37
1 Flexible Budgets and Performance Analysis Chapter 10

1 Flexible Budgets and Performance Analysis Chapter 10

Embed Size (px)

DESCRIPTION

3 Improve performance evaluation. May be prepared for any activity level in the relevant range. Show costs that should have been incurred at the actual level of activity, enabling “apples to apples” cost comparisons. Help managers control costs. Let’s look at Larry’s Lawn Service. Characteristics of Flexible Budgets

Citation preview

Page 1: 1 Flexible Budgets and Performance Analysis Chapter 10

1

Flexible Budgets andPerformance Analysis

Chapter 10

Page 2: 1 Flexible Budgets and Performance Analysis Chapter 10

2

Characteristics of Flexible Budgets

Planning budgetsare prepared fora single, plannedlevel of activity.

Performance evaluation is difficult when actual activity

differs from the planned level of

activity.

Hmm! Comparingstatic planning budgets

with actual costsis like comparing

apples and oranges.

Page 3: 1 Flexible Budgets and Performance Analysis Chapter 10

3

Improve performance evaluation.

May be prepared for any activity level in the relevant range.

Show costs that should have beenincurred at the actual level ofactivity, enabling “apples to apples”cost comparisons.

Help managers control costs.

Let’s look at Larry’s Lawn Service.

Characteristics of Flexible Budgets

Page 4: 1 Flexible Budgets and Performance Analysis Chapter 10

4

Larry’s Lawn Service provides lawn care in a planned community where all lawns are approximately the same size.At the end of May, Larry prepared his June budget based onmowing 500 lawns. Since all of the lawns are similar in size,Larry felt that the number of lawns mowed in a month wouldbe the best way to measure overall activity for his business.

Larry’s Budget

Deficiencies of the Static Planning Budget

Page 5: 1 Flexible Budgets and Performance Analysis Chapter 10

5

Deficiencies of the Static Planning BudgetLarry’s Planning Budget

Page 6: 1 Flexible Budgets and Performance Analysis Chapter 10

6

Deficiencies of the Static Planning BudgetLarry’s Actual Results

Page 7: 1 Flexible Budgets and Performance Analysis Chapter 10

7

Deficiencies of the Static Planning BudgetLarry’s Actual Results Compared with the Planning Budget

Page 8: 1 Flexible Budgets and Performance Analysis Chapter 10

8

Deficiencies of the Static Planning BudgetLarry’s Actual Results Compared with the Planning Budget

F = Favorable variance that occurs when actual costs are less than budgeted costs.

U = Unfavorable variance that occurs when actual costs are greater than budgeted costs.

F = Favorable variance that occurs when actual revenue is greater than budgeted revenue.

Page 9: 1 Flexible Budgets and Performance Analysis Chapter 10

9

Deficiencies of the Static Planning BudgetLarry’s Actual Results Compared with the Planning Budget

Since these variances are favorable, has Larry done a good job controlling costs?

Since these variances are unfavorable, has Larry done a poor job controlling costs?

Page 10: 1 Flexible Budgets and Performance Analysis Chapter 10

10

I don’t think Ican answer thequestions usinga static budget.

Actual activity is above planned activity.

So, shouldn’t the variablecosts be higher if actual

activity is higher?

Deficiencies of the Static Planning Budget

Page 11: 1 Flexible Budgets and Performance Analysis Chapter 10

11

The relevant question is . . .“How much of the cost variances is due to higher activity, and how much is due to cost control?”

To answer the question,we mustthe budget to theactual level of activity.

Deficiencies of the Static Planning Budget

Page 12: 1 Flexible Budgets and Performance Analysis Chapter 10

12

How a Flexible Budget Works

To a budget we need to know that: Total variable costs change

in direct proportion to changes in activity.

Total fixed costs remainunchanged within therelevant range. Fixed

Variable

Page 13: 1 Flexible Budgets and Performance Analysis Chapter 10

13

Let’s prepare a budget

for Larry’s Lawn Service.

How a Flexible Budget Works

Page 14: 1 Flexible Budgets and Performance Analysis Chapter 10

14

Preparing a Flexible BudgetLarry’s Flexible Budget

Page 15: 1 Flexible Budgets and Performance Analysis Chapter 10

15

Quick Check

What should the total wages and salaries cost be in a flexible budget for 600 lawns?a. $18,000b. $20,000.c. $23,000.d. $25,000.

Page 16: 1 Flexible Budgets and Performance Analysis Chapter 10

16

Quick Check

What should be the total wages and salaries cost in a flexible budget for 600 lawns?a. $18,000b. $20,000.c. $23,000.d. $25,000.

Total wages and salaries cost

= $5,000 + ($30 per lawn 600 lawns)

= $5,000 + $18,000 = $23,000

What should the total wages and salaries cost be in a flexible budget for 600 lawns?a. $18,000b. $20,000.c. $23,000.d. $25,000.

Page 17: 1 Flexible Budgets and Performance Analysis Chapter 10

17

Activity Variances

Planning budget revenues

and expenses

Flexible budget revenues

and expenses

The differences between The differences between the budget amounts are the budget amounts are called activity variances.called activity variances.

