23
1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

Embed Size (px)

DESCRIPTION

3 Attending most of the meeting In person rich, ken, astrid, vasily, matthias, wei, naohito, hideto, Shoji kohei, kazuya, John H, John L, dave K, imran, atsushi,?? On phone (for part of it) dave lee, vince, Ed Kinney, Mike L,??? RKS note – the highest priority was to reach some decisions – hence several talks were skipped

Citation preview

Page 1: 1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

1

Forward Upgrade MeetingCloseoutRichard Seto-UCR

BNLAug 18-19, 2004

Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

Page 2: 1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

2

Goals for this meeting Muon trigger technology Muon trigger fundingMuon trigger funding

we must decide!we must decide! the NSF proposal (jan!!)the NSF proposal (jan!!)

we must decide!we must decide! R and D plans and requests steps toward CDR (s)

Apr 2005 ?? Next major meeting?

Where are we going, and why am I in this handbasket?" 

Page 3: 1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

3

Attending most of the meeting In person

rich, ken, astrid, vasily, matthias, wei, naohito, hideto, Shoji kohei, kazuya, John H, John L, dave K, imran, atsushi,??

On phone (for part of it) dave lee, vince, Ed Kinney, Mike L,??? RKS note – the highest priority was to reach

some decisions – hence several talks were skipped

Page 4: 1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

4

Muon trigger technology-Performance for triggering:1) rejection for W in pp, heavy vector mesons in AA, open charm/bottom in pp and

AA. simulation for AA – wei timescale<1mo

2) Stability against collisions related backgrounds: decays into muons, combinatorial background from spectator fragments showering of the beampipe or material close to the beam pipe.

shielding help noise? kazuya and wei, yajun timescale<1mo use pisa to do this – fragments – check with kazuya for fragments

3) Beam related backgrounds: hardron punch through, neutrons, decay-muons, incoming vs outgoing beam background.

background from beam – incoming -finish Scint test – run4 (wei check this) mars to pisa Vasily< 1mo DECISION made: one plane or more of fast device – i.e. RPC

4) Can trigger info be passed on to LL1 within one clock tick? design – 2 beam clocks to lvl1 (fast hardware) RPC OK measure for Cathode – timescale< 1 month

5) "Noise" rate (in absence of any physics signal) in the trigger. Noise – RPC – measure or send email Matthias– few days- Answer by next week

DECISION: within 1 month Naohito/Matthias will agree on a trigger technology which will satisfy the requirements of W physics

This is the primary criteria in choosing a technology/?- additional information may come from NCC for W physics

RKS note – even end of Sep is late

Page 5: 1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

5

Muon trigger technology-Tracking issues, integration issuesTracking Issues1) Is it necessary to improve the pattern recognition in AA? (YES-Vince) How can this

be best done?2) muTr resolution vs splitting of a trigger signal at the front end (ASD may fix this for

cathode) This is a more difficult problem needs expertise from muon tracking person may increase cost- what is needed is probably theta

Integration issues1) How long does it take to upgrade muTr FEE; can this be done during a regular

shutdown? How can the installation of new decidcated trigger counters be integrated with the running schedule?

2 shutdowns2) How to solve integration issues for possible RPCs upstream of muTr magnet,

downstream of muTr magnet or downstream of muID in gap 5? Need to talk to Pete etc

3) Do we have a scheme in which we can combine the LL1 information for muId/muTr/RPC within the time budget for a level 1 decision?

John says at first order its OK [see John’s slides~ 25 clock ticks OK, probably have 10 available since 15 are used]

4) Coordination with PHENIX muon group. There may be pretty strong oppinions on which solution is preferrable.

RKS note : we will revisit these issues in a month after the technology is picked

Page 6: 1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

6

costs Mu trig (to solve W trigger problem)

RPC – $900K cathode readout

9K channels ~ $1M Bottom line

either scheme or hybrid costs ~$1M To solve pattern rec may double this just from

increase in channels NCC

1 side - $3M, Both sides $5M, incl gamma/pi0

Page 7: 1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

7

upgrades-Mu trig NSF?MRI

Decision: strawman for funding

$1M$1MJapan

special grant

DOE Nuclear

Japan-Riken upgrades-NCC

Later

$100K

$2M+

$1M+

Europe?

