1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino Physics Experiment 5.Beijing Spallation Neutron Sour ce 6. CXFEL

1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

Embed Size (px)

Citation preview

Page 1: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

1

Hesheng ChenInstitute of High Energy Physics

Beijing 100049, China

Future Plan of IHEP Future Plan of IHEP

1. Introduction 2. BEPCII3. Medium and long term plan4. Neutrino Physics Experiment5. Beijing Spallation Neutron Source6. CXFEL

Page 2: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

2

Institute of High Energy PhysicsInstitute of High Energy PhysicsChinese Academy of Sciences

Comprehensive and largest fundamental research center in China

For :For :– Particle physicsParticle physics– Accelerator technologies and applications Accelerator technologies and applications – Synchrotron radiation technologies and applicationsSynchrotron radiation technologies and applications1000 employees, ~ 650 physicists and engineers, 400 PhD Students and postdoctors

Established at 1950, and became an independent inEstablished at 1950, and became an independent institute for HEP at 1973 . stitute for HEP at 1973 .

Page 3: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

3

Major Facilities • Beijing Electron-Positron Collider (BEPC)

• Beijing Spectrometer (BES)

• Beijing Synchrotron Radiation Facility (BSRF)

• Yangbajing Cosmic Ray Observatory

• Beijing Free Electron Laser (BFEL)

• High Density Slow Positron Source

Page 4: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

4

BEPC constructed in 1984 –1988 with beam energy: 1 – 2.8 GeV– Physics Run : Luminosity 1031cm-2s-1 @ 1.89GeV, 5 month/year– Synchrotron Radiation Run : 140mA @ 2.2 GeV, 3 month/yearFinished running April 2004, and started upgrade interleaving with

SR runnning.

Page 5: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

5

Observation of an anomalous enhancement near the threshold of mass spectrum at BES II

M=1859 MeV/c2

< 30 MeV/c2 (90% CL)

J/pp

M(pp)-2mp (GeV)

0 0.1 0.2 0.33-body phase space

acceptance

2/dof=56/56

acceptance weighted BW +3 +5

10 25

pp

BES II

Phys. Rev. Lett. 91, 022001 (2003)   

X(1860)

Page 6: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

6

Statistical Significance 7.7

BESII Preliminary

J

BES: X(1835) in

X(1835)7.7

BESII Preliminary

2

2

MeV/c 7.73.207.67

MeV/c 7.21.67.1833

54264

M

Nobs

410)4.04.02.2()()( XBXJB59.1

8.0 10)4.00.7()()(:.. ppXBXJBfc

'/J

Page 7: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

7

X(1835) could be the same structure as X(1860) indicated by pp mass threshold

enhancement

• X(1835) mass is consistent with the mass of the S-wave resonance X(1860) indicated by the pp mass threshold enhancement.

Its width is 1.9 higher than the upper limit of the width obtained from pp mass threshold enhancement.

• On the other hand, if the FSI effect is included in the fit of the pp mass spectrum, the width of the resonance near pp mass threshold will become larger.

Page 8: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

8

Yangbajing Cosmic Ray Observatory ( Tibet, 4300m )

IHEP-INFN RPC China-Japan Air Shower Array

Page 9: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

9

Hard X-ray Modulate Telescope Satellitescan sky for hard X ray point sources

Charged particle shielding

Collimator

Crystals

PMTSupport structure

Page 10: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

10

Comparison between HXMT and INTEGRAL

Angular Resolution 2’ 15’Source Location 0.2’ 2’Sensitivity (10-7 / cm2 S keV) 3 10Observation Mode survey yes no local imaging yes yes pointing yes no

the HXMT satellite is expected to be launched by 2010

HXMT INTEGRAL

Page 11: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

11

BEPC

4w1

Diffuse ScatteringX-ray fluorescence

analysis

Topography

4B9

X-ray DiffractionSmall angle scattering

Photoemission SpectroscPopy

3B1

Lithography

3W1

Middle energy

4W1B

4W1A

4B9B

4B9A3B

1B

3B1A

3W1A

3W1B

4 wigglers and 13 beam lines. > 300 exp./year from > 100 institutions

Beijing Synchrotron Radiation Facility

[email protected]

1W1A

XAFS1W1B

High-pressure diffraction

LIGA

VUV

Macromolecular

3B3

1w1

4w2

3B3

Soft X-ray Optics

Page 12: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

12

Structure of third type of light–harvester protein. The structure diffraction data taken at BSRF.

