M/S. GACL IN JV WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC ORGANIC CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC, DAHEJ SUMMARY AND CONCLUSION KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 1 1 EXECUTIVE SUMMARY This executive summary provides overall justification for implementation of the project, explains how adverse effects shall be mitigated. It summarizes the findings of the EIA study and is structured in accordance with Terms of References (ToRs) issued by State Level Expert Appraisal Committee –Gujarat, in their Letter Ref: EIA-10-2016- 7531-E 2127 dated 14 th September, 2016 and TOR Amendment Letter No. /SEIAA/GUJ/EC/5(f), 4(d) & 1(d) / 475 /2017 dated 29 th April, 2017. 1.1 PROJECT DESCRIPTION Gujarat Alkalies and Chemicals Limited (GACL) was incorporated on 29 th March 1973 in the State of Gujarat by Gujarat Industrial Investment Corporation Limited (GIIC), a wholly owned company of Govt. of Gujarat, as a Core Promoter. Proposed Project falls in category including Project / Activity: “4(d), Chlor-Alkali Industry”, schedule “Manufacturing/fabrication” and Project or Activity “5(f), Synthetic Organic Chemicals Industry”, schedule “Mining, Extraction of Natural Resources and Power Generation, Project or Activity “1(d), Thermal Power Plants”, which shall be treated as Category “B”. 1.1.1 Proposed Project Gujarat Alkalies and Chemicals Ltd. (GACL) proposes setting up of New Chlor-Alkali Plant and Coal Based Captive Power Plant in JV with NALCO along with Synthetic Organic Chemical Plants at Plot No.: D II/9, GIDC Dahej, Taluka: Vagra, District: Bharuch, Gujarat. Synthetic Organic Chemical Plants shall include chemicals like Chlorotoluenes, Chlorinated Paraffin Wax, Epichlorohydrin (ECH) plant & Chloromethanes (CLM) plant. Plot area of the project consists of 76 Hectare. The project cost is estimated to be INR 3,153 Crore. Approximate 22-24 Months will be required for the project completion from the date of getting EC. Details of all the proposed products are listed in Table 1-1, Pg. 1. Table 1-1: List of Proposed Products S. No. Products Quantity (MTPD) A Chlor-Alkali Plant (800 TPD) 1 Caustic Soda (100%) Lye/ Prills / Flakes 800 2 Chlorine Gas 710 3 Hydrochloric acid 186 4 Hydrogen Gas 20 5 Sodium Hypochlorite 34 6 Dilute Sulphuric acid (78-80%) 16 B Chlorotoluenes Plant (205 TPD) 1 Benzyl chloride 100 2 Benzaldeyde 50 3 Benzyl Alcohol 55 Other Derivatives and Bi-products are listed below 4 Benzoyl chloride 5 5 Cinnamic aldehyde 5 6 Benzyl acetate 15

1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

Embed Size (px)

Citation preview

Page 1: 1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

M/S. GACL IN JV

WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC ORGANIC

CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC, DAHEJ SUMMARY AND

CONCLUSION

KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 1

1 EXECUTIVE SUMMARY

This executive summary provides overall justification for implementation of the project, explains how adverse

effects shall be mitigated. It summarizes the findings of the EIA study and is structured in accordance with Terms

of References (ToRs) issued by State Level Expert Appraisal Committee –Gujarat, in their Letter Ref: EIA-10-2016-

7531-E 2127 dated 14th September, 2016 and TOR Amendment Letter No. /SEIAA/GUJ/EC/5(f), 4(d) & 1(d) / 475

/2017 dated 29th April, 2017.

1.1 PROJECT DESCRIPTION

Gujarat Alkalies and Chemicals Limited (GACL) was incorporated on 29th March 1973 in the State of Gujarat by

Gujarat Industrial Investment Corporation Limited (GIIC), a wholly owned company of Govt. of Gujarat, as a Core

Promoter.

Proposed Project falls in category including Project / Activity: “4(d), Chlor-Alkali Industry”, schedule

“Manufacturing/fabrication” and Project or Activity “5(f), Synthetic Organic Chemicals Industry”, schedule “Mining,

Extraction of Natural Resources and Power Generation, Project or Activity “1(d), Thermal Power Plants”, which shall

be treated as Category “B”.

1.1.1 Proposed Project

Gujarat Alkalies and Chemicals Ltd. (GACL) proposes setting up of New Chlor-Alkali Plant and Coal Based Captive

Power Plant in JV with NALCO along with Synthetic Organic Chemical Plants at Plot No.: D II/9, GIDC Dahej,

Taluka: Vagra, District: Bharuch, Gujarat. Synthetic Organic Chemical Plants shall include chemicals like

Chlorotoluenes, Chlorinated Paraffin Wax, Epichlorohydrin (ECH) plant & Chloromethanes (CLM) plant.

Plot area of the project consists of 76 Hectare. The project cost is estimated to be INR 3,153 Crore. Approximate

22-24 Months will be required for the project completion from the date of getting EC. Details of all the proposed

products are listed in Table 1-1, Pg. 1.

Table 1-1: List of Proposed Products

S. No. Products Quantity (MTPD)

A Chlor-Alkali Plant (800 TPD)

1 Caustic Soda (100%) Lye/ Prills / Flakes 800

2 Chlorine Gas 710

3 Hydrochloric acid 186

4 Hydrogen Gas 20

5 Sodium Hypochlorite 34

6 Dilute Sulphuric acid (78-80%) 16

B Chlorotoluenes Plant (205 TPD)

1 Benzyl chloride 100

2 Benzaldeyde 50

3 Benzyl Alcohol 55

Other Derivatives and Bi-products are listed below

4 Benzoyl chloride 5

5 Cinnamic aldehyde 5

6 Benzyl acetate 15

Page 2: 1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

M/S. GACL IN JV

WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC ORGANIC

CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC, DAHEJ SUMMARY AND

CONCLUSION

KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 2

S. No. Products Quantity (MTPD)

7 Benzal chloride (Intermediate Product) 85

8 Sodium benzoate 4

9 Di benzyl ether 15

10 Hydrochloric acid 170

C Chlorinated Paraffin Wax Plant (100 TPD)