Later$2M+

Later

Japan

PHENIXR&D$100K

funded or promised

to be requested

hopes

RKS note – discussion (a tough one which took most of the time) included Hideto – hence the green linAstushi will be the point person for these funds

Page 8: 1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

8

NSF proposal (more from Ken who will run the show)

Request ~$1M for mu trig (DECISION) Will go through UIUC(matthias) (DECISION) participating – UIUC, UCR, ISU, Colorado,

RIKEN, Kyoto, Bejing, others? ~$1-200K per institution for now- people start looking for

matching fund (30%- no more, no less) ISU – trigger RPC (where? UIUC, Kyoto, Bejing) ??

John Hill- editor- 15 pages w/o budget (DECISION)

Page 9: 1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

9

R & D, CDR, meeting R and D plans and requests

(DECISION) NCC will ask for $100K from

PHENIX $100K from Riken (DECISION)

Next major meeting (DECISION) in Trieste at spin conference

Friday- ½ day ??? 2pm - eve

program – RKS zajc/matthias – physics trieste bnl prague shinichi atsushi

steps toward CDRs Apr 2005 goal for both

CDRs mu-trigger – john – editor

Physics-naohito, ed kinney hardware- electronics-john/john performace- wei integration R/D-naohito

ncc - ?? Jenchi? Rich Physics jenchi?, rich hardware-edward electronics-chi performance integration-edward Kist performace-vasily R/D

Page 10: 1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

10

NCC plan – to have 1 NCC in by 2008 (as in LOI)

2004 – R and D ($100K-Riken, $100K-PHENIX) 2005- prototype in (1 year from now) 2006 –mid-year Funding in place for 1 NCC

$3M +– $1M+ – NSF, $1.5M+ Japan, 0.5M+ DOE Application for NSF funding Jan 2006 (ready by Oct 2005)

2006 – Prototype 2 (full prototype) 2008 – NCC 1 w/pi0/gamma operational

2007- midyear Funding in place for NCC 2 $2M Europe, Japan, DOE

2009 – NCC 2 operational

Page 11: 1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

11

Additional documents

Page 12: 1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

12

NOSECONE CALORIMETER from the LOI

nosecone prototype 1 operational 6/7/05Run 5 [SiSi 200 14wks; pp 200 10wks] 10/3/05Nosecone prototype II operational 7/14/06Run 6 [AuAu 63 19wks; pp 500 2wks] 10/2/06SMD prototype operational 6/7/07Run 7 [pp 200 22wks; pp 63 5wks] 10/01/07Nosecone 1 SMD 1 operational 9/26/08Run 8 [AuAu 200 19wks] 10/1/08Nosecone 2 SMD 2 operational 5/13/09Run 9 [ pp 500 29wks] 10/1/09Run 10 [dAu 63 29wks] 10/1/10

Page 13: 1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

13

Agenda – Day 1 (9AM 3-192) Overview -rich -20 min EC/DC letter-discussion - rich 20 min Muon Trigger

Physics motivation for Muon Trigger and performance requirements- Naohito - 30 min

Muon Trigger Studies: Performance Issues -Wei 20 min

Muon trigger and Pattern recognition - Vince - 20 min

break 10:45 Case I - Using the Cathodes

R&D studies in Kyoto - Naohito-10 min Rejection Power of LVL-1 MuTr with

fast cathode readout- Kazuya Aoki - 30 min

Pulse shape analysis of Cathode signal from MuTr Chambers- Kohei Shoji - 20 mins

Case II - case for the RPC's - Matthias - 45 min

Discussion – Muon trig solution 30 min

Lunch 1:00 Afternoon 2-160 2:00 Funding the muon trigger

Overview of Costs for Muon trigger – Matthias/Naohito 30 min

R and D request Discussion - Funding

possibilities Hideto/Matthias/Naohito 45 min

Using the muon trigger+NCC in Spin Studies -Astrid 20 min

Break 4:30 Measuring the Spin structure

function and orbital angular momentum Ken - 30 min (talk skipped)

Page 14: 1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

14

Agenda – Day 2 (9AM 2-78)

CMS Muon Trigger RPCs- Yajun Mao- 20 min (talk skipped)

