°C and means maximum daily temperature is 36°C respectively.
Average rainfall data for last 5 years is shown in Figure 3.1.
Figure 3-1 Average Rainfall of Last Five Years
Wind rose for the month of February, March & April 2018 are given in Figures 3.2,
3.3 and 3.4 respectively.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
32
Figure 3-2 Wind Rose for Month of February 2018
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
33
Figure 3-3 Wind Rose for Month of March 2018
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
34
Figure 3-4 Wind Rose for the Month of April 2018
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
35
3.4 DRAINAGE
Thamirabarani, Nambiar, Chittar and Karamaniar are the important rivers draining the
district. Thamirabarani originating from Papanasam, flows through the district. The
Nambiyar River originates in the eastern slopes of the Western Ghats near
Nellikalmottai about 9.6 km west of Tirukkurugundi village at an altitude of about
1060 m amsl. The drainage pattern of area in general is dendritic.
The drainage map (10 km) of the project site is given as Figure 3.5.
Figure 3-5 Drainage Map (10 km) of the Study Area
3.5 GEOMORPHOLOGY
Tirunelveli district is bordered by Western Ghats (Ridge and valley complex) in the
west. A major part of the district constitutes a plain terrain with a gentle slope
toward east and southeast, except for the hilly terrain in the west. The general
elevation of the area varies from less than 10 to 1408 m amsl (Tulukkaparai hill range).
The prominent geomorphic units identified in the district through interpretation of
satellite imagery are Structural Hill, Bazada zone, valley fill, flood plain, pediment,
shallow buried pediment, deep buried pediment and coastal Plain.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
36
3.6 SOIL
Soils of the area have been classified into:
1) Deep red soil
2) Red sandy soil
3) Black cotton soil
4) Saline coastal Alluvium
5) River Alluvium
Major parts of the area are covered by deep red soil and are found in Sivakasi,
Tenkasi, Senkottai and Sankarankoil blocks and it is suitable for cultivating coconut and
palmyra trees. Red sandy soil also in reddish yellow in colour and are found in
Nanguneri, Ambasamudram, and Radhapuram blocks and it is suitable for cultivating
groundnut, millets and pulses etc., The black cotton soil is found in Tirunelveli,
Palayankottai and Sankarankoil blocks, and it is suitable for cultivating paddy, ragi, and
cholam etc., The saline coastal alluvium are dark grey to deep brown in colour and
spread over the Nanguneri and Radhapuram blocks. The River alluvial soils occur along
the river courses of Thamirabarani and Chittar River covering in the blocks Tirunelveli
and Palayankottai and it is suitable for cultivating Groundnut, Chillies and Cumbu.
3.7 GROUND WATER SCENARIO
3.7.1 Hydrogeology
The district is underlain by both porous and fissured formations. The important
aquifer systems in the district are constituted by i) Weathered and fractured hard rock
formations of Archaean age. ii) Porous sedimentary formations ranging in age from
Tertiary and Recent.
The porous formations are found as small patch in the southeastern part of the
district and include sandstones, limestones, laterite and clays from Tertiary to
Quaternary. Isolated occurrence of calcareous sandstone and fossiliferous limestone are
seen in coastal area on the southeastern side. The fossiliferous limestone is found
south west of Kudankulam covering an area of 3 sq. km. Laterites are exposed as
patches along Radhapuram-Edakkadu, Vijayanarayanam-Kumarapuram, Ittamoli,
Nanguneri and Uramozi area. Beach sand occurs as a patch along the coast with a
width varying from 50 to 250 m in Idindakarai-Ovari belt. The river alluvium is found
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
37
along the river courses and the thickness of alluvium is restricted to 5 to 6m.
The exploration in sedimentary tract has revealed that the depth to basement occurs at
a depth of 120 m bgl and granular zones are encountered between the depths of 20 to
92 m bgl. The yield of bore wells varies from 1 to 4.5 lps. The aquifer at the
shallow depth is under unconfined condition and aquifer at depth is under semi-
confined to confined condition. The shallow aquifer is developed through dug wells
and deeper aquifer through tube wells. The dug well can sustain a pumping of 4 to 6
hours while the tube wells can sustain a pumping of 6 to 8 hours.
The water-bearing properties of crystalline formations, which lack primary porosity,
depend on the extent of development of secondary intergranular porosity. These
aquifers are highly heterogeneous in nature due to variation in lithology, texture and
structural features even within short distances. Ground water generally occurs under
phreatic conditions in the weathered mantle and under semi-confined conditions in
the fissured and fractured zones at deeper levels. The thickness of weathered zone in
the district is in the ranges up to 30m bgl.
The yield of large diameter wells in the district, tapping the weathered mantle of
crystalline rocks ranges from 0.8 to 4.2 lps and are able to sustain pumping for 3 to 5
hours per day. The specific capacity of large diameter wells tested in crystalline rocks
ranges from 0.4 to 5 lps. of drawdown. The yield characteristics of wells vary
considerably depending on the topographic set-up, lithology and nature of weathering.
The groundwater exploration in the district down to a depth of 200m bgl has revealed
that in the western part of the district potential fractures are encountered beyond
100m bgl while in the rest of the area, potential fractures are restricted to 100m bgl.
The yield of the wells varies from 1 to 3.6 lps. In general, the wells drilled by various
state agencies mainly for domestic purposes have yield in the range of 1.1 to 4.5 lps.
Hydrogeology map of Tirunelveli District is shown in Figure 3.6.
The depth to water level in the district varied between 1.19 to 13.35 m bgl during
pre- monsoon (May 2006) and varied between 0.18 to 7.97 m bgl during post
monsoon (Jan 2007). The seasonal fluctuation shows a fall in water level, which ranges
from 0.12 to 2.14 m bgl, and rise in water level, which ranges from 0.33 to 11.24 m
bgl. The piezometric head varied between 1.72 to 13.65 m bgl (May 2006) during pre-
monsoon and 0.47 to 13.25 m bgl during post monsoon.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
38
Map showing depth to water level in pre-monsoon is shown in Figure 3.7 and map
showing depth to water level in post-monsoon is shown in Figure 3.8
Long Term Fluctuation (1998-2007)
The long-term water level fluctuation for the period 1998-2007 indicates both rise and
fall in different parts of the district. The rise in water level is in the range of 0.0021 to
1.1284 m/year, while the fall in the water level varies between 0.0169 to 0.6893
m/year.
Aquifer Parameters
Aquifer parameters are given in Table 3.3
Table 3-3 Aquifer Parameters
Formation Yield of Wells
(lps)
Transmissivity
(m2/day)
Hydraulic
Conductivity
(m/day)
Specific
Yield (%)
Porous Formation 1.0 – 4.5 50 – 250 20 -65 3 – 6
Weathered Rock <1 – 4.0 25 – 150 <1 – 15 1.5
Fractured Rock 1.0 – 3.6 25 - 250 <1 - 25 -
Figure 3-6 Hydrogeology Map of Tirunelveli District
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
39
Legend for Figure 3.6
Source: District Ground Water Brochure, Tirunelveli District, Tamil Nadu, Ministry of
Water Resources, Central Ground Water Board.
Figure 3-7 Map Showing Depth to Water Level in Pre-monsoon
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
40
Figure 3-8 Map Showing Depth to Water Level in Post-monsoon
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
41
3.8 LAND USE
The Land use classification is given in Table 3.4
Table 3-4 Land Use Classification
S.No. Land Classification 2012-2013 2013-2014
1 Forest 127758 127758
2 Barren and uncultivable waste 29682 29682
3 Land put to Non-Agricultural uses 103136 103148
4 Cultivable waste 35631 35319
5 Permanent Pastures and other
Grazing land
5156
5156
6
Land under miscellaneous Tree
Crops and Groves not included in net
area sown
8376
8446
7 Current Fallow 58138 42064
8 Other Fallow Land 179921 190778
9 Net Area Sown 128052 133501
10 Geographical area according to
village papers
675850
675850
11 Total cropped Area 136984 162144
12 Area sown than once 8932 28643
Land use/land cover map within 10 km radius study area is given in Figure 3.9.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
42
Figure 3-9 Land Use/ Land Cover Map within 10 km Study Area
3.9 SEISMICITY
There are 4 major seismic zones (zones II, III, IV and V) in India, based on the
seismo- tectonic parameters, history of seismicity and certain geophysical parameters.
The project site SIPCOT Industrial Growth Centre, Gangaikondan village, Tirunelveli
Taluk & District comes under Seismic zone II. Seismic zone map for the Tamil Nadu
state is shown in the Figure 3.10.
Figure 3-10 Map Showing Seismic Tectonic Zone
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
43
3.10 AIR ENVIRONMENT
The prime objective of baseline air monitoring is to evaluate the existing air quality
of the area. This will also be useful for assessing the conformity to standards of the
ambient air quality during the operation phase of the LPG bottling plant. This section
describes the selection of sampling locations, methodology adopted for sampling,
analytical techniques and frequency of sampling. The monitoring of ambient air
monitoring was carried out during the study in the month of February, March and
April 2018. The methodology adopted for ambient air quality monitoring is given below.
3.10.1 Selection of Sampling Locations
The locations for ambient air quality monitoring were scientifically selected based
on the following considerations using climatological data.
• Topography / Terrain of the study area
• Human Settlements
• Health status
• Accessibility of monitoring site
• Resource Availability
• Representativeness of the region for establishing baseline status
• Representativeness with respect to likely impact areas.
The ambient air quality monitoring locations are given in the Table 3.5 and shown in
Figure 3.11.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
44
Table 3-5 Ambient Air Quality Monitoring Locations
Air sampling
location code
Location
Geographical
location
Direction with
the Project Site
Distance with
respect to
project site ( km)
Environmental Setting
AAQ1
Project Site N-08º49’49.93”
E-77º44’41.10”
-
-
Industrial Area
AAQ2
Gangaikondan N-13º15’03.48”
E-80º18’14.65”
NE
5.29
Residential Area
AAQ3
Venkatasalapuram N-13º16’12.74”
E-80º16’47.04”
N
5.16
Residential & Rural Area
AAQ4
Alavanthankulam N-13º11’49.36”
E-80º16’45.32”
NW
6.21
Residential & Rural Area
AAQ5
Kattalai N-13º12’54.92”
E-80º19’10.75”
SE
4.32
Residential & Rural Area
AAQ6
Nanjankulam N-13º14’30.43”
E-80º16’20.26”
WSW
7.24
Residential & Rural Area
AAQ7
Thalaiyuthu N-13º12’51.89”
E-80º16’12.05”
SSW
5.76 Residential & Industrial
Area
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
45
3.10.2 Parameters for Sampling
The parameters chosen for assessment of ambient air quality were Particulate Matter
(PM10), Particulate Matter (PM2.5), Sulphur di-oxide (SO2), Nitrogen Di-oxide (NO2),
Ammonia (NH3), Ozone (O3), Carbon Monoxide (CO), Benzene (C6H6), BenzonePyrene
(BaP), Lead, Nickel and Arsenic.
3.10.3 Instruments used for Sampling
Respirable Dust Samplers APM- 460 BL of Envirotech were used for monitoring
particulate matter (PM10), gaseous pollutants like SO2 and NO2. Fine particulate
samplers APM 550 of Envirotech was used for monitoring PM2.5.
The map showing air quality monitoring locations is given in Figure 3.11.
3.10.4 Sampling and Analytical Techniques
PM10 and PM2.5 have been estimated by gravimetric method. In RDS, ambient air is
sucked through a cyclone. Coarse and non-respirable dust is separated from the air
stream by centrifugal forces acting on the solid particles, these particles fall through
the cyclone’s conical hopper and gets collected in the sampling cap placed at the
bottom. The fine dust (<10 microns) forming the respirable particulate matter (PM10)
passes the cyclone and is retained on the filter paper. A tapping is provided on the
suction side of the blower to provide suction for sampling air through a set of
impingers which contains absorbing solutions for SO2 and NO2.
PM2.5 was determined by Fine Particulate Sampler. The air inlet has a circular
symmetry so that air entry is unaffected by wind direction and is designed to keep
out rain, insects and very large particles. The inlet section immediately leads to an
impactor stage designed to trap particles with an aerodynamic diameter larger than
10 microns. Thus the air stream in the down tube consists of only medium and fine
particulates. The streamlined air flow of the down tube is accelerated through the
nozzle of the well- shaped impactor designed to trap medium size particulates with
an aerodynamic diameter between 2.5 and 10 microns. To avoid sampling errors
due to the tendency of small particles to bounce off the impaction surface a 37mm
diameter GF/A paper immersed in silicone oil is used as an impaction surface. The
air stream leaving the WINS impactor consists of microns. These fine particles are
collected on a special Teflon membrane filter of 47 mm diameter.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
46
Figure 3-11 Map Showing Air Quality Monitoring Locations
Modified West and Gaeke method (IS-5182 part-II, 1969) has been adopted for estimation
of SO2 and Jacobs-Hochheiser method (IS-5182 part-IV, 1975) has been adopted for the
estimation of NO2. The techniques for sampling and analysis of parameters are presented
in the Table 3.6
Table 3-6 Techniques Used for Ambient Air Quality Monitoring
S. No Parameters Technique
1. Particulate Matter (PM10), µg/m3 Gravimetric (High- Volume with Cyclone)
2. Particulate Matter (PM2.5), µg/m3 Gravimetric (Fine particulate Sampler)
3. Sulphur Dioxide (SO2), µg/m3 EPA Modified West &Gaeke method
4. Nitrogen Dioxide (NO2), µg/m3 Arsenite Modified Jacob &Hochheiser
5. Total Volatile Organic Compounds
(TVOC), µg/m3
EPA Method
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
47
6. Hydrocarbon, µg/m3 IS 5182: Part 12: 1991
7. Benzene (C6H6), µg/m3 IS 5182: Part 11: 2006
8. Benzo Pyrene (BaP), ng/m3 IS 5182: Part 12: 1991
9. Lead (Pb), µg/m3 IS 5182 Part 22: 2004
10. Arsenic (As), ng/m3 IS 5182 Part 22: 2004
11. Nickel (Ni), ng/m3 IS 5182 Part 22: 2004
12. Ammonia (NH3), µg/m3 Indophenols blue method
13. Ozone (O3), µg/m3 KI Absorption Method
14. Carbon Monoxide, mg/m3 Gas Analyser (NDIR)
3.10.5 Results
Various parameters like maximum, minimum and average have been computed
from the monitored data for all the locations and summary of ambient air quality
test results are presented in Tables 3.7.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
48
Table 3-7 Summary of Ambient Air Quality Result
Code
Location
PM10,µg/m3 PM 2.5,µg/m3 SO2,µg/m3 NO2,µg/m3
Min Max Avg 98 Per
Min Max Avg 98 Per
Min Max Avg 98 Per
Min Max Avg 98 Per
AAQ1 Project Site 38.7 52.4 44.90 51.94 18.2 25.1 21.17 24.62 5.02 6.74 5.86 6.66 8.59 14.1 8.59 14.1
AAQ2 Gangaikondan 39.8 54.8 46.43 53.9 18.8 26.8 22.56 26.75 5.02 6.85 5.97 6.70 9.88 13.6 12.01 13.6
AAQ3 Venkatasalapuram 37.1 50.1 45.43 49.87 18.8 24.7 21.90 24.42 5.03 6.25 5.61 6.23 8.56 12.7 10.20 12.56
AAQ4 Alavanthankulam 34.1 51.4 42.30 49.60 16.6 24.1 20.65 23.87 <5 6.63 - - 8.26 13.3 10.46 12.97
AAQ5 Kattalai 34.1 52.8 47.00 52.8 16.6 26.6 23.20 26.46 5.02 6.41 5.68 6.33 8.47 12.5 10.07 12.13
AAQ6 Nanjankulam 35.1 49.3 43.1 49.3 16.9 24.5 20.9 24.3 5.02 7.14 5.78 6.82 8.11 11.3 9.5 11.20
AAQ7 Thalaiyuthu 52.5 70.1 61.2 69.6 24.7 35.8 29.1 35.01 5.96 9.11 7.55 8.85 12.8 18.2 14.85 17.69
CPCB / MoEF&CC Standards
Industrial
/Residential / Rural
and Other Area
100
60
80
80
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
49
Code Location Ammonia
µg/m3
Ozone µg/m3
CO, mg/m3 Lead µg/m3 Total VOC
Min Max Avg 98 Per Min Max Avg 98 Per
AAQ1 Project Site BDL(<5) 7.14 10.3 9.07 10.25
BDL(<0.1)
BDL(<0.1) BDL (<1)
AAQ2 Gangaikondan BDL(<5) 8.56 14.1 11.05 13.87 BDL(<0.1) BDL (<1)
AAQ3 Venkatasalapuram BDL(<5) 7.69 10.5 8.89 10.31 BDL(<0.1) BDL (<1)
AAQ4 Alavanthankulam BDL(<5) 7.41 9.63 8.32 9.52 BDL(<0.1) BDL (<1)
AAQ5 Kattalai BDL(<5) <5 7.58 - - BDL(<0.1) BDL (<1)
AAQ6 Nanjankulam BDL(<5) 9.74 13.6 11.69 13.41 BDL(<0.1) BDL (<1)
AAQ7 Thalaiyuthu BDL(<5) 5.52 9.63 8.24 9.63 BDL(<0.1) BDL (<1)
CPCB / MoEF&CC Standards
Industrial /Residential / Rural and
Other Area 400 100 2 1 20
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
50
3.10.6 Observations
PM10: The maximum and minimum concentrations for PM10 were recorded as 70.1 µg/m3
and 34.1 µg/m3 respectively. The maximum concentration was recorded at Thalaiyuthu and
the minimum concentration was recorded at kattalai. The average concentrations were
ranged between 42.30 and 61.2 µg/m3.
PM2.5: The maximum and minimum concentrations for PM2.5 were recorded as 35.8µg/m3 and
16.6 µg/m3 respectively. The maximum concentration was recorded at Thalaiyuthu and the
minimum concentration was recorded at kattalai. The average values were observed to be
in the range of 20.6 and 29.1 µg/m3.
SO2: The maximum and minimum SO2 concentrations were recorded as 9.11 µg/m3 and BDL
(<5) respectively. The maximum concentration was recorded at Thalaiyuthu and the
minimum concentration was recorded at Project Site. The average values were observed to be
in the range of Nil and 7.55µg/m3.
NO2: The maximum and minimum NO2 concentrations were recorded as 18.2µg/m3 and
8.11µg/m3. The maximum concentration was recorded at Thalaiyuthu and the minimum
concentration was recorded at Nanjankulam. The average values were observed to be in the
range of 14.85 and 14.85 µg/m3.
Code Location Benzene, µg/m3 Benzo[a]pyrene
ng/m3
Arsenic
ng/m3
Nickel
ng/m3
AAQ1 Project Site BDL (<0.1) BDL (<0.01) BDL (<1) BDL (<1)
AAQ2
Gangaikondan
BDL (<0.1)
BDL (<0.01)
BDL (<1)
BDL (<1)
AAQ3
Venkatasalapuram
BDL (<0.1)
BDL (<0.01)
BDL (<1)
BDL (<1)
AAQ4
Alavanthankulam
BDL (<0.1)
BDL (<0.01)
BDL (<1)
BDL (<1)
AAQ5
Kattalai
BDL (<0.1)
BDL (<0.01)
BDL (<1)
BDL (<1)
AAQ6 Nanjankulam BDL (<0.1) BDL (<0.01) BDL (<1) BDL (<1)
AAQ7 Thalaiyuthu BDL (<0.1) BDL (<0.01) BDL (<1) BDL (<1)
CPCB Standards
Industrial/Residential/
Rural and Other Area
5
1
6
20
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
51
O3: The maximum and minimum O3 concentrations were recorded as 14.1µg/m3 and
BDL(<5). The maximum concentration was recorded at Gangaikondan and the minimum
concentration was recorded at Kattalai. The average values were observed to be in the range
of Nil and 11.05 µg/m3.
The concentrations of PM10, PM2.5, SO2 and NO2, are observed to be well within the standards
prescribed by Central Pollution Control Board (CPCB) for Industrial, Rural, Residential and
Other area. All the values of NH3, heavy metals (Pb, Ar, Ni & Hg), CO, Benzene and BaP were
found to be below detection limit.
CO: NIL
Lead: NIL
VOC: NIL
3.10.7 Traffic Survey
Table 3-8 Details of traffic on the NH 7
3.11 NOISE ENVIRONMENT
S. No. Parameter Details
1. Width & number of lanes of road
connecting NH 7 & Tirunelveli BP. 30 Feet & 2 Lane road – NH7
2. Number of entrances / exits to BP
Two – One main and another emergency.
3. Number of bullet trucks entering & exiting per day.
BTs – Entry - 16 Nos.
Exit – 16 Nos.
4. Number of vendor trucks entering & exiting per day
STs - Entry - 60 Nos.
Exit – 60 Nos.
5. Direction of exit for bullet trucks i.e. do the bullet trucks depart towards Chennai (back to IPPL) or do they refill elsewhere.
Bullet trucks will depart to either IPPL (Chennai) or MRPL (Mangalore) as per requirement and product availability.
6. Location of Distributors 58 Distributors are attached to plant who are present in the following directions :
1) South – 26
2) North – 15
3) West – 11
4) East – 6.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
52
The main objective of monitoring of ambient noise levels was to establish the baseline noise
levels in the surrounding areas and to assess the total noise level in the environment of
the study area.
3.11.1 Identification of Sampling Locations
A preliminary reconnaissance survey was undertaken to identify the major noise sources in
the area. The sampling location in the area was identified considering the location of industry,
residential area, highways and institutional areas. The noise monitoring locations are
presented in Table 3.8 and shown in Figure 3.12
Table 3-9 Noise Quality monitoring stations
3.11.2 Instrument used for Sampling
Noise levels were measured using a sound level meter. The sound level meter
measures the equivalent continuous noise level (Leq) by switching on the
corresponding function mode.
3.11.3 Method of Monitoring
Noise, in general, is sound which is composed of many frequency components of
various types of loudness distributed over the audible frequency range. Various
noise scales have been introduced to describe, in a single number, the response of
an average human to a complex sound made up of various frequencies at different
loudness levels. The most common and universally accepted scale is the ‘A’ weighted
Location
Code
Sample
location
Geographical
location
Direction
with
respect to
project
site
Distance with
respect to
project
site ( km)
Environmental
Setting
N1
Project Site N-08º49’49.93”
E-77º44’41.10”
-
-
Industrial Area
N2
Gangaikondan N-08º51’36.12”
E-77º46’22.65”
NE
4.46
Residential Area
N3
Pallikottai N-08º51’36.26”
E-77º42’48.39”
NW
4.76 Residential & Rural
Area
N4
Thenkalam N-08º49’15.34”
E-77º41’59.05”
WSW
5.11 Residential & Rural
Area
N5
Palamadai N-08º47’29.00”
E-77º45’32.36”
SSE
4.62 Residential & Rural
Area
N6
Thalaiyuthu N-08º47’33.77”
E-77º43’23.64”
SSW
4.83 Residential Area &
Industrial Area
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
53
Scale which is measured as dB (A). This is more suitable for audible range of 20 to
20,000 Hz. The scale has been designed to weigh various components of noise
according to the response of a human ear.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
54
Sound Pressure Level (SPL) measurements were measured at all locations. The readings
were taken for every hour for 24 hours. The day noise levels have been monitored
during 6 am to 10 pm and night levels during 10 pm to 6 am at all the locations covered
in 10-km radius of the study area. The noise levels were measured once during the
study period. These readings were later tabulated and the frequency distribution table
was prepared. Finally, hourly and 24 hourly values for various noise parameters viz.
Lday and Lnight were calculated.
For noise levels measured over a given period of time, it is possible to describe
important features of noise using statistical quantities. This is calculated using the
percent of the time certain noise levels exceed the time interval. The notations for
the statistical quantities of noise levels are described below:
L10 is the noise level exceeded 10 per cent of the time
L50 is the noise level exceeded 50 per cent of the time and
L90 is the noise level exceeded 90 per cent of the time
Equivalent Sound Pressure Level (Leq)
The Leq is the equivalent continuous sound level, which is equivalent to the same
sound energy as the actual fluctuating sound measured in the same period. This is
necessary because sound from noise source often fluctuates widely during a given
period of time.
This is calculated from the following equation:
Leq = L50 + (L10 - L90)2/60
Parameters Measured During Monitoring
For noise levels measured over a given period of time interval, it is possible to
describe important features of noise using statistical quantities. This is calculated using
the percent of the time, certain noise levels are exceeded during the time interval.
The notation for the statistical quantities of noise levels is described below:
Hourly Leq day: Equivalent noise levels between 6.00 hours to 22.00
hours.
Leq night: Equivalent noise levels between 22.00 hours to 6.00 hours.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
55
Figure 3-12 Map Showing the Location of Noise level Monitoring Stations
3.11.4 Results
The summary of computed ambient noise level parameters like Lday and Lnight are
presented in Table 3.11 and compared to the standards specified by CPCB
mentioned below in Table 3.12.
Table 3-10 Ambient Noise Level
Location
Code
Sample
location
Leq day
[dB(A)]
Leq Night
[dB(A)]
Leq
[dB(A)]
N1 Project Site 48.5 42.8 47.2
N2 Gangaikondan 51.6 43.5 50.1
N3 Pallikottai 50.2 43.2 48.8
N4 Thenkalam 49.1 42.8 47.8
N5 Palamadai 50.6 43.9 49.2
N6 Thalaiyuthu 52.3 44.6 50.8
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
56
Table 3-11 Ambient Noise Quality Standards
Category of Area / Zone
Limits in dB (A) Leq
Day Time Night Time
Industrial Area 75 70
Commercial Area 65 55
Residential Area 55 45
Silence Zone 50 40
Source: CPCB
Note: Daytime shall mean from 6.00 a.m. to 10.00 p.m.
Night time shall mean from 10.00 p.m. to 6.00 a.m.
3.11.5 Observations
Leq levels are observed to fall in the range of 47.2 dB to 50.8 dB
Daytime Noise Levels
Noise levels during day time were found to be in the range 48.5 to 52.3 dB (A). The
maximum noise level was observed to be 52.3dB (A) at Thalaiyuthu and a
minimum of 48.5 dB (A) was observed at Project Site.
Night time Noise Levels
Noise levels observed to fall in the range 42.8 to 44.6 dB (A) during the night
time. A maximum of 44.6 dB (A) was observed at Thalaiyuthu and a minimum of
42.8 dB (A) was observed at Project site & Thenkalam. Measured noise levels are
observed to be in compliance with prescribed standards for ambient noise for the
respective applicable categories.
3.12 WATER ENVIRONMENT
Water sampling has been conducted to establish baseline water quality in the area.
Water analysis was carried out for physical and chemical parameters as per the methods
prescribed in IS 10500 and “Standard Methods for the Examination of Water and
Wastewater (American Public Health Association)”.
3.12.1 Sampling Locations
The details of the water sampling stations are presented in the Table 3.11 and shown
in Figure 3.13.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
57
Table 3-12 Water Sampling Locations
Location
Code
Location
Geographical
location
Direction
with
respect to
project site
Distance
with respect
to project site
(km)
Type of
water
GW1
Project Site N-8º49’50.603”
E-77º44’43.39”
-
-
Ground Water
GW2
Gangaikondan N-08º51’26.75”
E-77º46’52.14”
NE
4.18
Ground Water
GW3
Thalaiyuthu N-08º47’42.04”
E-77º45’17.27”
SSW
4.67
Ground Water
GW4
Palamadai N-08º47’23.73”
E-77º45’24.82”
SSW
4.68
Ground Water
GW5 Alavanthan
kulam N-08º52’18.71”
E-77º42’16.01”
NW
6.38
Ground Water
SW1 Gangaikondan
kulam N-08º50’20.69”
E-77º47’05.95”
ENE
4.54
Surface Water
SW2 Thamirabarani
River N-08º45’29.09”
E-77º41’29.21”
S
7.98
Surface Water
Figure 3-13 Map Showing Water quality Monitoring Locations
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
58
3.12.2 Results
The physicochemical characteristics of water in the study area are presented in the
Tables 3.14 and is compared with the standards (IS 10500: Indian
Standards/Specifications for Drinking Water) reference value.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
59
Groundwater
Table 3-13 Results for Water Analysis
S. No Parameters Unit Test method
Limit as per
IS 10500 : 2012
GW1 GW2 GW3
1 Temperature C --- Not Specified 25.8 26.3 25.6 2 Colour Hazen APHA 22nd EDITION 5 Nil Nil Nil
3
Odour - APHA 22nd EDITION
Unobjectionable
No Odour
Observed
No Odour
Observed
No Odour
Observed 4 pH at 25°C - IS : 3025 Part 11- 1983 (Reaff: 2002) 6.5-8.5 7.47 7.51 7.63
5 Electrical
Conductivity, μS/cm IS : 3025 Part 14- 1984 (Reaff: 2002) Not Specified 960 1180 2010
6 Turbidity NTU IS : 3025 Part 10-1984 (Reaff: 2002) 1 BDL (<0.5) 0.6 BDL (<0.5)
7 Total Dissolved Solids mg/l IS : 3025 Part 16-1984 (Reaff: 2003) 500 523 674 1130
8
Total Hardness as
CaCO3 mg/l IS : 3025 Part 21-2009 200 152 310 510
9 Total Alkalinity as
CaCO3 mg/l IS : 3025 Part 23- 1986(Reaff:2003) 200 166 280 370
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
60
10 Chloride as Cl mg/l IS : 3025 Part 32-1988 (Reaff: 2003) 250 152 183 407
11 Sulphate as SO4 mg/l APHA 22nd EDN-4500- SO42- E 200 60 72 86
12 Fluoride as F mg/l APHA 22nd EDN -4500-F B&D 1.0 0.41 0.57 0.93
13 Nitrate as NO3 mg/l APHA 22nd EDN -4500- NO3- B 45 6 13 11
14 Ammonia as N mg/l APHA 22nd EDN -4500- NH3 B&C 0.5 BDL(<0.05) BDL(<0.05) 0.13
15 Phosphate as PO4 mg/l IS : 3025 Part 31-1988 (Reaff:2002) Not Specified 0.08 0.11 0.13
16 Sodium as Na mg/l IS : 3025 Part 45-1993 (Reaff:2003) Not Specified 118 127 218
17 Potassium as K mg/l IS : 3025 Part 45-1993 (Reaff:2003) Not Specified 17 3.6 2.6
18 Calcium as Ca mg/l IS : 3025 Part 40-1991 (Reaff:2003) 75 36 83 151
19 Magnesium as Mg mg/l APHA 22nd EDN-3500,Mg - B 30 15 25 32
20 Iron as Fe mg/l IS : 3025 Part 53-2003 0.3 BDL (<0.05) 0.13 BDL (<0.05)
21 Phenolic compounds as
C6H5OH mg/l APHA 22nd EDN 5530 B,C,D 0.001 BDL(<0.001) BDL(<0.001) BDL(<0.001)
22 Copper as Cu mg/l IS:3025 Part 42 (Reaff:2003) 0.05 BDL(<0.03) BDL(<0.03) BDL(<0.03)
23 Mercury as Hg mg/l APHA 22nd EDN -3112B 0.001 BDL(<0.001) BDL(<0.001) BDL(<0.001)
24 Cadmium as Cd mg/l APHA 22nd EDN -3113 B 0.003 BDL(<0.001) BDL(<0.001) BDL(<0.001)
25 Selenium as Se mg/l APHA 22nd EDN -3113B 0.01 BDL(<0.01) BDL(<0.01) BDL(<0.01)
26 Total Arsenic as As mg/l APHA 22nd EDN -3113 B 0.01 BDL(<0.01) BDL(<0.01) BDL(<0.01)
27 Cyanide as CN mg/l APHA 22nd EDN -4500-CN E 0.05 BDL(<0.05) BDL(<0.05) BDL(<0.05)
28 Lead as Pd mg/l APHA 22nd EDN -3113 B 0.01 BDL(<0.01) BDL(<0.01) BDL(<0.01)
29 Zinc as Zn mg/l APHA 22nd EDN -3111 B 5 0.12 0.18 0.16
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
61
30 Total Chromium as Cr mg/l APHA 22nd EDN -3113 B 0.05 BDL(<0.03) BDL(<0.03) BDL(<0.03)
31 Nickel mg/l APHA 22nd EDN -3113 B 0.02 BDL(<0.02) BDL(<0.02) BDL(<0.02)
32 Aluminium as Al mg/l APHA 22nd EDN -3500-Al-B 2012 0.03 BDL(<0.03) BDL(<0.03) BDL(<0.03)
33 Total Colifirm MPN/ 100ml
IS – 1622 (1981) (Reaff – 2014) Absent <2 2 14
34 Faecal Coliform MPN/ 100ml
IS – 1622 (1981)(Reaff – 2014) Absent <2 <2 <2
**BDL –Below Detectable Limit
S. No Parameters Unit Test method
Limit as per
IS 10500 : 2012
GW4 GW5
1 Temperature C --- Not Specified 25.1 25.8
2
Colour Hazen APHA 22nd EDITION 5 Nil Nil
3
Odour
-
APHA 22nd EDITION
Unobjectionable
No Odour Observed
No Odour Observed
4 pH at 25°C -
IS : 3025 Part 11- 1983 (Reaff: 2002)
6.5-8.5
7.47
7.54
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
62
5 Electrical Conductivity, μS/cm IS : 3025 Part 14- 1984 (Reaff:2002) Not Specified 1950 1290
6 Turbidity NTU IS : 3025 Part 10-1984 (Reaff: 2002) 5 BDL(<0.5) 0.6
7 Total Dissolved Solids mg/l IS : 3025 Part 15-1984 (Reaff: 2003) 500 1066 712
8 Total Hardness as CaCO3
mg/l IS : 3025 Part 21-1983 (Reaff: 1998) 200 460 390
9 Total Alkalinity as CaCO3
mg/l IS : 3025 Part 23-1988 (Reaff: 2003) 200 330 260
10 Chloride as Cl mg/l IS : 3025 Part 32-1988 (Reaff: 2003) 250 463 198
11 Sulphate as SO4 mg/l APHA 22nd EDI-4500- SO42- E 200 32 76
12 Fluoride as F
μS/cm IS : 3025 Part 14- 1984 (Reaff:
2002) 1 0.71 0.47
13 Nitrate as NO3
NTU
IS : 3025 Part 10-1984 (Reaff: 2002)
45 3 17
14 Ammonia as N-NH3
mg/l
IS : 3025 Part 16-1984 (Reaff: 2003)
0.5 BDL(<0.05) BDL(<0.05)
15
Phosphate as PO4
mg/l
IS : 3025 Part 21-2009 Not Specified 0.10 0.22
16
Sodium as Na
mg/l IS : 3025 Part 23-
1986(Reaff:2003) Not Specified 235 0.47
17
Potassium as K
mg/l IS : 3025 Part 32-1988 (Reaff:
2003) Not Specified 1.7 17
18 Calcium as Ca mg/l APHA 22nd EDN-4500- SO42- E 75 96 BDL(<0.05)
19 Magnesium as Mg mg/l APHA 22nd EDN -4500-F B&D 30 53 0.22
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
63
20
Iron as Fe mg/l APHA 22nd EDN -4500- NO3- B 0.30 BDL(<0.05) 0.47
21 Manganese as Mn
mg/l APHA 22nd EDN -4500- NH3
B&C 0.1 BDL(<0.05) 17
22 Phenolic compounds as
C6H5OH
mg/l
IS : 3025 Part 31-1988
(Reaff:2002) 0.001 BDL(<0.001) BDL(<0.05)
23 Copper as Cu
mg/l IS : 3025 Part 45-1993
(Reaff:2003) 0.05 BDL(<0.03) 0.22
24 Mercury as Hg
mg/l IS : 3025 Part 45-1993
(Reaff:2003) 0.001 BDL(<0.001) 0.47
25 Cadmium as Cd
mg/l IS : 3025 Part 40-1991
(Reaff:2003) 0.003 BDL(<0.001) BDL(<0.001)
26 Selenium as Se mg/l APHA 22nd EDN-3500,Mg - B 0.01 BDL(<0.01) BDL(<0.01)
27 Total Arsenic as As mg/l IS : 3025 Part 53-2003 0.01 BDL(<0.01) BDL(<0.01)
28 Cyanide as CN mg/l IS:3025:Part-58:2006 0.05 BDL(<0.05) BDL(<0.05)
29 Lead as Pd mg/l APHA 22nd EDN -3113 B 0.01 BDL(<0.01) BDL(<0.01)
30 Zinc as Zn mg/l APHA 22nd EDN -3111 B 5 0.09 0.26
31 Total Chromium as Cr mg/l APHA 22nd EDN -3113 B 0.05 BDL(<0.03) BDL(<0.03)
32 Nickel mg/l APHA 22nd EDN -3113 B 0.02 BDL(<0.02) BDL(<0.02)
33 Aluminium as Al mg/l APHA 22nd EDN -3500-Al-B 2012 0.03 BDL(<0.03) BDL(<0.03)
34 Total Colifirm MPN/ 100ml
IS – 1622 (1981) (Reaff – 2014) Absent <2 7
35 Faecal Coliform MPN/ 100ml
IS – 1622 (1981)(Reaff – 2014) Absent <2 <2
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
64
SurfaceWater
S.NO
PARAMETERS
UNIT
TEST METHOD
SW1
SW2
1 Temperature C --- 27.1 27.3
2 Colour Hazen APHA 22nd EDITION 17 21
3 Odour -
APHA 22nd EDITION No Odour Observed NoOdour Observed
4 pH at 25°C - IS : 3025 Part 11- 1983 (Reaff: 2002) 7.85 7.54
5 Electrical Conductivity, μS/cm IS : 3025 Part 14- 1984 (Reaff: 2002) 590 315
6 Turbidity NTU IS : 3025 Part 10-1984 (Reaff: 2002) 5.6 1.9
7 Total Dissolved Solids mg/l IS : 3025 Part 16-1984 (Reaff: 2003) 341 180
8 Total Hardness as
CaCO3 mg/l IS : 3025 Part 21-1983 (Reaff: 1998) 180 106
9 Total Alkalinity as
CaCO3 mg/l IS : 3025 Part 23- 1986(Reaff:2003) 210 108
10 Chloride as Cl mg/l IS : 3025 Part 32-1988 (Reaff: 2003) 76 41
11 Sulphate as SO4 mg/l APHA 22nd EDN-4500- SO42- E 14 8
12 Fluoride as F mg/l APHA 22nd EDN -4500-F B&D 1.14 0.36
13 Nitrate as NO3 mg/l APHA 22nd EDN -4500- NO3- B 2 BDL(<1)
14 Ammonia as NH3 mg/l APHA 22nd EDN -4500- NH3 B&C 0.56 0.14
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
65
15 Phosphate as PO4 mg/l IS : 3025 Part 31-1988 (Reaff:2002) 0.68 0.26
16 Sodium as Na mg/l IS : 3025 Part 45-1993 (Reaff:2003) 62 30
17 Potassium as K mg/l IS : 3025 Part 45-1993 (Reaff:2003) 3.6 1.5
18 Calcium as Ca mg/l IS : 3025 Part 40-1991 (Reaff:2003) 35 26
19 Magnesium as Mg mg/l APHA 22nd EDITION 22 9.96
20 Iron as Fe mg/l IS : 3025 Part 53-2003 0.56 0.18
21 Manganese as Mn mg/l APHA 22nd EDN -3500-Mn D BDL(<0.05) BDL(<0.05)
22 Anionic Surfactants as
MBAS mg/l APHA 22nd EDN -5540 C BDL(<0.025) BDL(<0.025)
23 Total Suspended Solids mg/l IS : 3025 Part 17-1984 (Reaff: 2002) 8 5
24 Dissolved Oxygen as O2 mg/l IS:3025:Part-38:1989 (Reaff:2003) 6.3 7.3
25 Chemical Oxygen
Demand mg/l IS:3025:Part-58:2006 22 13
26
Bio-Chemical Oxygen Demand
at 27°C for 3 days mg/l IS:3025:Part-44:1993 (Reaff:2003) 3.9 2.1
27 Phenolic compounds as
C6H5OH mg/l APHA 22nd EDN 5530 B,C,D BDL(<0.001) BDL(<0.001)
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
66
28 Copper as Cu mg/l IS:3025Part-42 (Reaff:2003) BDL(<0.05) BDL(<0.05)
29 Mercury as Hg mg/l APHA 22nd EDN -3112B BDL(<0.001) BDL(<0.001)
30 Cadmium as Cd mg/l APHA 22nd EDN -3113 B BDL(<0.001) BDL(<0.001)
31 Selenium as Se mg/l APHA 22nd EDN -3113B BDL(<0.01) BDL(<0.01)
32 Total Arsenic as As mg/l APHA 22nd EDN -3113 B BDL(<0.01) BDL(<0.01)
33 Cyanide as CN mg/l APHA 22nd EDN -4500-CN E BDL(<0.05) BDL(<0.05)
34 Lead as Pd mg/l APHA 22nd EDN -3113 B BDL(<0.01) BDL(<0.01)
35 Zinc as Zn mg/l APHA 22nd EDN -3111 B 0.26 0.31
36 Total Chromium as Cr mg/l APHA 22nd EDN -3113 B BDL(<0.03) BDL(<0.03)
37 Nickel as Ni mg/l APHA 22nd EDN -3113 B BDL(<0.02) BDL(<0.02)
38 Total Coliform MPN/ 100ml IS – 1622 (1981) (Reaff – 2014) >1600 220
39 E.Coli MPN/ 100ml IS – 1622 (1981)(Reaff – 2014) 170 24
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
67
3.12.3 Observations
GroundWater
The analysis of ground water results indicate that the average pH ranges in between
7 .47- 7.63, TDS ranges from 523 mg/l – 1130 mg/l, total hardness ranges from 152
mg/l – 510 mg/l, iron content ranges from BDL – 0.47 mg/l, nitrate content ranges
from 3 – 17 mg/l was observed.
