Upload
alejandro-oneil
View
222
Download
0
Tags:
Embed Size (px)
Citation preview
1
International Ice Charting Working Group
Sponsored by:U.S. National Ice Center
Office of Naval Research
Canadian Ice Service
Hosted by:Arctic and Antarctic Research Institute
2
IICWG-IV
• April 7-11, 2003
• IICWG agenda to be set after outcome is determined from WMO/JCOMM meeting
3
Technical Tours
Museum displays on:
The Arctic Environment
History of the Northern Sea Route
Culture of Northern Regions
Antarctica
US/Canada Joint Ice Working Group
Sixteenth Meeting held April 29-
May 1 in Wood’s Hole, Mass.
JIWG 2002
• Standing Committees– Operations, Icebergs, Technology &
Systems, Science and Remote Sensing
• Theme: North American Ice Service– Developed NAIS Plan of Action– NAIS to be signed following signing of
umbrella NESDIC/MSC IMOU, anticipated Fall 2002
6
IICWG -III Action Items: Plenary
1. Co-chairs of IICWG to inform WMO/JCOMM Sea Ice Expert Team (SIET) that Ms. Cheryl Bertoia will represent IICWG to the SIET.
2. Mr. Klaus Struebing to provide Mr. Eric Madsen with the URL the Baltic Sea Ice Meeting.
3. Ms. Florence Fetterer to place the CEOS Ice Hazards Report on the IICWG website.
4. Each ice center head to provide a training website URL to Mr. Paul Seymour/Mr. Keld Hansen.
5. A working group is established in order to establish guidelines for the development of these training web pages. This group shall include Mr. Seymour (NIC), Mr. Hansen (DMI), Dr. Tangen (DNMI) and Ms. Bourque (CIS).
6. The Data Access Sub-group to work toward release of an informal "request for information" for IICWG Consortium commercial SAR data access within the next six months. DASG to investigate possible relationship of IICWG informal RFI to NOAA formal RFI.
7. DASG to consider expanding work beyond access to space based SAR, to include other near-real-time sensors such as MODIS and QuikScat.
8. DASG to look to future sensors in the 8-10 year time frame and make recommendations to the IICWG.
9. DASG to consider whether to establish itself as a standing committee or to remain a sub-group of Data, Information and Customer Service.
7
Action Item Report of theAction Item Report of theApplied Science & ResearchApplied Science & Research
Standing CommitteeStanding Committee
Action Item Report of theAction Item Report of theApplied Science & ResearchApplied Science & Research
Standing CommitteeStanding Committee
IICWGIICWGInternational Ice Charting Working GroupInternational Ice Charting Working Group
Modelling & Data Assimilation (1)
Modelling & Data Assimilation (1)
• Action:– Convene ice/ocean modeling and data
assimilation workshop targeted for late 2002 or early 2003 - location TBD. Summary of workshop outcome to be reported on at IICWG-4 in St. Petersburg.
• Responsible:– Dennis Conlon, Doug Lamb, Tom Carrieres,
Chad Dick, Dean Flett
• Status:– CIS offered to host but experiencing financial
difficulties, TBD (Aug 2002)
9
• Action:– Coordinate and develop project and/or
proposal focussing on data assimilation for submission to funding opportunities.
• Status:– NASA Data Assimilation Workshop held July 02 at
USNA, Annapolis. CIS and NIC attended and presented operational community interests.
Modelling & Data Assimilation (2)
Modelling & Data Assimilation (2)
10
• Action:– Attend and present summary &
inventory of available digital and non-digital ice service ice archives at ACSYS/CliC-organized Sea Ice Extents Workshop, April'02.
• COMPLETE
Ice Archives & ClimatologyIce Archives & Climatology
11
Validation and Analysis (1)Validation and Analysis (1)
• Action:– Facilitate timely release of preliminary
results and findings from the Healy Cruise. Make data available to other researchers as necessary to support research activities.
• COMPLETE: JPL final report provided to IICWG members
• Action:– Continued coordination for Envisat and
future Science field validation activities.
• Continuing
12
• Action:– Pursue development of project proposal on
use of Visible/Infrared data (e.g. for ice typing, classification, cloud-masking, etc.) for submission to funding opportunities. Investigate opportunity for Visiting Scientist visit to DNMI.