Page 13: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

13

BEPC future development

High Precision Frontier: precision measurement in charm energy region (2-4 GeV), and search for new phenomena. • Transition between continuum and resonance's, perturbative and non-perturbative QCD• Rich of resonance's, charmonium and charmed mesons. • New type of hadronic matter predicted in the region, e.g. glueball and hybrid , pentquark, exotic particles…• Advantages at Threshold : large , low multiplicity, pure initial state, S/B optimum Upgrade BEPC into two ring collider, increasing luminosity by a factor 100, rebuild detector to adapt high event rate and reduce sys. errors. Estimated cost: 77M US$.

Page 14: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

14

2. BEPCII: High Lumi. Double–ring Collider

Build new ring inside existing ring . Two half new rings and two half old rings cross at two IR’s, forming a double ring collider.

BEPCII

Page 15: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

15

BEPC II Double ring Design• In the existing BEPC tunnel, add another ring, cross over at south a

nd north points, two equal rings for electrons and positrons. Advanced double-ring collision technology.

• 93 bunches , total current > 0.9A in each ring. • Collision spacing : 8 ns.• In south, collision with large cross-angle ( ±11 mr ) .• Calculated luminosity : 1033 cm-2 s-1 @ 3.78GeV of C.M. energy.• Linac upgrade: e+ 50mA/min. , Full energy injection up to 1.89GeV • In north cross point, connecting SR beam between two outer rings, in south cross point, use dipole magnet to bend the beam back to out

er ring.• SR run : 250mA @ 2.5 GeV.• Major detector upgrade : BES III.

Page 16: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

16

Schedule: 3 stages• Stage I:

– May –Oct. 2004: Linac upgrade – Dec. 2004 – June 2005: Synchrotron Radiation running

• Stage II: 1 June- 30 Nov. 2006: – Tuning of two ring machine – SR running – BES III detector assembling and tuning

• Stage III– 1 -15 Dec. 2006 dismount interaction region. – 16-31 Dec. 2006 BESIII detector moving into beam line– Jan. – April . 07 : Machine-Detector tuning.

• Physics run by May 2007

Page 17: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

17

Progress of BEPCII: Linac

• The installation of Linac upgrade finished at middle of Oct. 2004.

• Tuning Linac, e- beam available for the ring injection middle of Nov.

• Synchrotron radiation running started at the end of Dec. 2004,

• Linac Tuning progress: close to design goals. – e+ beam available at the end of Linac March 19 – At the end of Linac, e+ current reached design value, and em

mitance is better than design value. – Frequency 12.5Hz →25Hz → 50Hz– Positron injection successful.

Page 18: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

18

Page 19: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

19

Progress of BEPCII

• Most of prototype R&D are successful. – Antechambers – Magnets – Special magnets at interaction region– Power supplies– Pre-alignment of half unit. – ……

• Mass production of storage ring and detector components go smoothly.

• Jan.- June 2005 SR ruuning finished. • 4 July Storage ring upgrade started.

Page 20: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

20

SC cavities designed by KEK and IHEP, arrived

Page 21: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

21

Magnet Production finished

Page 22: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

22

Pre-alignment of half unit

Half unitHalf unit

Page 23: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

23Simulation of installation

Page 24: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

24

Injection kicker magnet

Page 25: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

25

Fabrication of vacuum chamber

Page 26: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

26

Production and test of SC quads at BNL

Page 27: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

27

Dual-aperture magnet (Q1)

Q1a Q1b

Page 28: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

28

Installation of two cryogenics systems finished, and reached the specification

Page 29: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

29

Event statistics at BESIII

Physics

Channel

Energy

(GeV)

Luminosity

(1033 cm–2s –1)

Events/year

J/ 3.097 0.6 1.0×1010

3.67 1.0 1.2×107

’ 3.686 1.0 3.0 ×109

D 3.77 1.0 2.5×107

Ds 4.03 0.6 1.0×106

Ds 4.14 0.6 2.0×106

Page 30: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

30

• Adapt to high event rate of BEPCII: 1033cm-2 s-1 and bunch spacing 8ns• Reduce sys. errors to match high statistics photon measurement, PID…• Increase acceptance