SurfaceWater
The analysis of surface water results indicate that the average pH ranges in between
7.54 - 7.85 , TDS ranges from 180 mg/l – 341 mg/l, total hardness ranges from 106mg/l
– 180 mg/l, DO ranges from 6.3 mg/l – 7.3 mg/l was observed.
3.13 SOIL ENVIRONMENT
3.13.1 Soil analysis
The present study of the soil quality establishes the baseline characteristics and this
will help in future identification of the incremental concentrations if any, due to the
operation of the LPG plant site. The sampling locations have been identified with the
following objectives;
• To determine the baseline soil characteristics of the study area and
• To determine the impact of LPG plant site on soil characteristics
Five locations within the study area were selected for soil sampling. At each location,
soil samples were collected from three different depths viz., 30 cm, 60 cm and 100 cm
below the surface. The samples were analysed for physical and chemical
characteristics. The details of the soil sampling location are presented in Table 3.14
and shown in Figure 3.14. The results are presented in Table 3.15 and compared
with Standard Soil Classification presented in Table 3.16.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
68
Table 3-14 Soil Sampling Locations
Location Code
Location
Geographical Location
Direction with the respect to
project site
Distance with respect to
project site in km
S1 Project Site N-08º49’49.93” E-77º44’41.10”
-
-
S2 Gangaikondan N-08º51’36.12” E-77º46’22.65”
NE
4.46
S3 Thalaiyuthu N-08º47’33.77” E-77º43’23.64”
SSW
4.83
S4 Alangaraperi N-08º43’23.26” E-77º46’32.93”
SE
4.31
S5 Thenkalam N-08º49’15.34” E-77º41’59.05”
WSW
5.11
Figure 3-14 Map Showing Soil Sampling Stations
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
69
Presentation of Results
The results of the soil analysis are tabulated in Table 3.15. Standard soil classification is given in Table 3.16.
Table 3-15 Soil Quality Results
S.No Parameters S1 S2 S3 S4 S5
1 pH 7.86 8.23 7.58 7.81 8.33
2 Bulk Density, g/cc 1.33 1.25 1.38 1.23 1.26
3 Electrical Conductivity, mS/cm 0.086 0.212 0.102 0.162 0.237
4 Available Nitrogen, kg/ha 478 536 325 623 410
5 Available Phosphorous, kg/ha 56.4 81.4 35.4 60.6 53.1
6 Available Potassium, kg/ha 302 247 284 352 291
7 Exchangeable Calcium as Ca, m.eq/100g 14.5 16.8 12.1 14.6 15.4
8 Exchangeable Magnesium as Mg, m.eq/100g 5.14 3.96 4.74 6.03 3.88
9 Exchangeable Sodium as Na, m.eq/100g 1.36 2.35 1.98 2.11 3.26
10 Organic matter (%) 0.63 0.91 0.46 0.82 1.03
11 Texture Classification Sandy Clay Clay Sandy Clay
Loam Clay Clay
12 Sand (%) 46.8 28.6 49.7 33.7 35.2
13 Clay (%) 36.5 51.4 26.4 46.4 54.8
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
70
Table 3-16 Standard Soil Classification
Chemical
Parameters
Ranking
Very Low Low Moderate High Very High
pH <4, very Strongly
Acidic
4-5, Strongly
Acidic
5-8, Ideal for Plant
Growth 8-9 Strongly Basic >9 Very Strongly Basic
Electrical conductivity
(μS/cm)
<2000,
Non saline
2000-4000
Saline
4000-8000
Moderately Saline
8000-16000
Highly Saline >16000 Extremely Saline
Total Nitrogen (%) <0.05
Very Low 0.05-0.15 Low
0.15-0.25
Moderate 0.25-0.5 High
>0.5
Very High
Total Phosphorous
(mg/kg)
<5
Very Low
5-10
Low 10-30 Moderate 30-60 High >60 Very High
Sodium
(mg/kg) - <200 Non Sodic 200-500 Moderate >500 Sodic
Potassium
(mg/kg) - <150 Low 150-250 Moderate 250-800 High >800 Very High
Calcium
(mg/kg) -
<1000
Low 1000-2000 Moderate >2000 High -
Magnesium
(mg/kg) <40 Very Low
40-100
Low 100-300 Moderate >300 High -
% Organic Matter 0.5-1.0
Very Low
1.0-2.0
Low 2.0-3.0 Moderate 3.0-5.0 High
>5
Very High
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
71
Observation
The soil results were compared with soil standards. It has been observed that the
pH of the soil was ranging from 7.58 to 8.33 indicating the soils are basic in
nature. Conductivity of the soil ranges from 0.086 to 0.237 mS/cm. Since the EC
value is less than 2000 µS/cm, the soil is said to be Non saline in nature.
Texture of the soil sample is predominantly loam. Soil organic content varied from
0.46 to 1.03% which indicates the very low level of organic matter.
The available nitrogen content ranges between 325 to 623 kg/ha in the locality and
the value of phosphorus content varies between 35.4 to 81.4 mg/kg. This indicates
that the soil have very high quantities of Nitrogen and Phosphorus.
The potassium content varies from 247 to 352 mg/kg which indicates that the soils
have high quantities of potassium.
From the above observations it was found that the soil in the Study area shows
moderate fertility.
3.14 Ecological Environment
Flora and fauna studies were conducted to assess the existing floral and faunal
composition of the area.
3.14.1 Objectives of Ecological Studies
The present study was undertaken with the objective of understanding the ecosystem
on the following lines:
• To assess the nature and distribution of vegetation in and around LPG plant
site.
• To assess the distribution of animal life spectra.
3.14.2 Methodology Adopted for the Study
Assessment of the existing vegetation types in the core and buffer zones has been done
using standard procedures. The terrain of the impact zone is chiefly plain.
The Biodiversity studies were already carried out in the entire study area of 10 km
radius. The study of flora is conducted as per the guidelines of the Ministry of
Environment and Forests, Government of India, with respect to the scope and
objectives. The study involved in collection of primary data by conducting survey in
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
72
the field, examination of floral and faunal records in previously published reports and
records, and analysis of the information in view of the possible alteration in
environment of the LPG Plant site. For the survey of fauna both direct and indirect
observation methods were used.
3.14.2.1 Flora in the Study Area The list of flora observed in the buffer zone is given in Table 3.17:
Table 3-17 List of Flora Observed In the Study Area
S.No. Botanical Name Local Name
1. Azadiracta indica A. Juss Vembu
2. Boerhhavia diffusa L. Mukkurttaikkoti
3. Calotropis gigantean (L.) R.Br. Eruku
4. Borassus flabellifer L. Panai
5. Cassia siamea Lam. Manja Kondrai
6. Cissus quadrangularis L. Nanmuga pirandai
7. Clerodendrum inerme (L.) Gaertn Pampu-k-kanni
8. Cleome gynandra L. Naikkaduku
9. Cleome viscosa L. Naikaduku
10. Cocos nucifera L. Thenai
11. Commelina benghalensis L. Thankaipoo
12. Cynodon dactylon (L.) Pers. Arukanpull
13. Cyperus rotundus L. korai
14. Cassia fistula L. Sarakonai
15. Nerium odorum nerium
16. Ficus benghalensis L. Alamaram
17. Ficus religiosa L. Arasamaram
18. Indigofera uniflora Buch. Avari
19. Moringa pterygosperma Goertn. Murunai
20. Jasminum angustifolium (L.) Willd. Malligai
21. Mangifera indica L. Mango
22. Ficus racemose Aththi
23. Delonix regia (Boj. ex Hook.) Raf. Myilkonrai
24. Carica papaya L. Pappali
25. Ocimum sanctum Tulsi
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
73
3.14.2.2 Fauna in the study area The field studies are conducted to assess fauna in the study area. The list of animals
present in the study area are given in Table 3.18:
Table 3-18 List of Fauna Observed in the Study Area
S.No. Common Name Zoological
Family/Order
1. Cat Felis catus
2. Dog Cannis familiaris
3. Frog Cannis vulpes
4. Goat Capra hircus
5. Ant Anochetus
6. Mosquito Anopheles rufipes
7. Crow Corvous corone
8. Common myna Acridotheres tristis
9. Lime butterfly Papilio demoleus
10. Lizard Gecko
11. Spotted deer Axis axis
12. Columba rupestris Pigeon
13. Tyto alba Owl
14. Gecko Lizard
15. Dicrurus macrocercus Black Drongo
16. Ardea purpurea Peria vellai kokku
17. Papilio demoleus The Lime Butterfly
18. Troides Minos The Southern Birdwing
19. Acridotheres tristis Common Myna
20. Corvus splendens Crow
21. Anopheles coustani Mosquito
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
74
3.14.3 Environmental Sensitivity
As per MoEF&CC guideline, 15 km radius from the project site is considered as study
area for evaluating environmental sensitivity. The description of the environmental
sensitivity of the LPG Plant site is given below:
National Parks and WildLife Sanctuaries
Gangaikondan Spotted deer sanctuary is 0.92km (E) away from the project site.
There is no National park or Bird sanctuary within the 15 km radius of the project
site.
Reserve Forests
List of the reserve forests along with distance and direction with respect to the project
site is given in Table 3.19.
Table 3-19 Reserve Forests within 10 Km Radius of the Project Site
S.No. Name of Reserve Forest Distance Direction w.r.t. Project Site
1. Thalaiyuthu RF 919 Metres West
2. Melpattam RF 6.6 Km South
Airport
The Tuticorin airport in Chennai is situated at a distance of 33.55 Km (SW) from the
project site. The LPG plant site is not falling in aviation path.
Archaeological Protected Sites
There are no archaeological protected sites falling within the 10km radius of the LPG
plant site.
3.15 SOCIO-ECONOMIC ENVIRONMENT
The assessment of socio-economic environment forms an integral part of an EIA
study. Socio-Economic status of the population is an indicator for the development of
the region. Any developmental project of any magnitude will have a bearing on the living
conditions and on the economic base of population in particular and the region as a
whole. Similarly, the LPG plant activities will have its share of socio-economic
influence in the study area. The section delineates the overall appraisal of society
relevant attributes. The data collection for evaluation of impact of LPG plant site on
socio-economic aspects in
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
75
the study area has been done through primary household survey and through the
analysis of secondary data available for study area.
3.15.1 Methodology
The methodology adopted in assessment of socio-economic condition is as given
below;
• To assess socio-economic conditions of the Population
• Analysis of the identified social attributes like population distribution,
availability of public utilities etc., through Census of India 2011
• Primary household survey to assess the present status of population of the study
area
3.15.2 Sources of Information
As per the scope of this study, the information on socio-economic aspects has been
gathered and compiled from several secondary sources. These include Taluk Office,
Collectorate, Agriculture Department, Irrigation Department, Central Ground Water
Board, Directorate of Census Operation, Tamil Nadu etc. The demographic data has
mainly been compiled from the Census of India 2011. The socio-economic details
are briefly described in following sections.
This section includes the present status of the socio-economic environment in the
study area. To determine the baseline socio-economic pattern, at and around the
project site, the required data have been obtained from the published data. Socio-
economic base line data were collected for the following indicators:
• Demographic Structure
• Economic Structure
• Availability of Basic Amenities
The major demographic and economic structure of the study area are classified into
population, literacy rate and workers details.
3.15.3 Settlement Pattern
The LPG plant site is at Gangaikondan village, Tirunelveli District, Tamil Nadu. The
area within 10 km radius from the LPG Plant site has been considered as study area.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
76
3.15.3.1 Population According to the 2011 census, Tirunelveli district has a population of 30,77,233. The
district has a population density 460 people per square kilometer. Its population
growth rate over the decade 2001-2011 was 12.97%. Tirunelveli has a sex ratio of
1023 females for every 1000 males and a literacy rate of 82.50 %.
3.15.3.2 Demography Almost all villages in the study area are experiencing a rapid growth of population,
which may be due to the process of urbanization and industrialization. According to
2011 census, Tirunelveli district had a population of 30,77,233. With a sex-ratio of
1023 females for every 1,000 males. A total of 3,21,687 were under the age of six,
constituting 1,64,157 males and 1,57,530 females. Scheduled Castes and Scheduled
Tribes accounted for 5,69,714 and 10,270 of the population respectively. Average
literacy rate of Tirunelveli in 2011 were 82.50% compared to 76.09% of 2001. The
district had a total of 8,15,528 households. There were a total of 12,71,407 main
workers, comprising 1,07,943 main cultivators, 3,21,083 main agricultural laborer’s,
6,26,714 other workers, 1,65,047 marginal workers, 7,772 marginal cultivators,
58,680 marginal agricultural laborers. The district has a population density of 460
inhabitants per square kilometer.
3.15.3.3 Distribution of Population
The distribution of population in the study area is given in Table 3.20.
Table 3-20 Distribution of Population in the Study Area
Particulars Study
Area
No. of Households 19,111
Male Population 35,476
Female Population 35,672
Total Population 71,148
Average Household Size 3.72
Sex ratio 1005
The males and females constitute about 49.86% and 50.13% respectively of
the total population in the study area.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
77
3.15.3.4 Average Household Size
The study area had a family size of 3.72 as per census records. This lower family size
could be attributed to a high degree of urbanization with migration of people with
higher literacy levels who generally opt for smaller family size with family welfare
measures and also due to the prevalence of single member families, a common
phenomenon in mining and industrial areas.
3.15.3.5 Sex Ratio
The configuration of male and female indicates that the males constituted about
51.15% population while the females worked out to be 48.84% of the population.
The sex ratio i.e. the number of females per 1000 males, which indirectly reveals
certain sociological aspects in relation with female births, infant mortality among
female children and single person family structure, a resultant of migration of
industrial workers, was found at 1005.
3.15.3.6 Social Structure
Census records show that about 25.29% of the population belonged to Scheduled
Castes (SC) and 0.15% to Scheduled Tribes (ST). This indicates that the weaker section
people work out to about 25.45% of the total population and the remaining 74.54%
people belong to Other Backward Castes and forward castes. The distribution of
population by social structure in the study area is presented in Table 3.21.
Table 3-21 Distribution of Population by Social Structure
S.
No. Particulars Study Area
1 Scheduled Castes 18,000
2 % to total population 25.29
3 Scheduled Tribes 109
4 % to total population 0.15
5 Total SC and ST 18,109
6 % to total population 25.45
7 Other Castes 53,039
8 % to total population 74.54
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 3 – DESCRIPTION OF ENVIRONMENT
78
3.15.3.7 Literacy Levels
The distribution of literate and literacy rate in the study area is given in Table 3.22.
Table 3-22 Distribution of Literate and Literacy Rates
S. No. Particulars Study
Area
1 Total literate 52,012
2 Average literacy (%) 73.10
3 Total illiterates 19,136
4 Average illiteracy (%) 26.89
The literacy rate works out to 73.10%. The rate of illiteracy was observed to be 26.89%
in the study area. This indicates a major sociological development in the region. This can
be attributed to the Tamil Nadu Government's literacy improvement schemes.
3.15.3.8 Occupational Structure
The occupational structure of residents in the study area is studied with reference
to main workers and non-workers. The main workers include 10 categories of workers
defined by the Census Department consisting of cultivators, agricultural labourers,
those engaged in live- stock, forestry, fishing, mining and quarrying; manufacturing,
processing and repairs in household industry; and other than household industry,
construction, trade and commerce, transport and communication and other services.
As per census records altogether the workers works out to be 43.86% of the total
population. The occupational structure of the study area is given in Table 3.23.
Table 3-23 Occupational Structure
S. No. Occupation
Study Area
No. % to
Population
1 Total workers 31,210 43.86
2 Total non-workers 39,938 56.13
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 4 – ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES
79
3.15.4 Availability of Infrastructure
Availability of infrastructure and facilities denote the level of overall development
in the study area. The list of industries, schools, colleges and hospitals located near
the study area are given below:
Industries
• Elcot IT Park
• Alliance Tire Group
• M/s.BOSCH Limited.
• M/s.Ramco Industries Ltd.
• M/s.South India Bottling Company Pvt Ltd.
• India Cements Limited
Institutions
• Sankar Polytehnic College
• Thamirabharani Engineering College
• Sri Jayendra Golden Jubilee School
Tourist & Pilgrim
• Fire Flame Church
• St. Luke Church
• St. Theresa’s Church
• Chepparai Natarajar Temple
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 4 – ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES
80
4 ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES
4.1 INTRODUCTION
The anticipated impacts of the LPG storage and bottling facilities at SIPCOT Industrial
Growth Centre, Gangaikondan village, Tirunelveli District on environment have been
evaluated and predicted based on the information collected at the site and the
information provided by the IOCL.
The environmental impacts can be categorized as either primary or secondary.
Primary impacts are those which are attributed directly by the construction and
operation of the project, secondary impacts are those which are indirectly induced
and typically include the associated investment and changed patterns of social and
economic activities by the construction and operation of facilities.
There is no sensitive location of historical or strategic importance around the IOCL’s
LPG storage and bottling facilities. Therefore, no such impact is anticipated during
construction and operation phases of LPG storage and bottling facilities.
The LPG storage and bottling facilities would create impact on the environment in two
distinct phases:
• During construction phase as temporary or short-term; and which is now over.
• During operational phase which would have long-term effects during the
life cycle of project.
The construction and operational phases of the LPG storage and bottling facilities
and distribution facility comprise various activities, which have been considered to
assess the impact on one or another environmental parameters.
• Topography,
• Soil,
• Water Resources and Quality,
• Climatology and Meteorology,
• Air Quality,
• Noise Levels,
• Land Use Pattern,
• Terrestrial Ecology,
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 4 – ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES
81
• Aquatic Ecology,
• Demographic and Socio-economic.
The details of the activities of the LPG storage and bottling facilities during
construction and operation phases are described in the following sections
4.2 Impact on Topography
4.2.1 Construction Phase
The mounded bullets, filling machines and unloading bays have been constructed
within the plant site. Existing topography of the area was not altered during the
construction activities within the site. Hence, impact on topography was not
envisaged during construction of the LPG storage and bottling facilities.
Mitigation Measures
• Land clearing at the site was kept at the absolute minimum practicable;
• Construction site was designed to minimize the removal of soil and vegetation;
• Excavated earth from foundation was used at the LPG plant for leveling and filling.
4.2.2 Operation Phase
During operation phase of LPG storage and bottling facilities, no impact is
anticipated on the topography, therefore, no mitigation measure is required.
4.2.3 Impact on Regional Climate
During construction and operation of IOCL’s LPG bottling plant, no stack gas
emissions are anticipated, therefore, no impact is anticipated on the climatology and
meteorology of the area during the construction and operation phase of LPG plant.
Hence, no mitigation measure is required.
4.2.4 Impact on Air Environment
4.2.4.1 Construction Phase
The sources of air emissions during construction included dust and gaseous
emissions from:
• From construction activity for installation of LPG storage and bottling facilities.
• Emissions from vehicles bringing materials to the site.
• From operation of construction equipment.
These emissions were resulted in temporary degradation of air quality, primarily,
close to the working environment affecting construction employees. Dust and other
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 4 – ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES
82
emissions were not spread in vicinity of site and surroundings.
The excavated earth from LPG storage and bottling facilities during construction
resulted emission of suspended particulate matter (SPM). However, the suspended
particulate matter (SPM) rise in the ambient air were coarse in size and settled within
a short distance closed to the construction site. Therefore, dust and gaseous
emissions due to construction activities at LPG storage and bottling facilities did not
affected the surrounding.
Hence, the impacts on the ambient air quality during construction phase was
temporary and reversible in nature for short duration and it was restricted to short
distance only.
Mitigation Measures
Construction materials were fully covered during transportation by
road to the project site.
Dust suppression systems (water spray) were used as per requirement
at the construction site.
Construction area was cordoned off by tin sheets up
to about 3 m height.
Earth moving equipment, typically with a grader blade and ripper
were used for excavation work.
Construction vehicles and machineries were maintained properly and
“Pollution under Control” certificate were kept up-to-date and checked.
Mixing of cement with other building materials was
done at isolated place.
4.2.4.2 Operation Phase
During the normal operation of the LPG storage and bottling facilities, there will be no
continuous source of air emissions. Hence, the impact on ambient air quality will be
insignificant during operation phase.
During operation phase, intermittent gaseous emissions are anticipated from DG sets
which will be operated during grid power failure at LPG storage and bottling facilities.
DG sets will be fitted with stack of sufficient height as per CPCB guidelines to
achieve natural dispersion of pollutants.
During receipt of LPG through bullet tankers and distribution of LPG cylinders, increase
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 4 – ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES
83
in vehicular emissions is anticipated due to bullet truck and Cylinder truck movement.
As an estimate 30 – 35 trucks will be reaching LPG plant for unloading of LPG and
distribution cylinders to authorized dealers in the area. To control vehicular emissions,
truck/tankers engaged in bulk LPG transportation and distribution of LPG cylinders
will essentially have Pollution under Control Certificate (PUCC) to minimize vehicular
emissions. It will be ensured at the gate of IOCL LPG plant. Therefore, during operation
phase the impacts on the ambient air quality shall be insignificant.
Mitigation Measures
• DG sets are fitted with the stacks of sufficient height as per CPCB guidelines to
achieve natural dispersion of exhaust gases.
• Compulsory Pollution Under Control Certificate (PUCC) for bullet trucks and
cylinder trucks to minimize vehicular emissions
Overall impact of LPG storage and bottling facilities in the study area will be positive
and beneficial in long term, as distribution of LPG cylinders will replace or minimize
use of traditional fuels, such as, wood, coal, petroleum oils and subsequently
improvement in ambient air quality of the area will be observed.
4.2.5 Impact on Noise Environment
4.2.5.1 Construction Phase
Some noise was generated due to operation of construction machines. However, these
noise sources were temporary nature and were operated mostly during day-time and for
short duration.
At the time of construction/erection of mounded bullets, bottling machine, unloading
bays, no major noise was generated.
At LPG storage and bottling facilities, construction activities produced maximum noise
levels of about 80 dB(A) during various erection activities like, excavation,
hammering, construction equipment operation etc at the construction site. The
construction workers in general were exposed to an equivalent noise level of 75-80
dB (A) intermittently for which all statutory precautions as per law were taken into
consideration. The mandatory use of proper personal protective equipment
mitigated adverse impact of the noise generated by equipment to the workers during
construction phase. Noise levels from construction activities were reduced
significantly at the boundary of LPG storage and bottling facilities. Hence, impact of
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 4 – ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES
84
noise generation from the construction of the facilities IOCL plant in surrounding area
was insignificant in nature.
Mitigation Measures
• Acoustic treatment of enclosure to DG Sets to control noise level as per CPCB
guidelines.
• Provision of rubber anti vibration padding to DG sets.
• Provision of silencers to modulate the noise generated by machines
• Provide protective devices like ear muff/plugs to the workers.
4.2.5.2 Operation Phase
The average ambient noise level at the boundary walls of the LPG storage and bottling
facilities, as monitored during baseline data generation are in the range of 48.5 to 52.3
dB(A). At the LPG storage and bottling facilities, pumps, DG sets, fire pumps, unloading
bays and cylinders truck and bullet tankers will be major source of noise generation.
The noise levels from these sources shall be in the range of 70 to 80 dB (A). DG sets
will be intermittent source of noise generation and will be operated only during grid
power failure. To control noise levels, DG sets have been provided with acoustic
enclosures and anti-vibration pads.
Hence, anticipated impact of noise generation from LPG storage and bottling facilities
during operation phase will be limited within the boundary.
Mitigation Measures
• Noise levels from LPG storage and bottling facilities will not reach its boundary.
• DG sets room will be acoustically treated to control noise levels as per CPCB
guidelines.
• Ear muff and ear plugs will be provided to operators while working DG sets
rooms/high noise areas.
4.2.6 Impact on Water Environment
The existing water quality around LPG storage and bottling facilities has been assessed
by conducting water quality monitoring from February, March and April 2018.
4.2.6.1 Water Requirement
The raw and potable water requirement of the LPG storage and bottling facilities will
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 4 – ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES
85
be supplied by SIPCOT. Water is required mainly for fire fighting, service water,
washing and potable purposes. The average water consumption of bottling plant will
be about 4 KLD.
The LPG storage and bottling facilities will be limited to unloading of LPG, storage in
mounded bullets (3 x 600 MT) and LPG bottling facilities and dispatch of LPG
cylinders to consumers by trucks. Hence, the water consumption will be 4 KLD.
Domestic water requirement will be 3 KLD. The quantity of sewage generated
during operation phase of the plant will be 2.4 KLD, which will be disposed through
septic tank followed by soak pit.
For washing of cylinders approx. 1 KLD water will be required. Waste water
generated from cylinders washing will be collected in settling tank and dosed for
flocculation of suspended particles. Treated water from clarifier will be reused for
cylinders washing purpose.
Water Resources Construction Phase
The requirement of water during the construction phase was as 3-5 KL/day. The
construction activities at LPG storage and bottling facilities have not affect the ground
water aquifers and surface water bodies in any way as the water requirement was
very small and obtained from SIPCOT water supply. Therefore, no significant impact
is anticipated on surface and ground water resources of the area during construction
phase.
Mitigation Measures
• Use of water was minimized during construction phase.
• Drainage channels and storm water drains was constructed at the site.
Operation Phase
For normal operation of LPG storage and bottling facilities, no process water is
required. However, about 1 KLD of water will be required for cylinder washing,
obtained from local water supply. For domestic purpose only 3 KLD water will be
required at the LPG storage and bottling facilities.
Mitigation Measures
• Treated waste water from washing will be reused for washing purpose to
minimize the use of fresh water.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 4 – ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES
86
Water Quality Construction Phase
During construction phase of LPG bottling plant, small quantity of metal cuttings, soil
debris, etc were generated as waste which were cleared after construction activity
was over and same were disposed in environmental sound manner. Therefore, no
significant impact could be observed on ground and surface water quality of the area
during construction phase.
Mitigation Measures
• The excavation work was carried out during non-monsoon season.
• All the debris generated from construction site were collected and disposed
suitably.
• A sediment trap was provided to prevent the discharge of excessive suspended
solids.
• An oil trap was provided in the drainage line to prevent contamination by
accidental spillage.
• To prevent contamination from accidental spillage of fuel oil, the storage areas
were bunded and cleaned at regular intervals.
• Sewage generated from the site was treated in septic tank followed by soak pit
Operational Phase
During operation of LPG plant, no process effluent will be generated. For washing of
cylinders approx 1 KLD water will be required. Waste water generated from cylinders
washing will be collected in settling tank. Treated water from clarifier will be
reused for cylinders washing purpose.
During operation the LPG storage and bottling facilities, 2.4 KLD sewage will be
generated, which will be disposed through septic tank followed by soak pit. Hence,
during the operation of the LPG storage and bottling facilities, no impact is anticipated
on water quality.
Mitigation Measures
• Waste water generated from cylinders washing will be collected in settling tank and
dosed for flocculation of suspended particles. Treated water from clarifier will be
reused for cylinders washing purpose.
• Proper collection and disposal of solid and hazardous waste to be generated
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 4 – ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES
87
from LPG storage and bottling facilities
4.2.7 Soil
4.2.7.1 Impact on Soil Construction Phase During the construction of LPG bottling plant, construction wastes such as excavated
soil, debris, some pipes/ metal waste and very small amount of oil & grease were
generated. These wastes were disposed-off properly in environmentally sound manner.
Mitigation Measures
Construction debris, fuel, oil drums, used grease cartridges were collected
and disposed of properly
Lubricating waste oil were collected separately in drums and same was
handed over to waste oil recyclers as authorized by TNPCB as per CPCB
guidelines.
All solid wastes were cleared after construction activities.
Operational Phase
During operation of LPG storage and bottling facilities, no process waste will be
generated in any form. It is estimated that about 20 kg municipal solid waste may be
generated by workers, canteen and truck drivers. Municipal solid waste generated
from LPG storage and bottling facilities will be segregated in the form of recyclable
waste, biodegradable waste and non bio-degradable wastes. Recyclable waste
including paper, plastic, etc. will be sent for recycling. Biodegradable waste will be
used for composting at the LPG plant to produce manure for green belt.
Occasionally, used oil will be generated from DG sets and engines maintenance,
which is categorized as Hazardous Waste as per Hazardous Waste (Management,
Handling and Trans boundary Movement) Rule 2008. The used oil at the LPG
bottling plant will be stored in containers and handed over to MoEF&CC/Tamil
Nadu State Pollution Control Board approved Used Oil recyclers for recycling
purpose.
Hence, no significant impact is anticipated on soil of the area and at LPG storage and
bottling facilities.
Mitigation Measures
• Municipal solid waste generated from the LPG bottling plant will be segregated in
the form of recyclable waste, biodegradable waste and non bio-degradable wastes.
Recyclable waste including paper, plastic, etc. will be sent for recycling.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 4 – ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES
88
• Biodegradable waste will be used for composting to produce manure for green belt.
• Sludge which is generated from septic tank, which will be used as manure for
green belt.
• Used oil will be collected separately in drums and sold to MOEF&CC/TNPCB
authorized used oil recyclers for recycling.
4.2.8 Land Use Pattern
The LPG storage and bottling facilities is located within land leased in SIPCOT
industrial growth centre. Therefore, no impact is anticipated on the land use of the
area during construction and operation phases. Therefore, no management plan is
required.
4.2.9 Biological Environment Construction Phase
The construction of LPG mounded bullets and LPG bottling plant will not require cutting
of trees and vegetation. Therefore, adverse impact on the terrestrial ecology would be
insignificant in nature.
Operational Phase
The LPG storage and bottling facilities will not have any impact of terrestrial ecology
of the area as no trees cutting is required during operation phase.
Mitigation Measures
• At LPG bottling plant peripheral green belt has been developed around the plant
boundary.
• In the open area landscaping has been carried out.
4.2.9.1 Impact on Forest & Wild Life
There would not be any impact on Gangaikondan spotted deer sanctuary and
forest from the LPG storage and bottling facilities.
4.2.9.2 Impact on Aquatic Ecology
No impact is envisaged on aquatic ecology from the operation of LPG storage and
bottling facilities during construction or operational phases as there is no water
body in the vicinity of the plant.
4.2.10 Socio-economic Environment Construction phase
The construction of LPG storage and bottling facilities has been done at industrial plot.
Therefore, socio-economic impacts linked to the acquisition of land were not
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 4 – ANTICIPATED ENVIRONMENTAL IMPACTS & MITIGATION MEASURES
89
appeared in the project.
The LPG storage and bottling facilities generated direct and indirect employment
opportunities during the construction phase. About 50 local skilled, semi-skilled and
unskilled labourers got employment in the construction activities. This was a
moderate positive impact of the LPG storage and bottling facilities.
The construction of the LPG storage and bottling facilities had beneficial impacts as
some local unskilled, semiskilled and skilled persons gained direct or indirect
employment.
Since the immigration of work force during construction of LPG storage and bottling
facilities was insignificant, the social impacts on literacy, health care, transport
and housing facilities and cultural aspects were also insignificant.
Operational Phase
The major positive socio-economic impact will be observed in the form of the following:
• Reduction of Emissions: The LPG storage and bottling facilities will ensure
availability of LPG for domestic and industrial establishments in the region which
will help in minimization of use fossil fuel (petrol, HSD, furnace oil, etc.), coal,
w o o d , e t c . Consequently, it will help in maintaining cleaner environment due to
reduction in emissions.
• Improved Health Conditions: Use of LPG as a cleaner fuel will also create healthy
environmental conditions and help in uplift of socio-economic conditions of
people of the region.
4.3 Conclution
In view of the above facts and figures, it may be concluded that the LPG storage and
bottling facilities at SIPCOT Industrial Growth Centre near Gangaikondan village in
Tirunelveli district of Tamil Nadu, shall not result in any adverse environmental impacts
on physical features, water, noise and air environment, biological and socio-economic
environment. The LPG storage and bottling facilities shall generate additional
direct/indirect employment and indirect service sector enhancement in the region and
would help in the socio-economic up- liftment of the state as well as the local area.