Page 18: 1 Flexible Budgets and Performance Analysis Chapter 10

18

Let’s use budgeting

concepts to compute activity variances for Larry’s Lawn Service.

Activity Variances

Page 19: 1 Flexible Budgets and Performance Analysis Chapter 10

19

Activity VariancesLarry’s Flexible Budget Compared with the Planning Budget

Page 20: 1 Flexible Budgets and Performance Analysis Chapter 10

20

Activity VariancesLarry’s Flexible Budget Compared with the Planning BudgetActivity and revenue increase by 10 percent, but net operating income increases by more than 10 percent due to the presence of fixed costs.

Page 21: 1 Flexible Budgets and Performance Analysis Chapter 10

21

Revenue and Spending Variances

Flexible budget revenue Actual revenue

The difference is a revenue variance.The difference is a revenue variance.

Flexible budget cost Actual cost

The difference is a spending variance.The difference is a spending variance.

Page 22: 1 Flexible Budgets and Performance Analysis Chapter 10

22

Now, let’s use budgeting

concepts to compute revenue and spending variances for Larry’s Lawn

Service.

Revenue and Spending Variances

Page 23: 1 Flexible Budgets and Performance Analysis Chapter 10

23

Revenue and Spending VariancesLarry’s Flexible Budget Compared with the Actual Results

$1,750 favorable$1,750 favorablerevenue variancerevenue variance

Page 24: 1 Flexible Budgets and Performance Analysis Chapter 10

24

Larry’s Flexible Budget Compared with the Actual ResultsRevenue and Spending Variances

Spending variances

Page 25: 1 Flexible Budgets and Performance Analysis Chapter 10

25

Now, let’s use budgeting

concepts to combine the revenue and spending variances reports for Larry’s

Lawn Service.

A Performance Report Combining Activity and Revenue and Spending Variances

Page 26: 1 Flexible Budgets and Performance Analysis Chapter 10

26

A Performance Report Combining Activity and Revenue and Spending Variances

Page 27: 1 Flexible Budgets and Performance Analysis Chapter 10

27

A Performance Report Combining Activity and Revenue and Spending Variances

50 lawns × $75 per lawn 50 lawns × $30 per lawn

Page 28: 1 Flexible Budgets and Performance Analysis Chapter 10

28

A Performance Report Combining Activity and Revenue and Spending Variances

$43,000 actual - $41,250 budget

Page 29: 1 Flexible Budgets and Performance Analysis Chapter 10

29

Performance Reports in Non-Profit Organizations

Non-profit organizations may receive funding from sources other than the sale of goods and services,

so revenues may consist of both fixed and variable elements.

Universities

Tuition and fees

DonationsState funding

Endowments

Page 30: 1 Flexible Budgets and Performance Analysis Chapter 10

30

Performance Reports in Cost Centers

Performance reports are often prepared for cost centers. These reports should be

prepared using the same principles discussed so far, except for the fact that these reports will not contain revenue or

net operating income variances.

Page 31: 1 Flexible Budgets and Performance Analysis Chapter 10

31

More than one cost driver may be needed toadequately explain all of

the costs in an organization.

The cost formulas usedto prepare a flexible

budget can be adjustedto recognize multiple

cost drivers.

Flexible Budgets with Multiple Cost Drivers

Page 32: 1 Flexible Budgets and Performance Analysis Chapter 10

32

Because of the large unfavorable wages and salaries spendingvariance, Larry decided to add an additional cost driver for

wages and salaries. The variance is due primarily to the number of hours required for the additional edging and trimming. So

Larry estimates the additional hours and builds those hours into both his revenue and expense budget formulas.

Larry’s New Budget

Flexible Budgets with Multiple Cost Drivers

Page 33: 1 Flexible Budgets and Performance Analysis Chapter 10

33

Flexible Budgets with Multiple Cost DriversLarry’s Budget Based on More than One Cost Driver

Page 34: 1 Flexible Budgets and Performance Analysis Chapter 10

34

Some Common Errors

The most common errors in preparing performancereports are to implicitly assume that:1. All costs are fixed or that 2. All costs are variable.

Assume all costs are fixed.

Page 35: 1 Flexible Budgets and Performance Analysis Chapter 10

35

Common Error 1: Assuming All Costs Are Fixed

Faulty Analysis Comparing Budgeted Amounts to Actual Amounts

Page 36: 1 Flexible Budgets and Performance Analysis Chapter 10

36

Common Error 2: Assuming All Costs Are VariableFaulty Analysis that Assumes All budget Items Are Variable

Page 37: 1 Flexible Budgets and Performance Analysis Chapter 10

37

Assign #8 pg. 397-398 – E9-3, E9-4-1. only, E9-5 (due 11/19).Assign #9 pg. 398-399 - E9-6, E9-7, E9-8, pg. 433-435 – E10-1, E10-2, E10-3, E10-4 (due 12/3).