1 Chlorinated Paraffin Wax 100

2 Hydrochloric Acid (33%) 180

3 Sodium hypochlorite 43

D Epichlorohydrin (ECH) Plant (84 TPD)

1 Epichlorohydrin (ECH) 84

E Chloromethanes (CLM) Plant (300 TPD)

1 Chloromethanes (CLM) 300

F Hydrochloric Acid (31%) 74

1 Coal Based Captive Power Plant (130 MW) 130 MW

1.1.2 Process

Caustic Chlorine Plant

Membrane cell based chlor alkali process will involve processing of brine electrolysis to produce caustic soda,

chlorine, and hydrogen. During manufacturing of process of caustic soda, Hydrogen and Chlorine gas as co

products are generated. HCl, hypochlorite, dilute H2SO4 are by products. The technology will be provided from M/s.

ThyssenKrupp Industrial Solutions, Germany.

Chlorotoluenes

Chlorination of toluene in presence of ultra violet lights will produce chlorinated mass of BCL, OPCT, BCL2 and BTC.

Hydrolysis of mixture of BCL2 fraction containing BCL2 and BTC separated from chlorinated mass with 10 % dilute

solution of ferrous chloride in agitated hydrolyser at an elevated temperature and atmospheric pressure will

produce hydrolyzed mass of BCHO and BCOOH mixture and HCl vapours as a by-product. Neutralization of BCOOH

with soda ash solution will produce NaB solution. Hydrolysis of BCL with fresh process water will produce

hydrolyzed mass of BOH and vapours of hydrogen chloride as a by-product. Separate heavy phase organic layer

from gravity separator fed to water and BCL fraction removal column. At elevated temperature and an under

vacuum recovered distillate BCL fraction recycle back to hydrolyser to produce BCO. Residue generated in the

process of burned in Incinerator. Technology will be supplied from M/s. LeLe Associate and Consultants, Mumbai.

Chlorinated Paraffin Wax

Normal/ Heavy Normal Paraffin (HNP), being straight- chain saturated hydrocarbons (alkanes) react with Chlorine

readily, replacing Hydrogen atoms to produce Chlorinated Paraffin & Hydrochloric Acid.

Epichlorohydrin Plant

Chlorination of Glycerine in presence of HCl gas will produce Epichlorohydrin. Technology will be provided from M/s.

KVIT, Austria.

Chloromethanes

Thermal and Hydro Chlorination of Methane gas and Methanol will produce Chloromethanes. Technology will be

provided from M/s. Shin – Etsu, Japan.

Page 3: 1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

M/S. GACL IN JV

WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC ORGANIC

CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC, DAHEJ SUMMARY AND

CONCLUSION

KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 3

Coal based Captive Power Plant

To carter the power requirement of the various plants, coal based captive power plant will be installed in which the

steam is produced in high pressure in the steam boiler due to burning of fuel (Imported Coal from Indonesia /

South Africa blended with Indigenous washed coal) in boiler furnaces. Super-heated steam enters into the turbine

and rotates the turbine blades. The turbine is mechanically coupled with alternator that its rotor will rotate with

rotation of turbine blades hence shall generate power.

1.1.3 Utilities

Power: Power requirement of 130 MW will be met from proposed CPP having backup source of DGVCL. Three DG

Sets of 1,000 kVA for Caustic Soda plant & 1 No. DG set of 225 kVA for Chlorinated paraffin wax plant will be

provided & used in case of main power failure.

Fuel: 1,760 MT/Day Imported Indonesian/ South African Coal having 0.55 % sulphur and 15.0 % ash content will

be used for the proposed CFBC Boilers and 800 Ltr/Hr. HSD/LDO will be used for DG Sets. In principle approval for

procurement of coal is obtained from Adani.

Water: 15.34 MLD of water requirement will be met from GIDC Reservoir. Assurance Letter from GIDC for Water

Supply upto 20.82 MLD to GACL is availed.

Manpower: During the construction phase around 500 workers will be hired. During operation phase, project will

generate direct employment for more than 750 people along with indirect employment for approx. 500 locals. They

may be hired locally. First preference shall be given to skilled, semi-skilled work force of local community, i.e. for

people of Bharuch District.

1.1.4 Air Emissions & Control

Point Source Emissions, i.e. PM, SO2 & NOx from boiler stacks shall be controlled by multistage ESP with one

filed extra. Process gas emissions of NOx, CO, HCl, C2H4Cl2, Cl2, SO2, TOC, Dioxin from various process vent and

incinerator shall be controlled by providing caustic/alkali scrubber, DM water scrubber & water scrubbers;

Area source as SPM emissions from coal stock piles is envisaged. It shall be controlled by providing

curtains/water sprinkling as and when required;

Line Source Emissions (CO, HC, PM, NOx) from 325 trucks, 5 staff buses, 50 cars, 100 two wheelers & 100

cycles is anticipated;

Fugitive emissions from storage & handling area for raw materials, solvents, finished products is envisaged due

to proposed project. Odor of raw materials & finished goods shall be limited to plant area.

1.1.5 Noise Generation Sources

Noise generation sources are the heavy machinery like crane, dumper, roller, bulldozers, boiler, compressors,

chillers, DG sets, etc. & during vehicular movement for transportation of raw material and finished goods.

1.1.6 Waste Water Generation & Disposal

Wastewater will be generated from the proposed unit from various areas such as Process, Cooling Tower, Boiler,

Domestic use, Washings, Safety Showers & from other Utility Blow downs etc. The generated effluent will be

treated in ETP 1 & ETP 2. Treated effluent from ETP 2 will be fully reused in the process. Treated effluent from ETP

1 after meeting the GPCB Norms will be discharged into GIDC effluent collection system for final disposal in the sea.

Sewage generated will be treated in STP and treated water will be reused in gardening.

No effluent from Chlor – Alkali & Power Plant will be discharged into GIDC effluent collection system. It will be fully

utilized within the plant premises. Separate waste water stream and storm water line will be provided.