The LPG storage and bottling facilities will make available LPG as a cleaner fuel and
will subsequently create healthy environmental conditions, which will result in uplift
of socio-economic conditions of people of the region.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 5 – ANALYSIS OF ALTERNATIVES (TECHNOLOGY & SITE)
90
5 ANALYSIS OF ALTERNATIVES (TECHNOLOGY & SITE)
5.1 INTRODUCTION
The consideration of technological alternatives for bulk LPG storage and bottling
facilities at SIPCOT Industrial Growth Centre near Gangaikondan village in Tirunelveli
district, is one of the more proactive side of environmental assessment - enhancing
the project through examining options instead of only focusing on the more
defensive task of reducing adverse impacts of a single option of the project. This
requires the systematic comparison of feasible alternatives for technology and
operational alternatives. Alternatives are compared in terms of their potential
environmental impacts, capital and recurrent costs, suitability under local conditions,
etc.
The examining alternative means of carrying out a project involves answering the
following three questions:
(i) What are the alternatives?
(ii) What are the environmental impacts associated with each alternative?
(iii) What is the rationale for selecting the preferred alternative?
5.2 ALTERNATIVE TECHNOLOGY
The bulk LPG storage and bottling facilities relates to installation of 3 nos. of mounded
bullets of 600 MT capacity each, 8 TLD bays, 2x24 Carousals and other online
facilities for unloading, storage and filling of LPG at the plant. IOCL has proven
technology of installation and operation of mounded bullets. The expertise of IOCL in
mounded vessel storage is well proven and working efficiently at different locations of
the country. IOCL is having excellent track record and progressive outlook in
regularly updating its technology. The technology adopted by IOCL for installation of
mounded bullets for storage of LPG is a fail-safe especially for BLEVE.
5.3 ALTERNATIVE SITE
The bulk LPG storage and bottling facilities has been installed on the land leased in
SIPCOT Industrial Growth Centre near Gangaikondan village in Tirunelveli district. The
reasons favorable to setting up the bulk LPG storage and bottling facilities at SIPCOT,
Gangaikondan village are
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 5 – ANALYSIS OF ALTERNATIVES (TECHNOLOGY & SITE)
91
1. The bulk LPG storage and bottling facilities is located in the SIPCOT Industrial
Growth Centre, where basic infrastructure of roads, power, water etc. is readily
available.
2. Presently, there is no IOCL bottling plants in down south of Madurai, i.e. in the
districts of Tirunelveli, Tuticorin, and Kanyakumari. Hence, this plant will cater
to the demands of the above districts and Trivandram, Kerala.
3. There is an estimated saving of Rs. 14.48 Crores/annum towards logistic cost.
4. The site is located near high demand area.
5. There is no likelihood of any residential development in the vicinity of the bulk
LPG storage and bottling facilities.
6. Possible mutual aid in emergency will be available in the industrial area.
7. Adequate availability of land within the bulk LPG storage and bottling facilities
for future expansion.
Owing to the various advantages listed above, SIPCOT Industrial Growth
Centre, Gangaikondan was chosen.
5.4 ALTERNATIVES FOR LPG STORAGE AND FILLING FACILITIES
The bulk LPG storage and bottling facilities is located in SIPCOT industrial area,
where infrastructure facilities such as land, road, power, etc are already available.
No land acquisition is required and adverse impacts related to land acquisition will not
be appeared.
5.5 ALTERNATIVE FOR RISK REDUCTION FOR LPG
Liquefied Petroleum Gas (LPG) handling has many challenges due to its inherent
dangerous properties. Some of the major fires/explosions have underlined the need for
total in depth review of design, procedures maintenance fire fighting and safety aspects
in LPG handling.
For bulk LPG storage and bottling facilities, mounded storage bullets technology has
been selected as per OISD 150. The major benefit of mounded storage bullets is that it
eliminates possibility of BLEVE. The BLEVE in mounded storage cannot occur, therefore,
mounded storage of LPG is considered relatively safe in comparison to above ground
bullets and Horton Spheres. Further, mounded bullets will be automated and
cathodically protected, hence, possibility of release of LPG will be negligible and system
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 5 – ANALYSIS OF ALTERNATIVES (TECHNOLOGY & SITE)
92
will be relatively safe.
The cover of the mound protects the bullets from fire engulfment, radiation from a fire
in close proximity and acts of sabotage or vandalism. The area of land required to locate
mounded system is minimal compared to conventional storage. Mounded tanks are
semi-conventional pressure vessels, covered by a layer of sand and stone aggregates.
The cover of the mound protects the vessel from fire engulfment, radiation from a
fire in close proximity and acts of sabotage or vandalism. Details of mounded bullet
construction are as given below:
1. MOC for Bullets: MS - IS 2041/2062 Fr Steel Plates.
2. The dimensions of the mound are 9.11m (H) & 50m (L) x 64m (B).
3. Excavation up to a depth of 0.75 M is done for construction of mounded bullet
foundation (Below FGL).
4. Bullets are fabricated at site and positioned on sand bed
5. Total quantity of sand required is approximately 16,500 cu.m
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 6 – ENVIRONMENTAL MONITORING PROGRAM
93
6 ENVIRONMENTAL MONITORING PROGRAM
6.1 INTRODUCTION
Regular monitoring program for the environmental parameters is essential to take
account the changes in the environment due to bulk LPG storage and bottling
facilities. To ensure the effective implementation of the mitigation measures and
environmental management plan during operation phase of the LPG bottling plant, it
is essential that an effective environmental monitoring plan be designed and followed
during operation phases.
The objectives of environmental monitoring plan for bulk LPG storage and bottling
facilities are:
• To verify the results of the impact assessment study in particular with regards to
pipeline
• To follow the trend of concentration values of the parameters which have been
identified as critical
• To check or assess the efficiency of the mitigation measures
• To ensure that new parameters, other than those identified in the impact
assessment study, do not become critical through the bulk LPG storage and bottling
facilities.
The environmental monitoring is the primary tool for assessing the prevailing quality
of air, water, noise, land etc. The environmental monitoring helps in suggesting and
taking corrective course corrections, monitored parameters are exceeding. The
monitoring of various environmental parameters for ambient air quality, water
quality, noise levels, and soil quality will be carried out on a regular basis at and
around the bulk LPG storage and bottling facilities to ascertain the following:
• Pollution caused due to operations within the bulk LPG storage and bottling facilities.
• Change in environmental quality within and outside the bulk LPG storage and
bottling facilities
• To assess environmental impacts after operation of bulk LPG storage and
bottling facilities.
• Evaluate the efficiency of pollution control systems installed.
The environmental monitoring shall be periodic and comply with the promulgated
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 6 – ENVIRONMENTAL MONITORING PROGRAM
94
standards. The frequency of monitoring of various environmental components and
frequency to be monitored is given in Table 6.1.
6.2 ENVIRONMENTAL MONITORING SCHEDULES
6.2.1 Ambient Air Quality (AAQ) Monitoring
Ambient air quality parameters suggested during operation phase of the bulk LPG
storage and bottling facilities, are Particulate Matters (PM2.5), Particulate Matter
(PM10), Nitrogen Dioxide (NO2), Sulphur Dioxide (SO2) and Carbon Monoxide (CO).
These are to be monitored at designated locations starting from the commencement of
construction activities. Data should be generated 24 hourly during operation phase at
identified locations in accordance to the National Ambient Air Quantity Standards.
During operation phase, there will not be any major source of air emissions except DG
sets and vehicular emissions through LPG road bullet tankers and cylinder trucks
approaching for loading of LPG. Six monthly ambient air quality monitoring should be
carried out at boundaries of LPG plant for Particulate Matters (PM2.5), Particulate
Matter (PM10), Nitrogen Dioxide (NO2), Sulphur Dioxide (SO2) and Carbon Monoxide
(CO). Six monthly monitoring should be done for Total VOC in LPG Bullet tanker
unloading areas and LPG cylinder truck parking areas.
6.2.2 Water Quality Monitoring
At the bulk LPG storage and bottling facilities, there will not be any source for ground
and surface water contamination during construction and operation phases. However,
ground water sampling and analysis can be carried out at the bulk LPG storage and
bottling facilities during operation phases. The locations, duration and pollution
parameters to be monitored and necessary institutional arrangements are detailed
in the environmental monitoring plan. The monitoring of the ground water quality
will be carried out at one location in accordance to Indian Standard Drinking Water
Specification-IS 10500 for relevant parameters as directed by Tamil Nadu Pollution
Control Board (TNPCB).
6.2.3 Noise Levels Monitoring
During operation phase of LPG bottling plant, noise will be generated due to
cylinder handling, DG sets operation, vehicles/truck movement. The measurement of
noise levels would be carried out at suggested locations in accordance to the
Ambient Noise Standards formulated by Ministry of Environment, Forest and Climate
Change (MoEF&CC).
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 6 – ENVIRONMENTAL MONITORING PROGRAM
95
Noise levels would be monitored on twenty-four hourly basis. Noise measurements
should be recorded at “A” weighted frequency using a slow time response mode of
the measuring instrument. The noise measurement location and duration are detailed
in the environmental monitoring plan.
6.3 ENVIRONMENTAL MONITORING PLAN
Environmental monitoring plan for operation phases of the bulk LPG storage and
bottling facilities is given in Table 6.1.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 6 – ENVIRONMENTAL MONITORING PROGRAM
96
Table 6-1 Environmental Monitoring Plan for LPG Bottling Plant
Environmental Component
Project stage
Parameter Standards Location Duration /
Frequency Implementation Supervision
Ambient Air Operation
Phase
VOC/HC in
IOCL LPG
Plant Area
--
- LPG Unloading
Facilities
- LPG Truck
Bullet
Parking Area
Six Monthly
Environmental
Cell of IOCL or
MoEF&CC/
NABL approved
monitoring
agency
IOCL
PM2.5, PM10,
SO2, NO2,
CO & HC on
Boundary of
IOCL LPG
plant
National
Ambient
Quality
Standard
s
At boundary wall
in upwind and
down wind
direction at
boundary of
bulk LPG
storage and
bottling
facilities
Continuous 24
hourly once in a
month.
IOCL through
MoEF&CC/
NABL approved
monitoring
agency
IOCL
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 6 – ENVIRONMENTAL MONITORING PROGRAM
97
Environmental Component
Project stage
Parameter Standards Location Duration /
Frequency Implementation Supervision
Water Quality Operation
Phase
As per IS:
10500 for
relevant
parameters
in
consultation
with TNPCB
As Water
quality
standards
(IS 10500)
bulk LPG storage
and bottling
abilities
Once in a year
IOCL through
MoEF/TNPCB/
NABL
approved
monitoring
agency
IOCL
Noise
Measurements
Operation
Phase
Noise Level in
dB (A)
As per
National
Noise
standards
At LPG
bottling plant
• LPG
Unloading
Facilities
LPG Truck
Tanker
Parking Area
24-hourly
measurement,
once quarterly.
IOCL through
MoEF/TNPCB/
NABL approved
monitoring
agency
IOCL
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 6 – ANALYSIS OF ALTERNATIVES (TECHNOLOGY & SITE)
98
6.4 LPG leak detection mechanism
The leakage of LPG will be monitored through gas monitoring sensors (GMS) that have
installed at strategic points inside the bulk LPG storage and bottling facilities premises.
At present there are 35 Nos. of GMS sensors have been installed which are connected
to a PC in the control room for monitoring the leak levels. The sensors will give initial
alarm at 20% LEL and continuous alarm at 60% LEL so that the leakage can be
controlled before the concentration of LPG reaches its lower explosive limit. The
records will be analyzed on daily basis by the concerned officer and faults are
rectified on immediate basis.
All the persons working inside the plant premises will be mandated to wear
protection devices such as safety shoes and safety helmets in order to protect them
from fatal injuries. Safety week will be celebrated every year to create awareness
among persons in order to develop a good culture. To monitor the health of people
working in plant a doctor will be appointed who visits the plant three times a week
and free check-ups will be carried out for all the persons in the plant.
6.5 Health, safety & environment management cell
In order to implement the environmental management program efficiently within
the organization, periodical monitoring as per statutory guidelines and midcourse
corrections/actions, if required based on the environmental monitoring results,
management intends to establish environmental cell for successful implementation.
The roles & responsibilities are clearly defined among the personnel within the
environmental cell. The responsibilities of personnel are given in Table 6.2.
Health, Safety & Environmental Policy of IOCL is shown in Figure 6.1.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 6 – ANALYSIS OF ALTERNATIVES (TECHNOLOGY & SITE)
99
Figure 6-1 Health, Safety & Environmental Policy of IOCL
Table 6-2 Responsibilities of Personnel of the HS&E Cell
Designation Responsibility
Plant Manager
Over all planning, execution and management of environmental
Protective measures and monitoring of parameters and
various Socio- economic measures, disaster management
measures and training programs regularly.
Safety In charge
To ensure the activities are carried out as per the OSHAS standard and All the employed given safety a primary importance while
working at the Lease Area.
Manager- In charge
Overall in-charge of Monitoring of Environmental parameters and
Effectiveness of environmental protective measures taken and decide about the additional protective measures in safeguarding the overall ecology and environment.
Medical Officer
(Part Time)
Healthy check-up of working persons, for identifying occupational
Health hazards, if any. The doctor will be available 3
days/week for periodic health monitoring.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
100
7 RISK ASSESSMENT
7.1 INTRODUCTION
Industrial plants deal with materials, which are generally hazardous in nature by
virtue of their intrinsic chemical properties or their temperature or pressure of
operation or a combination of these. Fire, explosion, hazardous release or a
combination of these are the hazards associated with industrial plants. These have
resulted in the development of more comprehensive, systematic and sophisticated
methods of Safety Engineering such as Hazard Analysis and Risk Assessment to
improve upon the integrity, reliability and safety of industrial plants.
The primary emphasis in safety engineering is to reduce risk to human life and
environment. The broad tools attempt to minimize the chances of accidents occurring.
There always exists, no matter how remote, that small probability of a major accident
occurring. If the accident involves highly hazardous materials in sufficient large
quantities, the consequences may be serious to the plant, to surrounding areas and the
populations therein.
7.2 RISK ASSESSMENT AND HAZARD IDENTIFICATION
Risk is defined as the unwanted consequences of a particular activity in relation
to the likelihood that this may occur. Risk assessment thus comprises of two variables,
magnitude of consequences and the probability of occurrence of accident.
The first step in risk assessment is identification of hazards. Hazard is defined as a
physical or chemical condition with the potential of accident which can cause
damage to people, property or the environment. Hazards are identified by careful
review of plant operation and nature of materials used. The various scenarios by
which an accident can occur are then determined, concurrently study of both
probability and the consequences of an accident is carried out and finally risk
assessment is made. If this risk is acceptable then the study is complete. If the risk
is unacceptable then the system must be modified and the procedure is restarted.
7.3 LIQUEFIED PETROLEUM GAS (LPG)
Liquefied Petroleum Gas (LPG) is a colourless and odourless gas. It is highly flammable
at normal temperature and pressure (flammability limits 2.2% to 9.6 % in air),
therefore there should be no ignition sources in close proximity to areas where LPG
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
101
is stored and handled.
On release it may give rise to both fire and explosion hazards. LPG is a blend of Propane
and Butane, readily liquefied under moderate pressure. LPG has a density of 1.5 to
2.1 and is heavier than air, therefore, difficult to disperse. It should never be used or
stored below ground, as this could result in asphyxiation when released in a confined
space. Since LPG has only a faint scent, a mercaptan odorant is added to help in
detection of its leakage especially when used as a domestic fuel. In the event of a
LPG leak, the vapourisation of liquid cools the surrounding atmospheric air and
condenses the water vapour contained in it to form a whitish fog, which is easy to
observe. LPG in fairly large concentrations displaces oxygen leading to a nauseous or
suffocating feeling.
Physical and chemical properties of
LPG are as given below : Boiling Point
: - 42 ºC - 0ºC
Vapour Pressure : 300 – 1400 kPa @ 40ºC
Solubility in Water @ 20ºC : < 200ppm
Physical State : Liquid (gas at ambient pressure)
Colour : Colourless
Specific Gravity : Liquid 0.51 – 0.58 (water = 1)
Vapour : 1.52 – 2.01 (air = 1)
Autoignition Temperature : 466.1 ºC Flammable Limits LEL
- Lower Flammability Limit (LFL) : 2.2% (in air v/v) Flammable Limits UEL
- Upper Flammability Limit (UFL) : 9.6% (in air v/v)
As part of LPG storage and filling facilities, IOCL has opted for mounded bullets
for storage of LPG. Hence in this case, there is no possibility of Boiling Liquid
Expanding Vapour Explosion (BLEVE) as in the event of early fire, flame impingement
or heating of bullet will not be possible on mounded bullet. Therefore, from mounded
bullets, release of LPG is possible only from leakage in piping, valves or flanges, etc.
7.4 HAZARDS FROM LPG STORAGE AND HANDLING
7.4.1 Jet Fire
If released LPG is ignited immediately, jet fire may take place. The extent of injury to
people depends on the heat flux and duration of exposure to heat.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
102
7.4.1 Vapour Cloud Explosion
If released LPG is not ignited immediately, the cloud of vapour LPG will spread in the
surrounding area. LPG vapours are heavier than air and tend to settle down at lower
level.
As long as the LPG concentration is between the lower and higher flammability
limits, the LPG vapour cloud may be set on fire by an ignition source. For generation
of over pressure effect, some degree of confinement of the flammable cloud is required.
7.4.2 Flash Fire
When released quantities of LPG are not ignited immediately, vapour cloud of LPG
spreads in the surrounding area, some portion of LPG vapour cloud will have LPG
concentration between the lower and upper flammable limits, the LPG vapour cloud
may be set on fire by an ignition source in entire length of flammable LPG vapour cloud
resulting flash fire. In the event of flash fire, essentially, no over pressure effect is
possible.
7.5 HAZARDOUS CONDITIONS DUE TO RELEASE OF LPG
As a result of release of LPG followed by immediate or delayed ignition, following
hazardous conditions may be encountered
7.5.1 Thermal Effects
In case of jet fire, thermal effect is likely to cause injury or damage to people and
damage to objects. A substantial body of experimental data exists and forms the basis
for thermal effect estimation. The consequence caused by exposure to heat radiation is
a function of:
• Radiation energy onto the human body [kW/m2]
• Exposure duration [sec]
• Protection of the skin tissue (clothed or naked body)
The following damage distances for thermal radiation are used in the risk analysis
37.5 kW/m2 : Damage to process equipment. 100% fatality in 60 s exposure.
1% fatality in 10 s exposure.
12.5 kW/m2 : First degree burn in 10 s exposure
4.0 kW/m2 : First degree burn in 30 s exposure
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
103
7.5.2 Delayed Ignition and Explosion
In case of delayed ignition of LPG cloud, two physical effects may occur in following
ways:
• Flash fire over the whole or part of the LPG vapour cloud;
• Vapour cloud explosion that results in blast wave with typical peak
overpressures in circle around the ignition source. Vapour cloud explosion
to occur some degree of confinement is essential.
TNO Multi-energy method is used to calculate the blast overpressure. Table 7.1 gives
extent of damage with respect to the peak overpressure resulting from a blast wave:
Table 7.2 given provides an illustrative listing of damage effects caused by peak
overpressure.
7.6 IDENTIFICATION OF HAZARD FOR LPG UNLOADING AND STORAGE AND FILLING
7.6.1 Categories of Hazards
For identification of hazards during handling and storage of LPG, it is essential to
identify categories of hazard. Hazard categories, which may be responsible for
accidental release of LPG from expansion are listed in Table 7.3.
7.6.2 Hazard Identification (HAZID)
Hazard Identification (HAZID) for the LPG storage and billing distribution facilities has
been carried out for likely hazardous events which may cause major accident hazards.
A systematic investigation has been carried with special focus on external events
that could potentially impact the operation and safety of facility during transfer, storage
and distribution of LPG.
7.7 Release and Outcome Scenarios
Based on unloading conditions and storage & handling conditions of LPG at the
IOCL’s, maximum credible LPG release and outcome scenarios which may result during
operation of LPG storage and filling facilities are given in Table 7.4.
Table 7-1 Damage Effects Due to Overpressure
Peak Overpressure Extent of Type
0.830 bar Total Destruction
0.350 bar Heavy Damage
0.170 bar Moderate Damage
0.100 bar Minor Damage
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
104
Table 7-2 Illustrative Damage Effects due to Overpressures
Peak Overpressure (Bar) Failure
0.005 5 % Window Shattering
0.02 50 % Window Shattering
Peak Overpressure (Bar) Failure
0.07 Collapse of a roof of a tank
0.07-0.14 Connection failure of panelling
0.08-0.1 Minor Damage to Steel Framework
0.15-0.2 Concrete block wall shattered
0.2 Collapse of Steel Framework
0.2-0.3 Collapse of self-framing Steel panel building
0.2-0.3 Ripping of empty oil tanks
0.2-0.3 Deformation of a pipe bridge
0.2-0.4 Big trees topple over
0.3 Panelling torn off
0.35-0.4 Piping failure
0.35-0.8 Damage to Distillation Column
0.4-0.85 Collapse of pipe bridge
0.5 Loaded Train Wagon overturned
0.5 Brick walls shattered
0.5-1.0 Movement of round tank, failure of connecting
piping
(Source: TNO)
Table 7-3 Hazard Categories
Extreme Weather and Natural Disasters
• High winds;
• Squalls;
• Lightning;
• Cyclone;
• Earthquake; etc
Human Factors
• Occupational accidents;
• Improper and Inadequate training;
• Non availability of SOPs; etc
Process Upsets
• Pressure deviations;
• Temperature deviations;
• Flow deviations;
• Level deviations; etc
Structural Failures
• Subsidence;
• Seismic;
• Corrosion;
• Fatigue; etc
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
105
Loss of Containment
Corrosion;
Change in fluid properties;
Deviation in Design / Operating Conditions;
Unloading activities;
Maintenance activities;
Human errors during:
Operations maintenance;
Instrumentation; etc
Ignition sources:
Electrical;
Hot surface; etc
Inspection and Maintenance
• Confined Space;
• Non Accessibility;
• Reduced visibility;
• Non availability of maintenance and inspection schedules; etc
Table 7-4 Selected Scenarios for Consequence Analysis
S.No Release Source Failure Mode Possible Outcomes
1. LPG Bullet Tanker (18
MT)
Catastrophic Rupture
(Fire) of LPG Bullet
Tanker
BLEVE/Fireball, Thermal
Radiation
Flash Fire/Vapour Cloud
Explosion
2. LPG Cylinder
(14.2 kg)
Catastrophic Rupture
(Fire) of Cylinder
BLEVE/Fireball, Thermal
Radiation
Flash Fire/Vssapour Cloud
Explosion
3. Mounded Bullets 600 MT
Failure of SRV for 15
Minutes
Jet Fire
Flash Fire/ Vapour Cloud
Explosion
4. LPG Pump Release of LPG
Jet Fire
Flash Fire/Vapour Cloud
Explosion
7. LPG Compressor Release of LPG
Jet Fire
Flash Fire/Vapour Cloud
Explosion
7.8 CONSEQUENCE ANALYSIS
Subsequent to the accidental release of a LPG, the consequence depends on various
factors e.g. type and quantity, presence and location of an ignition source,
meteorological conditions, etc. The consequence analysis for the selected accident
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
106
scenarios for LPG release has been carried out to estimate the effect distance or
vulnerability zone. Once the effect distances are computed for various failure cases,
risk can be quantified and appropriate measures can be taken for risk mitigation
to eliminate damage to life and property and enhance the safety.
7.8.1 Model Used For Consequence Analysis
The risk assessment study involves a large number of computations for which
established computing aids are essential.
PHAST (Version 6.53.1) software of DNV has been used to perform the consequence
calculations. PHAST is a consequence analysis software for calculation of physical
effects (fire, explosion, atmospheric dispersion) of the escape of hazardous materials.
PHAST software allows detailed modeling and quantitative assessment of release of
pure chemicals and mixtures.
7.8.2 Consequence Analysis for LPG Release Scenarios
The consequence analysis has been carried out for various LPG release scenarios as
described in Table 7.4 of Chapter 7. Out comes of consequence analysis have been
described in subsequent section.
7.8.2.1 Rupture of 18 MT Bullet Tanker In the event of catastrophic rupture of 18 MT LPG bullet tanker, BLEVE may be occurred
on immediate ignition. Various outcomes in the event of catastrophic rupture of
LPG bullet tanker will be as given below under different stability classes:
BLEVE: Fire Ball Occurrence
Outcome Parameters 18 MT LPG Bullet Tanker
Duration of Fire Ball, (s) 78.25
Radius of Fire Ball, (m) 10.88
Fireball Lift Off Height (m) 156.51
Flame Emissive Power (kW/m2) 285.56
Thermal Radiation: Fireball Ellipse
Radiation Effects B, 3 m/s D, 3 m/s E, 2m/s
4 (kW/m2) 439.01 449.199 439.01
12.5 (kW/m2) 237.853 237.853 237.853
37.5 (kW/m2) 78.2269 78.2269 78.2269
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
107
Late explosion worst case radii for fire ball due to catastrophic rupture of 18 MT bullet
truck are as given in Table 7.1:
Figure 7-1 Late Explosion Worst Case Radii for 18 MT
Flash Fire Envelope Concentration Distance (m)
Note: All values are in m
Flash fire envelope due to catastrophic rupture of 18 MT bullet truck is shown in Figure 7.2.
Concentration B, 3 m/s D, 3 m/s E, 2m/s
Furthest Extent (LEL) 222.883 224.435 222.682
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
108
Figure 7-2 Flash Fire due to Rupture for 18 MT Bullet Truck
7.8.2.2 Rupture of 14.2 Kg LPG Cylinder In the event of catastrophic rupture of 14.2 kg LPG cylinder, BLEVE may be occurred
on immediate ignition. Various outcomes in the event of catastrophic rupture of LPG
cylinder will be as given below under different stability classes:
BLEVE: Fire Ball Occurrence
Outcome Parameters 14.2 Kg LPG Cylinder
Duration of Fire Ball, (s) 7.67
Radius of Fire Ball, (m) 1.70
Fireball Lift Off Height (m) 15.35
Flame Emissive Power (kW/m2) 150.12
Thermal Radiation: Fireball Ellipse
Radiation Effects B, 3 m/s D, 3 m/s E, 2m/s
4 (kW/m2) 37.4981 37.9695 37.4981
12.5 (kW/m2) 19.3709 19.3709 19.3709
37.5 (kW/m2) 4.39453 4.39453 4.39453
Note: All values are in m
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
109
Intensity radii for fire ball due to catastrophic rupture of 14.2 kg cylinder are as given in Figure 7.3:
Figure 7-3 Intensity Radii for Fireball for 14.2 kg LPG Cylinder
UEL & LEL Concentrations Distance (m)
Concentration B, 3 m/s D, 3 m/s E, 2m/s
UEL 4.59188 4.5956 4.59643
LEL 27.4572 27.4699 27.1581
Note: All values are in m
Maximum Distance (m) at Overpressure Level due to Early Explosion
Concentration B, 3 m/s D, 3 m/s E, 2m/s
Overpressure (0.1 bar) 17.6617 17.6617 17.6617
Note: All values are in m
Late explosion worst case radii for fire ball due to catastrophic rupture of 14.2 kg
LPG cylinder are as given in Table 7.3:
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
110
Figure 7-4 Late Explosion Worst Case for 14.2 kg LPG Cylinder Flash Fire Envelope
Concentration Distance (m)
Note: All values are in m
Flash fire envelope due catastrophic rupture of 14.2 kg LPG cylinder is shown in Figure 7.5.
Concentration B, 3 m/s D, 3 m/s E, 2m/s
Furthest Extent (LEL) 27.4572 27.4699 27.1581
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
111
Figure 7-5 Flash Fire due to Rupture for 14.2 Kg LPG Cylinder
7.8.2.3 Release of SRV of Mounded Bullets of 600 MT
I. Jet Fire on Immediate Ignition
On release of LPG from SRV of mounded bullets, jet fire will be occurred on
immediate ignition. Thermal radiation distances from jet fire are given below:
Radiation Level Thermal Radiation Level Distances (m)
B, 3 m/s D, 3 m/s E, 2m/s
37.5 kW/m2 Not Reached Not Reached Not Reached
12.5 kW/m2 Not Reached Not Reached Not Reached
4 kW/m2 42.72 42.72 42.72
Thermal radiation intensity distance from jet fire are presented in Figure 7.6.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
112
Figure 7-6 Thermal Intensity from Jet Fire due to Release from SRV
II. UEL and LEL Concentration Distances
In the event of release of LPG from SRV of mounded bullets, vapour cloud will be
formed if it is not getting source of ignition. LPG vapours under UEL and LEL
concentration will be occurred at following distances.
Concentration UEL and LEL Concentration Distances (m)
B, 3 m/s D, 3 m/s E, 2m/s
UEL 0.145 0.148 0.147
LEL 2.316 2.796 2.606
UEL and LEL Concentration Height
Concentration UEL and LEL Concentration Height (m)
B, 3 m/s D, 3 m/s E, 2m/s
UEL 11.38 11.51 11.53
LEL 25.104
26.573
25.33
III. Flash Fire Envelope
On ignition of LPG vapours within UEL and LEL, flash fire envelope will be
formed as details given below:
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
113
Flash Fire Envelope (m)
B, 2 m/s D, 3 m/s E, 2m/s
Furthest Extent 2.316 2.796 2.606
Flash fire envelope distances are also presented in Figure 7.8.
Figure 7-7 Flash Fire Envelope Distance
7.8.2.4 Release of LPG from Pump
I. Jet Fire on Immediate Ignition
On release of LPG from pump, jet fire will be occurred on immediate ignition.
Thermal radiation distances from jet fire are given below:
Radiation Level Thermal Radiation Level Distances (m)
B, 2 m/s D, 3 m/s E, 2m/s
37.5 kW/m2 Not Reached Not Reached Not Reached
12.5 kW/m2 10.09 10.09 10.09
4 kW/m2 18.97 18.97 18.97
Thermal radiation intensity radii from jet fire are also presented in Figure 7.8.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
114
Figure 7-8 Radiation vs. Distance from Jet Fire due to Release from Pumps
II. UEL and LEL Concentration Distances
In the event of release of LPG from pump, vapour cloud will be formed if it is not
getting source of ignition. LPG vapours under UEL and LEL concentration will be
occurred at following distances.
Concentration UEL and LEL Concentration Distances (m)
B, 3 m/s D, 3 m/s E, 2m/s
UEL 0.084 0.083 0.079
LEL 1.038 1.073 1.041
UEL and LEL Concentration Height
Concentration UEL and LEL Concentration Height (m)
B, 3 m/s D, 3 m/s E, 2m/s
UEL 5.079 5.15 5.21
LEL 9.020 9.34 9.46
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
115
III. Flash Fire Envelope
On ignition of LPG vapours within UEL and LEL, flash fire envelope will be formed
as details given below:
Flash Fire Envelope (m)
B, 3 m/s D, 3 m/s E, 2m/s
Furthest Extent 1.038 1.073 1.041
Flash fire envelope distances are also presented in Figure 7.9.
Figure 7-9 Flash Fire Envelope due to Release from Pump
7.8.2.3 Release of LPG From Compressor
I. Jet Fire on Immediate Ignition
On release of LPG from compressor, jet fire will be occurred on immediate ignition.
Thermal radiation distances from jet fire are given below:
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
116
Radiation Level Thermal Radiation Level Distances (m)
B, 3 m/s D, 3 m/s E, 2m/s
37.5 kW/m2 5.21375 5.21375 5.21375
12.5 kW/m2 13.5293 13.5293 13.5293
4 kW/m2 23.4757 23.4757 23.4757
Thermal radiation intensity radii from jet fire are also presented in Figure 7.10.
Figure 7-10 Radiation vs. Distance from Jet Fire (Compressor)
II. UEL and LEL Concentration Distances
In the event of release of LPG from compressor, vapour cloud will be formed if it
is not getting source of ignition. LPG vapours under UEL and LEL concentration will
be occurred at following distances.
Concentration UEL and LEL Concentration Distances (m)
B, 3 m/s D, 3 m/s E, 2m/s
UEL 0.087 0.082 0.072
LEL 1.126 1.198 1.21
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
117
UEL and LEL Concentration Height
Concentration UEL and LEL Concentration Height (m)
B, 3 m/s D, 3 m/s E, 2m/s
UEL 3.80125 3.88819 3.95768
LEL 9.10101 9.63366 9.90947
III. Flash Fire Envelope
On ignition of LPG vapours within UEL and LEL, flash fire envelope will be formed
as details given below:
Flash Fire Envelope (m)
B, 3 m/s D, 3 m/s E, 2m/s
Furthest Extent 1.126 1.198 1.21
Flash fire envelope distances are also presented in Figure 7.11.
Figure 7-11 Flash Fire Envelope due to Release from Compressor
7.9 FAILURE FREQUENCY DATA BASE
An incident frequency can be derived from internationally well- known generic
databases in case the design is sufficiently similar to facilities represented in the
historical failure records. This database can be used to meet the project scope
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
118
requirements including LPG storage facility failure data. Using these data, the
frequencies of incidents can be estimated. The frequency of each incident is equal of
the failure frequencies of all individual components.
7.9.1 Flanges
For flanges, industrial sources give figures covering the range of 6E-4 (in LPG service)
to 1.6E-4 (in liquid ammonia service) failures per year. Whittle (1993) quotes a lower
failure rate of 6.2E-5 failures per year, while the failure rate quoted by Sooby (1992)
is even lower by over an order of magnitude of 3.3E-6 failures per year. Since the
quality of the pipe flanges varies enormously with application, it seems sensible to
regard this range as a reflection of flange and gasket quality. A failure frequency of 1E-
5 per year is used for high quality flanges (e.g. raised face, ring type, or grey lock
flanges used in high pressure, high temperature service). An analysis of flange failure
hole sizes shows them to be small. The analysis shows that the maximum equivalent
hole diameter for a flange leak from a 6 inch (15 mm) pipe is 12 mm. It has been
assumed that for pipes greater than 6 inch (15 mm) in diameter that 10% of all
flange leaks contribute to leaks in the range of 10 to 50 mm (i.e. 25 mm holes). For
pipes of 6 inch (15 mm) diameter or smaller all leaks are taken to fall into the 0 to 10
mm hole size range (i.e. 5 mm holes).
Table 7.5 summarizes the leak frequencies for flanges by hole size. Table 7-5 Frequencies of Flange Failure
S.No Hole size(mm) Failure Rate /year
1. 5 9.0 E-5
2. 25 1.0 E-5
3. Total 1.0 E-4
Leak frequencies for valve and flanges are summarized in Table 7.6 by hole size. Table 7-6 Frequencies of Valves and Flange Failure
S.No Hole size(mm) Failure Rate /year
1. 5 4.22 E-5
2. 25 1.38 E-4
3. Rupture 5.11 E-5
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
119
7.9.2 Pressure Vessel Failure Frequencies
All pressure vessels are subject to cracks of various sizes. If a crack propagates
across the whole of a vessel shell, the contents are released rapidly and a “catastrophic
rupture” is said to have occurred. Smaller cracks lead to discharge over a period of
time depending on the crack size and the vessel inventory. These are referred to as
“leaks”. The failure frequencies for pressure vessels with respect to hole sizes are
summarized in Table 7.7.
Table 7-7 Frequencies of Pressure Vessel Failure
S.No Hole size(mm) Failure Rate /year
1. 5 3.7 E-5
2. 25 9.6 E-5
3. 100 9.7 E-6
4. Rupture 6.5 E-6
7.9.3 Pumps Failure Frequencies
The NPRDS Annual Reliability Report gives the most detailed leak data records for
pumps. Most of the pumps failures is detected whilst the system is in service, the
failure modes "leak" and "crack" contribute to the 5 mm leak category. The failure
modes "breach", "collapse" and "fracture/break" contribute to the 25 mm leak category.
All failures are considered as common-mode failures. The pump leak frequencies are
summarized in Table 7.8.
Table 7-8 Frequencies for Leakage of Pump
Equivalent Hole
Size (mm)
Leak Frequency/Item year
Centrifugal
Single Seal Double Seal
5 5.2 E-2 7.5 E-3
25 1.0 E-3 1.0 E-3
100 or Rupture 1.0 E-4 1.0 E-4
Total 5.31E-2 8.6 E-3
Note: Maximum equivalent hole size for pumps is considered to be 100 mm
7.9.4 Probability of Ignition
For the frequency assessment, it is necessary to estimate the probability of ignition if
a leak occurs. Ignition of a leak may occur either at the point or at some distance from
it. The cause of ignition may be the leak itself (e.g. a leak may generate static
electricity) or an ignition source, which then gives a spark and ignites the leak. The
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
120
information available on probability of ignition is mostly in the form of expert
estimates. Table 7.9 details the ignition probabilities used in the studies.
Table 7-9 Probabilities of Ignition for Leaks of Flammable Fluids
Continuous Release
(kg/s)
Ignition Probability
Immediate Delayed No
<10 0.2 0.05 0.75 10-100 0.5 0.1 0.4
>100 0.7 0.2 0.1
Source: TNO (LPG – Study)
For small (0-25 mm) leaks probability
• Jet Fire (Immediate ignition- 25% probability)
• Flash Fire (75% probability) For Medium (25-100mm) leaks probability
• Jet Fire (Immediate ignition- 25% probability)
• Flash Fire (75% probability)
The probability of ignition depends on the availability of a flammable mixture, the
flammable mixture and ignition source and the type of ignition source (energy etc).