MDC: small cell & He gas xy=130 m sp/p = 0.5% @1GeV dE/dx=6%

EMCAL: CsI crystal E/E = 2.2% @1 GeV z = 0.5 cm/E

TOF: T = 100 ps Barrel 110 ps Endcap

Magnet: 1 T Super conducting

Muon ID: 9 layer RPC

Trigger: Tracks & ShowersPipelined; Latency = 2.4 ms

Data Acquisition: Event rate = 3 kHz Thruput ~ 50 MB/s

BESIII detectorBESIII detector

Page 31: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

31

Mechanical Structure of Draft Chamber

Page 32: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

32洁净间 穿丝机

Draft Chamber wiring machine

Page 33: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

33

Page 34: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

SC magnet: coil winding

Coil winding completed on June 3

Page 35: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

35

Assembling of BESII SC Magnet

Page 36: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

36

Return yoke pre-assembly completed May 31

Page 37: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

37

Return Yoke at Exp. Hall

Page 38: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

38

Progress of CsI calorimeter 6300 crystals, (5.2x 5.2 – 6.4 x 6.4) x 28cm3 PD readout, noise ~1100 ENC Energy resolution: 2.5%@1GeV Position resolution: 5mm@1GeV

crystal testing and assembling for barrel

Total in barrel

received tested Assembled

# of crystal

5280 3736 3340 2400

% 71% 63% 45%

Page 39: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

39

no partition wall Mechanical support structure

Page 40: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

40

Simulation of installation

Page 41: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

41

system : RPC• 9 layer, 2000 m2

• Bakelites, no lineseed oil

• 4cm strips, 10000 channels

• Noise less than 0.04 Hz/cm2

• Production finished

• Installation of end cap finished

Page 42: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

42

BESIII International Collaboration

• 20 Chinese Univ. and institutions

• US groups: Hawaii, Seattle …

• Japanese Groups: Univ. of Tokyo, KEK

• JINR

• Panda of GSI.

Page 43: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

43

BESIII Expected Physics Results

Because lum. Increase by two-orders of magnitude, BES III can obtain many important results in tau-charm physics, the main focus of this workshop.

Some expected results with Monte Carlo simulation:

• Precise measure CKM parameters

• Precise R measurement

• Search for glueballs and exotic states, determine spin and

parity

• studies on pentquark

Page 44: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

44

Progress of BEPCII

• Most of prototype R&D are successful. – Antechambers – Magnets – Special magnets at interaction region– Power supplies– Pre-alignment of half unit. – ……

• Mass production of storage ring and detector components go smoothly.

• Jan.- June 2005 SR ruuning finished. • 4 July Storage ring upgrade started.

Page 45: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

45

Possible projects for Middle term Possible projects for Middle term • Charm physics @ BEPCII • Modulated hard X-ray telescope satellite• Neutrino experiments:

– Reactor neutrino to measure sin2213 – National underground Lab.– Very LBL oscillation experiment: J-Prac→ Beijing

• High power proton Accelerator: – Chinese Spallation Neutron Source 100KW→200 KW– Accelerator Driven Subcritical system

• Hard X-ray FEL• Convert BEPC into dedicated SR source after

BEPCII finished physics running

Page 46: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

46

International Collaborations• CMS & Atlas @ LHC: tier 2 for each • EXFEL… • ILC:

Parameter choice, IHEP & Tsinghua U., headed by J.Gao Damping Ring study, IHEP group;Positron source study, sponsored by NSFC (G.X.Pei)RF power and modulators (Y.L.Chi)ATF2 collaboration, magnet production is in progress (J.Q.Wang);Superconducting RF cavity study (IHEP and Peking U., S.C.Zhao & D.Zhao);

Page 47: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

47

Superconducting laboratory in IHEP

Page 48: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

48

Multi-cell SRF cavity study ( 2003 - )