Page 4: 1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

M/S. GACL IN JV

WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC ORGANIC

CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC, DAHEJ SUMMARY AND

CONCLUSION

KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 4

1.1.7 Hazardous & Other Solid Waste

The following solid / hazardous wastes will be generated during operations:

Hazardous Waste: High M.P Liquid Impurities, Used/spent oil, Discarded drums and containers, Oil

Contaminated cotton rags or other cleaning materials, ETP waste, Incineration Ash, Waste residue from

industrial use of paint, Lead washers etc. as Lead scrap, Nickel Scrap, Copper tubing, caps and cables etc. – As

Copper scrap, Spent Carbon and Discarded bags / liner / packing material, Discarded PPEs, gaskets;

Non Hazardous Waste: Brine Sludge & Fly Ash;

Domestic Solid Waste: Paper and Food waste;

Small amounts of Municipal Solid Waste, Biomedical Wastes, e-waste and Construction and Demolition Wastes.

These will be managed as per the applicable Rules, mainly, Hazardous Waste (Management, Handling, Storage and

Transboundary) Rules 2016, as amended till date.

1.2 DESCRIPTION OF THE ENVIRONMENT

1.2.1 Study Period, Study Area, Monitoring & Sampling Locations

Baseline environmental study was carried out for Post Monsoon Season from 20th October, 2016 to 31st December,

2016 within 10 Km radius of the project site.

Air monitoring was carried out at 10 locations. Noise measurement was carried out at 8 locations. Surface water

samples from 8 locations (6 samples from ponds & 2 sample from estuary), ground water samples from 8 locations

(6 Borewells, 1 open well & 1 hand pump) and soil samples from 8 locations (1 from project site & 7 samples from

villages) were collected and analysed.

1.2.2 Land Use and Land Cover Distribution

Land use of study area is classified as Agricultural land (~ 32.2%), Vegetation cover (~ 28.1%), Water bodies (~

19.6%), Waste land (~ 15.2%), Buildup Land & Habitation (~ 4.0%) & others (~ 0.2%).

1.2.3 Meteorology

Based on the long-term climatological tables (1981 – 2010) by Indian Meteorological Department (IMD), for Surat

(Station ID: 42840), during post monsoon, mean daily maximum and minimum temperatures ranges from 16.5 oC –

35.1oC, in morning & evening relative humidity ranges 65 – 73 % and 43 – 52% respectively, average wind speed

was 0.72 m/sec., predominant wind direction was from NE to SW direction (16.5%).

Site specific meteorological data was collected at roof top of SEZ office, which is ~ 8.30 Km in W direction from

project site. Minimum and maximum temperature were recorded as 15.0°C & 36.0°C respectively. Mean hourly

relative humidity was 31%. Average wind speed & Predominant wind direction were 2.7 m/sec & from NE to SW

(26.8 %) respectively. Calm wind contributed to about 3.14%.

1.2.4 Ambient Air Quality

It is noted from Table 1-2 that PM10 results exceeds the permissible limits of 100 µg/m3 at Jolwa village due to:

Vehicular movement on the “kaccha” roads of the villages;

Industrial & infrastructure development activities in study area (PCPIR & residential projects);

Rural activities like burning of cow dung for household purposes like using it in “chullas”.

1.2.5 Traffic Survey

Traffic Survey was carried out on SH – 6 in S direction of the proposed site, road connecting site to Dahej &

Bharuch on 12th April, 2017. The road width of this road is 15 meters, which is a 3 Lane (One Way) Arterial Road.

Page 5: 1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

M/S. GACL IN JV

WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC ORGANIC

CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC, DAHEJ SUMMARY AND

CONCLUSION

KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 5

Average peak hourly (i.e. morning 0800 hours to 1200 hours and evening 1600 hours to 2000 hours) traffic on this

route i.e. from Dahej to Bharuch and from Bharuch to Dahej is 1,634 and 1,522 PCU respectively.

Page 6: 1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

M/S. GACL IN JV WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC ORGANIC CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC,

DAHEJ SUMMARY AND CONCLUSION

KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 6

Table 1-2: Ambient Air Quality Data

Station

code

All stations are in

Industrial, Residential,

Rural & Other Areas

(CPCB)

Name of Pollutant, Time for sample collection & Average Pollutant Concentration

Note: All units are in µg/m3. Figures in brackets indicate CPCB limits. Minimum Reportable Readings are 8 µg/m3 for SO2, 10

µg/m3 for NOX & NH3 , 1.0 µg/m3 for Cl2, HCl & 800 µg/m3 for HC and 1,142 µg/m3 for CO.

PM10 PM2.5 SO2 NOx NH3 HCl Cl2 HC CO

24 Hr. 24 Hr. 24 Hr. 24 Hr. 24 Hr. 24 Hr. 24 Hr. Grab Grab

[100] [60] [80] [80] [400] NS NS NS [2,000]

AA1 At Project Site

Maximum 84 32 9.8 20.3 <10.0 <1.0 <1.0 1,588 <1,142

Minimum 55 20 <8.0 <10.0 <10.0 <1.0 <1.0 1,184 <1,142

Average 72 26 <8.0 13.6 <10.0 <1.0 <1.0 1,308 <1,142

98%tile 84 32 9.3 19.7 <10.0 <1.0 <1.0 1,568 <1,142

AA2 Atali

Maximum 97 36 10.3 21.2 <10.0 <1.0 <1.0 ` <1,142

Minimum 55 17 <8.0 10 <10.0 <1.0 <1.0 1,183 <1,142

Average 75 27 <8.0 15.7 <10.0 <1.0 <1.0 1,316 <1,142

98%tile 94 35 10.3 21 <10.0 <1.0 <1.0 1,512 <1,142

AA3 Galenda

Maximum 82 31 9.5 16.6 <10.0 <1.0 <1.0 1,252 <1,142

Minimum 52 16 <8.0 <10.0 <10.0 <1.0 <1.0 988 <1,142

Average 68 24 <8.0 13 <10.0 <1.0 <1.0 1,144 <1,142

98%tile 80 31 9.2 16.4 <10.0 <1.0 <1.0 1,245 <1,142

AA4 Jolwa

Maximum 133 61 13.2 25.7 <10.0 <1.0 <1.0 1,561 <1,142

Minimum 78 28 5.9 11.8 <10.0 <1.0 <1.0 1,252 <1,142

Average 94 40 9.8 19.4 <10.0 <1.0 <1.0 1,370 <1,142

98%tile 129 59 13.1 25.4 <10.0 <1.0 <1.0 1,545 <1,142

AA5 Rahiyad

Page 7: 1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

M/S. GACL IN JV WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC ORGANIC CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC,