7.10 RISK REDUCTION MEASURES
Risk Assessment study provides a quantitative technique for assessing the significance
of the impact of any facility on its external environment, highlights key areas for
greater attention and provides a tool for comparing alternative options. Though, it
cannot substitute for close attention to the fundamentals of safety throughout the
design process or for design reviews.
For risk reduction, attempts should be made to either reduce inventories that could
get released in the event of loss of containment or failure likelihood or both as far as
feasible. Risk Assessment identifies the dominant risk contributors, which enables
prioritisation of plants/section that deserve special attention in terms of inspection
and maintenance in particular and over all safety management as a whole.
7.10.1 Risk Mitigation Measures
The LPG bottling plant is major accident hazard installations under Manufacture,
Storage, and Import of Hazardous Chemicals. Rule, 1989 and subsequent amendments.
During design, construction and operation of the facilities, numbers of safety
provisions and risk reduction measures will need to be implemented and followed
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
121
meticulously in compliance with applicable acts, rules, regulations, codes, standards,
guidelines and best industry practices. This also includes provisions of not only state-
of-the-art equipment, control and instrumentation to enhance safety but also high
level induction and refresher
Safety trainings from senior management to contractual workers levels at the facilities.
Risk mitigation measures for the LPG bottling plant are described below:
7.10.2 Mounded Bullets
The mounded storage of LPG has proved to be safer as compared to above ground
storage vessels since it provides intrinsically passive and safe environment and
eliminates the possibility of Boiling Liquid Expanding Vapour Explosion (BLEVE). The
cover of the mound protects the vessel from fire engulfment, radiation from a fire in
close proximity and acts of sabotage or vandalism. The area of land required to
locate a mounded system is minimal compared to conventional storage.
The following measures are suggested during design, erection and operation of
mounded storage bullets for LPG.
i. Provisions of “OISD Standards 150: Design and Safety Requirements f or
Liquefied Petroleum Gas Mounded Storage Facility” shall be included in
design and operation.
ii. Each mound bullet shall have accessibility to fire tender from at least two
sides.
iii. Minimum separation distance between mounded LPG storage and any other
(other than LPG pump/compressor house) facility associated with LPG plant
shall be 15 meters. This distance to be measured from the edge of the mound
at finished ground level and also from the first valve on the vessel i.e. ROV.
iv. The minimum inter-distance between the edges of the vessel in a mound
shall not be less than 2 meters.
v. Proper provision shall be made for countering the consequences of the
settlement of the vessel under mound. The surrounding of the bottom
connection should be filled with such material that can absorb such
settlement.
vi. Provision shall be made to monitor the settlements of the mound by
providing permanent reference point. A minimum of three reference
points shall be installed to be able to also identify possible vessel bending
(One each near the vessel ends and one in the middle.)
vii. The fire safe Remote Operated Shutdown Valve (ROV) on liquid drain line
from the vessel shall be either from bottom of the vessel or from the top of
the vessel as per the design considerations.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
122
viii. In case of liquid drain line from the bottom of the vessel, the minimum
distance of 3 meters from the vessel to ROV shall be maintained. The nozzle
pipe shall have a slope of 1.5 Deg.
ix. There shall not be any other flanges, or any other tapping up-to the ROV
except in case of liquid drain line from top of the vessels.
x. Each vessel shall have at-least two pressure relief valves. The full flow
capacity of Pressure Relief Valves (PRV) on mounded vessels may be reduced
to not less than 30% of the capacity required for an equivalent size of above
ground vessel. For safety reasons, the discharge of Pressure Relief Valves
shall be connected to flare system. In this case Pressure Relief Valves (PRVs)
shall have lock open (or car seal open) type isolation valves on both sides
of Pressure Relief Valve.
xi. The Pressure Relief valves shall be tested and calibrated every year by
a competent person and records shall be maintained.
xii. Cathodic protection system shall be provided, maintained and tested routinely.
xiii. Any change in the system will be marked on P&ID. The system of
“Management of Changes” may be developed as per “Guidelines on
Management of Change” (OISD GDN 178).
xiv. Any repairs or modifications should be undertaken after statutory
approval from applicable authority.
xv. Each storage vessel shall have minimum two different types of level indicators and one independent high level switch. High level alarms shall be set at not more than 85% level of the volumetric capacity of the vessel.
xvi. Audio-visual indication shall be at local panel and control room.
xvii. Automatic fire detection and /or protection (Fixed) system based on heat
detection through thermal fuses/ quartz bulbs shall be employed. Sensors
shall be installed at all critical places including as described below:
• Minimum 1 detector shall be provided on each exposed portion of
the vessel. However if the nozzles are covered in a dome, each group
shall have 2 numbers of detectors.
• At least one near the each liquid line ROV to take care of failure of
flanges.
xviii. Suitable gas detectors shall be placed at critical locations in the LPG storage area such as, near the ROV, in inspection tunnel, near water draining/ sampling points, etc.
xix. Audio- visual alarms showing the location of gas leakage shall be provided
on the control panel in the control room. First level alarm can be set at 20%
LEL and second level alarm at 60 % LEL of LPG.
xx. All mounded storage vessels, LPG Pump Houses, Bullet Tanker Gantries shall
be fully covered by medium velocity water spray system.
xxi. LPG storage area, automatic detection of heat for automatic actuation of medium velocity sprinkler system having remote/ local operated deluge
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
123
valve with spray density of 10 lpm/m2 of surface area shall be provided.
xxii. Hydrant and monitor coverage shall also be provided on all four sides of
the mounds for adequate coverage of unprotected portions exposed to
thermal radiation including for top of the mound and for piping, in the
immediate vicinity of the mound. In view of accessibility of unprotected
portions of the vessels, for effectiveness, installation of remote operated
monitors at appropriate height shall be considered.
xxiii. Hydrant /monitors shall be located at a safe place around the mound. In
any case fire hydrant and/or monitors shall not be installed within 15
meters from the facilities/equipment to be protected.
7.10.3 Maintenance Schedules
The proper preventive maintenance schedule should be prepared to facilitate the
maintenance service to be rendered in a planned manner covering the necessary
work to be done, mentioning the periodicity i.e. daily, weekly, monthly, half yearly and
yearly schedules.
7.10.4 Electrical Hazards
Some Important measures to minimise electrical hazards are as given below:
• The classification of area for electrical installations at LPG storage and handling
facilities shall be as per OISD Standards 113.
• Inspection of electrical equipment shall be carried out as per OISD Standards
137.
• All electrical equipments shall be provided with proper earthing.
• Earth pits shall be periodically tested and maintained in good condition.
• Emergency lighting shall be available at all critical locations including fire pump
room, control room, etc.
• All electrical equipments shall be free from carbon dust, oil deposits, and grease.
• All electrical cable will be tagged for easy identification and cable routing shall
be planned away from heat sources, gas, water, oil, drain piping and air
conditioning ducts.
• All lights in LPG storage area, pump house, unloading bays, etc will be flame
proof.
• Provisions shall be made for approved insulated tools, rubber mats, shock proof
gloves and boots, tester, fuse tongs, discharge rod, hand lamp, insulated ladder.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
124
• Flame and shock detectors and central fire annoucement system for fire safety
shall be provided in MCC control panel room.
• Temperature sensitive alarm and protective relays to make alert and
disconnect equipment before overheating shall be provided.
• Danger from excess current due to overload or short circuit should be
prevented by providing fuses, circuit breakers, thermal protection, etc.
• Only carbon dioxide and dry chemical fire extinguishers shall be used
for electrical fires.
7.10.5 Fire Fighting Facilities
Fire protection system shall be designed in accordance with the requirements of OISD,
NFPA standards, design requirements and safe engineering practices. Fire fighting
facilities should have full capability for early detection and suppression of fire. The fire
fighting system will primarily consist of:
• Hydrant system
• Foam protection system
• Deluge sprinkler system
• Portable fire extinguisher
• Fire detection and alarm system
Presently, fire fighting facilities are available at IOCL’s LPG Bottling Plant. After
commissioning of LPG Storage and filling facilities, fire fighting facilities should be
augmented as per relevant OISD/NFPA/TAC Standards. Fire water requirement and
fire water storage shall be evaluated for two fires for 4 hours at any point of time in the
Plant.
The following facilities are available in the plant:
Water storage capacity = 2500 Kl x 3 Nos
Fire water pumps = 3 Nos (main 2x 615 cum/hr & standby 1 x 615 cum /hr)
Jockey pumps - 2 Nos (10 cum/hr)
Hydrant Points (Double Head), Water Monitors, Sprinklers, Deluge valve systems are
installed for the project.
Automatic Medium Velocity Water Sprinkler System:
The system has been provided on all operating areas and considered to be a very
effective fire fighting system.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
125
It has a control valve or deluge valve which when actuated, will deluge water into
protect spray installation and give an effective spray cover to the area.
An additional feature, compressed air lines with heat detectors or quartzoid bulbs
which breaks at 79 oC and actuates the sprinkler system facility automatically.
Remote actuating / Solenoid valve facility is available near security
room.
Public Addressing System
This is an intrinsically safe, internal communication system which facilitates internal
communication as well as public address.
Intercom
This Intercom connected to P & T line can be used for communication internally and
externally at Main Office.
Occupational Health, Safety & Environmental Features in the
Project Process Safety & Safety Features
Process Safety focuses on the prevention of fires, explosions and accidental chemical
releases at LPG Bottling facilities.
Safety Management Systems
The Safety Officer in co-ordination with Shift-in-Charge review all plant operations to
identify potential unsafe conditions and / or potential problems which may lead to
health or safety exposures.
Plant personnel shall work with the Safety Officer to identify potential problems
and to identify proper operational procedures and the operational areas of the plant.
Actions to be taken include equipment or procedural changes, development of
exposure monitoring strategies, and inclusion of warning statements in procedures.
Hazard Analysis by the Team
QRA studies are conducted at plant before commissioning and also applied to the
installation and modification of buildings, equipments, mechanical and electrical
systems, utilities, fire protection system, grounds etc. Plans or specifications on
designated projects shall be submitted to an acceptance committee consisting of
Operations Manager, Engineering. Manager, Safety Manager for review prior to
project implementation. Recommendations will be submitted with the final plans
and specifications to the Departmental head for review. If the departmental head finds
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
126
that plans and specifications are not meeting the recommendations of the acceptance
committee, he shall return the final plans to the originator for modifications or a
justification of deviations.
Inspections
The officer in charge of each function are responsible for ensuring the timely
completion of periodic inspections and correction of problems.
The frequency of specific inspections is as follows:
Safety Facilities in the Plant
• Leak detection, prevention
• Elimination of source of ignition
• Fire prevention / fighting
• Communication, First aid, Rescue and Personnel protection equipment.
The facilities are detailed below.
Leak Detection:
Gas Monitoring System:
The system consists of gas detecting sensors with a control panel and audio / visual
alarms. The sensors were located at sensitive or potential hazard areas in the plant
with two audio alarms at security room and Filling shed to alert workmen regarding
the risk and continuous monitoring / recording in PC at control room .
Leak Prevention / Minimizing:
Air / Vapour Extraction System: It is basically a blower with ducts extended to
different operating points in filling shed. The blower extract any leaking LPG vapour
from the floor level and cold flares the same to free atmosphere at LPG cylinder filling
shed.
Remote Control Valves:
These are electro – pneumatically operated quick shut off valves provided on LPG
pipelines with actuating points located remotely and nearer to operating facilities
in plant. When actuated, the valves will close within 25 seconds, starving the LPG
flow in pipelines. The ROV’s are installed at the following locations:
• Storage bullets Liquid & Vapour lines
• TLD liquid lines
• LPG Pump out let lines near filling shed
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
127
ROV’s Interlock with High Level Alarm
All LPG bulk mounded vessels are fitted with High Level Alarm switches which gives
alarm when product reaches 85% of its volume. A signal has been taken from HLA to
actuate the ROV to close which will stop the flow of liquid into vessels. This stops the
over filling/flowing of LPG into vessels.
Ignition Sources
Another identified potential source for Fire accidents is “Ignition”. To eliminate such
sources, following are ensured.
Safety Equipments:
Electrically operated siren : 1 Nos. ( 3KM )
Hand Operated Siren : 8 Nos. In addition following First Aid / Rescue and Personnel Protection Equipments are
available. Breathing Apparatus : 1 sets (1 Spare cylinders)
Fire Proximity Suits : 1
Safety Helmets : 60
Rubber Hand Gloves : 2 Pairs
Resuscitator : 2
Safety Belt with Harness : 2
Explosive Meter : 2
Stretchers : 2
First Aid Boxes : 4
Leak Sealing Pad : 1
Water jel blankets : 2
Voltage & Current Detector : 1
Red / Green flags : 1 set
Fire Extinguishers
DCP - 9 kg Capacity : 97
75kg Capacity : 05
CO2 - 4.5 kg Capacity : 14
Foam Type– 9 lit : 05
7.10.6 Control Room
• Control room shall be located at a sufficient distance from operating areas
• All control room should be blast proof and shock proof.
• Critical switches and alarm should be always kept in line.
• Minimum number of doors shall be provided in the control room while
at least two door should be provided for safe exit during emergency.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 7 – RISK ASSESSMENT
128
• Smoke detection system shall be provided for control room.
7.10.7 Safety Audit and Inspection
Checklist based routine inspection and safety audits should be carried out in line with
OISD - 144 for mounded bullets, pumps, piping and unloading bays, etc. Any gap or
noncompliance should be implemented on priority in time bound manner.
7.10.8 Induction and Refresher Safety Trainings
The provision shall be made for structured induction and refresher safety trainings
for LPG handling system from senior management to contractual workers levels at the
facilities.
7.10.9 Emergency Response Plan
Anticipating and planning for various contingencies is crucial for ensuring the success
of any emergency response actions in an actual Emergency Situation. On-site
Emergency response plan shall be prepared for LPG Storage and filling facilities, to take
the action in an unlikely event of emergency due to accidental release of LPG.
Emergency Response Plan should be updated based on findings of mock drills.
7.10.10 Mock Drill Exercises
Mock drill should be conducted once in six months. Exercises or drills have two
basic functions, namely training and testing. While exercises do provide an effective
means of training in response procedures, their primary purpose is to test the
adequacy of the emergency management system and to ensure that all response
elements are fully capable of managing an unlikely emergency situation.
Mock drills are best means of accomplishing the following goals and
objectives:
• To reveal weaknesses in the plans and procedures before emergencies occur.
• To identify deficiencies in resources (both in manpower and equipment).
• To improve the level of co-ordination among various response personnel,
departments and agencies.
• To clarify each individual’s role and areas of responsibility.
7.11 PUBLIC HEARING
M/s IOCL, Tirunelveli bottling unit conducted public hearing through TNPCB on
14.12.2018. The details of PH proceedings along with time bound action is enclosed as
Annexure VIII.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
129
8 DISASTER MANAGEMENT PLAN
The Disaster Management Plan (DMP) is prepared for meeting any emergency
response in the event of fire accident, hazards etc., through the effective and optimum
utilization of all the facilities inbuilt in the plant and available in the neighbouring areas
as such. This plan has got two sub chapters, First chapter guides for meeting the ‘On
- Site Emergency” and the Second chapter guides “Off - Site Emergency”.
This off- site emergency response is prepared to ensure the participation of all the
concerned civil agencies in and around this plant with a view to seek their preparedness
in meeting such emergencies and to bring about a coordinated task force involving in
district authorities. Fire service department, railways, factories inspectorate,
electricity board and other protection forces available in similar type of industries
meeting of all the above agencies is also the method of operation of ‘ On site
Emergency Plan / Disaster Management Plan”.
Disaster management plan will have necessary scope for review of its effectiveness
in its working and adapting to any new systems of further improving upon the
implementation of the plan itself.
GENERAL INFORMATION
Indian Oil Corporation Ltd, Bulk LPG Storage & Bottling Facility plant, SIPCOT
Industrial Growth Centre, Gangaikondan Village Tirunelveli Taluk and District, Tamil
Nadu – desired to get a risk assessment study carried out for their Liquefied
Petroleum Gas (LPG) storage facility located at Gangaikondan Village Tirunelveli Taluk
and District, Tamil Nadu.
This plant is spread over an area of 42 Acres land and is surrounded by its entire
periphery with 3 m height compound wall over which 0.6 m of barbed fencing is
provided. Inside of the periphery wall of the premises, a width of 30 m green belt
area is developed with all around asphalted ring road. 13.86 Acres area has been
earmarked for green belt development.
The plant is constructed meeting all the statutory requirements of state / central
government and international standards and specifications stipulated. The fire fighting
system and organization established here is capable of taking care of any type of
fire and hazardous occurrence incidental to the operation and maintenance of the
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
130
plant and to serve the neighbouring areas.
8.1 INTRODUCTION
Emergency/disaster is an undesirable occurrence of events of such magnitude and
nature that adversely affect production, cause loss of human lives and property as well
as damage to the environment. Industrial installations are vulnerable to various kinds
of natural and manmade disasters. Examples of natural disaster are flood, cyclone,
earthquake, lightning etc. and manmade disasters are like major fire, explosion,
sudden heavy leakage of toxic/poisonous gases, civil war, nuclear attacks, terrorist
activities, sabotage etc. It is impossible to forecast the time and nature of disaster,
which might strike an undertaking. However, an effective disaster management plan
helps to minimize the losses in terms of human lives, plant assets and environmental
damage and resumes working condition as soon as possible.
Risk analysis forms an integral part of disaster management plan and any realistic
disaster management plan can only be made after proper risk analysis study of the
activities and the facilities provided in the installation. Correct assessment and
evaluation of the potential hazards, advance meticulous planning for prevention
and control, training of personnel, mock drills and liaison with outside services
available can minimize losses to the plant assets, rapidly contain the damage effects
and effectively rehabilitate the damage areas.
Indane Bottling Plant, Tirunelveli is located in SIPCOT Industrial Area at Gangaikondan
in Tirunelveli District of Tamil Nadu State. It is located adjacent to NH-7 which
connects Varanasi & Kanyakumari and 18 km from Tirunelveli city. The LPG Bottling
Plant covers about 42 acres of land.
The nearest railway station is situated at Gangaikondan at a distance of 4KM(E).The
nearest Airport is situated at Tuticorin at a distance of 33.55 km (SW). The activity of
this plant is to receive LPG in bulk trucks. Transfer LPG from Truck to mounded
bullets, transfer of LPG from mounded bullets to filling in cylinders. The entire
operation is a sealed delivery system. Further in this location there is no manufacturing
activity. The only activity is to transfer tank of LPG from
Truck → Vessel → Cylinder Filling
At the bottling plant, Liquefied Petroleum Gas (LPG) is received through road tankers.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
131
The LPG is then stored in bullets and sphere and filled in cylinders for distribution using
integrated filling machines called Carousals.
The following were present at the existing facility:
1. LPG Mounded Bullet 600 MT - 3 No’s (Total LPG Capacity)
2. LPG Pump/ Compressor House
3. TLD shed (8 Bays)
4. Loading and Unloading shed
5. Filling / Empty Storage shed
6. Fire fighting facility as per OISD standard
7. 750 KVA Capacity DG set - 1 No
8. 250 KVA Capacity DG set - 1 No
This plant is having DMP consisting of onsite emergency and off site emergency plan
cleared by competent authorities. In this connection the following plans, documents
are available in the ERDMP available for the plant.
1. Location plan of the installation indicating sitting of the installation at
neighbouring details up to a distance of 2 km from the installation in each
direction.
2. Site plan of the installation showing a complete layout of the installation
indicating boundary walls, exit and entry gates and location of various facilities.
3. Layout of fire water systems and fire fighting equipment details.
4. Line block diagram of manufacturing process and Process Flow Diagram
(PFD) of each unit.
5. Material Safety Data Sheet (MSDS) for all hazardous chemicals stored,
handled, produced and transported in the installation.
6. Internal and external emergency contact numbers and addresses of police, fire
station, hospitals, mutual aid industry, factory inspectors, State Pollution
Control Board, Petroleum and Explosive Safety Organization (PESO), etc.
7. Addresses and telephone directory of technical support services such as
environmental laboratories, fire fighting chemical suppliers, public and
private consultant associated with emergency handling and aviation medical
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
132
services, if any.
8. Security threat plan.
9. Health Safety and Environment (HSE) policy
8.2 PLANT DATA
Table 8.1: Contact Details of IOCL Plant
Location of the Plant SIPCOT Industrial Growth Centre Gangaikondan - 627 352
Postal Address
Indian Oil Corporation Ltd.,
Indane Bottling Plant
SIPCOT Industrial Growth Center
Gangaikondan-627 352
Tirunelveli, Tamilnadu.
Telephone
Numbers
STD Code - 0462-2445133, 2445233
0462-2445133 (Fax),
Jurisdiction of the Factory Inspectorate DY. Chief Inspector of Factories, Tirunelveli
8.2.1 Product Handled Liquefied Petroleum Gas (LPG) Licensed Storage Capacity
Mounded Bullets Mounded Bullet - 1 600 MT
Mounded Bullet - 2 600 MT Mounded Bullet - 3 600 MT Total 1800 MT
Tanker Load Decantation (TLD) 8 Bays
8.2.2 Manpower Requirement
The manpower requirement for the LPG Bottling plant is as given below:
Regular Employees 10
Security Staff 20
Personnel Trained in First Aid 10
Others (Technicians/Helpers) 5
8.3 POLICY, OBJECTIVE & AUTHORITY OF THE PLAN
It is one of the well-conceived policy of IOCL that every responsible care caution and
effort shall be made to provide and maintain safe and health working atmosphere
for the men, materials and methods. The policy also endeavours to ensure that the
surrounding environment is also assured of utmost safety and health conditions.
The objectives of the plan is ‘Prevention’ as its foremost achievement of any accident
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
133
or happening of any hazard which will lead to personal injury or damage to people and
property. This is the absolute and integrated theme of the plan. And in achieving the
objectives, every employee of this plant shall be discharging his duties and
responsibilities by voluntary co-operation and participation in maintaining &
improving the safety standards and parameters.
As the plan envisages potential hazards conditions remaining within the plant, the
objective is to ensure that it does not invite threat to safety and health standards of
the general public. Preservation of life is given the foremost place while drawing out
the plan and all procedures are to be carried out to reduce risks to emergency personal,
rescue and medical activities will have their own priorities towards this end.
This plan encompasses all applicable central and state statutory requirements
governing the emergency situations. The following statutory agencies are involved as
pioneer agencies for this plan:
1. Factories Inspectorate
2. District Authorities
3. Police Authorities
4. Chief Controller of Explosives
5. Pollution Control Boards
6. Fire Service Authority
7. Electricity Authority
8. Medical Authority
8.4 PLANT SAFETY COMMITTEE
8.4.1 Purpose
The purpose of the plant safety committee is to encourage team work is addressing
safety concerns and promoting safety ideas. Presently two teams namely safety
committee and safety circle and safety committee will be on a rotational basis once in
two years. The safety committee and safety circle meet once in a month to discuss the
issues.
The safety committee / circle consist of representatives from workmen and
management. Plant manager will chair in the meeting and safety officer is
responsible for convening, conducting the meeting and implementation of the decisions
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
134
taken during the meeting.
8.4.2 Procedure
The plant safety committee will meet once in one month, ideas and concerns presented
at the meeting should be discussed agreed upon and corrective actions taken. The safety
officer will keep minutes of each meeting. The minutes will include the review of the
earlier minutes of the meetings names of those present, points presented & discussed
during the current meeting and items to be resolved.
Likewise safety circle will meet once in a month, Plant manager, safety officer and
minimum other four employees. The Plant Safety Officer will keep minutes of each
meeting as outlined in safety committee meeting and minutes will be posted to
regional operations and S & EP department.
8.4.3 Bottling Process and Product Specifications
This LPG bottling plant will be engaged in receipt of bulk LPG in bullets trucks, stores
and bottling of LPG in cylinders and supply to various customers/consumers/
distributors coming under marketing jurisdiction.
The plant will consist of receiving LPG in bulk bullets trucks (bullet trucks) from
refinery and import terminals and loading at the same in the plant in the storage
tanks and filling into the cylinders for subsequent dispatch to distributors. LPG
mainly consists of commercial butane and propane. It is stored in liquid from with
moderate increase in pressure and becomes gas under atmospheric conditions.
8.4.3.1 Specifications and Typical Characteristics of LPG
Table 8.2: Specifications and Typical Characteristics of LPG
Vapour Pressure at 65 C˚ 16.87/sqcm
Density of Liquid at 15 C˚ 0.525-0.570
Boiling Point (-) 18 oC to +6 oC
Gross calorific value 11400 Kcal/kg
Limits of flammability 1.8% to 9.2%
Theoretically maximum flame 2000 oC
Minimum ignition temperature 410 oC
• Liquid LPG is about half as heavy as water
• LPG vapour is about 1.5 to 2 times heavier than air. As a result of this
property, and leakage of LPG tends to settle down at floor level particular fly
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
135
in drains, pits etc.
• Coefficient of volumetric expansion of LPG is 100 times that of steel.
• When liquid LPG is released from a container or a pipe, it vaporizes
almost immediately. This cools the surrounding air and may cause water
vapour in the air to condense, freeze and become visible. In this way, LPG
leakage may be detected even the gas itself is invisible.
• LPG is distinctively odorized to give warning in case of leakage.
• Flammable mixture of LPG vapour and air will never ignite or explode unless
the ignition source is present.
• Evaporating product, especially in liquid form, can become cold enough to
cause frost burns on bare flesh.
• One volume of liquid LPG will expand to approximately 250 volumes of
vapour in air, Liquid LPG leaks; therefore create more hazards compared to
vapor Leaks. Pressure in a LPG vessel is independent of the amount of the
liquid within it as long as it is neither full nor empty of liquid. For any given
LPG, the temperature is the only variable, governing the pressure.
8.4.4 Other Important Properties
• LPG reaches lower limit of flammability very quickly as compared to other
gases. “Auto-Refrigeration” occurs when liquid LPG evaporates into gaseous
LPG.
• Presence of air in lines/vessels/cylinders will cause build-up of high pressure.
• Liquid LPG can cause “Cold Burns”
• Explosion can occur in case ignition of accumulated LPG air mixtures.
• LPG can be ignited by static electric charges, tiny sparks, etc., Pressure
inside a cylinder drops marginally with use.
8.4.5 Hazardous Substance
The following are the list of hazardous and consumable materials
received/stored and handled in the plant.
1. LPG – will be received through bullet trucks and stored in the mounded
bullets and bottling the same in cylinders.
2. HSD - Fuel for use in generators, fire engines.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
136
3. LUBEOILS - for lubricating engines and other machineries
4. CHIANKOTE - Soap solution for use in the conveyor systems
This plant will be receiving, storing and then filling the LPG in cylinders and supply
to the customers, consumers through distributors. The LPG is being received in bulk
through bullet truck from Chennai Petroleum Corporation Limited, Chennai and
Mangalore Refineries and Petrochemicals. Ltd., Mangalore. The bulk product received
through the bullet trucks will be stored in the storage bullets/sphere and then filled
into cylinders.
The filled cylinders and then transported through stack trucks to the authorized
distributors for supply and delivery to the consumers/customers. This distribution
is being done from the distributors end through open mini-lorries, tricycles etc.
8.5 CONCEPT OF EMERGENCY OPERATION
The basic concept of this disaster management plan is to provide a comprehensive
approach for managing emergencies. The following are the four class classified
approach towards managing the plan.
1. Prevention
2. Preparedness
3. Response
4. Recovery
1. Prevention includes all those activities that are aimed at elimination or
reduction in the probability of a disaster itself.
2. Preparedness includes all activities required for ensuring a high degree of
alertness top respond instantaneously to any accident/ disaster.
3. Response activities are those activities which refer to the measures taken
during the emergency occurrence to minimize / eliminate damage to the plant
and surrounding areas and prevent the loss of life.
8.5.1 Assumptions
The certain assumptions have been made in the course of designing this plan viz.
1. That the fire services, Police department, other emergency service agencies
shall be contracted and they shall be readily respond to an emergency
occurrence and will provide necessary support.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
137
2. That the Indane Bottling Plant, Tirunelveli of the IOCL, employees recognize and
will carry out their basic responsibilities in an emergency.
3. Thus the local fire police personnel and other local authorities will assume
their responsibility for On-site emergency response.
8.5.2 Situations
Situations for which the provisions if this plan are designed are those emergency
incidents where is a potential for severe consequences. This includes situations that
may not be limited to the Indane Bottling Plant alone and would involve a risk to life,
health, the environment or to property.
Technological disasters include a hazards occurrence such as materials
accident, fire, explosion, utility failure etc.
Natural disasters include earthquake, flood, wisdom etc.
Social disasters include bomb threat, arson, riot, labour strike, terrorism,
hostage incident etc.
Health disasters include epidemic, pollution etc.,
International crisis includes war, terrorism etc.,
8.6 HAZARDS
8.6.1 Hazards of LPG
8.6.1.1 Health Hazards Inhalation-Vapour Phase LPG in its pure form, is odourless and contains no toxic components and is therefore
non- poisonous, Ethyl Mercaptan is added to odorize LPG to help in detecting any
leakage.
Burns by Freezing
LPG in liquid form should not come in contact the surface of the body otherwise it will
flesh the freezing effect called “Cold Burn”. The result may be serious.
8.6.1.2 Fire Hazards
Product Discharge Liquid Phase
A liquid discharge is always more serious than a discharge in the vapour phase. As
liquid discharges and vaporises, the volume of liquid changes in to vapour volume
approx. 250 times greater, therefore a greater hazard exists.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
138
Fire (Fed by Vapour Discharge)
Fire fed by a vapour discharge may be elevated and not impinging upon tanks,
buildings etc. The vapour fed fire would normally burn relatively close to the point of
discharge.
Explosion
The distribution of LPG vapour within the atmosphere in people proportions and
within confined space can create an explosion should the source of ignition be
provided. Following on LPG explosion of fire nay be caused by the ignition of other
flammable materials or a continuous discharge of gas may burn.
8.6.1.1 Other Hazards
Leakage to atmosphere especially of liquid LPG will result in rapid vaporization
creating large volume of flammable Vapour. Because LPG is heavier than air it tends
to flow along the ground. Unless efforts are quickly made to disperse its
accumulation, it may at under normal conditions, remain there for a long time, with
the possibility of fire through an ignition source some distance away from the
source leakage. A very small proportion of vapour in air will give rise to flammable
mixture which can cause fire if source of ignition is present.
8.7 COPING MECHANISM
8.7.1 Coping within the Industry
• Full safety control mechanism which has incorporated, manpower
maintenance and human resource development programme in
addition to mechanical component/plant Maintenance.
• Built-in safety measures with a constant control over safety parameters and
access to information on component failure records with respect to plant and
machinery.
• Additional measures over and above statuary requirements to ensure
safety in plant operations, maintenance work procedure and storage codes.
• Compliance of statutory requirements under various safety regulations
currently enforced.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
139
8.7.2 Coping Mechanism at Community Level
• Calculated, well-organized formal and conscious effects to involve all
concerned agencies in disaster preparedness have been identified and mock
drills are planned / to be practiced.
• Informal pressure groups, social, non-governmental organizations have
been making efforts to organizations for community preparedness based
on available hazard information.
• Formal and specific hazards information exists in the majority of the
neighbouring general public but does not amount to concern for
preparedness to react cogently.
• Informal and general community awareness created by media etc. Exists
whereby only knowledge about possible major risk involving community
exists.
8.8 EMERGENCY PREPAREDNESS
The main features and elements of the disaster management plan are as follows
1. Emergency plan for the plant (On-Site)
2. Emergency plan for the surrounding area (Off-Site)
8.8.1 On Site Emergency Plan for the Plant
1. In the enclosed blue print of the premises of LPG plant premises, the
hazardous and non-hazardous zones have been indicated.
2. The emergency control will be the main administrative building where the
Fire In-charge will direct the entire operation. He will also coordinate
the entire operations with the key persons. The assembly points for pre-
designated persons from the works, contractors and other will be either
(a) area nearer to the main administrative building of (b) nearer to the
main gate security cabin which are non-hazardous areas.
8.8.1.1 Procedure for Meeting the Emergency
The following are the procedures for fighting the emergency situation.
1. Communications System
1. Public Address System - 1 no
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
140
2. Motorola handset Walkie-Talkie - 8+1 nos. (One base station + 6 handsets)
3. BSNL Telephones
4. Electrically operated siren
5. Hand operated siren
Attention all the employees working in the plant and also stack truck / bullet
truck crews contractors will be called for the emergency situations by operating the
Fire sirens.
2. Services & Control Systems
The following facilities and firefighting equipments / apparatus / installations are available.
1. Red / Green Flags - 2 nos (each)
2. Fire Pumps - Centrifugal pumps 5 nos.
- Capacity 615 m3 / Hr-88 m lead
3. Water Hydrant - Double hydrant - 44 nos.
4. Manual Call Points - 10 nos.
5. Hand Siren - 08 nos.
6. ETB - 06 nos.
7. Automated ROVs - 11 nos
8. Gas Monitoring System (No. of sensors) - 35 nos
9. Electrically operated fire sirens - 01 nos
10. Portable Mega Phone - 01 nos
11. Red/Green Flags - 02 sets
12. Bore wells - 03 nos
13. Sprinkler System - All area
14. 10 kg DCP Fire Extinguishers - 101 nos
15. 75 Kg DCP Fire Extinguishers - 05 nos
16. CO2 type Fire Extinguishers - 15 nos
17. Fire Hoses (15 m length) - 65 nos
18. Jet Nozzles - 28 nos
19. Universal Nozzle - 02 nos
20. Water Curtain Nozzle - 02 nos
21. Fire Hydrant Monitors - 44 nos
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
141
22. Sand Buckets - 08 nos
23. Water Gel Blanket - 02 nos
24. First Aid Box with Medicines - 04 nos
25. Safety Helmet - 50 nos
26. Breathing Apparatus - 01 nos
27. Resuscitator - 01 nos
28. Explosimeter - 02 nos
29. Stretchers - 02 nos
30. Fire Proximity Suit - 01 nos
31. Rubber Hand Gloves for electrical safety - 02 pairs
32. CO2 cartridges for 10 kg DCP - 101 nos
33. DCP bags - 1010 kg
34. Fire Trolley - 01 nos
3. Control Room
The control room is equipped with the following facilities for firefighting
emergency/hazardous situation
1. 1 no. Telephone
2. Main control - All car pager phone
3. Layout of the plant premises and the layout of the firefighting equipments
location.
4. Nominal roll of employees
5. List of key persons and their telephone numbers viz, fire station, police
station, hospital etc are available on a board prominently displayed.
6. Officer’s in-Charge available at the control room during working hours
including on Sundays and holidays / night hours.
4. Roll Calls
All personal except those who are detailed to fight emergency will be asked to
assemble in safe place.
8.8.1.2 Maintenance of Equipments / Facilities Supplies Purpose
To ensure an effective response to emergency situations, adequate quantities and
types of supplies and equipments are to be maintained on-site for use by the
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
142
emergency brigade and others.
Responsibility
Responsibility for maintaining plant equipment is assigned to the operations officer
(Maintenance) and operations officers (Safety) jointly. Elaborate and effective safety
facilities are provided in plant to combat any type of contingencies.
The facilities are broadly provided considering the following:
1. Leak detection, prevention
2. Elimination of source of ignition
3. Fire prevention / fighting
4. Communication, Fire aid, Rescue and Personnel protection.
The facilities provided are
1. The fire water storage tanks (2 nos) of capacity 2500 kl each (7500 kl)
2. 3 nos. fire water pumps capable of 615 kl / hour
1. Gas Monitoring System
The system consists of gas detecting sensors with a control panel and audio / visual
alarms. 35 nos. of sensors are located at sensitive and potential hazard areas in the
plant with alarms at control room, office administration building and local station to
monitor the gas leaks and regarding the risk.
2. Air / Vapour Extraction System
It is basically a blower with ducts extended to different operating points in filling shed.
The blower extract any leaking LPG vapour from the floor level and cold flares the
same to free atmosphere. This system is electrically interlocked with filling machines
to ensure operation when, filling operation are carried out.
3. Remote Operated Valves (ROV)
These are electro pneumatically operated quick shut off valves provided on liquid
LPG pipelines with actuating points located remotely and nearer to operating facilities
in the plant, when actuated the valves will close within 10 seconds, stalling the LPG
flow in pipelines.
4. Additional Safety Measures
Another identified potential source for fire accidents is Ignition. To eliminate such
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
143
sources, following are ensured:
1. Flame proof and intrinsically safe electrical systems and equipments only are
installed.
2. Spark retardant flooring or mastic floor in cylinder handling area.
3. Effective bonding and earthing connection for equipments and product
pipelines to prevent static electricity.
8.8.1.3 Fire Organisation Chart Fire Organisation Chart for On-Site Emergency Response
A detailed and exhaustive firef ighting chart as per Annexure ‘c’ spelling out the
specific responsibilities for the personnel in the event of fire / hazard (both in English
& Tamil) is exhibited prominently near the administrative block for precise co-
ordination & action during the emergency operation.
The entire firefighting operation has been classified into three groups of personnel.
They are,
I. Fire combating team
II. Rescue team
III. Auxiliary team
An exhaustive functions of the different teams during the emergency are as detailed
below.