Page 49: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

49

Parameterization of neutrino mixing

6 fundamental parameters in neutrino physics : Known : | m2

32|,sin2232 , m221,sin2221

Unknown: sin22 , , sign of m232

Exp. : reactor VLBL oscillation

Daya Bay Reactor J-Parc → Beijing

Neutrino mixing parameters

U 1 0 0

0 cos23 sin23

0 sin23 cos23

cos13 0 e i sin13

0 1 0

e i sin13 0 cos13

cos12 sin12 0

sin12 cos12 0

0 0 1

e

Ue1 Ue2 Ue3U1 U2 U3

U1 U2 U 3

1

2

3

Page 50: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

50

Experiment to measure sin2213 using Daya Bay reactor neutrino

• Daya Bay NPS is the best site in the world: – 60 km from Hong Kong, – 12GW now, 18 GW @ 2008– good mountain near NPP for near and far detectors.

• Near (500m) and Far detector (1.8km), modular, expect accuracy of 1% in sin2213 • NPS is happy to cooperate • Site study and tunnel design are underway • Chinese funding agencies agreed to support • US physicists from LBL… joined collaboration, and DOE expressed interest to support

Page 51: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

51

3535大亚湾与岭澳核电站大亚湾与岭澳核电站

大亚湾核电站大亚湾核电站 岭澳核电站岭澳核电站

Dayabay Nuclear Power StationDayabay Nuclear Power Station

Page 52: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

52

Page 53: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

53

Schematics of a multi-module detector

Page 54: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

54

(4) (4) Beijing Spallation Neutron SBeijing Spallation Neutron Sourceource

Page 55: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

55

Main Parameters of the BSNS

Approved by Chinese Government in principle July 2005

Page 56: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

57

H- ion source (20mA):

RFQ (3.5 MeV)

ML loaded RF cavity

Rapid cycling magnet

White circuit power supply

Ceramic vacuum chamber

BSNS R &D Activities

Page 57: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

58

The Beijing XFEL Test Facility

Seeding L. s=270nm , P=200MW, s=100fs

e beam E=1.1GeV , Ip=600Amp , n=2.5mmmrad , E/E=0.01%

Parameters 1st stage 2nd stage

Undulator u (cm ) 6.0 4.0 4.0 2.8

g (cm) 0.94 0.92 0.92 0.92

Dispersion d/d 2.3 4.0

FEL

(nm) 270 45 45 9

Lg (m) 0.84 0.91 0.91 1.43

Lu (m) 1 5.7 1 8.7

P (MW) 200 in 1140out 300 in 711out

Page 58: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

59

The CXFEL plan

Undulators and user stations of stations

LCLS TESLA PAL XFEL SCSS CXFEL

Radiation wavelength [Å] 1.5 1.0 3.0 36 1.5

FEL parameter, [x10-4] 5.0 3.4 4.3 8.7 4(3.5)

Peak coherent power [GW] 9 24 2.3 1.8 4.4(2.8)

Peak brightness [x1033]* 1.2 5.4 0.14 0.01 0.3

Average brightness[x1022 ] 3.3 4320 0.22 0.01

Electron beam energy [GeV] 14.35 20 3.0 1.0 7.7(6)

Peak current [kA] 3.4 5.0 4.0 2.0 4

Normalized emittance [m-rad] 1.2 1.4 1.5 2.0 1.5

RMS energy spread [%] 0.008 0.0125 0.02 0.02 0.02

FWHM bunch length [fs] 230 200 230 470 230

Repetition rate [Hz] 120 10 60 50 25

Bunches per pulse 1 4,000 1 1 1

Undulator period/full gap [mm] 30/5 38/10 12.5/3.0 15/3.5 25/8(18/4)

Undulator peak field [T] 1.32 1.06 0.97 0.94 0.8(0.95)

Undulator parameter, K 3.71 3.8 1.14 1.3 1.9(1.6)

Undulator beta [m] 18 35 15 10 25(25)

Saturation length/total length [m] 86/113 145/175 50/58.5 20/22.5 120(104)

Segment length [m]* No. of segment 3.42x33 5x35 4.5x13 4.5x5

Cost/construction schedule ~225M$/3 684 M€/6 42M$/3 30M$/4 ~1.5BRMB/5

Page 59: 1 Hesheng Chen Institute of High Energy Physics Beijing 100049, China Future Plan of IHEP 1.Introduction 2.BEPCII 3.Medium and long term plan 4.Neutrino

60

Thanks !