DAHEJ SUMMARY AND CONCLUSION

KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 7

Station

code

All stations are in

Industrial, Residential,

Rural & Other Areas

(CPCB)

Name of Pollutant, Time for sample collection & Average Pollutant Concentration

Note: All units are in µg/m3. Figures in brackets indicate CPCB limits. Minimum Reportable Readings are 8 µg/m3 for SO2, 10

µg/m3 for NOX & NH3 , 1.0 µg/m3 for Cl2, HCl & 800 µg/m3 for HC and 1,142 µg/m3 for CO.

PM10 PM2.5 SO2 NOx NH3 HCl Cl2 HC CO

24 Hr. 24 Hr. 24 Hr. 24 Hr. 24 Hr. 24 Hr. 24 Hr. Grab Grab

[100] [60] [80] [80] [400] NS NS NS [2,000]

Maximum 95 56 14.1 26.5 <10.0 <1.0 <1.0 1,292 <1,142

Minimum 56 18 <8.0 12.9 <10.0 <1.0 <1.0 1,087 <1,142

Average 76 32 9.5 18.9 <10.0 <1.0 <1.0 1,152 <1,142

98%tile 93 51 13.7 26.1 <10.0 <1.0 <1.0 1,274 <1,142

AA6 Koliyad

Maximum 73 31 10.7 17.9 <10.0 <1.0 <1.0 1,215 <1,142

Minimum 45 14 <8.0 <10.0 <10.0 <1.0 <1.0 988 <1,142

Average 58 21 <8.0 13.6 <10.0 <1.0 <1.0 1,058 <1,142

98%tile 71 30 10.5 17.4 <10.0 <1.0 <1.0 1,203 <1,142

AA7 Kaladara

Maximum 78 31 9.9 17.6 <10.0 <1.0 <1.0 1,135 <1,142

Minimum 53 18 <8.0 10.9 <10.0 <1.0 <1.0 995 <1,142

Average 66 23 <8.0 13.7 <10.0 <1.0 <1.0 1,055 <1,142

98%tile 78 30 9.8 17.4 <10.0 <1.0 <1.0 1,130 <1,142

AA8 Suva

Maximum 88 43 12.8 26.9 <10.0 <1.0 <1.0 1,210 <1,142

Minimum 58 20 <8.0 11 <10.0 <1.0 <1.0 1,050 <1,142

Average 73 29 8 15.7 <10.0 <1.0 <1.0 1,114 <1,142

98%tile 86 42 12.3 25.4 <10.0 <1.0 <1.0 1,202 <1,142

AA9 Akhod

Maximum 67 25 7.8 15.9 <10.0 <1.0 <1.0 1,063 <1,142

Minimum 47 15 <8.0 <10.0 <10.0 <1.0 <1.0 982 <1,142

Page 8: 1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

M/S. GACL IN JV WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC ORGANIC CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC,

DAHEJ SUMMARY AND CONCLUSION

KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 8

Station

code

All stations are in

Industrial, Residential,

Rural & Other Areas

(CPCB)

Name of Pollutant, Time for sample collection & Average Pollutant Concentration

Note: All units are in µg/m3. Figures in brackets indicate CPCB limits. Minimum Reportable Readings are 8 µg/m3 for SO2, 10

µg/m3 for NOX & NH3 , 1.0 µg/m3 for Cl2, HCl & 800 µg/m3 for HC and 1,142 µg/m3 for CO.

PM10 PM2.5 SO2 NOx NH3 HCl Cl2 HC CO

24 Hr. 24 Hr. 24 Hr. 24 Hr. 24 Hr. 24 Hr. 24 Hr. Grab Grab

[100] [60] [80] [80] [400] NS NS NS [2,000]

Average 60 20 <8.0 12.8 <10.0 <1.0 <1.0 1,007 <1,142

98%tile 67 25 7.6 15.8 <10.0 <1.0 <1.0 1,061 <1,142

AA10 Nr. Kaladara

Maximum 78 26 8.6 15.9 <10.0 <1.0 <1.0 1,147 <1,142

Minimum 51 16 <8.0 <10.0 <10.0 <1.0 <1.0 988 <1,142

Average 61 20 <8.0 11.7 <10.0 <1.0 <1.0 1,043 <1,142

98%tile 75 26 7.9 15.8 <10.0 <1.0 <1.0 1,139 <1,142

Page 9: 1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

M/S. GACL IN JV

WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC ORGANIC

CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC, DAHEJ SUMMARY AND

CONCLUSION

KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 9

1.2.6 Noise Levels

Based on the noise monitoring results as mentioned in Table 1-3 , it is observed that noise level during day &

night time, in Residential area, were slightly higher which is due to vehicular movements in nearby highways.

Table 1-3: Noise Level Monitoring Results

Location

Code Location Date Category

CPCB Limits in

dB (A)

Average Noise levels

in dB (A)

Day

Time

Night

Time

Day

Time

Night

Time

NL1 At Project boundary(NE) 22.11.16 Industrial 75.0 70.0 58.9 54.5

NL2 At Project Boundary (NW) 23.11.16 Industrial 75.0 70.0 61.2 57.2

NL3 At project Site 25.11.16 Industrial 75.0 70.0 57.5 52.3

NL4 At Project boundary (SW) 24.11.16 Industrial 75.0 70.0 56.8 51.8

NL5 Atali Village 25.11.16 Residential 55.0 45.0 55.1 45.5

NL6 Nr Jolwa Village 21.11.16 Residential 55.0 45.0 55.5 45.9

NL7 Rahiyad Village 26.11.16 Residential 55.0 45.0 55.7 45.1

NL8 Koliyad Village 28.11.16 Residential 55.0 45.0 55.2 44.8

1.2.7 Water Quality

Quality of Surface water (Pond)

It is observed from Table 1-4:

Atali Pond (SW 4) is worst polluted source where total 8 parameters are more than acceptable limits, whereas

Koliyad Pond (SW 3) pond is the least polluted sources.