I. Fire Combating Team In –charge - Location In -charge
Alternative In charge - Dy. Manager (Plant)
Alternative - Floor Officer
Fire Fighting Order
1. Person noticing the fire should immediately try to put it out using 10 kg DCP fire
extinguisher and shout “FIRE”, “FIRE” to draw the attention of others and call for
help and intimate location of fire spot to the security, trip the ETB / Operate
hand siren.
2. Person nearer to the fire spot should communicate over the page phone or by
shouting the spot of fire.
3. On receipt of information, one of the security personnel at the main gate intimate
public address system. Another security personnel will rush to the spot with red
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
144
flag shouting, “Fire”…… “Fire”……
4. On hearing fire siren, the in-charge / Alternate in-charge of combat team will rush
to the fire spot and issue instruction for speedy combating.
Filling Shed / Cold Repair Shop
Floor officer’s in-charge of individual functions like productions, cold repair shop,
evacuation, purging should direct personnel as per fire fighting orders and lead them
to the fire spot and await instructions from fire chief. On instructions from the fire
chief give instructions to down the line members.
Work Stations
Tare Weight Punching (Carousel Inlet)
The operator working at this work spot should rush to the fire spot. Take position in
one fire monitor and operate after instruction.
Unloading / Inspection / Tally Cylinder work
Operator, working at this work spot shall rush to fire spot, take position in one fire
monitor and operate after instruction.
Integrated Correction Unit
Operator working at this work spot to rush to fire spot assist unloading tally in
monitor opening.
Online Evacuation
Operator working in this area to remove the cylinders from the evacuation stands, place
them upright and disconnect the hoses. Stop all leaks from the cylinders by plugging
with safety caps, to close the isolation valves and rush to fire spot assist inlet operator
in monitoring opening.
LPG Pump House
Operation Officer in-charge of pump house operations / bulk decantation operation to
closely supervise personnel to carry out the fire fighting orders and make sure that
the unloading arms are disconnected without leak and moved out to safer place. Report
to the fire chief for his instructions.
One of the pump house operator to release the pneumatic pressure for closing remote
operated valves, pump house / TLD operator to shut down liquid and vapour valves,
disconnect hoses and advise BT drivers to move out cautiously under the advice of
Officer in-charge and rush to fire spot, after collecting breathing apparatus from Fire
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
145
Trolley. Another pump house operator will rush to the spot and operate the sprinkler
system and assist in the hydrant operations.
Fire Pump House / Air Compressor Room
PMCC operator should ensure the fire engine operation and monitor.
Generators Switch Room
The operators will ensure that power supply to the motors / equipments are tripped
and rush to the fire pump house and a wait instruction of fire chief.
Operator at Loading Point / Cylinder Tally Work
Rush to the fire spot take position in one hydrant point and operate after instruction.
Maintenance Operator-1
Rush to the fire spot take position in one hydrant point and operate after instruction.
II. Rescue Team
In-Charge - Accounts officer / in-charge Accounts. Alternative In-
Charge - AO-II/ OO II
Fire Fighting Orders
1. Ensure that all the personnel in the office follow the fighting orders of the
rescue team.
2. Set up communication with fire station /District authorities, etc. in coordination
with fire chief and await instructions on hearing fire alarm.
Relief-1
The operator relief-1 will rush to the fire spot with stretcher.
Relief-2
The operator relief-1 will rush to the fire spot with water jel blanket and wait for team
leader instruction.
Maintenance-2
The operator in maintenance-2 will rush to fire spot with fire proximity suit and wait
for instructions.
Accounts officer-II
Keep documents under safe custody and allow visitors, contractor labours to move to the
safe place.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
146
1. Rush to canteen and move out of the contract labours/outsiders to the assembly
point.
2. To move visitors from out of office to the assembly point.
III Auxiliary Team
In-charge - Dy. Manager (Plant) Alternative
In-charge - Officer in General Shift
1. Rush to the emergency spot along with the team members, with required
hoses, nozzles, helmets etc. and assist Combating team.
2. Arrange to move the fire trolley to the emergency spot.
ICU Operator
The operator in ICU will rush to the fire spot assist the trolley operator in operating
Monitor.
Evacuation
The operator in ICU will rush to the fire spot assist the inlet operator in operating
monitor. The security gate in general shift should ask all the visitor, contract labours to
assemble at the assembly point, near S & D and should do the head counting as per the
entry pass.
Fire Fighting Orders
1. Supervise smooth movement of vehicles out of the gate.
2. To ensure relief personnel from workers change room to rush to the firespot with
nozzles.
3. Personnel working in stores shall keep all important documents in safe custody
and rush to the fire spot with first aid box and other consumables.
4. Operations officer in S & D will ensure the smooth evacuation of the cylinder
trucks.
5. Auxiliary team members to move CO2 cartridges, nozzles, DCP, Fire hoses etc,
to fire spot as per the instructions of auxiliary team in charge.
Security
1. Run to the fire spot with red flag, shouting “FIRE.... FIRE....
2. One security guard will close / open the gate & regulate the traffic
3. One security guard will be able at the emergency gate and will count the number of
cylinders in truck going out.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
147
4. Security supervisor will count the number of men at the assembly point and tally
with the entry passes.
8.8.1.4 Action Plan for Raising Emergency Alarm and Communication to
Various Agencies (During Working Hours) Alarm
- Person seeing the fire will raise the alarm by shouting “FIRE, FIRE” to attract the
attention of all
- Person hearing “FIRE, FIRE” sound shall operate nearby hand siren or electric
siren (at office) to give signal of emergency.
- Security at gate shall operate electric siren to communicate emergency to all
plant personnel for action plan.
- If the situation is uncontrollable, the fire chief shall instruct AO II to contact and
get the assistance from external agencies.
Communication
- Operations officer, on the advice of chief fire in-charge shall communicate to
police, adjoining industries. Ambulance and panel doctor and other important
persons.
- AO II shall contact fire service and external agencies if required under advice
from fire chief.
- Fire station on advice of IOCL’s chief fire in-charge shall contact outside
agencies, for rendering assistance and arranging rescue, evacuation and medical
aid.
- Police control room on receiving the emergency message shall communicate to
Dist. civil and police officials on wireless network.
8.8.1.5 Action Plan in Case of LPG Leakage
1. Leakage from Cylinder Valve with Fire
- Operate fire extinguishers and blanket the valve exposed to fire
- Use sand and blanket the valve exposed to fire
- Immediately after the fire is extinguished close the valve or fix safety cap
- If the valve cannot be closed, remove the cylinder to isolated place away from
source of ignition and vent out LPG under controlled condition.
- When filled cylinder is involved in a fire, the pressure inside the cylinder will
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
148
rise abnormally if the pressure is not relieved, and ultimately rupture the container.
In such cases, the cylinders adjacent are to be cooled by spraying water and the
container under fire should be approached from upward wind direction and to
be removed to the place of safety, remote form sources of ignition.
2. Leakage from Pressure Relief Valve with Fire
- Allow the fire to continue
- Cool the vessel to reduce evaporation
- Attempt to cool the vessel extensively so as to reduce the internal pressure
- Pressure relief valve will close automatically
- Extinguish the fire
- Cool adjoining vessels(s) and structure
3. Leakage from Pipeline / Vessel without Fire
- Cordon off the area around 30 m radius so that no automobile or source of
ignition approaches the area
- Attempt to close the control valve
- Attempt to transfer LPG into another vessel
- Avoid entrapping into the vapour cloud
- Use water spray to disperse vapour cloud
- Concentrate on cooling the vessel to reduce the heat input to the vessel
and thus reduce pressure.
4. Leakage from Pipeline / Vessel with Fire
- Cool the exposed to flames continuously to reduce the rate of LPG evaporation
- Allow the fire to continue under controlled conditions
- Attempt to close the control valve by using water spray to form a curtain
with fog / curtain nozzle
- Attempt to put off the fire only after control valve is closed
- Keep persons away from dished end\
- Withdraw the persons to safe zone in case of rising sound coming from safety
valves or discoloration of vessels.
8.8.1.6 Action Plan in Case of Cylinder Fire
When filled LPG cylinder is involved in fire, the internal pressure relived shall build
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
149
up above 70 kg / sq.cm and ultimately rupture the container. Rupture may also
occur lower pressure if body has become weak by direct flame impingement by jet
action.
If container’s pressure is not risen up to 70 kg/sq.cm leakage from screwed valve
joint can occur due to different expansion of steel and brass. Ignition of the escaping
gas would aggravate the fire but release of fire reduces the possibility of rupture.
- No attempt should be made to extinguish the burning gas but the container
under fire and other containers in the vicinity should be kept cool by water
spray.
- If the gas leakage does not ignite, the container should be approached from
upward wind direction and removed to a place of safety way from the source of
ignition.
8.8.1.7 Action Plan in Case of Electrical Fire
- Disconnect the electric supply of affected area
- Attempt to extinguish fire with the help of CO2 / DCP fire extinguishers
- If fire is not extinguished, extinguish by spraying water with fog nozzle after
ensuring complete isolation of electric circuit.
8.8.1.8 Action Plan for Gas Leak Fire beyond Normal Working Hours ALARM
- Person seeing the fire will raise the alarm by shouting “FIRE, FIRE” and
blowing hand siren to alert all personnel.
- Security at Gate shall operate electric siren to communicate emergency.
1. Communication
One security person shall inform PM / on phone and contact fire station on P
& T telephone.
- Shift In charge security supervisor who is on duty will works as
chief fire In-charge, supervise the fire fighting operation and issue
necessary instructions as per the need till plant manager arrive
and take over the charge.
- Fire pump operator shall run required no of fire pumps.
- Second person shall operate the fire extinguisher to put out
the fire and operator sprinkler system / operate monitor /
hydrant with the help of security person.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
150
- Security guards at gate shall continue to remain in position,
allow entry to outside rescue agencies and direct them to the
scene of fire. No congestion should be allowed at gate.
- Operator in the shift should ensure that on spill is enters drains
and if unavoidable, post one security personnel along the drain
and see that no spark is brought within the vicinity.
2. Fire during Night Shift / Sundays / Holidays
In-charge - Security Supervisor
3. On Hearing the Fire Alarm
Advice security guard immediately set in emergency plan
1. Security guard to telephone as per emergency plan
4. For Employees Living Near the Plant
On hearing the fire alarms rush to the plant, do not panic, and follow fire fighting
orders issued by officer in-charge.
8.8.1.9 Assignment of Responsibilities
1. Plant Manager
The plant manager has final authority for the implementation of the disaster
management plan and the plan includes the following activities.
1. Assuring continued compliance with the provisions of politics of the corporation
on emergency prevention and response.
2. Approving the plan’s provisions and all subsequent revisions.
3. Reviewing and approving the release of any information to the press or to
other recognized authorities or public.
4. Approving the initiation of formal or informal agreements with any
governmental, community or industries.
5. Assuring that adequate resources are made available to support the
emergency management activities.
6. Monitoring the effectiveness of response activities during emergencies and
taking action to ensure that appropriate procedures are followed
7. Determine the termination of an emergency clear plan.
The plant manager will also be responsible for overseeing all on-site
emergency plan activities which specifically includes the following.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
151
1. Appointment of personnel to the emergency brigade.
2. Determining a full site evacuation plan.
3. Conducting post-emergency investigations.
The deputy manager will be responsible for fulfilling the duties of the plant manager
in his absence, in addition he will act as a liaison officer between the responding
organizations and the media during emergencies and will participates in public
information and community awareness activities.
The safety officer is responsible for developing the plant emergency management /
disaster management plans and procedures and the specific responsibility includes:
1. Formulating, reviewing and ensuring implementation of the emergency plan.
2. Ensuring that emergency response training concerning provisions of the
plan is provided to all employees.
3. Ensuring that this plan is tested through the conduct of drills and exercises.
4. Administrating safety and health review programs.
5. Preparing and submitting emergency related reports to management and the
plant as required.
The operations officers (maintenance) will be responsible for providing technical
advice and assistance to the plant manager in the formulation of the disaster
management plan and during the emergencies. He will also be responsible for
fulfilling the duties of the plant manager or the deputy plant manager of safety officer
is unable to perform the functions.
2. Inspections
Hazard studies are conducted at the plant before commissioning and also applied
to the installation and modification of buildings, equipments, mechanical and
electrical systems, utilities, fire protection system, grounds etc.
Plans or specifications on designated projects shall be submitted to an acceptance
committee consisting of operations manager, engineer manager and Safety Manager
for review prior to project implementation. Recommendations will be submitted with
the final plans and specifications to the departmental head for review. If the
departmental head finds that plans and specifications are not meeting the
recommendations of the acceptance committee, he shall return the final plans to the
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
152
originator for modifications or a justification of deviations.
Purpose
This procedure provides for the inspection and correction of ensuring the timely
competitions of periodic inspections and correction of problems.
Responsibility
The officer in-charge of each function is responsible for ensuring the timely
completion of periodic inspections and correction of problems.
Frequency
The frequency of specific inspections to be carried out at the plant as per the norms
is as follows:
Internal
Plant inspection - Daily, monthly (By Safety Officer & Plant Manager)
Regional office (Operations) - Yearly
Regional office (S & EP) - Yearly
Head office (S & EP) - Yearly
CAP Exercise - Monthly
Electrical audit - Once in Two years
Emergency equipments - Weekly
Maintenance - Monthly
Office - Quarterly
Fire protection systems - Monthly/ Annually
External Safety Audit
1. Surprise inspection by OSID
2. Safety audit by competent person, approved by chief inspector of factories-
once in a year.
8.8.1.10 Public Information on Site Emergency Response Plan
1. Purpose
Purpose of this procedure is to provide a program that ensures the distribution of
information concerning the plant emergency management to the media and the general
public.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
153
2. Objectives
The objectives of the plant public information program are
1. To help foster the view that Indane bottling plant, Tirunelveli is responsible on
issues concerning environmental health and safety.
2. To clearly communicate Indane bottling plant, Tirunelveli LPG Bottling
Plant’s policies positions and activities to the public.
3. To inform the Public about the positive contributions of the plant to the
community.
4. To produce materials as needed to further internal or external understanding
of key issues.
5. To encourage collaboration among business. Government and citizen groups
within the community.
3. Responsibility
The operations officer is responsible for developing,-coordinating and implementing
all elements of the IOCL’s Community Awareness program. The public relations
manager will be provided assistance as necessary.
The ensure effectiveness, management will participate in this program to the extent
possible. The Deputy General Manager (LPG), and other senior managers are expected
to participate in the public speaking engagements.
4. Procedure
Only the plant manager / Public relations manager shall respond to questions from the
media. All media contacts should be referred to one of these individuals.
Plant manager shall provide a list of those members from the plant who might be
expected to participate in public information program or dealing with the press. These
members should be provided with specialized training in dealing with public relations.
A program covering various community groups involving the following aspects
will be prepared for presentation to general public.
1. History, description and location of the plant 2. Safety performance
3. Environmental protection measures
4. Community development program
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
154
5. Jobs provided
6. Over view of emergency plan
7. Coordination with off-site authority
8. Joint training drills & exercises
9. Mutual aid assistance
The plant manager will identify those community organizations to whom this program
should be offered through the following agencies.
1. Local Govt. High School
2. District fire services authorities
3. Neighboring Industries
4. Local Panchayat authorities
5. Local Police
6. Central & State Government agencies
On-site visit shall be provided to interested groups to have a firsthand information
and look of the plant operations.
IOCL recognizes that its employees are the best and most effective communicators
of the Corporation’s programmers and policies. Therefore the plant manager will
annually provide an update of the plant’s community and emergency management
program to all employees.
Operations officer shall keep a record of all community awareness activities in which
IOCL participates and the summary of the activities shall be sent to Regional Office.
Operations officer will be responsible for maintaining and updating this procedure and
any changes shall be coordinated with the Safety officer and approved by the Plant
manager.
5 Surrounding Areas
The plant is located adjacent to NH 7 which connects Varanasi & Kanyakumari and 18
km from Tirunelveli city. The nearest railway station is situated at Gangaikondan at
a distance of 4 km (E).The nearest Airport is situated at Tuticorin at a distance of
33.55 km (SW).
8.9 OFF-SITE EMERGENCY PLAN
An integral part of the disaster management plan is the Off-Site emergency plan. The
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
155
plan is mainly dependent upon a very close co-ordination and assistance from the
local administration like police, fire brigade, medical services (hospitals) etc.
8.10 PLANT MAINTENANCE AND DISTRIBUTION
It is the responsibility of the safety officer to ensure that all section of the plant
are kept current and are being implemented. The plant is to be reviewed annually
to ensure the accuracy of information. The major provisions are to be tested at last
yearly.
The safety officer is to ensure that the plan is modified as required to reflect any
changes in the facilities/organization or operating conditions .The safety officer that
all required revisions identified by post incident review and investigation are
implemented. All changes and modifications should be forwarded to all possessor of
this plan. Distribution of the plan shall be determined by the plant manager but
generally it includes the following: The brief description of plant activities chart in
Annexure-A
8.10.1 Internal Distribution
1. LPG Operation Dept. Head Office, Mumbai.
2. Safety and Environment Protection Dept. Head, Mumbai.
3. LPG Dept. Tamil Nadu State Office, Chennai.
4. Safety & EP, Southern Region, Chennai.
5. Plant Manager
6. All Officers in the plant
8.10.2 External Distribution
7. Collectorate
8. Factory inspectorate
9. Pollution Control Board
10. Local Police
11. Local Fire Brigade
12. Hospitals
13. Local Panchayat
14. Neighbouring Industries & Intuitions
15. Telephone/Telegraphs Department
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
156
16. Electricity Board
8.11 PUBLIC INFORMATION
8.11.1 Off-Site Emergency Response Plan
1. Purpose
Purpose of this procedure is to provide a program that ensures the distribution of
information concerning the plant emergency management to the media and the general
public.
2. Objectives
The objectives of the plant public information program are:
1. To help foster the view that Indane Bottling Plant, Tirunelveli in responsible on
issue concerning environmental, health and safety.
2. To clearly communicate Indane Bottling Plant, Tirunelveli policies positions and
activities to the public.
3. To inform the public about the positive contributions of the plant to the community.
4. To produce materials as needed to further internal or external understanding
of key issues.
5. To encourage collaboration among business, Government and citizen groups
within the community.
3. Responsibility
The operation officer is responsible for developing, coordinating and implementing all
elements of the IOCL’s community awareness program. The public relations manager
will be provided assistance as necessary.
To ensure effectiveness, management will participate in this program to the extent
possible. The Deputy General Manager (LPG), Tamil Nadu State Office and other senior
managers are expected to participate in the public speaking engagements.
4. Procedure
Only the Plant manager/Public relations manager shall respond to questions from the
media. All media contacts should be referred to one of these individuals.
Plant manager shall provide a list of those members from the plant who might be
expected to participate in public information program or dealing with the press.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
157
These members should be providing with specialized training in dealing with public
relations.
A program covering various community groups involving the following aspects
will be prepared for presentation to general public.
1. History description and location of the plant.
2. Safety performance
3. Environmental protection measures
4. Community development program
5. Jobs provided
6. Over view of emergency plan
7. Coordination with off-site authority
8. Joint training drills & exercises
9. Mutual aid assistance
The Plant Manager will identify that community organization to whom this program
should be offered through the following agencies.
1. Local Government High school
2. District fire service authorities
3. Neighbouring industries
4. Local Panchayat authorities
5. Local police
6. Central & State Government Agencies
On site visit shall be provided to interested groups to have a first-hand information
and look of the plant operations.
IOCL’s recognizes that its employees are the best and most effective communications
of the corporation’s programmers and policies. Therefore, the plant manager will
annually provide an update of the plant’s community and emergency management
program to all employees.
Operations officer shall keep a record of all community awareness activities in which
IOCL participates and the summary of the activities shall be sent to regional office.
Operation officer will be responsible for maintaining and updating this procedure and
any changes shall be coordinated with the safety officer and approved by the plant
manager.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
158
5. Surrounding Areas
East - Vacant Land
West - Nova carbon - Factory
North - Vacant Land
South - 30 ft. Road
8.11.2 Off-Site Emergency Plan for the Surrounding Areas
In the event of a major fire accident / gas leak in the plant, it is anticipated that it may
have an effect on the surrounding areas adjoining the plant. The fire in- charge with the
assistance of other officers on duty will coordinate the following activities.
1. Seek the assistance by telephone from police station, police control room to control
the movement of traffic / public on the road.
2. To alert the residents of the surrounding villages / hamlets and other industrial
units / establishments.
3. Inform commissioner / superintendent of police, Tirunelveli. District fire offices
at Tirunelveli and other industrial units / establishments surrounding the plant
area for alert and necessary assistance.
4. Contact any other protection forces such as CRPF, RPF, Fire officers / safety officers
available in the respective offices / establishments / units of the surrounding areas.
5. Contact electricity board, Tirunelveli and the nearby electrical sub-station in-
charges for continuous power supply/total disconnection of power as the case may
be according to hour to hour situation and firefighting needs.
6. Arrange for the security of the premises, pipelines, pressure vessels, employees
and other vital installations.
7. Arrange for required number of transport vehicles for movement of key
personnel/employees from residence to location or from location to places of safety
or residence as the case may be required.
8. Alert station master Gangaikondan Railway station.
9. Contact and seek assistance of the medical personnel from the primary health
Centre / Government Hospital and other available medical officers from the
nearby factories, industrial units/establishments.
10. Assign a team for recharging fire extinguishers, monitoring the water. Pressure
for continuous supply of water and other firefighting materials.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
159
11. To provide food, water etc., for the employees who are manning the emergency
situation.
12. Inform important customers like road transport corporations, railways, defense,
police, Electricity Municipal Corporation, milk diaries etc. of the repercussions of
the emergency situation.
The off-site emergency plan of the plant is based on the following services:
1. Alarm
2. Evacuation
3. Power-shut down
4. Fire/Hazardous incident
5. Control Centre
6. Communication
7. Security
8. Medical
9. Rescue
10. Repairs
11. Decontamination
12. Transportation
13. Traffic control
14. Mutual aid
15. Public Relations
16. Welfare
The details are given here under:
1. Alarm
One Nos. of electrically operated sirens and 5 Nos. hand operated sirens are
provided in the plant premises/main gate entrance.
2. Evacuation
Main Gate is available for emergency exit and emergency entry separately for
men and vehicles. All trained personnel are to handle the situation.
3. Power Shut Down
All electrical supply lines, hazardous liquid carrying pipelines, valves, vapor lines,
water lines etc. are color coded for identification. 2 Nos. 275 kVA and 1 No. 140
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
160
kVA Generator sets are available for operation during power failure. All incoming
power mains provided in the power motor control room for on/off operation.
4. Fire Organization Chart
Fire organization chart hast been updated and displayed at prominent places.
Telephones are available local fire brigades for immediate assistance.
5. Control Centre / Communication
The Administrative building/plant manager’s cabin will be the control room
where telephones, pagers, fax, machines are provided and it will be manned by
key personnel round the clock during the emergency operation.
6. Security
Security Guards are provided round the clock. 100% frisking at all the gates for
the entry of persons into the plant premises is enforced during all the time
and in emergency situations. Employees of the plant are provided with identity
badges.
7. Safety of Records
All the records pertaining to the plant are stored safely in a room in safe vaults.
8. Medical Facilities in Organization
Number of person from staff within the plant has been fully trained in first aid.
A first aid team consisting of officers and staff of IOC has been constituted to
take care of first aid needs. Details and names of the members of this team are
displayed at plant.
All important first aid medicines are stored in the plant to ensure round
the clock availability of same.
Action Plan
• Do cover the frostbitten area with water jet.
• Bring victim inside to warm area as soon as possible.
• Imperious frost bitten area in cool to cold water.
• Gently cover affected parts with water jet if affected area cannot be
immersed in cool water.
• On affected parts, injured party should start exercising fingers, toes and legs.
• Do not turn water pressure or pour water on burn areas.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
161
• Give victim a warm, non-alcoholic drink. Get the victim to a physician.
• Do not use hot water, hot water bottles or heat lamp on burn. Do not rub
with snow or ice, as this increase the chances of gangrene infection.
Tell physician that a freeze or frostbite form LPG is parallel to a burn. For the
purpose of mutual aid in case of off-site emergency situation, the services
from the following. Hospitals Dispensaries have been identified:
1. Govt, hospital, Tirunelveli
2. Govt, Primary Health Center
3. Govt. Hospital, Tirunelveli
4. ESI hospital, Tirunelveli
9. Rescue
Life saving equipments / materials such as resuscitator, water Jel blankets, first
aid boxes, air breathing apparatus etc. is provided. At the nearest Hospital
standby arrangements will be made for effective medical aid for such of those
people who are injured during the disaster.
10. Repairs / Hot Works
All the repair works in the plant premises is carried out under proper
permission and effective supervision. No hot work is permitted inside the plant
operational areas.
11. Pollution Control
Sufficient vegetation - Green Belt of 30 meter wide is developed all round the
plant premises which serve to prevent air pollution.
12. Traffic Control
Local police control room/traffic police will be contacted for their assistance
to control traffic in and around the plant premises. Similarly, railway station /
control office will also be contacted for regulating the movement of trains in the
vicinity of the plant premises.
8.11.3 Off-Site Emergency Response Plan Bulk LPG Bullet Trucks
Following are the emergency actions envisaged for the road accidents involving
Bulk LPG Bullet trucks based on the historical accident records.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
162
Accident with no Damage to the Bullet (Head on Collision with Cabin
Damage and Minor Injury to Crew)
Place of Accident - Main Highway and within populated area actions required.
1. TREM Card instructions in case of emergency should be immediately enforced.
2. The Battery should be disconnected immediately.
3. Fire Extinguisher kept aside, as a standby.
4. Bullet Tank should be surveyed thoroughly for leakage from any of the
fittings.
Traffic should be stopped in case of major leakage.
5. Nearby police station should be informed' through passing truck or Messenger.
6. With the assistance of TREM Card, nearest LPG plant and transporter should
be contacted through telephone.
7. In case the crew has been moved to Hospital for first aid, the truck should be
guarded by any willing volunteer.
8. Crowding around by people and smoking in the vicinity of 30 m radius should
be controlled.
9. In case of any leakage from any of the fittings, the portion should be covered with
wet gunny bags and water should be continuously applied, to allow, the
freezing / ice formation around the areas of leakage. Alternately, "Leak Sealing
Pad” should be wrapped around the spot.
10. Police shall control the Traffic with Fire Brigade as stand by, till the rescue
operations were completed and tank is moved to nearest plant for decantation
of product and degassing.
11. Subsequently the truck can be taken for repairs.
Accident with No Damage to Bullet (Head on Collision with Cabin Damage and
Fatal Injury to Crew)
Place of Accident: Main Highway and within populated area actions required:
1. TREM card instructions in case of emergency should be immediately enforced.
2. The injured crew should be removed from the cabin and to be admitted in nearest
Hospital through any vehicle available
3. If the accident resulted in death of crew, the bodies should be removed, should
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
163
be kept at a clean place covering them with a cloth.
4. The battery should be disconnected immediately. Fire extinguisher kept as
standby.
5. Bullet tanks should be surveyed thoroughly for leakage from any of the fittings.
6. Traffic should be stopped in case of any major leakage.
7. Nearby police station and fire brigade should be informed through passing truck
of messenger with the assistance of TREM CARD, nearest LPG plant and transporter
should be contacted through telephone.
8. In case of crew has been moved to hospital for first aid, the truck should be guarded
by any willing volunteer.
9. Crowding around by people and smoking in the vicinity of 30 m radius should be
controlled.
10. In case of any leakage from any of the fittings a portion should be covered with wet
gunny bags and water should be applied continuously to allow the freezing ice
formation around the area of leakage. Alternatively, leaks sealing pad should be
wrapped around the spot.
11. Simultaneously information should be sent to chief controller of explosives at
The following address:
Chief Controller of Explosives, Govt, of India,
Department of Explosives, Nagpur
Telegram: Explosive, Nagpur
Police shall control the traffic with fire brigades standby, till the rescue operations
were completed and tank is moved to nearest plant for decantation of the product
and degassing.
1. Accident with Bullet (Overturning of Bullet without Damage to Bullet)
Place of Accident: Main Highway/ populated area Actions required:
1. In case crew requires any first aid treatment at any nearby hospital the
truck should be attended by any other responsible person who may
volunteer to do so.
2. The Battery should be disconnected immediately.
3. Fire extinguishers kept aside as a standby.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
164
4. All tanks fitting like safety relief valves, liquid and vapor valves, pipeline
and rotogauge should be checked closely for any leakage / damage.
5. In case of minor leakage, it can be controlled by sealing the spot by wet
gunny bag or marking an earth bund around. Message should be sent to
nearest police station and fire station for assistance. Truck owner should
be informed as per the information painted on tank body.
6. Police should inform the LPG plant, nearest Indian oil depot and the truck
owner through nearest telephone for any assistance. Police / volunteers
should be gathered and advised to stop all persons smoking within the
vicinity of 30 m radius if gas is leaking and also should advise people
staying in nearby areas to be in readiness for evacuating the area. People
should be moved from upwind side to downwind side.
7. The vehicle should be hoisted into an upright position using a suitable
capacity crane or pulley block arrangement while taking all precautions
about fittings to avoid any further damage which may lead to leak.
8. After the completion of the rescue operations the tank should be moved to
the nearest Bottling plant for decantation and degassing. Subsequently the
vehicle shall be taken for repairs.
2. Accident to Bullet Truck with Damage to Bullet Truck Resulting In
Leakage and Fire Action to be taken:
Effort should be made to confine or control rather than extinguishing. In case of fire is
minor in nature it should be extinguished using fire extinguisher, provided it is very
sure that the source of leakage can be stopped.
If the fire is uncontrollable, nearby public and vehicle should be alerted to move away
from the fire spot. People in the vicinity of 100 m. should be evacuated and the spot
should be cordoned off.
People should be moved from up-wind side to downwind side. Simultaneously,
police and fire brigade should be informed through telephone/messenger. If the fire
cannot be controlled still, await till the help arrives.
Fire brigade should control the fire as per the following:
1. Fire should be handled with extreme caution.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
165
2. Provide 2 water nozzles lines one from each direction. If space permits
give special attention the space between the rear and Driver’s cabin and
avoid possibility of vehicle overturning due to water jet force.
3. Two water nozzles lines with 250 GPM nozzles at 80 PSI should move
one line directing the spray system of the tank and the other using wide
angle sprays for protection, make sure that continuous cooling is
maintained on dish ends of bullet truck.
4. When reinforcement arrives, attack with 2 lines with 4 fire man on each
line with the third approach line dish end.
5. With continuously cooling, safety relief values which have opened due to
increase in pressure inside the tank will reset. Cooling should be
continued till normal vapor pressure reached inside the tank. When
the relief value closes all three attack lines should be switched to narrow
angle spray and back-up line to narrow line. After stable condition is
achieved, close the leaky value or leaky fitting using proper blanks,
without coming in line with the attack line. After controlling the fire on
tank, attack fire on tyres, cabin and engine compartments. Fire fighters and
personnel dealing with vapor clouds must be protected continuously by
water spray. Care should be taken to ensure that static charge is not
generated in the vapor cloud. Hence solid jets of water must be avoided
and spray nozzles should be used. Use protective clothing like fire
proximity/fire entry suits and self- contained breathing apparatus, when
necessary.
3. Accident to Bullet Truck with No Damage to Bullet Popping Of Safety Relief
Valve Actions Required:
1. Operate isolation switch and take fire extinguishers from hold.
2. Stop traffic both sides of road.
3. Inform police and fire brigade through telephone or messenger.
4. Volunteers/police should be gathered and should be advised to stop all
persons smoking within the vicinity of 30 m radius if gas is leaking and
also should advise people staying in nearby areas to be in readiness for
evacuating the area. People should be moved from up-wind side to down-
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
166
wind side.
5. If the water source is available around, pour water on the upper surface
of the tank to cool the surface.
6. When fire brigade arrives, water jet should be applied through
narrow angle on the upper portion of the tank to induce cooling effect.
7. If the safety relief valve is in the proper shape/adjusted it will reset
as soon as the pressure falls below the set pressure.
8. If the valve is not reset, allow the vapor to escape under controlled
condition, with fine spray of water dispersing the vapor cloud.
9. Surrounding areas should be guarded to ensure to ignition source is
not generated.
Afterwards move the bullet truck slowly to the nearest bottling plant fr- emptying
out the contents.
8.11.4 Nature Hazards
8.11.4.1 Action Plan for High Winds
1. Weather reports shall be monitored from broadcast warnings regarding
threatening conditions.
2. If the high winds have been sighted or effect is felt, following steps should be
taken by plant personnel.
a. Persons shall be notified over public address system or through
siren.
b. Emergency services shall be alerted for assistance.
c. Plant personnel should be advised to assemble in the administration
building basement/staff room/recreation room and rest room.
d. All safety system should be kept on alert and all non- essential
utilities should be put off.
3. After the status is rested, personal should inspect all the facilities for resources,
first aid and damage control activities, damage assessment clean-up,
restoration and recovery.
8.11.4.2 Action Plan for Floods
4. Based on weather broadcast warning regarding impending flood conditions,
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
167
following steps should be taken.
5. Shifting of all men, moveable equipments and supplies to the elevated area.
6. If time permits, sand pad dikes can be constructed to drive of control the flood
waters from high risk facilities.
8.11.4.3 Action Plan Earthquake
7. When first tremors are sensed during an earth quake, all personnel should
evacuate building and assemble at safe place away from structures, walls
and falling objects. Emergency shutdown should be declared.
8. Emergency services should be contacted for assistance.
9. After the status is restored, personnel should inspect all the facilities for rescue,
first aid and damage control activities, damage assessment, clean up,
restoration and recovery.
8.11.5 Social Emergencies
8.11.5.1 Action Plan for Water / Food Poisoning Symptoms
Sudden discomfort affecting the digestive system shortly after consumption of
food / water.
Action to Be Taken
1. Employees noticing the persons with symptoms should alert plant manager.
Plant manager will initiate steps for identifying the source and cutting of the supply.
2. First aid shall be rendered to the affected persons.
3. They will be moved to nearest hospital in the emergency vehicle for further
treatment. All explosive can be decanted by mechanical shock. This is usually referred
to as “Sensitivity Shock” initiating explosives such as lead acid, Mercury fulminate
etc. are detonated may mild shock as tap of pencil they are extremely hazardous
because any movement is apt to detonate then with without any warning. As such
explosives should be handled only under the supervision of an expert like controller of
Explosives.
8.11.5.2 Bomb Threat
When a Bomb Threat call is received the following measures are to be take.
4. Inform the message details to the highest local Police Authority and seek their
assistance for patrolling and security need.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
168
5. Inform Controller of Explosives the details and nature of anonymous message
and required operations.
6. Request the Local Fire Brigade to position at least one fire tender at the
location immediately.
7. Keep the concerned Department at the Regional level inform with the
development at regular intervals.
8. Alert the local Government / Private Hospitals and seek their help for providing
ambulances if necessary.
8.11.5.3 In The Location Premises
9. Keep the Fire Hydrant system / all fire fighting and personal protective
equipments in readiness.
10. Every one entering the location must be frisked at the gate / check all hand
bags, parcels, etc., for suspected explosive / dangerous objects.
11. Have thorough inspection of the location for any suspected / unidentified
dangerous object.
12. Materials and other boxes to be brought into the location must be deposited at
the gate for minimum curing period of 48 hours.
13. Organize vigilance cell consisting of Employees and Officers for round the
clock observation of the premises.
8.11.5.4 If The Suspected object is Found
1. In case of finding of suspected article, do not disturb its position, but the area
around it should be cordoned off to a distance of 100 Mts. And more-depending
upon the gravity of the situation.
2. Adequate staff or police squad posted to prevent any unauthorized entry
into the enforced cordon.
3. Contact Controller of Explosives immediately who on reaching the site will
decide suitable action for defusing the disposal of the suspected objected.
4. Evolutions of thick billowing smoke is an indication of impending explosion
and in such cases withdraw or evacuate all personnel from the spot which has
been identified.
As a general measure regulate the movement of the outsiders inside our premises and
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
169
restrict their entry with permit.
1. Sabotage
This section is intended to provide an effective means of preventing acts. Of sabotage
by employees of Indane Bottling Plant, Tirunelveli or others and of reaching to such
acts.
This section defines sabotage as any deliberate action by an individual or group
designed to Indane Bottling Plant, Tirunelveli personnel, damage, equipment or
disrupt normal operation are to be prevented.
2. Critical Equipment
The safety manager will construct a list of critical pieces of production equipment and
stores of materials that are considers suspect able to sabotage. For those items
identified, the following procedures should be implemented.
Access is restricted.
Devices are locked where possible.
3. Facility Access
Access to Indane Bottling Plant, by vendors, contractors and other visitors is
controlled in accordance with Tirunelveli Bottling Plant, gate control procedure.
1. Visitors shall be permitted inside the plant licensed area only with the special
authorization by PM.
2. All visitors are logged in and out.
3. Visitors must wear a special badge
4. Visitors are escorted by Indane Bottling Plant, Tirunelveli employees.
5. Contractors, vendors, delivery drivers etc., are to be restricted to the
immediate location of the work area.
