2Federal AviationAdministrationNovember 3, 2010
Florida NextGen Test Bed Project Description
• Purpose– Provide a platform for NextGen concepts and technologies to be
demonstrated and evaluated– Provide capability for rapid integration of prototypes– Integrate technologies from flight domains to allow multi-domain
and end-to-end demonstrations & evaluations– Foster innovation & industry partnerships and allow governed
access for industry users, government, and academia
• Methodology– Leverage on existing Florida Test Facility capabilities– Coordinate with other Test Bed sites and stakeholders for
capability integration and information sharing– Expand Florida Test Bed in a phased approach
3Federal AviationAdministrationNovember 3, 2010
Test Bed Project Description
• Logically united, but physically distributed:
– Atlantic City, NJ (Tech Center)– Dallas/Fort Worth, TX (NASA NTX)– Daytona Beach, FL
• FL Test Bed FY10 Activities:– Initiate Florida planning and implementation
activities– Coordinate with Tech Center– Coordinate with NASA– Initiate coordination with our Government /
Industry partners– Support continual demonstrations
• FL Test Bed FY11 Activities:– FL Test Bed Facility upgrades– FL Segment 1 Test Bed System
implementation activities– FL Segment 2 and 3 planning activities– Support continual demonstrations
4Federal AviationAdministrationNovember 3, 2010
FTB Facility
FTB Entrance Area Aerial view of FTB Facility at DBIA
Florida Test Bed Integration Area
• Daytona Beach Int’l Airport (DBIA) Facility:– Access to local aircraft fleet and medium size
airport environment with large GA operations– Leverages ERAU Center of Excellence– Access to academic aviation researchers &
ATC experts– Strong supportive relationship among FAA,
ERAU, and airport community– Area and layout allows future NextGen Test
Bed expansion
5Federal AviationAdministrationNovember 3, 2010
FTB Phased Deployment Approach
• Segment 1 (Begin FY09/10): Rapid Integration environment for Prototypes
– Initial Test Bed Capability with limited test bed infrastructure
– Standalone initial demonstration capability using recorded data only
• Segment 2 (Begin FY10/11): Add external & live data feeds
– Basic agreements in place to receive initial external FAA data feeds
– Test Bed infrastructure ready to receive and demonstrate with external data
– Local support staff established for continual demonstration support
• Segment 3 (Begin FY11): Integrated demo with other NextGen sites
– Data integration capability with WJH Tech Center and NASA NTX
– Integration capability with Industry Supporters and Stakeholders
7Federal AviationAdministrationNovember 3, 2010
Test Bed Planned Capabilities• Microcosm of NAS with actual integrated systems
(ATOP, ERAM, TRACON, TMA, Wx, AOC, SMS, etc.)– Systems integrated to support multiple flight domains &
information sharing
• Facility & System reconfigurability to support demos– System for configuration management of varying versions of
systems to support respective demos– Recording & replay of demonstrations
• Audio/Visual capability to support demonstrations• Dedicated area for conducting demonstrations
– Mimics ATC environments– Area for observers to view demonstrations
• Separate integration area for industry to test integration
10Federal AviationAdministrationNovember 3, 2010
FTB Timeline
Program Planning
Segment 1 Technology Refresh & MaintenanceSegment 1 Planning &
Implementation
Segment 2 Planning & Implementation
Segment 3 Planning & Implementation
Initial Project Charter
FL Test Bed ConOps
Connect to WJHTC
FL Near-TermStrategy
NASA Coordination
Initiated
WJHTC Coordination
InitiatedConnect to
R&D Domain
NextGen Partners
Connections
Connect to NASA
Inter-Facility System Architecture
Conduct Integrated NextGen Test Bed Demo
FY 2009 2010 2011 2012 2015
Multi-Test Bed ConUse
. . . .