Parameters such as TDS, Chloride, Sulphates, alkalinity, fluoride, total nitrogen and coliforms are above

acceptable limits in major pond sources, thus requiring necessary treatment if utilized for drinking purposes.

As per classification of inland surface water standards, analysis results for all surface water of all ponds could

be considered under Class “C” except for BOD values which range from 7 mg/l to 22 mg/l. This is due to

anthropogenic sources such as washing, bathing etc.

Quality of Surface water (Estuary)

It is observed from Table 1-5:

The Quality of Narmada estuary (upstream and downstream) is nearly matching with class SW-I as per causal

water marine standards.

Quality of Ground Water

It is observed from Table 1-6:

The presence of high TDS and Chlorides is imparted by saline geological formation.

The geological formation is having low storability since it is made up of fine sand and silt thus groundwater

supply will always be limited.

1.2.8 Soil Quality

It is observed from Table 1-7 that at different locations:

The porosity ranged from 55% (Koliyad village) to 61% (Jolwa village) and WHC varied from 67% (Rahiyad

village) to 77 % (Jolwa & Atali village);

Page 10: 1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

M/S. GACL IN JV

WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC ORGANIC

CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC, DAHEJ SUMMARY AND

CONCLUSION

KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 10

The soil permeability was low to medium which ranged from 0.37 mm/hr (Jolwa village) to 12.5 mm/hr

(Kolliyad village), however soil texture in all the soil samples was clay loam, hence whatever variation observed

was mainly due to variation in organic matter content of soils;

The EC of soil ranged from 178 dS/m (Koliyad village) to 506 dS/m (Suva village), while ESP varied from 0.19

(Koliyad village) to 1.78 (Suva village);

These soils are neither saline nor sodic as ESP is < 5.0;

The pH of soil ranged from 7.86 (Koliyad village) to 8.26 (Jolwa village), which indicates that soils are neutral

to slightly alkaline.

The overall soil quality indicates that soils are normal as the area is located in GIDC and not under cultivation since

long and whatever salts were there are washed off or leached down due to rain water over the years.

Page 11: 1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

M/S. GACL IN JV WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC ORGANIC CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC,

DAHEJ SUMMARY AND CONCLUSION

KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 11

Table 1-4: Surface Water (Ponds) Analysis Results

S.

No. Parameters Units

IS 10500 Standard Limits for drinking

water Samples

Requirement

(Acceptable

Limit)

Permissible limit in

the absence of

alternate source

SW1

(Jolwa)

SW2

(Suva)

SW3

(Koliyad)

SW4

(Atali)

SW5

(Galenda)

SW6

(Akhod)

Source Pond Pond Pond Pond Pond Pond

Date of sampling 22.11.16 22.11.16 22.11.16 22.11.16 22.11.16 22.11.16

1 pH pH scale 6.5-8.5 No Relaxation 8.4 7.95 7.99 8.17 7.70 7.83

2 Temperature o C NS NS 29 29 29 29 27 23

3 Turbidity NTU 1 5 3.6 2.5 2 2.1 7.4 2.3

4 TDS mg/lit 500 2,000 1,875 1,342 560 2,900 672 840

5 Electrical conductivity µmhos/cm NS NS 3,200 2,400 1,177 1,510 960 1,268

6 COD mg/lit NS NS 56 60 32 69 24 57

7 BOD mg/lit NS NS 17 18 10 22 7.0 17

8 Phenol mg/lit 0.001 0.002 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001

9 Chlorides mg/lit 250 1,000 839 574 256 593 226 327

10 Sulphates mg/lit 200 400 303 209 48 375 111 153

11 Total Hardness mg/lit 200 600 120 200 90 120 500 370

12 Ca++ Hardness mg/lit NS NS 32 132 80 90 240 320

13 Mg++ Hardness mg/lit NS NS 88 68 10 30 260 50

14 Total Alkalinity mg/lit 200 600 320 230 240 280 180 200

15 Nitrate mg/lit 45 NR 30.18 31.62 30.43 8.50 35.76 46.29

16 Fluoride mg/lit 1 1.5 0.53 0.05 0.80 1.17 0.84 0.93

17 Sodium mg/lit NS NS 386.6 238.4 113.6 228.5 101.9 101.2

18 Potassium mg/lit NS NS 31.1 29.8 34.2 40.3 32.9 18.5

19 Calcium mg/lit 75 200 12.8 52.9 32.1 36.1 96.1 128.2

20 Magnesium mg/lit 30 100 21.4 16.5 2.4 7.3 63.1 12.1

21 Salinity mg/lit NS NS 1,512 1,034 460 1,069 226 573

22 Total Nitrogen mg/lit 0.5 NR 6.16 9.00 7.30 3.40 9.24 11.2

Page 12: 1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

M/S. GACL IN JV WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC ORGANIC CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC,

DAHEJ SUMMARY AND CONCLUSION

KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 12

S.