6. Remote entrance points are to be kept secured except as needed.
4. Others Provisions
The finance dept: A head is responsible for developing and maintaining access cards
and key control procedures. All management and supervisors should immediately
report suspected acts of sabotage to the safety officer and plat manager.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
170
Since the results of an act of sabotage are the same as those resulting from accidental
(i.e fire, explosion, spill, etc.,) appropriate response procedures are to be used as
appropriate.
Specific individuals are to be assigned responsibility for securing designated doors
gates cabinets, etc., at the end of shift periods.
All issues relating to sabotage and other security questions should be referred to
the local police.
8.11.5.5 Recovery
The procedures outlined in this section are intended to minimize the adverse effects
of an emergency incident by providing an effective means of re-establishing. Normal
operation conditions in the least amount of time. In addition, the procedures also
provide for determining the cause of the accident so that future incidents can be
prevented. Emergency response activities will be reviewed so that more effective can
be used in the future.
This section is divided into five parts:
14. Incident investigation
15. Establishing a recovery team
16. Damage assessment
17. Clean-up and restoration
18. Post emergency & recovery reporting
1. Incident Investigation
As soon as it is safe to do so, an incident investigation to determine the cause of an
emergency and to determine the means of preventing any further occurrences to be
conducted.
Responsibility
The plant manager will co-ordinate the investigation and prepares all final reports.
The investigation is to be conducted by a team to be headed by the plant manager and
consist of appropriate personnel including all or some of the following.
1. Safety Officer
2. Shift Officer
3. Plant Maintenance Officer
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
171
Procedure
The investigation of the scene should
include
1. Photographing the area
2. Determining the point of origin of the fire/leak/explosion, if possible
3. Note the position of values, controls and devices
4. Note any unusual items in the area or any damage that is inconsistent with the
type of incident or intensity written or recorded statements from all operators
involved, potential witnesses and others, who might have pertinent knowledge
of the incident. Description of events leading upto the incident, assessment of
what might have happened, why, and suggested corrective actions should be
obtained. Where possible (and when no risk of another incident exists) tests of
equipment and / or simulations should be employed.
Report
A final report is to be prepared to include the most probable cause and
recommended corrective measures. The report should consider.
1. Failures of Equipment
2. Failures of maintenance
3. Failures of procedures
4. Inadequate training
5. Human error
Corrective Action
The Investigation team is also responsible for conducting a review of response
activities during the emergency to evaluate the adequacy of training, equipment and
procedures.
The plant manager is responsible for ensuring that all corrective actions to prevent a
recurrence of the incident better response to emergencies are taken.
2. Establishing a Recovery Team Purpose
In order to facilitate the restoration of normal plant operations as soon as an
emergency situation has been declared under control, a recovery team is to be
established to manage recovery activities, including damage assessment. The
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
172
recovery team is to be activated by the plant manager
Organization
The recovery team organization will vary depending on the nature of the incident
and the event of recovery operations. As a general rule however, the following
individuals should be included.
1. Plant Manager to act as team leader
2. Maintenance officer to expedite contracts
3. Accounts officer to provide assistance in maintaining accurate accounting of
losses.
4. The safety officer to prepare final reports and to assess the incident’s
impact on the environment and to develop necessary government reports.
The recovery team will be responsible for damage assessment, clean-up and salvage
operations and the restoration of operations. The plant manager will forward
weekly status reports to the general manager and other as necessary, including all
estimates of repair costs, inventories and schedules.
Each member of the team is to designate an alternate person to act in their seat
when necessary. Other departments may be called on by the team leader to assist
in recovery operations.
3. Damage Assessment
A primary function of the recovery team will be to assess the damage to plant
structures, equipment and materials as well as to assess damage to offsite areas and
the environment in conjunction with civil authorities.
Responsibility
The plant manager will co-ordinate the team’s efforts and assigns tasks and areas of
responsibility. The maintenance officer will supervise the inspection and testing
of equipment by qualified maintenance personnel.
The shift officer will consult with the plant maintenance officer and technical
personnel, to develop a list of necessary replacement items and services.
The maintenance officer is to contact vendors of damages items to obtain any
necessary technical assistance. Operation officer is to ensure that all damaged items,
labour costs etc., are recorded and that proper documentation is maintained.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
173
Each team member will report their findings to the plant
manager
Based on the findings of the Recovery Team, an action plan will be prepared which
includes the following.
1. Ensure that the attending physician is given all appropriate technical
support
2. That proper notification of next of kin has been made
3. Obtain estimates of medical costs
Based on the findings of the Recovery Team, an action plan will be prepared which
includes the following
1. An estimate of losses detailing equipment, machinery, personnel injured
and material lost.
2. A prioritized listing of necessary repair / reconstruction work, personnel
assignment and estimates of completion schedules.
4. Clean - Up and Restoration Operation
As soon as incident investigations are completed and restoration plans have been
made, clean-up and restoration activities should commence.
Responsibility
The safety officer is responsible for the proper reporting and documentation to
necessary central, state and local agencies. The Maintenance officer will direct
repair, clean-up and restoration of utilities and salvage activities.
The Maintenance Officer, is responsible for co-ordinating the activities of
contractors / vendors and supply all necessary reference information. The
Maintenance officer is responsible for monitoring all activities to ensure the safety of
cleanup and salvage personnel making sure that proper personnel protective
equipment is utilized. The Maintenance Officer should replace or restore all emergency
equipment and supplies as necessary. The maintenance officer will expedite all
orders for necessary equipment, supplies and services. The operations officer will
monitor and record all costs related to recovery activities. All recovery team members
will submit weekly progress reports to the Dy.General Manager (LPG). A consolidated
report will be forwarded to the General Manager.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
174
Damage
Temporary storage facilities has been established for damaged equipment to
facilitate inspection by insurance personnel. Prior to restoration of normal
operations, all affected equipment is to be tested and checked out according to
procedures established by statutory rules & regulations such as SMPV and Factory
rules etc.,
5. Post - Emergency Recovery Reports
As soon as is practical after the session of the recovery phase, the safety officer is
to hold review sessions with emergency response personnel to evaluate
1. The adequacy of emergency response procedures
2. The adequacy of the investigation of the cause of the incident
3. Summarize the post - emergency activities
The safety officer will then prepare and submit a full report of the incident to the
General Manager with copies to other persons as necessary. This final report will
summarize all previous reports and reviews as mentioned in this section.
Mutual Aid
It is the policy of Indane Bottling Plant, Tirunelveli to assist its neighbours in
preparing for the responding to emergencies that may occur either on-site or off-site.
Indane Bottling Plant, Tirunelveli provides response assistance to local emergency
response agencies and to neighbouring industrial facilities.
Indane Bottling Plant, Tirunelveli provides this assistance under verbal agreement
with local officials. Assistance is only provided in cases where plant property and
personnel would be reasonably safe from harm.
8.11.6 Government Private Agency Coordination Purpose
The extent of involvement, if any by Government Agencies (i.e. Fire, police,
Electricity Board, etc.,) and other organizations (i.e.) Hospitals, Telephones,
Railways, Local Bodies, etc., in a plant emergency, will depend upon the type and
magnitude of the crisis. This section outlines the types of assistance available from
outside organizations during any plant emergencies. Shown in Table no. 8.3
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
175
Table no. 8.3: Government Private Agency Co-ordination
Organization Fire Spill Security Medical Others
Fire Services Yes Yes -- Yes --
Police Yes Yes Yes Yes --
Hospital -- -- -- Yes Yes
EB Yes -- -- -- Yes
Local Panchayat -- -- -- Yes Yes
Telephones -- -- -- -- Yes
Transport -- -- -- -- Yes
Neighbour
Industries
Yes
Yes
Fire Service
Fire Service forces will rush the Fire Tenders and their force to the plant and to co-
ordinate with the plant Authorities in meeting the emergencies.
Police
Police force will maintain the “Law & Order” at the emergency scene and adjacent area
to the plant. They will also regulate the movement of traffic on the High-way in co-
ordination with the RTO Authorities. Priority for movement of Ambulance, Fire
Service vehicles, etc., will be given by the police.
Hospital
Emergency panel of Doctors with Para-medical attendants equipped with life saving
drugs and for treatment of cold burns, First Aid equipments and apparatus shall
rush to the site. They will establish camp for treatment of those affected by the
emergency situations.
Electricity Board
They will assist in emergency cut-off/ supply of power to the emergency area and
will co- ordinate with the plant authorities to contain the situation.
Local Panchayat
Local Panchayat will coordinate the evacuation of the Community, surrounding the
plant area aid in information dissemination regarding the emergency situation and
assist in rescue operations.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
176
Telephones
Telephones & Telegraph personnel will extend their service in speedy communication
regarding the emergency situation and operation in co-operation with the plant
authorities.
Transport
Necessary adequate movement of Public Transport required for evacuation of
community surrounding the plant area will be arranged.
Neighbour Industries
Services like Fire Tenders, Ambulance, Medical Personnel, and Trained Fire Fighting
Personnel will be drawn to the site to co-ordinate with plan authorities in meeting
the emergency situation.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
177
ANNEXURE A
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 8 – DISASTER MANAGEMENT PLAN
178
ANNEXURE-B
MATERIAL SAFETY DATA SHEET
IDENTITY OF MATERIAL
Product Name LPG, Bottle gas liquefied
hydrocarbon gas
UN No
1075
Label / Class
Red: Flammable Liquid
/ 2.1 Trade Name LPG CAS No. 68476-85-7
Formula Mixture of propane and HAZCHEM code 2WE
PHYSICAL AND CHEMICAL PROPERTIES
Physical State Gas Boiling Point/Range. oC. 1 Vapor Pressure at 25 oC mm Hg
1823
Appearance Colorless Melting / Freezing point, oC 138
Odor Odorless / Stanched Vapor Density (Air=1) 1.5 - 2.0 Evaporation rate at 30 oC.
much>1 9 Bu Ac=1 Solubility in water Insoluble Specific Gravity, 20 deg. C 0.53 - 0.57
Calorific value
Kcal/Kg
4.63E + 07 Dyn. Viscosity (PAS 30 oC) Heat of Vaporization
Kcal/kg
3.17E+05
Molecular Weight Sp. Heat liq./J/kg 2.23E+03
FIRE AND EXPLOSIVE DATA
Explosivity
Highly dangerous Auto Ignition Temp. oC.
405-50 Flash point, C, CC / oC
60
Flammability Dangerous Explosive Limits, % 1.8-9.6 Burning Rate 7.9 mm / min
Extinguishing Media CO2 DCP water spray may be used to control and confine LPG fires
Special Procedures DO not attempt to extinguish fire until leak has been shut off. For small fire use dry chemicals. Let large fires bum.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 9 – PROJECT BENEFITS
179
9 PROJECT BENEFITS
9.1 INTRODUCTION
The present demand for bottled LPG in Tamil Nadu is growing at 7% per annum.
MOP&NG has mandated coverage of 88.9 % population with LPG connection by the
year 2017-18 including LPG connection in rural markets under RGGLV Scheme. The
bottled LPG demand projections in the state of Tamil Nadu are estimated to be
1396 TMTPA by the year 2019-20. Even after exhausting the available possibilities
of additional capacity generation in the existing LPG Bottling Plants in Tamil Nadu,
the available LPG capacity would not be sufficient to meet the increased demand of
1396 TMT during the year 2019-20. Therefore, there is a requirement of setting up a
new LPG Bottling Plant in the state of Tamil Nadu.
The bulk LPG storage & bottling facility, by installation of 03 mounded bullets of 600
MT capacities each, 8 TLD bays, 2 x 24 Carousals and other online facilities at LPG
bottling plant, will yield following benefits:
• Provide continuity of LPG gas cylinder supply to the consumers through
distributors.
• By implementation of 3 x 600 Mounded Bullets, risk profile of the plant will
not be enhanced
• Discourage deforestation and reduce the use of fire wood & fossil fuels.
• Improve the quality of life of women engaged in household activities specially
cooking.
9.2 DIRECT BENEFITS
Presently, there are no IOCL bottling plant in down south of Madurai, i.e. in the districts
of Tirunelveli, Tuticorin, and Kanyakumari. There is a backlog at times during monsoon
season and festival seasons. In order to overcome this problem, a bottling plant is very
much necessary to be established in Tirunelveli to cater to the customers in the above
districts so that there would not be a shortfall in supplies and customers will not be
affected on any account.
• Tirunelveli LPG Bottling Plant shall be feeding this essential commodity
(domestic LPG) not only to Tirunelveli District, but also other neighbouring
Districts of Tuticorin, Kanyakumari, Virudunagar in Tamil Nadu and Trivandrum,
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 9 – PROJECT BENEFITS
180
Kerala State.
• Improves the quality of life by overcoming the health implications arising due to
the use biomass fuel like wood, dung and crop residues.
• The overhead costs incurred during LPG cylinder transport through roads
(trucks) from Madurai will be eliminated.
There is an estimated saving of Rs. 18.38 Crores/annum to the nation towards
logistic cost.
9.3 IMPROVEMENT IN THE SOCIAL INFRASTRUCTURE
The LPG bottling facility will create opportunities for direct and indirect employment
in the area. The LPG bottling plant will initiate local economic growth and thereby the
potential to enhance quality of life of the local communities. Local population may get
benefited due to increased business activated after LPG bottling plant.
9.4 EMPLOYMENT POTENTIAL
About 50 work forces of different categories on an average basis were engaged
during construction phase of the LPG bottling plant. The project activities provided
employment to persons of different skills and trades. The local population was given
preference depending on availability to employment of different categories during
construction phase. During operational phase, about 60 people will get direct and
many more indirect employment opportunity. Local people will get employment
opportunity for security, house- keeping, maintenance, etc. at the plant and indirectly
during LPG bottling plant.
9.5 REDUCTION OF EMISSIONS
The LPG bottling plant will be helpful in ensuring availability of LPG for domestic and
industrial establishments which will help in minimization of use fossil fuel (petrol, HSD,
furnace oil, etc), coal and wood. It will, therefore, help in maintaining cleaner
environment due to reduction in emissions. Use of LPG by domestic and industrial users
will also help in reduction in generation of greenhouse gases responsible for global
warming.
9.6 OTHER TANGIBLE BENEFITS
The LPG bottling plant shall create tangible benefits as described below:
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 9 – PROJECT BENEFITS
181
• No private land acquisition is required for construction of LPG bottling plant. The
socio-economic impacts linked to the acquisition of land and structures will not
appear in the project.
• During operation phase of the project no significant impacts on environment are
anticipated.
• The LPG bottling will generate direct and indirect employment opportunities mainly
during the operation phase. Local semi-skilled and unskilled labourers will get
direct employment in operation phase. This is a moderate positive impact of the
project.
• The LPG bottling plant will provide cleaner fuel, which will create healthy
environmental conditions in the region.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 10 – ENVIRONMENTAL MANAGEMENT PLAN
182
10 ENVIRONMENTAL MANAGEMENT PLAN
10.1 INTRODUCTION
The objective of the environmental management plan (EMP) is to identify
administrative aspects for ensuring that mitigation measures are implemented and
their effectiveness is monitored. The EMP focuses on direct impacts, which are
identified as having the potential to cause significant impacts on the environment and
identifies:
• Specific measures that will be taken to prevent, reduce or manage the
adverse environmental impacts during construction and operation; and
• Where it is not possible to specify these at this stage, the level of
environmental performance that will be expected during the operation.
Indian Oil Corporation Limited (IOCL) is committed to adopt best environmental
management practices during construction and operation phases of the bulk LPG
storage and bottling plant. During construction of mounded bullets and various
component of LPG plant, necessary mitigation and environmental management
measures were implemented. IOCL will ensure that operation activities of the bulk LPG
storage and bottling plant are undertaken as per the various regulatory
requirements. There will be an Environment Management Cell overseeing all
environment responses to ensure that implementation of mitigation measures and
monitoring programme.
10.2 ENVIRONMENTAL MANAGEMENT PLAN DURING CONSTRUCTION PHASE
The environmental impacts anticipated during construction phase of the LPG bottling
plant were considerably insignificant. The impacts in the environmental during
construction phase were basically of temporary nature and disappeared on
completion of the construction phase. The following activities were completed during
construction phase
10.2.1 Site Preparation
The minor levelling of land for installation of bullets and other associated facilities was
undertaken. For suppression of dust from excavated earth work, periodical sprinkling
of water was carried out during working period.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 10 – ENVIRONMENTAL MANAGEMENT PLAN
183
10.2.2 Sanitation
Adequate and suitable sanitary facilities were provided to maintain proper standard of
hygiene for construction workers during working at the site.
10.2.3 Construction Equipment & Wastes
The debris was generated during civil works. The generated wastes were used in
leveling of low lying areas within the plant area. During installation of mounded
bullets & laying of pipes, some solid discarded materials were generated as solid wastes.
These metal wastes were sold through registered scrap dealers by the contractors. The
gas cylinders used for welding were returned back to the supplier. Cement bags, coal
tar drums and other container used during construction and discarded as wastes were
auctioned through registered vendors as per standard practices adopted by IOCL.
Similarly the damaged tools were also disposed in the above manner.
10.2.4 Storage of Hazardous Materials
The hazardous materials such as, lubricating oils, compressed gases (for welding),
paints, varnishes, etc. were stored at the site during construction phase. The quantity
of used oil from DG sets was approx. 100 lit. Since, used oil are hazardous in nature;
they were stored separately in barrels as per the prescribed / accepted safety norms
handed over to authorized recyclers by the contractors under the supervision of IOCL
management at the site.
10.2.5 Hazardous Waste Disposal
The hazardous materials were stored, handled & disposed off according to the
guidelines specified under Hazardous Waste (Management, Handling & Transboundary
Movement) Rules dated 24th September 2008 by MoEF&CC and subsequent
amendments. Some of the precautions of storage and handling of the hazardous
materials, followed during construction phase are as given below:
• Diesel and other fuels were stored in separate earmarked area as per the said
guidelines.
• Separate storage was created for waste paints and thinners, contaminated rags
and brushes to facilitate recycling and reuse or disposal as per Hazardous Waste
Authorization of TNPCB.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 10 – ENVIRONMENTAL MANAGEMENT PLAN
184
10.3 ENVIRONMENTAL MANAGEMENT PLAN DURING OPERATION PHASE
10.3.1 Air Environment
There will be no continuous source of air pollution from the operation of LPG bottling
plant during operation phase. The sources of air pollutants will be limited to the DG
sets and diesel engine driven fire water pumps which will be operated during
emergency. These sources of air pollution will be intermittent in nature and would
emit mainly exhaust gases containing NO2, SO2, and negligible quantity of
particulate matters. The pollution control in DG sets will be achieved by providing
stack of appropriate height as per CPCB guidelines.
10.3.2 Fugitive Emission
The bottling plant will receive LPG through bullet trucks, unloading and storage of
LPG in mounded bullets, filling in cylinders and dispatch of the same by
truck/lorries to consumers. The LPG plant will be operated in a well proven leak proof
system, thus there will no source of emissions from the storage and bottling of LPG at
the bulk LPG storage and bottling plant.
10.3.3 Water Environment
10.3.3.1 Waste Water Generation
For normal operation of LPG bottling plant, no process water will be required.
However, about 3 KLD of water will be required for domestic use and will be obtained
from SIPCOT water supply. It is expected that approx 2.4 KLD sewage will be generated
from the LPG plant. For washing of cylinders, 1 KLD of water will be required and
tentatively 0.8 KLD waste water will be generated from cylinder washing.
10.3.3.2 Waste Water Treatment & Disposal
From the washing of cylinders, 0.8 KLD waste water will be generated and same
will be treated in settling tank followed by clarifier. Treated water from clarifier will
be reused for washing purpose. Sewage generated from kitchen and toilets will be
treated in septic tanks.
10.3.3.3 Rain Water Harvesting
Three rain water harvesting pits have been constructed at LPG bottling plant. Rain
water harvesting system for bulk LPG storage & bottling facility has been designed
to utilize the under-ground water system sustainably.
Keeping in mind the depleting water table in the region, storm water drains has been
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 10 – ENVIRONMENTAL MANAGEMENT PLAN
185
engineered in such a way that rain water can be collected into two rain water
harvesting tanks placed at strategic locations so that underground water can be
recharged.
Sizes of rain water harvesting tanks are 2.5 m in diameter with depth of 5 m and have
been filled with brick bats to collect the water in case of heavy rain. Since much of the
plant area including truck parking area has been covered with RCC roads and bitumen
roads, Drains have been maintained to collect the storm water & rain water and using
the natural slope of plant, waters will be collected to rain water harvesting tank. Size of
rain water harvesting tank is 2.5 m in diameter with depth of 5 m. Three recharge pits
(2 on-site & 1 truck parking area) have been set up at the site to harvest run-off water.
10.3.4 Noise Environment
10.3.4.1 Sources of Noise
The sources of noise at the bulk LPG storage & bottling facility are limited to the
pumps, compressors, DG Sets, fire water pumps and vehicle movement.
10.3.4.2 Control of Noise
The following measures will be practiced at the LPG bottling plant for control and
abatement of noise & vibration:
• The foundations of DG sets and fire water pumps have been provided with anti-
vibration padding.
• The DG sets and fire water pumps are designed to produce noise within the
permissible limit and strict compliance of this will be ensured during procurement.
• The DG Sets have been provided with acoustic enclosures.
• Regular condition monitoring e.g. speed, vibration and regular preventive
maintenance including schedule lubrication are being conducted for the moving
machines to keep them in good condition and also to reduce vibration.
• Trees grown in the green belt around the LPG Plant also facilitates attenuation of noise
level beyond the boundary walls.
10.3.5 Solid waste management
Environmental management with respect to solid waste management may be
summarized as under:
• Practically, no solid waste shall be generated from operation of LPG bottling
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 10 – ENVIRONMENTAL MANAGEMENT PLAN
186
facility.
• Used oil, grease and empty drums shall be disposed of through TNPCB registered
vendors as per Hazardous Wastes (Management, Handling and Transboundary
Movement) Rules, 2008 and subsequent amendments.
10.3.6 Green Belt Development
At the LPG bottling plant, 13.86 Acres green belt is being developed. Green belt is being
developed at 33% of total plot area. Approximately 1670 trees are available in the
plant, additionally trees will be planted to strengthen for the proposed expansion. The
list of plants and the number of samplings planted are given in Table 10.1. Green
belt being developed at the LPG Bottling plant is shown in Figure 10.1.
Table 10-1 Details on Greenbelt Plantation
S. No. List of tree saplings Nos.
1 Neem Tree 230
2 Flame of the forest 210
3 Cassia Fistula 535
4 Samaneasaman 100
5 Teak 105
6 Indian Almond 150
7 Pongamiapinnata 340
Total 1670
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 10 – ENVIRONMENTAL MANAGEMENT PLAN
187
Figure 10-1 Green Belt being developed at LPG Bottling Plant
10.3.7 Safety and Fire Fighting
10.3.7.1 Safety
The main safety features associated with the bulk LPG storage & bottling facilities
are as follows:
• The layout and firefighting systems is as per OISD - 169 & OISD- 150.
• Boundary of 3.0 m height, brick masonry wall with 0.6 m height barbed wire
fencing have been provided in all directions.
• Approach roads of adequate width shall be provided as per OISD-169 and to
avoid congestion and to have safe exit in emergencies.
• All electrical fittings provided in licensed areas are flame proof and
intrinsically safe as per IS-2148.
• Cylinder filling area is completely open type and covered from top with colour
coated galvalume roof.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 10 – ENVIRONMENTAL MANAGEMENT PLAN
188
• Water drain from cylinder filling area is provided with vapour trap.
• Fixed Water Spray system has been installed for LPG handling area.
• Suitable storm water drains have been provided with vapour traps.
10.3.7.2 Fire Fighting Facilities
The firefighting system in the facilities consists of fire water storage, fire water
pumps and fire hydrant system. As IOCL is dealing with hydrocarbons that are
volatile in nature, safety of the plant becomes very important factor. The
firefighting facilities are of state of the art and are fully automated which operate
themselves in case of fire. The fire water ring main is always kept in auto mode
with pressurized water with the help of jockey pumps which have auto start/stop
facility. There are deluge valves which cover all the vulnerable areas of the LPG
plant. These valves operate automatically in case of fire and water is sprayed in
the concerned area for controlling the fire. Moreover 10 kg and 75 kg DCP fire-
extinguishers are placed as per OISD-144 norms to control fire at initial stages.
CO2 fire extinguishers are also provided in power motor control centre and other
buildings in plant to put off fire in emergency situations. Fire Hydrant rings has
been provided as per OISD - 169.
The firefighting detection and prevention system in the storage & handling area
comprise of the following:
• Three no’s of 615 cum/hr diesel engine drive fire pumps and the system
is kept pressurized by electric motor driven jockey pump.
• Other fire pump house equipment like security air compressor for MVWS
system, fire alarm panel.
Hydrants and Monitors
• Medium velocity water spray system consisting of 19 zones have been
provided in filling shed,
LD, LPG Pump House and Mounded Bullet
• Fire Detection and Alarm System
• Gas Detection System
• Manual call points and Emergency shutdown system
The plant is equipped with firef ighting facilities as per OISD 144. Fire water
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 10 – ENVIRONMENTAL MANAGEMENT PLAN
189
storage consists of MS fixed cone roof fire water storage tank of 3 x 2500 kl,
capacity.
10.3.7.3 Safety Organization
The Fire and Safety Department will be under the control of trained and responsible
officer. All the officers and staff of the LPG bottling plant will be trained for combating
fire and use of safety equipment.
10.3.7.4 Security
The following security arrangement have been provided within LPG Bottling Plant
• The facilities are guarded round the clock by efficient security personnel. They
prevent any unauthorized entry inside the plant.
• 3.0 m high boundary wall with 0.6m barbed wire fencing has been provided
around the installation to resist any unauthorized entry.
10.3.7.5 Safety & Environmental Audit
In view of the high hazard potential of LPG, extreme cares will be taken to maintain the
safety needs of the LPG installation. Safety audits will be carried out regularly by a
multi- disciplinary team. The safety audit will include operating procedures,
housekeeping, provision of firefighting and safety gadgets, mock drills etc.
10.3.7.6 Occupational Safety and Health
Safety Department in the LPG plant will be looked after the occupational safety
aspects of the workers. IOCL will follow OISD-166 to maintain occupational health
and safety of the employees and workers. Workers will be well informed about the
preventive measures and safe operating practices to be followed for various types of
job. Training courses will be organized for the workmen and the officers before they
are put on the job. Contractor's labourers will also be trained and educated to ensure
safe operating practices for the jobs.
10.3.7.7 Tool & Tackles
In LPG installation, it is customary to use non-sparking type tools (spanners, wrenches
etc). Electrical hand tools like torches; lamp etc. to be used in the hazardous area
should be flame proof type. All tools should be of approved quality and make and will
be purchased with test certificates.
10.3.7.8 Preventive Maintenance & Planned Inspection
To facilitate inspection and maintenance service in planned manner, a schedule will
be made for jobs to be done daily, weekly, bi-weekly, monthly, half yearly and yearly.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 10 – ENVIRONMENTAL MANAGEMENT PLAN
190
The record of the jobs done will be kept properly. The inspection & maintenance
schedule will be done as per the directive & procedure lay down by OISD as well
as instructions of suppliers and
OEM. The planned inspection will also include statutory inspection of pressure
vessels, storage tanks, safety valves, etc.
10.3.8 Safety, Health & Environmental Policy of IOCL
IOCL is committed to conduct business with strong environment conscience
ensuring sustainable development, safe workplaces and enrichment of quality of
life of employees, customers and the community. IOCL believes that good SH&E
performance is an integral part of efficient and profitable business management.
Health, Safety & Environmental Policy of IOCL is shown in Figure 10.2.
Figure 10-2 Health, Safety & Environmental Policy of IOCL
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 10 – ENVIRONMENTAL MANAGEMENT PLAN
191
Accordingly, the IOCL's endeavour is to:
• Establish and maintain good standards for safety of the people, the processes
and the assets.
• Comply with all rules and regulations on Safety, Occupational Health and
Protection.
• Plan, design, operate and maintain all facilities, processes and procedures to
secure sustained Safety, Health and Environmental Protection.
• Remain trained, equipped and ready for effective and prompt response to
accidents and emergencies.
• Welcome audit of our SH & E conduct by external body, so that stakeholder
confidence is safeguarded.
• Adopt and promote industry best practices to avert accidents and improve our
S,H&E performance.
• Remain committed to be a leader in Safety, Occupational Health and
Environmental Protection through continuing improvement.
• Make efforts to preserve ecological balance and heritage.
10.4 ENVIRONMENT MANAGEMENT CELL
It is necessary to have a permanent organizational set-up charged with the task of
ensuring effective implementation of all identified mitigation measures. Conscious of
this, IOCL will create Environmental Management Cell to coordinate the activities
concerned with the management and implementation of the environmental mitigation
measures during operation phases of the LPG Bottling plant. IOCL will also develop a
well-documented system for pollution monitoring and control.
The IOCL will be responsible for the implementation of mitigation measures during
operation phases of the LPG bottling plant. Environmental Management Cell (EMC)
will be headed by Territorial Manager supported by adequate number of personnel
having sufficient educational and professional qualification and experience to
discharge responsibilities related to environmental management including statutory
compliance, pollution prevention, environmental monitoring, preventive maintenance
of pollution control equipment and green belt development as well as maintenance.
Environment Management Cell (EMC) will look after the environment related matters
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 10 – ENVIRONMENTAL MANAGEMENT PLAN
192
Manger (HSE)
during the operation phase of the LPG bottling plant. EMC will perform the following
assignments:
• Periodic monitoring of GMS and report any abnormalities for immediate
corrective measures.
• Periodic monitoring of ambient air quality, ground and surface water quality.
• Periodic noise monitoring of the building zone and surrounding area.
• Regular monitoring of storm water drains.
• Green belt plantation, maintenance, development of other forms of greenery.
• Regular monitoring of garbage wastes.
• Development & maintenance of schemes for water conservation.
The Environmental Management Cell (EMC) will take the overall responsibility for co-
ordination of the actions required for environmental management and mitigation,
and for monitoring the progress of the management plan and actions to be taken.
The organization set-up of the Environmental Management Cell (EMC) is presented in
Figure 10.3.
Territorial Manager
Manager (Utility)
Technician Technician Technician Technician
Figure 10-3 Environmental Management Cell
10.5 REPORTING AND MONITORING SYSTEM
Proper reporting of implementation of mitigation measures plays important role in
effective environmental management. The reporting system will provide the
necessary feedback for project management to ensure proper quality of the work
and that the environmental management programmes are on schedule. The rationale
for a reporting system is based on accountability to ensure that the mitigation
measures as part of the Environmental Management Plan gets implemented during
construction and operation phases of the LPG bottling plant.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 10 – ENVIRONMENTAL MANAGEMENT PLAN
193
The reporting system will operate linearly with the person who is at the lowest
level of the implementation system to the project management and shall report to
Territorial Manager of IOCL.
For the project all reporting to the Territorial Manager of IOCL will be on weekly
basis. The IOCL’s Environmental Management Cell will be responsible for preparing
targets for each of the identified mitigation measures.
The compliance monitoring and the progress reports on environmental components
may be clubbed together and submitted to the Territorial Manager to IOCL weekly
during each phase of implementation period. At the end of implementation, weekly
progress report on environmental issues may be discontinued.
During the operation period, a compliance report may include description of the
items of mitigation measures, which were not complied by any of the responsible
agencies. It would also report the management actions taken to enforce compliance.
It may however, be noted that certain items of the EMP might not be possible to be
compiled at the field level due to a variety of reasons. The intention of the compliance
report is not to suppress these issues but to bring out the circumstances and reasons
for which compliance was not possible. This would help in rationalizing the
implementation of the mitigation measures during the remaining duration of
implementation. Solutions for further effective implementation would also come out
as a result of the compliance monitoring reports.
Photographic records will also be established to provide useful environmental
monitoring tools. A full record will be kept as part of normal contract monitoring.
10.6 BUDGETS FOR IMPLEMENTATION OF EMP AND MONITORING PLAN
The budget for implementation of mitigation measures and environmental management
plan to mitigate the potential adverse environmental impacts during operation phase
are suggested in Table 10.2.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 10 – ENVIRONMENTAL MANAGEMENT PLAN
194
Table 10-2 Budget for Implementation of EMP and Monitoring Plan
S.
No. Description
(Cost in Lakh Rupees)
Capital Cost Recurring Cost Per Annum
1. Gardening / Horticulture 40 4.8
2. Rain Water Harvesting 15 0.5
3. Septic Tank / Soak Pits 7.5 0.8
4. Gas Monitoring System 46 2.0
5. Signage’s for EMP 5.5 0.5
6. Monitoring of Air and Noise
Pollution (Acoustic Enclosure) 15 1.5
7. Water Management–Cylinder
Washing Unit and in line bath 14 0.5
Total 143 10.6
10.7 Corporate Social Responsibility
The following Corporate Social Responsibility (CSR) activities will be taken-up by
LPG Bottling plant in the area:
Timeframe
(Year) Activity
2015-16 Construction of Toilet Facility for Government High School,
Gangaikondan village at a cost of Rs 7.5 lacs
2016- 17 Provision of Basic Library Equipments/ Furniture at Gangaikondan
Library at a cost of Rs. 1.0 Lacs
2017-18 Construction of toilet block at Govt. Rani Anna College, Tirunelveli at
a cost of Rs. 19.87 Lacs
2018-19 Rectification of RO system at Govt. School, Thuraiyur at a cost of Rs.
30,000/-
2018-19 Construction of Hu-Methane Gas plant at Narikkuravar colony, Pettai
at a cost of Rs 20.0 lacs
Total 48.67 Lakhs
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY
RESOURCE AUGMENTATION PLAN
195
11 ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE AUGMENTATION PLAN
11.1 PREAMBLE
M/s. Indian Oil Corporation Ltd has set up a LPG bottling plant i.e., Tirunelveli Bottling
Plant with a LPG bottling capacity of 1,20,000 MTPA at SIPCOT Industrial Growth Centre,
Gangaikondan village in Tirunelveli District of Tamil Nadu State.
bulk LPG storage & bottling facility (Indane LPG bottling plant) comprise bulk LPG storage
(1800 MT) and LPG throughput of 1,20,000 MTPA through 2 LPG Filling carousels and is
located on B37/pt to B43/pt, B50/pt, B51/pt, C30 to C41 in SIPCOT Industrial Growth
Centre, Gangaikondan Village, Tirunelveli Taluka & District Tamil Nadu.
M/s Indian Oil Corporation Limited at above location has been established in
November 2014 and not yet commissioned/operated as Environmental Clearance was not
yet obtained. So, the project has been notified under violation as per the Ministry of
Environmental Forest and Climate Change Notification, 14-15 march 2017. IOCL has
applied for post facto Environmental Clearance for the bulk LPG storage & bottling facility
from Ministry of Environment, Forest & Climate Change (MOEF&CC) on 23rd January 2018.
The proposal was discussed in 6th Expert Appraisal Committee (Industry-2) (Violation)
meeting held during 19-20th April, 2018 and the ToR was granted on 21st May 2018.
The EIA Report was prepared with a detailed study on assessment of Ecological
damage, remediation plan, natural and community resource management plan on the
basis of the TOR issued by MoEF&CC vide letter number F. No. 23-86/2018-IA.III (V)
(Annexure I)
EIA Report has been prepared by M/s ABC Techno Labs India Pvt. Ltd. (accredited
by NABL, MoEF). A professional team consisting of Scientists and Engineers have
undertaken a detailed study for an Ecological damage, remediation plan and community
resource management plan.
11.2 INTRODUCTION
The LPG Bottling plant was established in 42 acres of land of SIPCOT Industrial Growth
Centre, Gangaikondan village, Tirunelveli Dist. There are number of other Industries
operating in the SIPCOT Industrial Area. LPG Bottling plant has valid Consent to Establish
(CTE) under water and Air Act obtained from TNPCB vide consent order and other
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY
RESOURCE AUGMENTATION PLAN
196
Licenses
CCOE Licenses (Chief Controller of Explosives)
Description of Item License Details
License to Store Compressed Gas in Pressure Vessels
S/HO/TN/03/1034(S51373)
License to fill Compressed Gas in Cylinders G/HO/TN/05/387(G29929)
License to Store Compressed Gas in Cylinders G/HO/TN/06/363(G29929)
Storage of HSD inside premises for Own Use P/HQ/TN/15/5144(P378315)
The unit has obtained Consent for Operation from Tamil Nadu Pollution Control Board.
However, Indian Oil Corporation is awaiting Environmental Clearance for commencement
of operation. The Design and Construction of the mounded bullets and other Bottling
facility was done as per OSID 150 and OSID 144.
As the Gangaikondan Spotted Deer Sanctuary is located within a distance of 1 Km from the
project site, The NBWL clearance under Wild Life (Protection) Act, 1972 is also under
process. Application submitted online on 13.10.2015 and currently the NBWL Clearance
proposal is under final stage of scrutiny by National Board of Wildlife/MoEFCC (WL).