Segment 2 Technology Refresh & Maintenance
Segment 3 Technology Refresh & Maintenance
Initial Seg2 Capability
FL Governance Document
Data and Inter-facility Information Sharing
Requirements
FL Kickoff
FL Facility Location
Assessment
Multi-Year Program Plan
Initial Seg1 Capability
Initial Seg3 Capability
2013
FL Core Infrastructure Requirements
& System Architecture
11Federal AviationAdministrationNovember 3, 2010
FTB Upcoming Demo Activities
DemoActivities
FY Contract Vehicle Short Description Systems Used
Oceanic In-Flight Advisory Operational
Trial Planning
FY09/10/11
• ERAU OTA (Task H)• Industry Contribution
Plan an operational trial that makes available the Oceanic In-flight Advisory tool to AOCs via SWIM-like infrastructure
• ATOP• SATL• Oceanic In-flight Advisory tool
Aircraft Arrival Management System
(AAMS)
FY10/11 • ERAU OTA (Task J)• Industry Contribution
Collect data and determine potential benefit of using an AOC based metering tool and provide analysis in support of future NAS enhancements towards the implementation of point in space metering in the NAS
• AAMS Metering Tool• AOC Partner systems
Flight Data Objects Phase 3
FY10 • ERAU OTA (Task K)• Industry Contribution
Develop a Preliminary FDO Benefits Analysis
Initiate the Demonstration engineering analysis
Establish Demonstration scenarios data elements, procedures, stakeholders, engineering needs and scheduling.
• ATOP • ERAM • SWIM like interface• Single Thread SATL
Standard Color
Palette for Air Traffic
Displays
FY10 • ERAU OTA (Task L)• Industry Contribution
Define a set of colors to be used to uniquely code information on computer-driven Air Traffic Displays to be used in the Next Generation Air Transportation System (NextGen).
• ERAM• ATOP• CARTS• ASDE-X
NNEW & 4D
Weather Cube
FY11 • ERAU OTA (Task N)• Industry Contribution
Investigate weather integration and republication capabilities
• NNEW Weather Distribution Server / Client
12Federal AviationAdministrationNovember 3, 2010 12
Further Coordination
• Align with SWIM program office goals– Better understand anticipated SWIM architecture and program
plans– Align Test Bed system design & architecture with SWIM
program office
• Support SWIM program office activities– Test Bed available to support possible SWIM capability
demonstrations and evaluations– Existing DEX implementation at Test Bed can facilitate SWIM
information sharing activities
14Federal AviationAdministrationNovember 3, 2010
FNTB Past Demo Examples
DemoActivities
FY Contract Vehicle Short Description Systems Used
Wx Integrated into TMA/ERAM
FY08 • ERAU OTA (Task A)• Industry Contribution
Improve weather detection and prediction, pass to TMA via SWIM-like network
Evaluate SWIM-Enabled CONOPs and controller user interface concepts for ERAM based re-planning around convective weather for flights En-route to meter fix
• ERAM• CARTS• TMA• SDSS• Vendor Wx data• CWIS
International Flight Data Object
FY09 • ERAU OTA (Task D)• Industry Contribution
Lab demonstration of international flight data exchange between ATOP/ERAM and ATOP/SATL
• ATOP • ERAM • SWIM like interface• Single Thread SATL
UAS FY09/10 • ERAU OTA (Task E)• Industry Contribution
Investigate ATC and UAS Pilot interaction
Demonstrate use of 4D Flight Management Systems (FMS) as a control mechanism for precise/manageable flight trajectory.
Improve UAS pilot traffic / weather “situational awareness” with ADS-B
• ADS-B• NVS Prototype• TMA• ERAM• STARS/CARTS
Surface Exchange of Flight Data
Objects
FY09 • ERAU OTA (Task F)• Industry Contribution
Extends flight data object to include airport surface operation & demonstrate collaboration and info exchange
• ASDE-X • Surface Decision Support Tools
4-D FMS FY09/10/11
• ERAU OTA (Task G)• Industry Contribution
Characterizing the performance of advanced FMS capabilities in relation to future Air Traffic Required Time of Arrival (RTA) concepts
• TMA• GE FMS
15Federal AviationAdministrationNovember 3, 2010
FNTB Upcoming Demo Examples (cont’d)
DemoActivities
FY Contract Vehicle Short Description Systems Used
AIRE Oceanic FY08/
09/10
• FAA / Industry Contracts Reduce emissions in Oceanic airspace via increased collaboration and info exchange
• ATOP• SATL
AIRE Tailored Arrivals FY08/
09/10
• NASA / FAA Space Act Agreement• FAA / Industry Contracts
Reduce emissions in Arrivals airspace via Tailored Arrivals
• ATOP• ERAM / EDA• STARS/ CARTS• TAATS
AIRE Optimum Profile Descent
FY08/
09/10
• FAA / Industry Contracts Reduce emissions in Arrivals airspace via Optimum Profile Descent
• ATOP• ERAM / EDA• STARS/ CARTS
AIRE Surface FY08/
09/10
• FAA / Industry Contracts Reduce emissions on the ground via Surface Systems
• ASDE• SDSS