• Responsible:– Lars-Anders Breivik, Roger De Abreu, Doug
Lamb
• Status:– NIC investigating sending Dr Joerg
Haarpaintner to DNMI
Validation and Analysis (2)Validation and Analysis (2)
13
Validation and Analysis (3)Validation and Analysis (3)
• Action:– Provide information to the group
and coordinate communication on QuikScat (SeaWinds) data and algorithm access and evaluation.
• COMPLETE
14
Improving Accuracy of Ice Charts&
Transition of Science to Operations
Improving Accuracy of Ice Charts&
Transition of Science to Operations
• Action:– Revisit Ice Classification problem. Science
groups at each ice centre to consider own requirements and desired methodology for machine-assisted segmentation and classification and exchange ideas and concepts. Ice agencies to develop regional training and validation data sets to allow for training and/or testing of tools and systems.
• CONTINUING:– NIC will make available a validation data set
of 34 manually classified RADARSAT images.
15
Action Item Report of theAction Item Report of theData, Information and Data, Information and
Customer SupportCustomer SupportStanding CommitteeStanding Committee
Action Item Report of theAction Item Report of theData, Information and Data, Information and
Customer SupportCustomer SupportStanding CommitteeStanding Committee
IICWGIICWGInternational Ice Charting Working GroupInternational Ice Charting Working Group
16
Data, Information and Customer Support
• Action Item CD 2.3 - Each ice centre to gather an inventory of ice chart data attributes and post this inventory on the IICWG web by March 15 2001. (Florence Fetterer, NSIDC)– Draft ice chart attributes table is on the
IICWG web.
• Status: Open
17
Data, Information and Customer Support
• Action Item CD 2.4 - IICWG participants to gather information on climatological products produced by each service and provide this information to Florence Fetterer by December 2000. (Florence Fetterer, NSIDC)– Draft table of climatological products is now on
the IICWG web.
• Status: Ongoing under GDSIDB.
18
Data, Information and Customer Support
Action Item CD 3.1 - Colour Code Standard.– Colour code to be finalised by the end of December
2001.
– Each ice centre to produce internal charts using the agreed colour code for the period January to October 2002 and inform the working group about any difficulties encountered.
– Revised colour code to be presented to the JCOMM Expert Team on Sea Ice in October 2002 for adoption.
19
Data, Information and Customer Support
Action Item CD 3.2 - Nomenclature for Ice decay (Vasily Smolyanitsky, Roger De Abreu)– Investigate inter-relationship between traditional stages of
melt and new ice strength index with respect to physical process in seasonal cycle and movement of ships in ice.
– Improve exchange of ice melt / strength science (past, present, future) within IICWG.
– Prepare progress report for JCOMM Expert Team on Sea Ice in October 2002.
• Recommend move to Science Committee
20
Data, Information and Customer Support
• Action Item CD 3.3 - Common training activities (Task group)
– Request Noetix to formally issue Offer to Purchase.– NIC to coordinate the mechanics of CBT purchase by individual IICWG
members.– NIC to coordinate the participation in further CBT module development by
IICWG members.– Ad hoc training committee to develop and distribute guidelines for creation of
training web pages by IICWG members.– All member ice services to create training web pages to be linked to master
IICWG training web page.• Web page development to be completed NLT IICWG IV
• Status: NIC has beta copy of IICWG website generated (Aug 2002). Looking for links to training websites at other centers.
21
Data, Information and Customer Support
• Action Item CD 3.4 - XML Sea Ice Nomenclature (Vasily Smolyanitsky).– Develop an XML WMO nomenclature
on ice sea together with JCOMM Expert Team on Sea to be included in the JCOMM XML Marine Glossary.
• Status: COMPLETE
22
Data, Information and Customer Support
• Action Item CD 3.5 - Data Access Subgroup.– Data access subgroup to work toward releasing an RFI for SAR
data access before June 2002.
– Data access subgroup to consider expanding work beyond access to space based SAR, e.g. MODIS, QuikScat etc.
– Look to future data sources.. In the 8-10 years time frame.
– Consider if expanded roles require this group to become an independent standing committee.
• Status: DASG will remain a sub-group, co-chaired by Mike Manore and Henrik Steen Andersen. DASG will expand to focus on non-SAR sensors.
23
Data, Information and Customer Support
• Action Item CD 3.6 - ShapeFiles.– Develop a formal definition for the format for ice
chart archiving data based on the ShapeFile and SIGRID code proposal and publicize to all IICWG members.
– Develop appropriate supporting XML style sheets and schema definition
• Status:– SIGRID-3 proposal to be presented to ETSI.– Stylesheet developed; FGDC Schema definition
needs to be modified, tested and accepted