However, the plant is well designed and equipped with all necessary safety, Fire
prevention and very effective firefighting system.
11.3 NEED FOR THE PROJECT
Presently, there is no IOCL bottling plants in down south of Madurai, i.e. in the districts of
Tirunelveli, Tuticorin and Kanyakumari. Tirunelveli LPG BP shall be feeding this essential
commodity (domestic LPG) not only to the above Districts in Tamil Nadu but also the
neighbouring Trivandrum and other areas of Kerala State. Decreased movement of trucks
conveying LPG cylinders from Madurai to southern district will have a direct positive
impact on the ambient air quality (i.e. improvement in air quality as fugitive emissions will
be reduced) & the existing traffic scenario will also be reduced. In view of this, LPG Bottling
Plant has been established in SIPCOT Industrial Growth Center at Gangaikondan,
Tirunelveli.
11.4 LOCATION & CONNECTIVITY
IOCL’s Indane Bottling Plant is located at S.F Nos. B37/pt to B43/pt, B50/pt, B51/pt, C30
to C41, C24/pt to C27/pt at SIPCOT Industrial Growth Centre, Gangaikondan village,
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY
RESOURCE AUGMENTATION PLAN
197
Tirunelveli Taluk & District, Tamil Nadu between the latitude 8°49'50.10"N and
77°44'41.27"E longitude.
The project site is well connected by road and rail network. The project site is located
adjacent to NH 7 which connects Varanasi & Kanyakumari. Gangaikondan Railway Station
is located at the distance of 4 km (E). Tuticorin Airport is located at the distance of
33.55km (SW). Co-ordinates of all four corners of the site.
North west North East South West South East
8°49'54.91"N 8°49'54.93"N 8°49‘47.02"N 8°49'43.35"N
77°44‘32.28"E 77°44‘50.30"E 77°44‘32.59"E 77°44‘49.49"E
Figure 11-1 Site Location
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE AUGMENTATION PLAN
198
Figure 11-2 Topomap Showing 10 Km Radius of Project Site.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE AUGMENTATION PLAN
199
Figure 11-3 Geographical Location of the Project Site & Gangaikondan Spotted Deer Sanctuary
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
200
11.5 ENVIRONMENTAL QUALITY
As part of Environmental Impact assessment, baseline environmental monitoring studies
were conducted during the period from January 2018 to March 2018 and details are as
follows
11.6 METEOROLOGY
The maximum and minimum temperature recorded during the study period is 34°C and
23°C. The relative humidity is found varying from 60 to 83%. The predominant winds are
mostly from Northwest, Northeast and Southeast directions. Maximum 63mm rainfall was
recorded during study period.
11.6.1 OBSERVATIONS
o The soil results were compared with soil standards. It has been observed that the pH of
the soil was ranging from 7.58 to 8.33 indicating the soils are basic in nature.
Conductivity of the soil ranges from 0.086 to 0.237 mS/cm. Since the EC value is less
than 2000 µS/cm, the soil is said to be Non saline in nature.
o Texture of the soil sample is predominantly loam. Soil organic content varied from 0.46
to 1.03% which indicates the very low level of organic matter.
o The available nitrogen content ranges between 18.6 to 41.4 mg/kg in the locality and the
value of phosphorus content varies between 45.8 to 112.3 mg/kg. This indicates that the
soil have very high quantities of Nitrogen and Phosphorus.
o The potassium content varies from 325 to 623 mg/kg which indicates that the soils have
high quantities of potassium.
From the above observations it was found that the soil in the Study area shows
moderate fertility. Similar plants established in Tamil Nadu do not cause any impact on Air,
Water, Soil and Noise Environment as there is no process involved except storage filing and
dispatch. The fugitive emissions if any during filling cylinders will be collected through hood,
duct and discharge into the atmosphere.
11.7 ECOLOGICAL ENVIRONMENT
Ecosystem shows complex inter-relationships between biotic and abiotic components
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
201
leading to dependence, competition and mutualism. Biotic components comprise both plant
and animal communities, interacting not only within and between themselves but also with
the abiotic components of the environment. The map showing the bio-geographic provinces
of India is shown in Figure 11.4.
Generally, biological communities are good indicators of climatic and edaphic factors
because of their strong relationships with them. The studies on the biological aspects of the
ecosystem are important in Environment Impact Assessment studies for the suitability of
natural flora & fauna. Information on the impact of environment stress on the community
structure serves as an inexpensive and efficient early warning system to check the damage
on a particular ecosystem. The biological environment includes mainly terrestrial and
aquatic ecosystem.
A change in the composition of biotic communities under stress is reflected through a change
in the distribution pattern, density, diversity, frequency, dominance and abundance of
natural species of fauna and flora existing in the ecosystem. These changes over a span of
times can be quantified and related to the existing environment.
Objectives
The objectives of ecological study during the study period of EIA study period may be
outlined as follows:
To characterize the environmental components like land, water, flora and fauna;
To understand their present status;
To understand carrying capacity of the ecosystem;
To assess present bio-diversity; and
To identify susceptible and sensitive areas.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
202
Figure 11-4 Map Showing Biogeographic Classification of India: Provinces
The detailed ecological assessment of the study area has been carried out with the following
objectives:
To establish the present status of ecological conditions surrounding the project
location;
To study the existing anthropogenic stresses on the prevailing ecosystem.
To identify and predict the likely impacts on the local ecosystem from the activities;
To list out floral species, terrestrial vertebrate and aquatic flora and fauna present
within the study area, and significance status under The Wildlife (Protection) Act,
1972
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
203
To define ecological/conservation status of each species as per IUCN categories (Red
Data List).
To formulate mitigation measures and a sustainable Environmental Management
Plan (EMP) basing upon the likely impacts.
During survey, following aspects were considered for ecological studies:
Assessment of present status of flora and fauna;
Identification of rare and endangered species of plants and animals (if any);
Identification of ecologically sensitive areas within the study area;
Assessment of migratory route of wildlife (if any)
Assessment of Aquatic Ecology with specific reference to aquatic birds and fishery
resources.
11.7.1 Methodology
Terrestrial investigations for flora and fauna records were collected by random field survey
and a checklist was prepared. During field survey, discussions with the local people were
carried-out to collect information related to local biodiversity in and around the villages. The
ecological status of the study area has been assessed based on the following methodology:
Primary field surveys to establish primary baseline of the study area;
Compilation of secondary information available in published literatures/ working
plan was referred from State Forest Department.
Site Verification and finalization in consultation with Project proponent, local
inhabitants.
Vegetation analysis through quadrate method using sampling plots of 10m x 10m.
10m X 10m for tree species (record trees >25 cm in GBHOB /species);
5m X 5m [four plots] was laid along diagonals wherein all the shrubs recorded.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
204
1m X 1m [five plots], one at the centre and four at one per quadrate] was laid and
herbs, grasses in five plots to be noted.
11.7.2 Protocol for Sampling through Quadrate Method
The standard method chosen for the assessment of plant diversity involves the use of square
vegetation quadrates (‘plots’). These quadrates were used to measure most vegetation
attributes in most vegetation types. Quadrate locations marked by pegs or sometimes by grid
system.
The study area is demarcated as 10 km from the periphery of project area based on the
MoEF&CC guidelines. After demarcation, the study area is divided into sampling units, i.e.
the areas which are approximately true representative of the whole area, and were sampled
for the identification of plant and animal species.
A. Floral Study
The assessment of the flora of the study area is done by an extensive field survey of the area.
Plants species were identified based on their specific diagnostics characters of family,
genus and species using available floral, other related literature and herbarium
Botanical Survey of India (BSI).
Besides the identification of plant species, information was collected on the
vernacular names and uses of plants made by local inhabitants.
Qualitative analysis of vegetation is made by two different methods such as floristic
(by simple studying various genera and species of various plant groups i.e. herbs,
shrubs, trees etc).
B. Phyto-sociology
A nested quadrates technique was used for sampling the vegetation. All the plots sampled
were representative of most common types, sampling 10m x 10m for trees and 5m x 5m for
shrubs, 1m x 1m for herbs square meter quadrates were laid. Selection of sites for sampling
of vegetation is done by random sampling procedure. However, in general to study the
phytosociological attributes, quadrates of 10 m × 10 m size for tree species are randomly laid
out at each site at different elevations. Then the observation on the following parameters is
recorded:
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
205
1. Name of the species.
2. Number of the occurrence of each species in each quadrate.
The field data for phytosociological studies was collected in the study area. Vegetation data
was quantitatively analyzed for frequency, density and dominance using standard
methodologies. The relative values of frequency, density, and dominance of all the recorded
species was summed up to represent Importance Value Index (IVI). Not only IVI facilitates
comparison between species of a community, but also the data collected on dispersion,
number and cover can be profitably used in comparing the vegetation structure of two or
more stands or of the same stand over a period of time. Vegetation structure with respect of
varying environmental factors can also be studied through such studies in sets of varying
environmental conditions. The IVI was determined as the sum of the relative frequency,
relative density and relative dominance. It thus incorporate three important parameters that
measures of productivity and diversity of every species therefore.
IVI = Relative frequency + Relative density + Relative dominance
C. Faunal Study
Ground surveys are carried out by trekking the study area for identification of important
animal groups such as birds, mammals and reptiles for sampling of animals through the
following methods.
For sampling birds/ avifauna ‘point sampling’ along the fixed transects (foot trails)
were done to record all the species of birds with the help of binoculars; field guides
and photography for more than 1 hour on each transect (n=4).
For sampling mammals, ‘direct count on open width (20 m) transect’ were used on
the same transects. Besides, information on recent sightings/records of mammals by
the locals are also collected from the study areas.
‘Reptiles’ mainly lizards were sampled by ‘direct count on open width transects’.
Secondary information collected from local villagers, published government data etc.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
206
List of the endangered and endemic species as per the schedule of The Wildlife Protection
Act, 1972
Emphasis is given to identify avifauna and mammals to determine the presence and absence
of Schedule-1 species, listed in The Wildlife Protection Act 1972, as well as in Red List of
IUCN. Various methods used for study animals are as follows:
A. Point Survey Method: Observations were made at each site for 15-20 min duration.
B. Road Side Counts: The observer travelled by motor vehicles from site to site and all
sightings were recorded.
Code Locations Co-ordinates
EB1 Gangaikondan 8°51'30.11"N, 77°46'43.62"E
EB2 Aladipatti 8°50'3.96"N, 77°47'19.73"E
EB3 Rajavallipuram 8°47'19.50"N, 77°45'9.10"E
EB4 Thalaiyuthu 8°47'37.62"N, 77°43'40.96"E
EB5 Thenkalam Pudur 8°50'4.35"N, 77°42'11.94"E
EB6 Alangaraperi 8°48'22.97"N, 77°46'36.46"E
Figure 11-5 Ecology and Biodiversity Monitoring Locations
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
207
11.8 ECOLOGY AND BIODIVERSITY
The area belongs to semi-arid rocky hilly region. The biodiversity survey was conducted in
the month of March 2018 to study the richness of flora and fauna of the project area. The
floral study was carried out using randomly placed quadrates of 10m x 10m for trees, 5m x
5m for shrubs and climbers and 1m x 1m for herbs.
11.9 FLORAL COMPOSITION
The floral study in the 10 km radius of the LPG bottling plant indicates that 62 plant species
were observed. The list plants are given below.
Table 11-1 Floral Composition
S.No. Botanical Name Common Name
1. Azadiracta indica A. Juss Vembu
2. Boerhhavia diffusa L. Mukkurttaikkoti
3. Calotropis gigantean (L.) R.Br. Eruku
4. Borassus flabellifer L. Panai
5. Cassia siamea Lam. Manja Kondrai
6. Cissus quadrangularis L. Nanmuga pirandai
7. Clerodendrum inerme (L.) Gaertn Pampu-k-kanni
8. Cleome gynandra L. Naikkaduku
9. Cleome viscosa L. Naikaduku
10. Cocos nucifera L. Thenai
11. Commelina benghalensis L. Thankaipoo
12. Cynodon dactylon (L.) Pers. Arukanpull
13. Cyperus rotundus L. korai
14. Cassia fistula L. Sarakonai
15. Nerium odorum nerium
16. Ficus benghalensis L. Alamaram
17. Ficus religiosa L. Arasamaram
18. Indigofera uniflora Buch. Avari
19. Moringa pterygosperma Goertn. Murunai
20. Jasminum angustifolium (L.) Willd. Malligai
21. Mangifera indica L. Mango
22. Ficus racemose Aththi
23. Delonix regia (Boj. ex Hook.) Raf. Myilkonrai
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
208
24. Carica papaya L. Pappali
25. Ocimum sanctum Tulsi
26. Pergularia daemia L Veliparuthi
27. Parthenium hysterophorus L. Parthenium
28. Abutilon indicum (Linn.) Sweet. Thuthi
29. Tribulus terrestris Linn Nerunji
30. Tamarindus indica L. Puli
3 1 . Thespesia populanea (L.) Soland. Poovarasu
32. Aloe vera (L.) Burm.f. Sodrukathalai
33. Ricinus communis L. Athalai
34. Croton sparsiflorus Morong Eliamanakku
35. Opuntia Kalli
36. Ziziphus Elantha Pazham
37. Polyalthua longifolia (Sonner) Thw. Nedulingam
38. Aerva lanata (L.) Juss. ex. Sch. Kanupula sedi
39. Cassia auriculata L. Avarai
40. Morinda tinctoria Roxb Manchanathi
41. Cuscuta L. Verillankothan
42. Tectona grandis L. f. Thekku
43. Hibiscus rosa-sinensis L. Chembaruthi
44. Acacia planiformis Wight & Arn Odaimaram
45. Samanea samen (Jacq.) Marrill. Thungumungi maram
46. Millingtonia hortensis L. Pannerpoomaram
47. Tridax procumbens L kinatruppasan
48. Leucaena leucocephala (Lamk) Wit. Subapull
49. Agave americana L. Aanai katraalai
50. Albizzia lebbeck Benth. Vagai
51. Mimosa pudica Thottaccurungi
52. Terminalia catappa L. Vatham
53. Typha latifolia Sambu
54. Achyranthes aspera Nayuruvi
55. Jatropha gossifolia Seemayamanakku
56. Musa paradisiaca L. Vallai
57. Bougainvillea spectabilis Kakithapoo
58. Eucalyptus Thaila Maram
59. Prosopis julifera Karuvelam
60. Marsilea Aalai Keerai
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
209
61. Arundina Bamboo Orchid
62. Vinca rosea Nithya Kalyani
Among the 62 species of plants, Borassus flabellifer was found to be the dominant species,
whereas Cyperus rotundus was observed to be having lower number of individuals. Cuscuta
sp. was occurred as a parasitic species in the site, invading the common tree species like
Azadiracta indica.
Table 11-2 Consolidated details on the floral diversity
The Diversity index was calculated using standard methods and Shannon index was found
to be 3.33.
11.10 FAUNAL COMPOSITION
Primary data on the fauna was collected within 10km radius of the LPG bottling plant in
SIPCOT complex of Gangaikondan village. In each plot faunal species were identified based
on direct sightings and indirect evidences such as call, foot prints if any, nesting, excreta etc.
Based on identification the list animals is given below.
Table 11-3 Faunal Composition
S.No. Botanical Name Common Name
1. Ovis aries Sheep
2. Capra aegagrus hircus Goat
3. Canis lupus familiaris Dog
Number of Species 62
Number of Individuals 972
Dominance 0.041
Shannon Diversity 3.33
Simpson 0.95
Evenness 0.86
Menhinick 3.64
Margalef 7.23
Equitability index 0.95
Fisher alpha diversity 20.77
Berger-Parker 0.08
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
210
4. Gecko Lizard
5. Felis catus Cat
6. Bos taurus Cow
7. Macaca radiate Monkey
8. Corvus splendens Crow
9. Acridotheres tristis Common Myna
10. Loriculus vernalis Parrot
11. Collocalia esculenta Glossy Swiftlet
12. Bubulcus ibis Cattle Egret
13. Tyto alba Owl
14. Columba rupestris Pigeon
15. Passer domesticus House Sparrow
16. Milvus migrans Black Kite
17. Dicrurus macrocercus Black Drongo
18. Naja naja oxiana Central Asian Cobra
19. Varanus sp. Monitor Lizard
20. Chamaeleo gracilis Graceful Chameleon
21. Bufo melanostictus Indian Toad
22. Duttaphrynus melanostictus Toad
23. Anopheles rufipes Mosquito
24. Anopheles coustani Mosquito
25. Culex annulioris Mosquito
26. Ficalbia splendens Mosquito
27. Musca domestica House fly
28. Anochetus Ant
29. Technomyrmex Ant
30. Acantholepis Ant
31. Ardea purpurea Peria vellai kokku
32. Ardea cinerea Sambal narai
33. Anaphaeis aurota The Pioneer butterfly
34. Papilio demoleus The Lime Butterfly
35. Pachliopta aristolochiae The common Rose Butterfly
36. Troides Minos The Southern Birdwing
37. Danaus chrysippus Plain tiger butterfly
38. Mycalesis anaxias Indian common butterfly
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
211
Table 11-4 Consolidated details on the fauna diversity
Totally 38 faunal species were identified in the project area. During public consultation
it was informed by the locals that the wild life found in the spotted deer sanctuary
constitute Deer, Rabbit and Wild boar etc. Domestic fauna constitute of sheep, goat, cow
etc. are the integral part of rural livelihood.
11.11 PROTECTED AREA
The LPG bottling plant area does not have any National park, Biosphere reserve within
10 km radius except the recently declared spotted deer sanctuary, which is about 0.9 km
away from the plant site.
The topography of the forest area is mainly rocky and Hilly terrain. As per the revised
classification of forest types by Champion and Seth (1968), the existing forest is coming
under Forest Types - 6A Southern tropical thorn forest and Sub types – 6A/C – Southern
thorn forest
Details of the Sanctuary
Name of Sanctuary Gangaikondan Spotted Deer Sanctuary
1 District Tirunelveli
2 Taluk Tirunelveli
3 Village/s Gangaikondan & Alankaraperi
4 Block Gangaikondan
5 Total Area 288.40 hectares
Number of species 35
Number of Individuals 504
Shannon index 2.70
Simpson index 0.92
Evenness 0.86
Menhinick 2.73
Margalef 4.46
Equitability index 0.94
Fisher alpha diversity 11.74
Berger-Parker 0.131251
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
212
Flora
The entire area is a dry and the predominant species observed in the area are Prosopis
juliflora and Acacia species (leucocephala and nilotica). In total 30 plant species consists of 6
trees, 5 shrubs, 19 herbs, were recorded from Gangaikondan Deer Sancturay. There is no
endemic or endangered flora found in the study area.
Primary and secondary data were collected and details of flora and fauna furnished below.
Table 11-5 List of Plants Recorded in Gangaikondan Spotted Deer Sanctuary
S.No Name Family Herbs
1. Capparis zeylanica Capparaceae 2. Cissus quandrangulais Vitaceae 3. Hemidesmus indicus Periplocaceae 4. Tylophora indica Asclepiadaceae 5. Achyranthes aspera Amaranthaceae 6. Aerva javanica Amaranthaceae 7. Ageratum conyzoides Asteraceae 8. Aloe vera Liliaceae 9. Aristida setacea Poaceae
10. Argyreia nervosa Convolvulaceae 11. Barleria prionitis Acanthaceae 12. Boerhaavia diffusa Nyctaginaceae
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
213
13. Chloris barbata Poaceae 14. Cynodon dactylon Poaceae 15. Euphorbia resinifera Euphorbiaceae 16. Lepidagathis cristata Acanthaceae 17. Rostellularia prostrata Acanthaceae 18. Themeda triandra (kangaroo grass) Poaceae 19. Vernnonia cinerea Asteraceae
Shrubs 20. Canthium parviflorum Rubiaceae 21. Catunaregam spinoa Rubiaceae 22. Dodonea viscosa Sapindaceae 23. Jatropha gladulifera Euphorbiaceae 24. Phyllanthus reticulatus Euphorbiaceae
Trees 25. Acacia leucoceploea Mimosaceae 26. Acacia nilotica Mimosaceae 27. Borasus flabelifer Arecaceae 28. Carissa carandus Apocynaceae 29. Leucaena leucocephala Mimosaceae 30. Prosopis juliflora Mimosaceae
11.12 FAUNA
In total 33 faunal species were recorded from the Gangaikondan Deer Sanctuary area that
belong to 4 mammals, 12 birds, 3 reptiles and 11 butterflies. The detail list of fauna recorded
from the study area is at below table.
Among 33 faunal species recorded from the study area, Pavo cristatus (Cited) and comes
under Schedule-I of Wildlife Protection Act, 1972.
Table 11-6 List of fauna Recorded in Gangaikondan Spotted Deer Sanctuary
S.No Common Name Scientific name WLPA, 1972
Mammals
1. Indian Grey Mongoose Herpestes edwardsii Schedule II
2. Indian Palm squirrel Funambuus palmarum Schedule IV
3. Rabbit Lepus nigricollis Schedule IV
4. Spotted Deer Axis axix Schedule III
Birds
5. Black Drongo Dicrurus macrocercus Schedule IV
6. Common Babbler Turdoides caudatus Schedule IV
7. Common Crow Corvus splendens Schedule V
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
214
8. Common Myna Acridotheres tristis Schedule IV
9. Greater Coucal Centropus sinensis Schedule IV
10. House Sparrow Passer domesticus Schedule IV
11. Indian Peafowl Pavo cristatus Schedule-I
12. Indian Robin Saxicoloides fulicata Schedule IV
13. Purple Sunbird Cinnyris asiaticus Schedule-IV
14. Red-vented Bulbul Pycnonotus cafer Schedule IV
15. Red-wattled Lapwing Vanellus indicus Schedule IV
16. Spotted Dove Streptopelia chinensis Schedule IV
Reptiles
17. Common skink Mabuya carinata -
18. Dhaman /Rat snake Ptyas mucosa Schedule II
19. Garden calotes Calotes versicolor -
Insects-Butterflies
20. Blue tiger Tirumala limniacae -
21. Common emigrant Catopsilia pomona -
22. Common grass yellow Eurema hecabe
23. Common tiger Danaus genutia
24. Common grass dart Taractrocera maevius -
25. Common jezebel Delias eucharis -
26. Common mormon Papilio polytes -
27. Common sailor Neptis hylas -
28. Dark grass blue Zizeera knysna -
29. Indian cabbage white Pieris canidae -
30. Lemon pansy Junonia lemonias -
Insect-Odonates (dragon flies)
31. Common Club tail - Ictinogomphus rapax -
32. Green Marsh Hawk Orthetrum sabina -
33. Ground Skimmer Diplacodes trivialis -
11.13 ENVIRONMENTAL IMPACT
The LPG bottling plant in the SIPCOT complex of Gangaikondan village is meant for
transporting, storing and bottling LPG in a leak proof closed system with all precautions.
Hence there is little possibility of pollution from the plant and its impact on the environment
especially fauna and flora. There is a possibility of dust and noise pollution during
construction period, but the construction and the installation all infrastructure was over
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
215
and hence that impact on flora and fauna is also ruled out at present. There is a possibility
of noise and stalk emission from the gen sets, whenever they are in use. This may cause
dislocation of small animals from the vicinity of the site. The establishment of the plant may
not have any impact on the animals in the spotted deer sanctuary, as the sanctuary is far
away from the plant. The movement of vehicles, especially the trucks which transport the
LPG may create noise and dust pollution, which may have temporary impact on small
animals as they may move away to safer place to avoid noise. To minimize dust while
transport the roads are to be maintained without dust emission. The risk analysis and was
carried out and given in the EIA report.
11.14 MITIGATION
To create greenery in the plant site in the SIPCOT complex, establishment of greenbelt was
initiated by planting about 1670 trees with Neem tree (230 nos.), Casia fistula (535 nos.),
Sananea saman (100 nos.), Teak (105 nos.), Indian almond (150 nos.) and Pongamia pinnata
(340 nos.). It is also to plant 500 more trees of native species within the plant. This creates
a green cover of the entire site, which will attract many bird species and provide shelter for
them.
The DG sets stack heights were raised as per the norms stipulated by pollution control board
and the emissions from exhaust will be dispersed and may not have any impact on the flora
and fauna of the project site area. As the plant is a leak proof closed system of LPG bottling
plant, there is little possibility emission from the plant and it is no way going to have impact
on the flora and fauna of the spotted deer sanctuary, which is far away the plant.
1) Steps take to provide special care to protect flora & fauna.
We have planted trees (native species) like Neem, Ashoka, inside the project site.
Green-belt is developed to the extent of 33%.
At present trees are grown to a height of 2m and are protected well.
Manure is added to all trees for growth periodically.
Water is supplied to all trees on regular basis.
Gardeners are employed for maintaining green belt.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
216
Compound wall to a height of 3.0 m is provided all along the boundary to prevent
unauthenticated entry & walk.
There are approx. 1700 trees inside our boundary.
11.15 Our Wild Protection Plan to protect flora & fauna are as follows
1. Adequate storm water drains are provided within our project site. Avenue trees are
also provided. Rain water is channelized to storm water drains.
2. We have planned to set up 30KWp power panel which will produce 360 units of
electricity.
3. Any endangered or threatened species is noticed, District forest officials will be
contacted for their safe entry into nearest Reserve Forest.
4. In the event of any requirement for providing water storage ponds within the nearest
Reserve Forest, Our unit will render financial assistance based on the District Forest
Administration estimate.
5. A workers campaign will be conducted for protection of forests and to increase green
cover among the employees and village community in the vicinity of our project area.
6. If any community forest is provided, our unit will be participating actively for supply
of saplings.
Total approximate financial cost under this would be:
S.No. Name of Activity Amount (in lakhs)
1. Water storage pond
3.0
2. Awareness campaign on wildlife
protection act for the nearby villages 1.0
Total 4.0
11.15.1 Safeguard Measures
In addition to the various plans, Project authorities are suggested to furnish appropriate
guidelines to their workers as safeguard measures. Some of the measures to be followed
are mentioned below:
1. Strict monitoring of contract labourers within our project site for any activity
related to endangering the life or habitat of wild animals and birds.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
217
2. Strict restrictions will be imposed on the workers at Project sites to ensure
that they do not harvest any produce from the natural forests and cause any
danger or harm to the animals and birds in wild.
3. The Project authorities will be bound by the rules and regulations of the Wildlife
Protection Acts or any such agency of the State, for the preservation of habitats
and protection of wild animals.
4. It is to be ensured that the noise levels do not go above 90 dB in the Project area.
One of the measures that is to be adopted is that trucks and Lorries under constant
and strict surveillance for monitoring of noise levels. DG sets have been provided
with acoustical enclosures to control noise. The suggested methodologies aim at
reducing and mitigating noise so as to cause as little disturbance to the animals as
possible.
The monitoring and evaluation of Biodiversity Management and Wildlife
Conservation Plan for protection of Flora & Fauna within the Gangaikondan spotted
deer sanctuary will be done in consultation with Tamil Nadu Forest Department.
11.15.2 Budget provided for Wildlife Conservation Plan
Total budget for the Wildlife Conservation Plan would be Rs. 11.0 Lakhs. The breakup
of the budget is given below:
Table 11-7 Wildlife Conservation Budget
S.no Name of Activity Total Amount (in lakhs)
1. Wildlife Conservation Plan 4.0
2. Biodiversity Monitoring 2.0
3. Afforestation 5.0
Total 11.0
11.16 CONSTRUCTION PHASE
The impact on one or another environmental parameters from various activities during
construction phases of the LPG storage and bottling facilities and distribution facility
are considered and assessed in the study.
11.16.1 Topography
Impact on topography was not envisaged during construction of the LPG storage and
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
218
bottling facilities.
The Site is allocated to IOCL from SPICOT Industrial Estate, so Land clearing at the
site was kept at the absolute minimum practicable
Mounded bullets, filling shed and loading / unloading bays are constructed within
the plant site.
Excess quantity of Excavated earth was used for of filling the elevated basement of filling
sheds, loading / unloading bay etc.
11.16.2 Air Environment
The emissions from operation of construction equipments and vehicles bringing materials
to the site resulted in temporary degradation of air quality, primarily, close to the
working environment affecting construction employees. Dust and other emissions were
not spread in vicinity of site and surroundings as
Construction materials were fully covered during transportation by road to the
project site.
Dust suppression systems (water spray) were used as per requirement at the
construction site.
Earth moving equipment, typically with a grader blade and ripper were used for
excavation work.
Construction vehicles and machineries were maintained properly and “Pollution
under Control” certificate were kept up-to-date and checked.
The excavated earth from LPG storage and bottling facilities during construction resulted
emission of suspended particulate matter (SPM). Dust and gaseous emissions due to
construction activities at LPG storage and bottling facilities was minimised by water
sprinkling at periodic intervals
Construction area was cordoned off by tin sheets up to about 3 m height.
Mixing of cement with other building materials was done at isolated place.
Hence, the impacts on the ambient air quality during construction phase was temporary
and reversible in nature for short duration and it was restricted to short distance only.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
219
11.16.3 Noise Environment
Some noise was generated due to operation of construction machines. However, these noise
sources were temporary nature and were operated mostly during day-time and for short
duration.
At the time of construction/erection of mounded bullets, filling machine, sheds, buildings etc.,
no major noise was generated. Acoustic treatment of enclosure and rubber anti vibration
padding are provided to DG Sets to control noise level as per CPCB guidelines.
At LPG storage and bottling facilities, construction activities produced maximum noise levels
of about 80 dB(A) during various erection activities like, excavation, hammering,
construction equipment operation etc at the construction site. Silencers were provided to
modulate the noise generated by machines. The construction workers in general were
exposed to an equivalent noise level of 75-80 dB(A) intermittently for which all statutory
precautions like ear muff/plugs were provided to the workers as per law were taken into
consideration. The mandatory use of proper personal protective equipment mitigated
adverse impact of the noise generated by equipment to the workers during construction
phase.
Noise levels from construction activities were reduced significantly at the boundary of LPG
storage and bottling facilities. Hence, impact of noise generation from the construction of the
facilities IOCL plant in surrounding area was insignificant in nature.
11.16.4 Water Environment
The domestic requirement of water during the construction phase was maximum upto
5 kl/day. The construction activities at LPG storage and bottling facilities did not affect
the ground water and surface water quality in any way as the water requirement was
very small which was also obtained from SIPCOT and Sewage generated was treated in
septic tank followed by soak pit. Therefore, no significant impact is anticipated on surface
and ground water resources of the area during construction phase.
During construction phase of LPG bottling plant the excavation work was carried out
during non-monsoon season. Waste includes small quantity of metal cuttings, soil debris,
etc were generated and cleared after construction activity was over and same were
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
220
disposed in environmental sound manner.
The construction water requirement vary per day of about 5-30 kl/day were sourced from
local vendors by the contractors, Use of water was minimized during construction phase.
Drainage channels and storm water drains were constructed at the site. Sediment traps
provided at appropriate locations to prevent the discharge of excessive suspended solids
and to prevent contamination from accidental spillage of fuel oil, the storage areas were
bunded and cleaned at regular interval
Therefore, no significant impact could be observed on ground and surface water quality of
the area during construction phase.
11.16.5 Soil
During the construction of LPG bottling plant, construction wastes such as excavated soil,
debris, some pipes/ metal waste and very small amount of oil & grease were generated.
Lubricating waste oil were collected separately in drums and same was handed over to
waste oil recyclers as authorized by TNPCB as per CPCB guidelines
11.16.6 Land Use Pattern
The LPG storage and bottling facilities is located within land leased in SIPCOT industrial
growth centre. As such, no impact was observed on the land use of the area during
construction phase.
11.16.7 Biological Environment
The construction of LPG mounded bullets and LPG bottling plant did not involve any tree
cutting and vegetation. Therefore, adverse impact on the terrestrial ecology was
insignificant in nature.
11.16.8 Forest & Wild Life
There would not be any impact on Gangaikondan spotted deer sanctuary and forest
from the LPG storage and bottling facilities due to the following
NH17 is dividing the sanctuary and project site. The project site is at 0.9 Km from
National Highway.
A compound wall was erected all along the boundary during construction itself to
prevent entry of any unauthorised person.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
221
Green belt was being developed in 33% of area.
11.16.9 Aquatic Ecology
No impact is envisaged on aquatic ecology during construction of LPG storage and
bottling facilities during construction as there is no water body in the vicinity of the
plant.
11.16.10 Socio-Economic Environment
The construction of LPG storage and bottling facilities has been done at industrial plot.
Therefore, socio-economic impacts linked to the acquisition of land, Resettlement and
Rehabilitation are not there.
Distribution of Population
The males and females constitute about 49.86% and 50.13% respectively of the total
population in the study area.
Particulars Study Area
No. of Households 19,111
Male Population 35,476
Female Population 35,672
Total Population 71,148
Average Household Size 3.72
Sex ratio 1005
Distribution of Literate
The distribution of literate and literacy rate in the study area is given in below table.
This indicates a major sociological development in the region. This can be attributed to the
Tamil Nadu Government's literacy improvement schemes.
S. No. Particulars Study Area
1 Total literate 52,012
2 Average literacy (%) 73.10
3 Total illiterates 19,136
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
222
4 Average illiteracy (%) 26.89
The LPG storage and bottling facilities generated direct and indirect employment
opportunities during the construction phase. About 50 local skilled, semi-skilled and
unskilled labourers got employment in the construction activities. This was a moderate
positive impact of the LPG storage and bottling facilities.
The construction of the LPG storage and bottling facilities had beneficial impacts as
some local unskilled, semiskilled and skilled persons gained direct or indirect
employment. Since the immigration of work force during construction of LPG storage
and bottling facilities was insignificant, the social impacts on literacy, health care,
transport and housing facilities and cultural aspects were also insignificant.
11.17 Operation Phase
The impact on one or another environmental attributes from various activities during
operation phases of the LPG storage and bottling facilities and distribution facility are
considered and assessed in the study.
11.17.1 Topography
During operation phase of LPG storage and bottling facilities, no impact is anticipated on
the topography, therefore, no mitigation measure is required.
11.17.2 Impact on Regional Climate
During operation of IOCL’s LPG bottling plant, no gaseous emissions are anticipated,
therefore, no impact is anticipated on the climatology and meteorology of the area during
the operation phase of LPG plant. Hence, no mitigation measure is required.
11.17.3 Air Environment
During the normal operation of the LPG storage and bottling facilities, there will be no
source of air emissions. Hence, the impact on ambient air quality will be insignificant during
operation phase.
During operation phase, intermittent gaseous emissions are anticipated from DG sets which
will be operated during grid power failure at LPG storage and bottling facilities. DG sets are
fitted with stack of sufficient height as per CPCB guidelines to achieve natural dispersion
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
223
of pollutants.
Air modelling
The potential impact on air quality would mainly be from
Combustion of Fuels (D.G set)
Vehicles (Trucks)
Combustion of Fuels - Operation of Diesel Generator sets use High Speed Diesel (HSD) as
fuel. Upon combustion they will have impact on air quality. The anticipated key air emissions
from the project would be Particulate Matter. They which will be of intermittent nature.
Fugitive Emissions - Vehicles plying for transportation of Bulk LPG & filled cylinders will
also be sources of air emissions.
The air emissions from the operation are particulate matter, oxides of nitrogen and Oxides
of Sulphur. The oxides of sulphur and nitrogen are from the fuel combustion of used in the
emergency diesel generators. In order to conservatively estimate the operations, it is
assumed that all the emissions were estimated to maximum operating conditions.
The air quality estimation is performed based on air quality modelling using USEPA
approved AERMOD dispersion modelling software to identify if there are any impacts to the
environment associated with the operations of the project. The DG stack emission from the
project is normally considered as continuous air emissions.
11.17.3.1 Emission Inventory: The project is conceptual stage, so emission estimates based on manufacturer’s data would
be used as primary estimates and if reasonable emission rates were not obtainable USEPA
emission factors is used.
11.17.3.2 Air Dispersion Modelling A dispersion model is a series of equations describing the relationships between the
concentration of a substance in the atmosphere arising at a chosen location, the release rate,
and factors affecting the dispersion and dilution in the atmosphere. The model requires
information on the emission characteristics and the local meteorology. Modelling can also be
used to predict future scenarios, short-term episodes, and long-term trends.
Nearby buildings and complex topography can have significant effects upon the dispersion
characteristics of a plume Buildings may cause a plume to come to ground much closer to
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
224
the stack than otherwise expected, causing significantly higher substance concentrations.
Plumes can impact directly on high buildings under certain meteorological conditions, which
may trap emissions during low-level inversions. Based on the scope of the project, AERMOD
would be an appropriate model to assess the ground level concentration within the project
area and at ambient level outside of the plant boundary.
In order to conservatively estimate the maximum ground level operation, maximum
operating conditions under maximum emission scenario is calculated.
Key steps of the assessment would include:
Emission estimation to quantify emissions. The emission estimates will be based on
manufacturers data on comparison with the scheduled operation; in the absence of
manufacturers data, emission factors obtained from USEPA, AP-42 or emission
estimates from similar operating facility will be used.