NCC Review of NCC physics and studies

done so far - rich 30 min(talk skipped) NCC - update on costs and design

Ed Kist - 45 min(talk skipped) R and D request

Break 10:45 NCC studies-Vassily - 45 min Status for Foreign Collaborators

Matthias, Ed Kinney - 20 min Trigger Electronics for mu-trig+NCC

-John L 30 min Integration Issues - Ed Kist - 30

min(talk skipped) Lunch 1:00

Aug 19th Afternoon 2-187 2PM Guest speaker – the Hera-B

calorimeter - 20 min (talk skipped) Scope and Planning for NSF

proposal Ken 20 min john hill- updat from ISU - 10 min

discussion : the NSF proposal (45 min)

Break 4:30 Disscussion and planning- toward

the CDR(s): Charting the future for the NCC -

Edward Kistinev, Rich Charting the future for the muon

trigger - matthias/Naohito Close-out – Rich (talk skipped) END: 6PM

Page 15: 1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

15

Page 16: 1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

16

Muon Trigger Cost Estimate: Draft -1, November 30th

Assumptions:

0) $100k from regular UIUC budget for RPC related R&D and prototypes

a) Upstream tracker (UT) is dedicated RPC upstream of muTr station I: 2m^2

b) Downstream tracker (DT) is dedicated RPC in gap 5: 110m^2

c) two gaps in each station need 20% spare modules

==> need 538m^2 at $162k

d) $300/m^2 for RPC ($110/m^2 is the Belle price) This includes the two cathodes (azimuthal and tile) and frontend needed to form azimuthal tiles.

e) Granularity: 360 azimuthal strips in each station 10x10cm^2 tiles upstream 30x30cm^2 tiles downstream -> 4184 channels + 10% spares

f) Cost for Frontend electronics $100/channel + 30% overhead

(obviously this is a generic number; we need to develop new amplifier-discriminators including some logic .OR.

for the azimuthal strips and should re-use existing FEMs ->

TOF?!).

==> $599k

g) Need two muId-type LL1 to collect RPC signals on one side and

one additional one to correlate muID.LL1 and RPC.LL1 -> 6+4 spares.

Assume: $10k/board including overhead and manpower for modest

modifiations.

h) online and off-line software - including the FPGA algorithms -

will be written by postdocs and graduates students supported

by the regular grants.

RPC costs

Page 17: 1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

17

RPC costs contWith this:

-> R&D, prototypes $100k (from regular NSF grant)======================================================= -> Mechanics for integration: $50k (from NSF-MRI ... (labor from PHENIX operations) -> Gas System $50k (labor from PHENIX operations) -> RPC hardware $162k -> RPC FEMs $599k -> LL1 $100k ...) ======= $961k -> get NSF grant for undergraduate institutions -$100k ======= $861k to NSF MRI

Page 18: 1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

18

costs cathode readout

9K channels ~ $1M

Bottom line either scheme or hybrid costs ~$1M To solve pattern rec may double this just from

increase in channels

Page 19: 1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

19

rest is notes

Page 20: 1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

20

2004 (now) 2005 long pp 2006 (prototype)(500) 2007 (prototype) 2008 (fully ready)(500 GeV) must be pads? – then it needs new

chambers 2009(500 GeV)

Page 21: 1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

21

add kyoto, riken, Bejing ISU trigger rpc’s where? (UIUC/Kyoto?) document – John 15 pages w/o budget add naohito, atsushi

Page 22: 1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

22

Things that need to be answered to choose a technology to do W physics simulation for AA – wei <1mo shielding help noise? kazuya

and wei, yajun <1mo use pisa to do this

background from beam – incoming -finish Scint test – run4 (wei check this)

mars to pisa < 1mo DECISION made: one plane or

more fast device – i.e. RPC design – 2 beam clocks to lvl1

(fast hardware) RPC OK, measure for Cathode - 1 month

Noise – RPC – measure or send email – few days

Things that need to be answered to fix the pattern recognition problem This is a more difficult

problem needs expertise from muon

tracking person may increase cost

tracking yes, needs some work

ASD may fix this for cathode 2 shutdowns Integration issues

installation of RPC Time budget in LL1

John says at first order its OK

mu trig- plans to reach decision on technology

Page 23: 1 Forward Upgrade Meeting Closeout Richard Seto-UCR BNL Aug 18-19, 2004 Bridgeline x8383 rooms: 3-192/2-160/2-78/2-187

23

CDR April 2005 both

mu-trigger – john – editor Physics-naohito, ed kinney hardware- electronics-john/john performace- wei integration R/D-naohito

ncc - ?? Jenchi? Rich Physics jenchi?, rich hardware-edward electronics-chi integration-edward Kist performace-vasily R/D