No. Parameters Units

IS 10500 Standard Limits for drinking

water Samples

Requirement

(Acceptable

Limit)

Permissible limit in

the absence of

alternate source

SW1

(Jolwa)

SW2

(Suva)

SW3

(Koliyad)

SW4

(Atali)

SW5

(Galenda)

SW6

(Akhod)

Source Pond Pond Pond Pond Pond Pond

Date of sampling 22.11.16 22.11.16 22.11.16 22.11.16 22.11.16 22.11.16

23 Total Phosphorous mg/lit NS NS <1 <1 <1 <1 <1 <1

24 Dissolved Oxygen mg/lit NS NS 4 4.2 4.1 4.3 4.3 3.9

25 Ammonical Nitrogen mg/lit NS NS <0.01 1.84 0.94 1.63 0.17 0.15

26 SAR - NS NS 15.30 7.30 5.20 9.00 1.97 2.28

27 Heavy Metals

a Arsenic (as As) mg/l 0.01 0.05 <0.01 <0.01 <0.01 <0.01 <0.001 <0.001

b Cadmium (as Cd) mg/l 0.003 NR <0.003 <0.003 <0.003 <0.003 <0.003 <0.003

c Chromium (as Cr) mg/l 0.05 NR <0.02 <0.02 <0.02 <0.02 <0.02 <0.02

d Copper (as Cu) mg/l 0.05 1.5 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03

e Cyanide (as CN) mg/l 0.05 NR <0.003 <0.003 <0.003 <0.003 <0.003 <0.003

f Iron (as Fe) mg/l 0.3 NR <0.05 <0.05 <0.05 <0.05 2.179 4.467

g Lead (as Pb) mg/l 0.01 NR <0.01 <0.01 <0.01 <0.01 <0.01 <0.01

h Mercury (as Hg) mg/l 0.001 NR <0.001 <0.001 <0.001 <0.001 <0.001 <0.001

i Manganese (as Mn) mg/l 0.1 0.3 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02

j Nickel (as Ni) mg/l 0.02 NR <0.02 <0.02 <0.02 <0.02 <0.004 <0.004

k Zinc (as Zn) mg/l 5 15 0.03 0.057 <0.03 <0.03 0.040 0.020

28 Total Coliform MPN/100 ml Shall not be detectable

Shall not be detectable

4,300 3,500 2,200 5,400 2,100 5,200

29 Faecal Coliform MPN/100 ml Shall not be detectable

Shall not be detectable

1,400 1,300 940 1,700 1,600 1,350

* - Drinking Water Stander IS-10500, 2012

Note: NS – Not Specified; NR – No Relaxation

Page 13: 1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

M/S. GACL IN JV WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC ORGANIC CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC,

DAHEJ SUMMARY AND CONCLUSION

KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 13

Table 1-5: Analysis Result of Estuary Water Sample

S.

No. Parameters Unit

Water Quality Standards for Coastal Waters Marine Outfalls

Nr. Koliyad Nr. Suva

SW7 SW8

Narmada

Estuary (U/s)

Narmada

Estuary (D/s)

SW-I SW-II SW-III SW-IV SW-V 22.11.16 22.11.16

1 pH - 6.5 to 8.5 6.5 to 8.5 6.5 to 8.5 6.0 to 9.0 6.0 to 9.0 7.31 7.34

2 Total Dissolved Oxygen mg/l 5.0 4.0 3.0 3.0 3.0 4.5 4.0

3 Colour and Odour - No Colour No Odour

No Colour No Odour

No Colour No Odour

No Colour No Odour

No Colour No Odour

No Colour No Odour

No Colour No Odour

4 Floating Matters mg/l None None None 10 NS None None

5 Suspended Solids mg/l

None from Sewage or

Industrial waste Origin

NS NS NS NS 40 61

6 Turbidity NTU NS 30 30 NS NS 1.1 1.3

7 BOD mg/l NS 3 NS 5 NS 5 7

8 Oil and Grease

(including Petroleum Products)

mg/l 0.1 NS NS NS NS <0.4 <0.4

9 Mercury (as Hg) mg/l 0.001 NS NS NS NS <0.001 <0.001

10 Lead (as Pb) mg/l 0.001 NS NS NS NS <0.01 <0.01

11 Cadmium (as Cd) mg/l 0.01 NS NS NS NS <0.001 <0.001

12 Dissolved Iron (as Fe) mg/l NS NS 0.5 NS NS <0.05 <0.05

13 Dissolved Manganese ( as

Mn) mg/l NS NS 0.5 NS NS <0.04 <0.04

14 Faecal Coliform ml (MPN) NS 100/100 500/100 500/100 500/100 <1.8 <1.8

15 Sludge Deposits, Solid refuse

floating Solids, Oil Grease and Scum

NS NS NS NS NS None except for treated Sewage and Industrial

waste Effluent None None

Note: NS – Not Specified

Page 14: 1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

M/S. GACL IN JV WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC ORGANIC CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC,

DAHEJ SUMMARY AND CONCLUSION

KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 14

Table 1-6: Analysis Results of Groundwater Samples

S.

No. Parameters Unit

IS 10500:2012 Standard

Limits for drinking water (2nd

Revision) Acceptable limit

Sampling Code & Location

GW1 GW2 GW3 GW4 GW 5 GW 6 GW 7 GW 8

Bore well Bore well Bore well Hand

Pump

Bore

well

Bore

well

Bore

well

Bore

well

Rahiyad Suva Jolwa Atali Koliyad Vegni Akhod Galenda

1 pH pH scale 6.5-8.5 7.8 8.01 7.78 8.28 8.12 8.11 8.13 7.93

2 Temperature o C NS 29 29 29 29 29 21.7 23.3 21.8

3 Turbidity NTU 1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1

4 TDS mg/lit 500 1,142 3,929 6,852 1,693 570 4,552 488 1,456

5 Electrical conductivity µmhos/cm NS 2,300 6,900 11,000 3,100 1,200 6,502 697 2,080

6 COD mg/lit NS <4 <4 <4 <4 <4 <4 <4 <4

7 BOD mg/lit NS <1 <1 <1 <1 <1 <1 <1 <1

8 Phenol mg/lit 0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001

9 Chlorides mg/lit 250 434 1,822 3,053 781 246 1,336 171 438

10 Sulphates mg/lit 200 241 549 1,175 191 57 478 105 105

11 Total Hardness mg/lit 200 240 200 360 190 140 3,800 250 1,120

12 Ca++ Hardness mg/lit NS 126 80 160 76 78 1,040 66 408

13 Mg++ Hardness mg/lit NS 114 120 200 114 62 2,760 184 712

14 Total Alkalinity mg/lit 200 200 240 200 300 260 260 260 220

15 Nitrate mg/lit 45 14.2 58.23 8.67 15.22 22.78 80.92 <0.08 81.3

16 Fluoride mg/lit 1 0.03 1.42 0.83 1.29 0.05 0.18 1.55 0.09

17 Sodium mg/lit NS 214 922 1,264 312.3 76.4 16.9 39.7 23.8

18 Potassium mg/lit NS 25.9 88.3 101.3 41.6 36.5 6.9 12.9 18

19 Calcium mg/lit 75 51 32 64 30 31 41 26 25

20 Magnesium mg/lit 30 28 29 49 28 15 67 44 17

21 Salinity mg/lit NS 782 3,284 5,502 1,407 443 4,208 307 789

22 Total Nitrogen mg/lit 0.5 3.36 12.88 1.87 3.29 5.09 19.6 <0.001 19.04

Page 15: 1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

M/S. GACL IN JV WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC ORGANIC CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC,