Obtaining local meteorological file, for months of monitoring for one season for the
monitoring period
Model inputs with stack/vent related specifications such as height, type of stack,
diameter, exhaust temperature, exit velocity, orientation of the stack, exhaust flow
rate and emission rate
The regional meteorological data set from the data collected from the monitoring location is
verified with the Indian Meteorological Data (IMD) repository. The onsite data is then
processed using AERMET to produce the meteorological input files and on-site data to
further enhance the detailed analysis of the atmospheric and dispersion conditions
applicable to the project area.
The general process approach for AERMOD would include:
Process meteorological data using AERMET;
Obtain digital terrain elevation data;
Incorporate building downwash using BPIP-PRIME;
Characterize site - complete source and receptor information;
Perform terrain data pre-processing for AERMOD dispersion model using AERMAP
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
225
11.17.4 METEOROLOGY
Meteorological data collected from the study area is used for analysis. This micro-
metrological data is cross referred with the 10 year meteorological data collected from
nearest IMD station.
11.17.4.1 Results and Discussion: Modelling results consist of maximum concentrations (in μg/m3) for each of the modelled
substances. The concentration isopleths are shown in Figure 11.6 to Figure 11.8 and the
summary of dispersion modelling results for each of the selected substances is given in Table
11.7. The modelling assessment was carried out for all the stack sources within the project
site and the emissions were based on maximum operating conditions.
Stack/Point Sources: The primary pollutants from the stack/point sources are the
particulates PM10, SO2 and NO2, which are emitted from sources described in Table 11.7
within the facility.
Table 11-8 Summary of dispersion modelling results
S. No Pollutant Predicted GLC, µg/m3
1 Particulate Matter (PM10) 6.01
2 Sulphur Dioxide (SO2) 14.3
3 Nitrogen Dioxide (NO2) 14.3
Cumulative impact on baseline ambient air quality, after the implementation of the project
has been arrived by superimposing the present baseline maximum air quality levels of each
pollutant. The resultant ambient air quality after implementation of the plant is given in 11.8.
Table 11-9 Resultant concentrations at site after implementation of the project.
Sl.
No. Pollutant
Maximum
Baseline
Conc , µg/m3
Predicted
Incremental
Increase GLC µg/m3
Resultant
Maximum
Conc., µg/m3
NAAQS
Limits
µg/m3
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
226
1. Particulate
Matter(PM10) 54 6.01 60.01 100
2. Sulphur
Dioxide (SO2) 6.2 14.3 20.5 80
3. Nitrogen
Dioxide (NO2)
12.2 14.3 26.5 80
The predictions indicate that the contribution of the facility to the ambient air quality will be
minimum and concentrations of PM10, SO2 and NO2 concentrations will be well within the
prescribed limit for industrial, residential and rural zone even after plant comes into
operation.
Figure 11-6 Maximum Ground Level Concentration for 24 - hours - PM10
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
227
Figure 11-7 Maximum Ground Level Concentration - 24 hour - SO2
Figure 11-8 Maximum Ground Level Concentration - 24 hour - NO2
Based on the Air quality assessment for the project, the air quality neighbouring the project
would have a negligible increase in the ambient concentration of the pollutants, and the
values would be marginal such that the impact would not be felt. The maximum
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
228
concentration was found closer to the source of the project site and impact to regional or
local air quality will not be felt beyond 1 km.
The ground level concentration will not increase significantly the concentration of PM10;
PM2.5, NOx & SO2 values are well below the standards prescribed by CPCB for ambient air
quality.
DG sets are fitted with stacks of sufficient height as per CPCB guidelines to achieve natural
dispersion of exhaust gases. Green belt also acts as green lung which greatly helps improving
the air quality of the area.
S.no. Capacity(KVA) Quantity Fuel used Stack
height(m)
Stack
Diameter(in)
1 750 1 HSD BS IV 13.5 12
2 250 1 HSD BS IV 13.5 6
Figure 11-9 Diesel Generator with Adequate Stack Height
11.17.5 Traffic study
During receipt of LPG through bullet tankers and distribution of LPG cylinders, increase in
vehicular emissions is anticipated due to bullet truck and Cylinder truck movement. As an
estimate 50 – 60 trucks will be reaching LPG plant for unloading of LPG and distribution
cylinders to authorized dealers in the area. To control vehicular emissions, truck/tankers
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
229
engaged in bulk LPG transportation and distribution of LPG cylinders will essentially
have Pollution under Control Certificate (PUCC) to minimize vehicular emissions. It will be
ensured at the gate of IOCL LPG plant.
Traffic study of the area
S.No. Parameter Details
1. Width & number of lanes of road
connecting NH 7 & Tirunelveli BP 30 Feet & 2 Lane road – NH7
2. Number of entrances / exits to BP Two – One main and another
emergency.
3.
Number of bullet trucks entering
& exiting per day (please provide
separate values)
BTs – Entry - 16 Nos.
Exit – 16 Nos.
4.
Number of vendor trucks
entering & exiting per day (please
provide separate values)
STs - Entry - 60 Nos.
Exit – 60 Nos.
5.
Direction of exit for bullet trucks
i.e. do the bullet trucks depart
towards Chennai (back to IPPL)
or do they refill elsewhere.
Bullet trucks will depart to either
IPPL (Chennai) or MRPL
(Mangalore) as per requirement
and product availability.
6.
Since we say that the BP will cater
to several districts what is the
direction taken by vendor trucks
(if possible can you specify the
high usage vs low usage zones).
We can plot the traffic route
accordingly
58 Distributors will be attached
to plant who are present in the
following directions :
1) South – 26
2) North – 15
3) West – 11
4) East – 6.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
230
Air Quality and the future traffic scenario considering expansion can be used as input
parameter and the ambient air quality after expansion can be predicted using CALINE4, a line
source model used to predict the air pollution concentration near road ways. Upon,
scrutinizing the predicted Pollutant concentration results it can be found that even after the
increased truck movement due to prosed activities there will not be any significant rise in the
Ambient Air Quality.
Table 11-10 CALINE4 Predicted Results
Parameter
Maximum
Baseline
Conc., µg/m3
Predicted
Incremental Increase
Conc., µg/m3
Resultant
Maximum
Conc.,µg/m3
NAAQ
Standards
(μg/m3)
PM10 57 0.325 57.325 100
NOx 16.4 0.109 16.509 80
CO 160 0.616 160.616 2000
The Air quality after the project operation considering the results as predicted by CALINE4
also is well within NAAQ Standards. Therefore, during operation phase the impacts on the
ambient air quality shall be insignificant.
Overall impact of LPG storage and bottling facilities in the study area will be positive and
beneficial in long term, as distribution of LPG cylinders will replace or minimize use of
traditional fuels, such as, wood, coal, petroleum oils and subsequently improvement in
ambient air quality of the area will be observed.
11.17.6 Noise Environment
The average ambient noise level at the boundary walls of the LPG storage and bottling
facilities, as monitored during baseline data generation are in the range of 40.9 to 51.8
dB(A). At the LPG storage and bottling facilities, pumps, DG sets, fire pumps, loading /
unloading bays and cylinders truck and bullet tankers will be major source of noise
generation. The noise levels from these sources shall be in the range of 70 to 80 dB (A).
DG sets will be intermittent source of noise generation and will be operated only during
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
231
grid power failure. To control noise levels, DG sets have been provided with acoustic
enclosures and anti-vibration pads. Hence, anticipated impact of noise generation from
LPG storage and bottling facilities during operation phase will be limited within the
boundary.
Noise levels from LPG storage and bottling facilities will not reach its boundary.
DG sets are acoustically enclosed to control noise levels as per CPCB guidelines. The
greenbelt also diminishes noise pollution by absorbing high degree of noise due to their
spongy foliar crown.
Ear muff and ear plugs will be provided to operators while working DG sets
rooms/high noise areas.
Figure 11-10 Avenue plantation at Entrance for minimizing noise and dust emissions
11.17.7 Water Environment and Quality
For normal operation of LPG storage and bottling facilities, no process water is required so,
no process effluent will be generated. However, about 1 KLD of water will be required for
cylinder washing which will obtained from SIPCOT. Waste water generated from cylinders
washing will be collected in settling tank and dosed for flocculation of suspended
particles. Treated water from clarifier will be reused for cylinders washing purpose to
minimize the use of fresh water.
For domestic purpose only 3 KLD water will be required at the LPG storage and bottling
facilities, 2.4 KLD sewage will be generated, which will be treated through septic tank
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
232
and disposed through soak pit. 5 nos. of septic tanks of dimensions 2.4m X 1.2 m X 1m are
constructed in Admin building, Amenity Building &Contract labour rest room, Truck crew
rest room, Security Cabin and S&D block to ensure the same. Refer figure is shown below.
Figure 11-11 Septic Tank & Soak Pits
In order to conserve rain water, Two numbers of rain water harvesting tanks of 4 X 2 sq.m
with 2 m depth are provided to collect the water, drains have been maintained to collect the
storm water using the natural slope of the plant. Strom water drains are provided all along
the plant area, collecting the entire storm water and it is connected to SIPCOT’s common
drain provided outside our compound wall.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
233
Figure 11-12 Storm Water Drains inside the Plant
Proper collection and disposal of solid and hazardous waste to be generated from LPG
storage and bottling facilities
Hence, during the operation of the LPG storage and bottling facilities, no impact is
anticipated on water quality.
Figure 11-13 Rain Water Harvesting Sumps inside the Plant
11.17.8 Soil
During operation of LPG storage and bottling facilities, no process waste will be
generated in any form. It is estimated that about 15 kg municipal solid waste may be
generated by workers, canteen and truck drivers.
Municipal solid waste generated from the LPG bottling plant will be segregated in the form
of recyclable waste, biodegradable waste and non-bio-degradable wastes. Recyclable waste
including paper, plastic, etc will be sent for recycling. Biodegradable waste will be used
for composting at the LPG plant to produce manure for green belt. Sludge will be
generated from septic tank, which will be used as manure for green belt.
Occasionally, used oil will be generated from DG sets and engines maintenance, which is
categorized as Hazardous Waste as per Hazardous Waste (Management, Handling and
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
234
Transboundary Movement) Rule 2008. The used oil at the LPG bottling plant will be
stored in in drums and handed over to MoEF&CC/Tamil Nadu State Pollution Control
Board approved Used Oil recyclers for recycling purpose.
Hence, no significant impact is anticipated on soil of the area and at LPG storage and
bottling facilities.
11.17.9 Land Use Pattern
The LPG storage and bottling facilities is located within land leased in SIPCOT industrial
growth centre. Therefore, no impact is anticipated on the land use of the area during
operation phases. Therefore, no management plan is required.
11.17.10 Biological Environment
The LPG storage and bottling facilities will not cause any impact on terrestrial ecology of
the area as no trees cutting is involved during operation phase. Green belt was developed
in 13.86 Acres (33%) area, peripheral green belt are developed around the plant boundary
and in the open areas landscaping are carried out.
Approximately 1700 trees were planted and proposal to add 500 more trees in the bottling
plant. Greenbelt are important habitats for birds, which add to the aesthetic value of the
environment.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
235
Figure 11-14 Green Belt Development within the Site
11.17.11 Forest & Wild Life
There would not be any impact on Gangaikondan spotted deer sanctuary and forest
from the LPG storage and bottling facilities. Detail ecology study was carried out and
prevention, monitoring measures to safeguard the flora and fauna in the sanctuary were
given.
11.17.12 Aquatic Ecology
No impact is envisaged on aquatic ecology from the operation of LPG storage and
bottling facilities during operational phases.
11.17.13 Socio-Economic Environment
Due to this Plant positive socio-economic impact will be observed in the form of the
following:
Reduction of Emissions: The LPG storage and bottling facilities will ensure
availability of LPG for domestic and industrial establishments in the region which
will help in minimization of use fossil fuel (petrol, HSD, furnace oil etc.) , coal,
wood, etc. Consequently, it will help in maintaining cleaner environment due to
reduction in emissions.
Improved Health Conditions: Use of LPG as a cleaner fuel will also create healthy
environmental conditions and help in uplift of socio-economic conditions of
people of the region.
The LPG storage and bottling facilities shall generate additional direct/indirect
employment and indirect service sector enhancement in the region and would
help in the socio-economic up-liftment of the state as well as the local area.
Emergency /disaster is an undesirable occurrence of events of such magnitude and nature
that adversely affect production, cause loss of human lives and property as well as damage
to the environment. The plant is constructed meeting all the statutory requirements. The
fire prevention and firefighting system and organisation established here ids capable of
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
236
taking care of any type of hazardous occurrence incidental to operation, maintenance of
plant and to serve the neighbouring sites
Fire Prevention /Protection System
Multi gas detector:
Two Numbers of portable multi gas detectors are available, which is used to detect the
presence of hydrocarbons & oxygen level at any point.
Vapour Extraction System:
Vapour extraction system installed is having suction points in filling shed at carousal area,
Evacuation and Integrated weight correction unit and Degassing shed where the gas
concentration is likely to be high. The system discharges collected gas/air mixture at higher
level over the roof top so that explosive free atmosphere is continuously maintained at
filling area.
Gas Leak Detectors: 35 numbers of Gas detection sensors are provided at major places in
Plant. Gas monitoring system with warning and alarms at 20 % LEL and 60 % LEL
respectively is present to automatically sense the leakage of LPG. This system is also
connected to a microprocessor based system for storing history over a long period for
review. Mimic repeater panels are available at Location In-charge cabin, S&D cum Control
Room and Main gate security cabin to show the exact place of Emergency.
Fire and safety provisions
Firefighting facilities provided in the Bottling plant are
• Fire water storage tanks – 3 Nos. Above ground (Capacity of 3x2500KL)
• Fire water pumps - 3 Nos. (Capacity: 615 m3/hr),Total head: 88 m
• Discharge Head – 9.0 Kg/Cm2g
• Jockey Fire Water Pump - 2 Nos. Cap: 10 m3/hr each, Total head: 90 m
• Discharge Pressure – 10 Kg/Cm2
Prevention / Elimination of Source of Fire:
The identified potential source for fire is “Ignition”. To eliminate/prevent such
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
237
sources, following measures are taken.
• All installations are only flame proof and intrinsically safe electrical systems
and equipments.
• Spark retardant anti- static mastic flooring in cylinder handling areas like
Unloading & loading shed, filling shed, Degassing repair shed and filled
cylinder storage shed.
• Effective Bonding and Earthing connections for equipment and product
pipelines to dissipate static electricity. A well maintained earth grid
interconnected with 93 earth pits for safe passage of any leakage current.
• Use of Non-sparking tools & wooden hammers for preventing sparks during
maintenance work.
• Thorough screening of people at entry of plant for lighter/matches, cell
phones, electronic equipments, cameras and any article capable of producing
static charges.
• 6 nos. of Emergency Shutdown Buttons (ESDs) at strategic areas to activate
audio/visual alarm and tripping of electrical system are provided. Also 10 nos.
of manual call points (MCPs) are provided at all approach roads of licensed &
non licensed area to give alarms.
• The Fire hydrant network is always kept under pressure using 2nos. jockey
pumps to maintain a pressure of 7 Kg/Cm2 at the farthest point of plant. i.e
Truck parking area.
• Interlocking of sprinkler system with Remote Operated Valves (ROV) and
electrical siren.
• Intrinsically safe public address /paging system is provided in license and
non- license area.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
238
Figure 11-15 Gas Monitoring Sensor Figure 11-16 Control Panel for GMS
Figure 11-17 Sprinkler System within Filling Shed
11.18 Activities along with budget for Protecting Environment, Conserving Ecology &
Biodiversity.
Installation of roof top 30 kWp solar PV panels for reduction in grid/DG power
consumption leading to reduced fossil fuel consumption.
Additional two Rain water harvesting bore well is to be installed for Ground water
recharge and conservation.
LED light fittings to reduce grid/DG power consumption leading to reduced fossil
fuel consumption.
Planting of More Trees: 500 more trees of native species are to be planted in
consultation with District Forest Officials at the bottling plant.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
239
Timeframe (year)
Activity
2015-16 Construction of Toilet Facility for Government High School, Gangaikondan village at a cost of Rs 7.5 lacs
2016- 17 Provision of Basic Library Equipments/ Furniture at Gangaikondan Library at a cost of Rs. 1.0 Lacs
2017-18 Construction of toilet block at Govt. Rani Anna College, Tirunelveli at a cost of Rs. 19.87 Lacs
2018-19 Rectification of RO system at Govt. School,
Thuraiyur at a cost of Rs. 30,000/-
2018-19 Construction of Hu-Methane Gas plant at
Narikkuravar colony, Pettai at a cost of Rs 20.0 lacs
Total Rs. 48.67 lakhs
Remediation Plan and Natural & Community Resource Augmentation Plan Budget
S.No Environmental/
Social Issue Existing measures
Existing cost of mitigation measures (Rs Lakh)
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
240
11.19 Damage Assessment and Remediation Plan due to Construction Activity
AIR ENVIRONMENT
Activity impacts Damage
Assessment
Mitigation
measures carried
out
Remediation
Planned
Budgetary
Estimate in Rs
1 Air pollution
mitigation
PPEs and Water Sprinklers are deployed during construction
phase 15
Plantation on 14 acres of land of about 1700 Trees
20
Monitoring of Air and Noise pollution (Acoustic Enclosure)
15
2 Water pollution
mitigation
Rain water harvesting tanks of 4x2 sq. m with depth of 2 m are
provided. 14.7
Storm water drains are provided all along the plant area.
45.05
Water Management – cylinder washing unit and in line bath
14
3 Safety
Gas Monitoring of System 13.4
Signage’s for EMP 10
Firefighting Measures 480.83
4 Energy savings
LED Lighting fixtures instead of CFL
-
Solar Panel of 30KW -
5 CSR 48.67
Amount already
spent 676.65
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
241
Excavation
Dust
generation
Change in air
quality due
to dust
Water sprinkling at
periodic intervals in
the construction sites
was carried out.
Regular wetting of
loose construction
materials at sites.
Adequate stack height
has been provided for
DG sets.
Regular
monitoring of
ambient air
quality near
sensitive area
and site (once
in 3 months)
Air Quality
monitoring (@Rs.
8000 per season x
4 for 2 years
samples i.e. Rs.
32000 x 2
locations = Rs.
64000).
DG Sets and
other
construction
activities
Gases
emissions
Air Pollution
due to
particulates
and gaseous
emissions
Transportati
on of
materials
Vehicle
exhaust
The internal roads are
well developed by
SIPCOT Construction
vehicles and
machineries were
maintained properly
and “Pollution under
Control” certificate
were kept up-to-date
and checked. Provided
PPEs to the
construction workers.
Creating
awareness and
Distributing
brochures on
vehicular
emissions and
its air
pollution
Rs,50,000
Total cost on remediation measures on Air Environment is Rs. 1,14,000/-
11.20 Damage Assessment and Remediation Plan –
NOISE ENVIRONMENT
Activity impacts Damage
Assessment
Mitigation
measures carried
out
Remediation
Planned
Budgetary
Estimate
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
242
Construction
activities
including
operation of
equipment’s
and
machineries
Operation of
D.G.
set
Increase in
Noise level
due to
constructi
on
activities,
machinery
and DG set
operation.
Disturbance
to the fauna
in the nearby
Deer
sanctuary.
Health issues
to
construction
workers.
The mandatory use
of proper personal
protective
equipment
mitigated adverse
impact of the noise
generated by
equipment to the
workers.
Proposal to
add 1000
more trees in
the bottling
plant.
Greenbelt are
important
habitats for
birds.
Rs. 11,0000 @
Rs. 1000/tree
for planting &
maintenance
Rs. 1, 20,000/-
per annum for
gardener.
Acoustic treatment
of enclosure and
rubber anti
vibration padding
are provided to DG
Sets to control noise
level as per CPCB
guidelines.
Operated mostly
during day-time and
for short duration.
Plantation on 14
acres of land of
about 2000 Trees.
Total cost on remediation measures on Noise Environment is Rs. 11,20,000/-
11.21 Damage Assessment and Remediation Plan – Water Environment
The construction water requirement vary per day of about 5-30 kl/day were sourced from
local vendors by the contractor. LPG storage and bottling facilities did not affect the ground
water and surface water quality in any way as the water requirement was very small which
was also obtained from SIPCOT and Sewage generated was treated in septic tank followed
by soak pit. No significant impact could be observed on ground and surface water quality of
the area during construction phase.
Apart from the above IOCL has already taken so many measures to protect the water
environment under CSR
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
243
2015-16 Construction of Toilet Facility for Government High School, Gangaikondan
village at a cost of Rs 7.5 lacs
2016-17 Construction of bore well and pipeline facility Chirancherry village at cost of
Rs. 9.5 Lacs
2017-18 Provision of RO plant at Uraiyur village at a cost of Rs 9.5 Lac in
2018-19 Renovation of Toilet Facility for Government High School, Chirancherry
village at a cost of Rs 8.0 lacs.
11.22 Damage Assessment and Remediation Plan – Land Use Pattern & Soil
Environment
Construction wastes such as excavated soil, debris, some pipes/ metal waste and very small
amount of oil & grease were generated. Based on assessments it was found that the soil in
the Study area shows moderate fertility. Plant is located within land leased in SIPCOT
industrial growth centre. Land clearing at the site was kept at the absolute minimum
practicable. Excess quantity of Excavated earth was used to raise the level of filling the
elevated basement of filling sheds, Compressor shed and in TLD bays. As such, no impact was
observed on the land use of the area during construction phase.
11.23 Damage Assessment and Remediation Plan – Socio Economic Environment
The construction of LPG storage and bottling facilities has been done at industrial plot.
Therefore, socio-economic impacts linked to the acquisition of land and no Resettlement and
Rehabilitation. The proposed LPG storage and bottling facilities generated direct and indirect
employment opportunities during the construction phase. About 50 local skilled, semi-
skilled and unskilled labourers got employment in the construction activities. This was a
moderate positive impact of the proposed LPG storage and bottling facilities. The
immigration of work force during construction of proposed LPG storage and bottling
facilities was insignificant as local people was utilized & so social impacts on literacy, health
care, transport and housing facilities and cultural aspects were also insignificant.
Similar plants established in Tamil Nadu and other states do not cause any impact on Air,
Water, Soil and Noise Environment as there is no process involved except storage filing and
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
244
dispatch. The fugitive emissions if any during filling cylinders will be collected through hood,
duct and discharge into the atmosphere.
11.23.1 Summary of Remediation Plan
S. No Damage details Budget Allocation
1 Air Environment Rs 1,14,000
2 Noise Environment Rs 11,20,000
3 Ecological Environment Rs 11,00,000 Total Rs 23,34,000
11.24 Natural Resource Augmentation Plan
The remediation plan concentrated on activities that cause impacts to the study area due to
the construction activity.
S.No Activity
Cost breakup during
operation Phase
Total
Budget
in Rs 2019 2020 2021
1
Planting of More trees of native species
are proposed to be planted in consultation
with District Forest Officials at the
bottling plant and nearby areas.
2,18,000 2,00,000 2,00,000 6,18,000
2 LED light fittings are to be introduced to
reduce energy conservation. 19,00,000 15,00,000 34,00,000
3
Additionally two Rain water harvesting
borewell are proposed to be installed to
maximize rain water harvesting potential.
14,00,000 - 7,00,000 21,00,000
4
In order to harvest solar Energy,
Installation of roof top 30 kWp solar PV
panels to reduce dependence on Grid.
18,29,000 - 18,29,000
Total 79,47,000
11.25 Community Resources Augmentation Plan
S.No Activity
Cost breakup during
operation Phase Total
Budget 2018-2019 2019-2020
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY RESOURCE
AUGMENTATION PLAN
245
1 Construction of Hu-Methane Gas plant at
Narikkuravar colony, Pettai - 20, 00,000 20,00,000
2 Rectification Of RO system at Govt.
School, Thuraiyur - 30,000 30,000
3 Provision of Basic Library Equipments/
Furniture at Gangaikondan Library 91,000 - 91,000
4 Construction of toilet block at Govt. Rani
Anna College, Tirunelveli 19,87,000 - 19,87,000
41,08,000
11.26 Summary of Remediation Plan & Natural and Community Resource
Augmentation Plan
Total budgetary provision w.r.t. violation as envisaged in Notification dt. 14-03-2017
Cost proposed on Remediation plan + Natural and Community Resources Augmentation plan
S.No Amount in lakhs
1 Cost proposed on Remediation plan 23,34,000
2 Cost proposed on Natural Resource Augmentation Plan 79,47,000
3 Cost proposed on Community Resource Augmentation Plan 41,08,000
Total 143,89,000
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY
RESOURCE AUGMENTATION PLAN
246
11.27 Noundue Economic Benefit Derived During The Period Of Violation.
No undue economic benefit has been derived by IOCL during the period of violation
as the project has not been put into use by IOCL. Though the project has been
mechanically completed in Nov 2014, its commissioning has been kept on hold by
IOCL for want of EC.
On the contrary IOCL has so far incurred a loss of Rs. 53.09 crore on account of denial
of benefits from logistics cost saving that would have accrued to IOCL had the project
been commissioned in Nov 2014. The project was approved by Board of Directors of
IOCL based on logistic costs saving to the tune of Rs. 18.38 crore per annum on
completion of project. Since the project has been idling for last 4 years and 2 months,
IOCL could not derive cumulative benefit of Rs. 77.19 crore saving.
Apart from the above, there has been tangible loss to customers and the Govt. to the
tune of Rs. 140.32 crore and Rs. 40.82 crore respectively and intangible losses as
detailed below
Loss to Customers (General Public)
Present no. of customers in Tirunelveli, Kanyakumari and Tuticorin districts –
10,00,000 approx.
Potential customers in the above districts – 2,65,000 approx.
a) Loss due to backlog in LPG cylinder delivery as LPG cylinders could not be reached
to customers from far away supply points.
b) Potential customers numbering 2.65 lakh have not got LPG connection.
c) Hardship expenses on account of using other costlier fuel/ energy sources such as
electricity, procurement of food from outside by affected customers on account of
unavailability of LPG for the past 50 months - only for affected customers (@ Rs
100 per customer per month) – Rs 125.0 Crore.
d) Environmental issues – Use of firewood by potential customers which affects
environment due to severe pollution and health hazards, could have been avoided
had they received LPG.
e) Loss of employment opportunities - Direct employment to the poor including
drivers, cleaners, contract labourers numbering approx. 200. Loss of income for
the past 50 months –10 crore approx.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY
RESOURCE AUGMENTATION PLAN
247
Loss to Government
a) Idling of assets – Loss of interest for 50 months on investment of 140.32 crore
@10% – Rs. 14.03 crore.
b) Idling of manpower – Salary paid to direct and indirect manpower – Rs. 4.62 crore
approx.
c) Loss of investment opportunities to contractors and consequent revenue to Govt.
11.28 CONCLUSION
There is no environmental damage caused due to act of violation. It is submitted that
IOCL has established the LPG bottling plant only after obtaining consent to establish
and operate from Tamilnadu Pollution Control Board wide consent orders.
IOCL after establishment of LPG storage and bottling unit was not in operation for want
of Environmental Clearance.
We submit herewith a model calculation regarding savings in terms of transportation
cost besides reduction in gaseous emission.
At present a LPG bottling plant at Madurai is supplying LPG cylinders to Tirunelveli,
Madurai and Kanyakumari districts besides Trivandrum. In order to save
transportation cost to the turn of Rs. 18.386 Crores, it is carefully planned to establish
a LPG bottling plant at Tirunelveli. A detail of reduction transportation cost is given in
the following table.
Packed LPG Transportation from Madurai to Tirunelveli
Rate/MT/KM 9.4
Round trip distance in Kms
Between Madurai and Tirunelveli 163
Savings per MT Rs. 1532.2
Savings for 1,20,000 MT per a year Rs. 18,38,64,000/
Environmental issues – Use of firewood by potential customers which affects
environment due to severe pollution and health hazards, could have been avoided had
they received LPG.
A household consumes 2 tonnes of wood per year which is the equivalent of 10 trees =
180 kg of LPG gas*
If IOCL bottling plant have been established, it was possible to save 66 lakh trees per year
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY
RESOURCE AUGMENTATION PLAN
248
= 10*120000*1000/180 = 6666666.667 ~ 6666667 trees. (13 lakh Tonnes of wood)
Relaxation period:
The average consumption of LP gas 180 kg / household-year.
A typical 13-kg cylinder of LP Gas would avert deforestation of a 7 m2 forest area.
The time required for the forest to return to its state immediately pre-harvest is 63.5
years.
Carbon Elimination:
A switch from Biomass to LP Gas can eliminate two-thirds of the net carbon emissions.
The net carbon emission for using wood = 21.544 tonnes CO2 per year
The net carbon emission for using LP Gas = 7.185 tonnes CO2 per year
Switching from harvested wood to LP Gas reduces net carbon emissions by 67%.
CO2 Emission Comparison:
By operating the LP gas plant, for the net production of 1, 20,000 MT of gas the CO2
emission will be 8. 6 lakh tonnes of CO2 / year.
If biomass is used as the fuel the tonnes of wood required to replace the LP gas is 13lakh
tonnes per year, burning the wood will emit 287 lakh Tonnes of CO2 / year.
Avoiding Deforestation:
100 household from consuming 200 tonnes of harvested wood a year to 1.8 tonnes of LP
Gas would annually save one hectare of forest. Each household would save about 100
square metres of forest.
Energy Content:
LP Gas cooks more efficiently, transferring 60% of its energy content, compared to
wood’s 10-20%. Per unit of delivered cooking heat, burning wood generates about seven
times the carbon of LP Gas.
Calculation basis: Source - A report on substituting LP Gas for Wood by the world LP
Gas Association.
Ecological and Biodiversity Benefits;
By supplying LPG to the customers in Tuticorin, Kanyakumari, Tirunelveli, Trivandrum
districts the cutting of tress for fuel will be avoided. If we operate our bottling plant trees
will be saved there by CO2 absorption by trees due to LPG burning will also be achieved
and enhancing greenhouse effect.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 11 – ECOLOGICAL DAMAGE, REMEDIATION PLAN AND NATURAL & COMMUNITY
RESOURCE AUGMENTATION PLAN
249
Had their bottling plant have been established, it was possible to save trees at least
20000 per day (in Tuticorin, Kanyakumari, Tirunelveli, Trivandrum).
Carbon di oxide emission would have absorbed by trees to an extent of 2000 tons.
Trees would provide habitation to bird’s animals besides improvising climatic
condition. By virtue of the earth planet, food chain will be ensured.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 12 – DISCLOSURE OF CONSULTANT
250
12 DISCLOSURE OF CONSULTANT
This chapter describes about the environmental consultant engaged in preparation of
EIA report for LPG Bulk Storage & Bottling Facility at SIPCOT Industrial Growth
Centre, Gangaikondan village, Tirunelveli Taluk & District, Tamil Nadu by IOCL.
12.1 INTRODUCTION
ABC Techno Labs India Private Limited (formerly ABC Environ Solutions Pvt. Ltd.) is
an ISO 9001, ISO 14001 & OHSAS 18001 Certified Company & leading Environmental
Engineering & Consultancy Company constantly striving towards newer heights since
its inception in 2006. Our Company is dedicated to provide strategic services in the
areas Environment, Infrastructure, Energy, Engineering and Multilab.
It is the first firm to be accredited by NABET (National Accreditation Board for
Education and Training), Quality Council of India, as an EIA Consultant, approved
for carrying out EIA studies and obtaining environmental clearance for various
sectors such as Thermal Power Plants, Infrastructure, Industrial Estates / Complexes/
Areas, Mining, Township & area development and Building construction projects etc.
ABC Techno Labs is equipped with in-house, spacious laboratory, accredited by
NABL (National Accreditation Board for Testing & Calibration Laboratories),
Department of Science & Technology, Government of India.
Since establishment ABC Techno Labs focus on sustainable development of Industry
and Environment based on sound engineering practices, innovation, quality, R&D and
most important is satisfying customers need. The company has successfully completed
more than 100 projects of variety of industries, in the field of pollution control and
environmental management solutions. The company is also dealing in the projects of
waste minimization and cleaner production technology.
The team of technocrats and scientist are well experienced to deal with the design,
Manufacture, Fabrication, Installation, commissioning of Effluent/Wastewater
treatment plants, Sewage Treatment plants and Combined Treatment plants.
The company is having well experienced team of Scientists & Engineers who are
looking after environmental projects & well equipped analytical laboratory with a
facility including analysis of physical, chemical and biological parameters as per the
requirements of the State Pollution Control Board and our clients.
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 12 – DISCLOSURE OF CONSULTANT
251
12.2 Services of ABC Techno Labs India Private Limited
12.2.1 Environmental Services
• Environmental Impact Assessment (EIA)
• Environmental Management Plan (EMP)
• Social Impact Assessment (SIA)
• Environmental Baseline data collection for Air, Meteorology, Noise,
Water, Soil, Ecology, Socio-Economic and Demography etc;
• Environmental Monitoring
• Socio Economic Studies
• Resettlement & Rehabilitation Plan
• Ecological & Human Health Risk Assessment Studies
• Ecological Impact Assessment
• Environmental Management Framework
• Solid Waste Management
• Hazardous Waste Management
• Internship & Training 12.2.2 Turnkey projects
• Water Treatment Plants
• Sewage Treatment Plant
• Recycling & Water Conservation Systems
• Zero Discharge System
12.2.3 Other services
• Operation & Maintenance of Water & Waste Water Plants
• Water & Waste Water Treatment Chemicals
• Pilot Plant studies
• Feasibility studies & preparation of budgetary estimates
12.2.4 Laboratory services
• Chemical Testing
• Environmental Testing
• Microbiological Testing
• Food Testing
• Metallurgical Testing
12.3 SECTORS ACCREDITED BY NABET
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 12 – DISCLOSURE OF CONSULTANT
252
S.
No. Sectors Name
1. Mining of minerals (Opencast only) Mining (Open cast and Underground)
2. Irrigation projects only
3. Thermal Power Plant
4. Metallurgical industries (sec. ferrous only)
5. Cement Plants
6. Petroleum refining industry
7. Leather/skin/hide processing industry
8. Chemical Fertilizers
9. Synthetic organic chemicals industry (dyes & dye intermediates; bulk drugs and intermediates excluding drug formulations; synthetic rubbers; basic organic chemicals, other synthetic organic chemicals and chemical intermediates)
10. Distilleries
11. 24 Pulp & paper industry excluding manufacturing of paper from wastepaper and manufacture of paper from ready pulp without bleaching
12. Isolated storage & handling of hazardous chemicals (As per threshold planning quantity indicated in column 3 of Schedule 2 & 3 of MSIHC Rules 1989 amended 2000)
13. Airports
14. Industrial estates/ parks/ complexes/ Areas, export processing zones(EPZs), Special economic zones (SEZs), Biotech parks, Leather complexes
15. Ports, harbours, jetties, marine terminals, break waters and dredging
16. Highways, Railways, transport terminals, mass rapid transport systems
17. Common effluent treatment plants (CETPs)
18. Common municipal solid waste management facility (CMSWMF)
19. 38 Building and large construction projects including shopping malls, multiplexes, commercial complexes, housing estates, hospitals, institutions
20. Townships and Area development Projects
12.4 STUDY TEAM
ABC Techno Labs India Private Limited has carried out this Environmental Impact
Assessment (EIA) study. The multidisciplinary team included expertise in
Environmental Impact Assessment, Air & Water pollution & Control measures, Noise
Control measures, Ecology & bio-diversity, Land use, Geology, Environmental
Chemistry and Socio-Economic planner. The team members involved in EIA study
area
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 12 – DISCLOSURE OF CONSULTANT
253
S. No.
Name Role
1. Mr. V.K.Gautam
EIA coordinator Isolated Storage &
Handling of Hazardous Chemicals & FAE
– Meteorology, Air Quality Modelling &
Prediction
2. Dr. R.K. Jayaseelan Functional Area Expert – Land use, Water Pollution, Prevention & Control and Hydrogeology
4. Dr.Muthiah Mariappan
FAE – Solid & Hazardous Waste Management, Air Pollution, Prevention & Control and Water Pollution, Prevention & Control
5. Dr. N. Sukumaran FAE – Ecology & Biodiversity
6. Dr. Thillai Govindarajan FAE – Geology
7. Mr. M. Senthil Kumar FAE – Risk Assessment & Hazard Management
8. Mr. R. Rajendran FAE – Air Pollution, Prevention and Control, Noise & Vibration and Municipal Solid Waste Management
9. Mrs. Geetha Shreeneevasakam FAE – Socio-Economic Expert
10. Mrs. K. Vijayalakshmi AGM – Environment, FAE – Air Quality, Noise & Vibration and Risk Assessment & Hazard management
11. Mr. Bharath P. Project Engineer, FAA- Air Pollution, Prevention & Control and Water Pollution, Prevention & Control
12. Mr. Pratheesh B Junior Project Engineer – Report Analysis and Documentation
13. Ms. Cibichakaravarthy P Junior Project Engineer – Report Analysis and Documentation
14. Mr. Robson Chinnadurai Technical Manager (Lab)
15. Mrs. Kalaiarasi S Senior Chemist
17. Mr. Venkateshwaralu Field Technician
LPG STORAGE AND BOTTLING FACILITY IOCL TIRUNELVELI PLANT
CHAPTER 12 – DISCLOSURE OF CONSULTANT
254