17
1 FIELD DEMONSTRATION Verizon site at Albany International Airport

1 FIELD DEMONSTRATION Verizon site at Albany International Airport

Embed Size (px)

Citation preview

Page 1: 1 FIELD DEMONSTRATION Verizon site at Albany International Airport

1

FIELD DEMONSTRATION

Verizon site at Albany International Airport

Page 2: 1 FIELD DEMONSTRATION Verizon site at Albany International Airport

2

Grid ParallelPower

2000

Innovators / Early Adopters

2020

Value

Commodity

Pric

ing

RemoteStationary

Automotive

IntermittentPower

On-site H2

Generation

MARKET ENGAGEMENT

Progressive market engagement

Page 3: 1 FIELD DEMONSTRATION Verizon site at Albany International Airport

3Economical small scale hydrogen production

On-Site Hydrogen Generation

Value PropositionValue Proposition Low Cost of Ownership

• Low Maintenance• Low Operating Overhead

Reliable Ease of Use Security

ApplicationsApplications Generator Cooling Metal Fabrication

Page 4: 1 FIELD DEMONSTRATION Verizon site at Albany International Airport

4

Over 385 GenSys reformer based units sold to date

GenSys systems have run for over 2M kWhrs

Reformer availability >98%

BOPFuel

Processor PSA

Customer Header

LowPressure

Compressor

AC Power

Natural Gas

WaterCompressorW/Storage(optional)

Leverage existing technology

Page 5: 1 FIELD DEMONSTRATION Verizon site at Albany International Airport

5

Performance AttributesPerformance Attributes Purity

• Type 1 Grade B Hydrogen • >99.95% H2• -51C Dew Point

Pressure• 125 psi

Flowrate• 7 Nm3/hr

Reformer based on-site hydrogen generation

Page 6: 1 FIELD DEMONSTRATION Verizon site at Albany International Airport

6

Commercial Units to Customers

2003 2004 2005

Design Phase for Commercial Units

Design Phase for Demonstration Systems

FieldDemonstration

Program Review

DEVELOPMENT PLAN

Page 7: 1 FIELD DEMONSTRATION Verizon site at Albany International Airport

7

*$/100 scf figures include Cost of capital, Service (Matl & Labor), NG, Electric (@$0.12/kWhr), Water.GenSite capitalized over 5 years, Electrolysis capitalized over 10 years.

Feature PEM Electrolysis GenSite™

Pressure 150 psi-200 psi 120 psi

Purity 99.999% 99.95%

Life 10 years 5 years

Maintenance $30K/year $9K/year

Output 8 nm3/hr

(2.8 100scf/hr)

7 nm3/hr

(2.5 100scf/hr)

Capital Payback 3 years 3 years

Safety CE, UL, NFPA and other Cert’s necessary

CE, UL, NFPA and other Cert’s necessary

$/100 scf** $3.65 – 3.95 $2.60 - $2.80

TECHNOLOGY COMPARISON

Significant economic benefit vs.electrolysis

Page 8: 1 FIELD DEMONSTRATION Verizon site at Albany International Airport

8

OEM/Distributor channel• Field Service• Direct Sales• Product content• Collaboration

1. Technical2. Marketing

Existing Markets “Gas”

Multiple OEMs

Plug Power

Distributors

Integrated Products “Value”

GENCORE MARKET ACCESS

Partnering for success

Page 9: 1 FIELD DEMONSTRATION Verizon site at Albany International Airport

9

Grid ParallelPower

2000

Innovators / Early Adopters

2020

Value

Commodity

Pric

ing

Automotive

IntermittentPower

On-site H2

GenerationRemote

Stationary

MARKET ENGAGEMENT

Progressive market engagement

Page 10: 1 FIELD DEMONSTRATION Verizon site at Albany International Airport

10Grid independent remote prime power

Value PropositionValue Proposition Reliable Environmentally Friendly

• Quiet / Low Emissions

Efficient• Lower fuel consumption

Ease of Use• Power on Demand

ApplicationsApplications Prime power for remote facilities:

telecommunications, residential, small commercial (rest areas, agricultural and farming) applications…

LPG fueled AC/DC prime power systems

GenSys 5I

Page 11: 1 FIELD DEMONSTRATION Verizon site at Albany International Airport

11

Grid ParallelPower

2000

Innovators / Early Adopters

2020

Value

Commodity

Pric

ing

Automotive

IntermittentPower

On-site H2

GenerationRemote

Stationary

MARKET ENGAGEMENT

Progressive market engagement

Page 12: 1 FIELD DEMONSTRATION Verizon site at Albany International Airport

12

A group of grid connected decentralized fuel cell systems that are centrally controlled to meet the

peaking demand of the electric grid.

Gas

Heat PowerHot water

Load Profile

Peak Demand

Gateway

Service

Fuel Cell Operating

Net Control

Value PropositionValue Proposition Environmentally Friendly

• Efficient, Quiet & Low Emissions Ease of Use

• Power on Demand• Install, Maintenance and Operation

Reliability• Improve grid reliability

– Black start and stand-by

ApplicationsApplications Residential / small commercial

facilities in congested and load pocket areas

The Virtual Power Plant

Grid parallel prime power

Page 13: 1 FIELD DEMONSTRATION Verizon site at Albany International Airport

13

Grid ParallelPower

2000

Innovators / Early Adopters

2020

Value

Commodity

Pric

ing

Automotive

IntermittentPower

On-site H2

GenerationRemote

Stationary

MARKET ENGAGEMENT

Progressive market engagement

Page 14: 1 FIELD DEMONSTRATION Verizon site at Albany International Airport

14

Clean, Reliable, On-Site Energy A group of grid connected decentralized fuel cell

systems that produce electricity, heat and hydrogen. Supplying energy for the facility and fuel for your car.

Value PropositionValue Proposition Environmentally Friendly

• Efficient, Quiet & Low Emissions

Ease of Use• Power on Demand• Install, Maintenance and Operation

Reliability• Improve grid reliability

– Black start and stand-by

ApplicationsApplications Residential / small commercial

facilities

Home Energy System

Grid parallel prime power / hydrogen infrastructure

Page 15: 1 FIELD DEMONSTRATION Verizon site at Albany International Airport

15

Plug Power has established a clear leadership position: Consistent achievement of milestones Technology leadership World-class partners / relationships Strong and proven management team Field experience: Installed more stationary PEM fuel cell

systems than anyone in the industry

Fuel cell industry is at a point of separation: Hydrogen economy is gaining momentum “Winners” are being distinguished from “losers” Opportunity exists now Plug Power is the right company at the right time

SUMMARY

Page 16: 1 FIELD DEMONSTRATION Verizon site at Albany International Airport

16

Page 17: 1 FIELD DEMONSTRATION Verizon site at Albany International Airport

17

HEADQUARTERS 968 Albany-Shaker Road Latham, New York 12110 Phone: (518) 782-7700 Fax: (518) 782-9060

WASHINGTON, D.C. 499 South Capitol Street, SW Suite 606 Washington, D.C. 20003 Phone: (202) 484-5300 Fax: (202) 554-2896

EUROPE 7301 BC Apeldoorn P.O. Box 880 The Netherlands Phone: 31 55 53 81 000 Fax: 31 55 53 81 099

www.plugpower.com