DAHEJ SUMMARY AND CONCLUSION

KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 15

S.

No. Parameters Unit

IS 10500:2012 Standard

Limits for drinking water (2nd

Revision) Acceptable limit

Sampling Code & Location

GW1 GW2 GW3 GW4 GW 5 GW 6 GW 7 GW 8

Bore well Bore well Bore well Hand

Pump

Bore

well

Bore

well

Bore

well

Bore

well

Rahiyad Suva Jolwa Atali Koliyad Vegni Akhod Galenda

23 Total Phosphorous mg/lit NS <1 <1 <1 <1 <1 0.06 0.06 0.06

24 Dissolved Oxygen mg/lit NS 3.3 3.4 3.5 3.2 3.3 3.3 2.9 3.1

25 Ammonical Nitrogen mg/lit NS <0.01 <0.01 <0.01 <0.01 <0.01 0.8 <0.01 0.17

26 SAR - NS 6 28.2 28.85 9.81 2.8 0.12 3.6 0.31

27 Heavy Metals

a Arsenic (as As) mg/l 0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.001 <0.001 <0.001

b Cadmium (as Cd) mg/l 0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003

c Chromium (as Cr) mg/l 0.05 <0.02 <0.02 <0.02 <0.02 <0.02 <0.002 <0.002 <0.002

d Copper (as Cu) mg/l 0.05 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 0.03

e Cyanide (as CN) mg/l 0.05 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003 <0.003

f Iron (as Fe) mg/l 0.3 <0.05 <0.05 <0.05 <0.05 <0.05 0.307 <0.01 0.901

g Lead (as Pb) mg/l 0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.04 <0.04 <0.04

h Mercury (as Hg) mg/l 0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001

i Manganese (as Mn) mg/l 0.1 <0.02 <0.02 <0.02 <0.02 <0.02 <0.01 <0.01 <0.01

j Nickel (as Ni) mg/l 0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.004 <0.004 <0.004

k Zinc (as Zn) mg/l 5 0.03 <0.03 0.041 0.034 <0.03 0.11 0.06 0.02

28 Total Coliform MPN/100ml Shall not be detectable in any 100

ml sample Absent Absent Absent Absent Absent <1.8 <1.8 <1.8

29 Faecal Coliforms MPN/100ml Shall not be detectable in any 100

ml sample Absent Absent Absent Absent Absent <1.8 <1.8 <1.8

Note: NS – Not Specified

Page 16: 1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

M/S. GACL IN JV WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC ORGANIC CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC,

DAHEJ SUMMARY AND CONCLUSION

KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 16

Table 1-7: Soil Analysis Results

S. No Parameter Unit

Sampling Location

ST1 ST2 ST3 ST4 ST5 ST6 ST7 ST8

At Site Rahiyad Suva Jolwa Atali Koliyad Vegni Akhod

1 Porosity % 59 56 58 61 57 55 58 57

2 Water Holding Capacity % 70 67 75 77 77 72 65 71

3 Permeability mm/hr 5.88 7.58 6.43 0.37 6.8 12.5 6.62 7.24

4 Particle Size Distribution -

a Sand % 23 10 10 12 10 26 24 17.12

b Silt % 36 63 53 32 56 49 20 52

c Clay % 42 26 36 45 34 26 38 30

5 Texture - Clay Loam Silty Clay Loam Silty Clay Loam Clay Silty Clay Loam Loam clay loam silty clay loam

6 Cation Exchange Capacity meq/100gm 40 38.5 35 34.5 33 30.5 32.5 31

7 Electrical Conductivity dS/m 442 333 506 334 258 178 223 448

8 Sodium Absorption Ratio 1.67 1.11 1.78 1.53 1 0.98 0.74 0.73

9 Exchangeable Sodium % 1.18 0.38 1.34 0.98 0.21 0.19 1.28 0.87

10 pH 8.08 8.21 8.12 8.26 8.15 7.86 8.39 8.12

11 Calcium gm/kg 0.32 0.21 0.16 0.48 0.24 0.22 0.35 0.33

12 Magnesium gm/kg 0.24 0.21 0.29 0.05 0.24 0.16 1.24 0.27

13 Sodium gm/kg 0.73 0.43 0.73 0.59 0.41 0.35 0.59 0.36

14 Potassium gm/kg 0.17 0.18 0.29 0.3 0.16 0.09 0.19 0.15

Page 17: 1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

M/S. GACL IN JV

WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC

ORGANIC CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC, DAHEJ EXECUTIVE SUMMARY

KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 17

1.2.9 Ecology & Biodiversity

There is no Wildlife Sanctuary, National Park, Reserve Forest or Sanctuary, Biosphere Reserve, Tiger / Elephant

Reserve, Migratory Corridors, breeding sites, nesting sites / grounds, foraging and resting grounds in the

project study area of 10 km radius.

Project Site / Core Zone

The core zone area is dominated by Prosopis juliflora. There is no tree species at site. Overall 11 species of

common flora were recorded from the core zone. Only 3 common species of birds were reported from the

project site. While, No direct or indirect evidences of mammals were reported from the core zone.

Study Area / Buffer Zone

Overall 104 species of flora were recorded from the buffer zone of the study area. On the behalf of the

qualitative analysis, the maximum species were trees (40) followed by herbs (27), shrubs (26), and grasses (5)

and climbers (6).

