7
1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab

1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab

Embed Size (px)

Citation preview

Page 1: 1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab

1

HVAC OVERVIEWfor Single Tunnel

Configuration

November 17, 2008

ILC CFS Workshop 2008 Chicago, IL

Lee Hammond, Fermilab

Page 2: 1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab

Klystron Cluster August Cost Basis

2

Page 3: 1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab

Single Tunnel Alcove Layout • Alcove and Area of Refuge Consideration• NFPA 520 …shall have fresh air from the surface during a fire emergency• Air quantity shall be 34m³/hr (944 L/s, 20cfm) per person or minimum required to

prevent smoke infiltration. • Shall maintain 12.5Pa (0.05in.wg) relative to adjacent space.• Shall be provided with food, water, emergency lighting, blankets, toilets facilities, first

aid kits, two communications.

3

Area of Refuge Rack Alcove

Page 4: 1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab

Tunnel Section with Ventilation Piping in Floor

4

SE

VENTILATION DUCTS

Page 5: 1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab

Area of refuge Layout

5

Page 6: 1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab

Single tunnel Airflow

• Air supply into area of refuge and rack alcoves. “Heat to air” in beam tunnel considered to be quite small. 95% reduction from RDR

6

Page 7: 1 HVAC OVERVIEW for Single Tunnel Configuration November 17, 2008 ILC CFS Workshop 2008 Chicago, IL Lee Hammond, Fermilab

Airflow during Emergency

• Smoke barrier/water curtain at approx. 600m intervals

7

test