1 Final Estimates and Asphalt Reports

1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

Embed Size (px)

Citation preview

Page 1: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

1

Final Estimatesand

Asphalt Reports

Page 2: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

2

Setting Spread Rate For Asphalt Base

Page 3: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

3

Setting Spread Rate For Asphalt Super-pave Concrete

Page 4: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

4

Setting Spread Rate For Asphalt Concrete Friction Course

Page 5: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

5

Page 6: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

6

Page 7: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

7

Roadway Target Spread Rate

The Target for Traffic Level D, Design Mix SP 04-3807, Coarse SP-9.5 with a gmm of 2.339.

43.3 lbs./SY x 2.339 = 101.28 Lbs/SY/in. 101.28 Lbs/ in. x 1.5” = 151.92 lbs./SY or

a target of 152 lbs./SY +/- 5% Minimum = 144.4 lbs/SY Maximum = 159.6 lbs/SY

Page 8: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

8

Asphalt Road Reports

Page 9: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

9

Page 10: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

10

Target Spread Rate Set

Page 11: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

11

Page 12: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

12

Asphalt Road Report Header

Page 13: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

13

Page 14: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

14

Page 15: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

15

Page 16: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

16

Page 17: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

17

Page 18: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

18

Page 19: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

19

330-2.2 Minimum Process Control Testing Requirements

5. Monitor the mix spread rate at the beginning of each day’s production, and as needed to control the operations, at a minimum of once per 200 tons (200 metric tons) placed to ensure that the spread rate is within 5% of the target spread rate. When determining the spread rate, use an average of five truckloads of mix.

If the Contractor fails to maintain the construction process in accordance with the approved Quality Control Plan, the Engineer may elect to stop the construction operation at any time until the deficiencies are corrected.

Page 20: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

20

Page 21: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

21

Target and Actual Spread Rate

Page 22: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

22

Page 23: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

23

Paving Completed

Page 24: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

24

Pay Is Limited To 105% Of Set Spread Rate

Page 25: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

25

Page 26: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

26

Lot Density

Page 27: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

27

How the Quantities of Density and Non-Density Tons Affect

the Composite Pay Factor (CPF)

Page 28: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

28

Page 29: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

29

Page 30: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

30

Page 31: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

31

Page 32: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

32

Page 33: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

33

Page 34: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

34

Page 35: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

35

Page 36: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

36

Page 37: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

37

Page 38: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

38

Page 39: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

39

Plant Reports

Page 40: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

40

Page 41: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

41

Page 42: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

42

Lot Submittal Package

Page 43: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

43

Page 44: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

44

Page 45: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

45

Page 46: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

46

Page 47: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

47

Page 48: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

48

Page 49: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

49

Page 50: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

50

Page 51: 1 Final Estimates and Asphalt Reports. 2 Setting Spread Rate For Asphalt Base

51