Overall 54 species of fauna were reported from the buffer zone of the proposed project. Canis aureus (Jackal)

was observed and rescued from the industrial drain of GIDC, Dahej, Phase II with the help of Forest department

during site visit. On the behalf of the qualitative analysis, the maximum species were Birds (39) followed by

Mammals (9) and herpetofauna (6).

Marine Biodiversity

Marine biodiversity study shows that, buffer zone supports phytoplankton, zooplanktons, benthos, fishes and

other marine fauna. Bombay duck (Harpadon nehereus) constitutes the dominant fishery (13%) of the region

of the total marine catch. The coastal water also serves as the migratory route for the clupeid Hilsa (Tenualosa

ilisha) on their way to the Narmada River for breeding and the outward route for the newly hatched juveniles

and some of the adults. This makes Hilsa fishery an important activity inside the Gulf and the estuarine region

of Narmada.

Status of Threatened Biodiversity

No any threatened species of plants were reported from the area under study while most of the fauna reported,

from the buffer as well as core zone falls under Schedule-IV of IWPA, 1972 except Indian Peafowl (Schedule-I,

Lc). Among recorded faunal species, none of the species can be designated as an endemic.

Agriculture Pattern

The crops grown in this region was mostly Tuver (Cajanus indica), Wheat (Triticum aestivum) and Cotton

(Gossypium herbaceum) during rainy seasons. Other crops like Bajra (Pennisetum typhoides), Jowar (Sorghum

bicolar) and Divel (Ricinus communis) are grown in some area. The vegetables grown in the study area are,

Rigan (Solanum melongena), Tomato (Lycopersicon lycopersicum) and Val, Valpapadi (Lablab purpureus).

Horticulture activity is very less. The cultivation is essentially through rain water and in some area through

GIDC water supply.

1.2.10 Socio Economic

The summary of the social survey for the study area is provided as below:

Page 18: 1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

M/S. GACL IN JV

WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC

ORGANIC CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC, DAHEJ EXECUTIVE SUMMARY

KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 18

Population and its distribution: There are 27 villages, with a total population of 27,059 persons and 5,766

households out of which within 3 Km there is a population of 5,573 persons in 5 villages;

Sex Ratio: 924 females per 1,000 males;

Literacy Level: male literacy is 79.3 % and female literacy is 64.3 % of total population;

Educational Facilities: There is presence of Anganwadi & Primary schools in all villages in study area. For

attaining the higher education like High School, ITI, Diploma or Engineering, facilities are available from

Bharuch;

Drinking water: The water connectivity is provided by the GIDC. At few habitation of the study area the

existing companies provide drinking water through tanker or giving tap connection water from their

companies;

Power supply is available in the villages.

Major issues in the communities are inadequate supply of drinking water, sanitation, unemployment for land

losers & poor infrastructure.

1.3 ANTICIPATED ENVIRONMENTAL IMPACTS AND MITIGATION MEASURES

1.3.1 Air Environment

Dispersion modelling (using “AERMOD” modelling software) was carried out for point and line sources. This

indicates:

Maximum 24 hourly average GLC’s for PM10 (20.7 µg/m3), SO2 (5.38 µg/m3), NOx (5.40 µg/m3), HCl (0.40

µg/m3), Cl2 (0.05 µg/m3) are within 250 m to 750 m from the proposed site;

Maximum 8 hourly average GLC’s for HC (0.025 µg/m3) & CO (2.14 µg/m3) are within 250 m to 500 m

from the proposed site;

Average incremental GLC’s at all villages will continue to be well within specified norms of CPCB for

ambient air quality.

Mitigation Measures for Air Quality Impacts:

Lime dosing will be done in the CFBC Boilers to meet the SO2 emission standards;

Adequate height of at least 80 m will be provided as per the statutory requirements to flue gas stacks

attached to boilers. APC like ESPs will be installed to meet PM emission standards;

Well-designed APCM like scrubbers (DM water & Caustic) will be provided as per the applicability to control

emissions HCl, Cl2, NOx, CO, C2H4Cl2, TOC, from process vents/stacks;

Dioxin emission will be prevented by maintaining proper combustion temperature;

Online sensors for PM, SO2 & NOx shall be provided with flue gas stack attached to boilers;

Online sensors for HCl & Cl2 shall be provided with stack attached to Hypo plant;

Plant load will be maintained to reduce the air emissions;

Effective water spraying will be done on the access roads to control re-entrained dust during dry season (if

required);

Proper operating procedures will be followed during start-up and shutdown;

Proper PPE like dust masks will be provided to workers and its use ensured;

Regular Work place monitoring will be done.

Page 19: 1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

M/S. GACL IN JV

WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC

ORGANIC CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC, DAHEJ EXECUTIVE SUMMARY

KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 19

1.3.2 Incremental Traffic

From the proposed facility, approximately on daily basis, during peak hour, additional 132 PCU’s & 49 PCU’s

will be merging into the existing traffic of SH-6. The incremental traffic will lead to maximum PCU of 1,917

(Dahej to Bharuch) & 1,805 (Bharuch to Dahej). As per IRC, carrying capacity of this approach road is 3,600

PCU. Thus, the road is capable of carrying the excess traffic from the proposed project.

To ensure smooth traffic movement in the plant, proper in and out movement will be ensured. PUC certified

vehicles, covered with tarpaulins, will be used.

1.3.3 Noise Environment

Sound Pressure Levels (SPL) were predicted from the proposed project activities using “SoundPlan” Modelling

software. SPL predicted at receivers varies from 27.8 (dB) to 45.9 (dB). Logarithmic incremental of these levels

in baseline monitored data shows variation from 55.1 (dB) to 61.3 (dB) during day time and 44.9 (dB) to 57.3

(dB) during night time. Beyond 250 m from the project boundary, increase in noise level is negligible.

Passive and active controls such as noise barriers or acoustic enclosure will be provided in DG sets. Use of

suitable PPE (ear muffs or ear plugs) will be ensured. Thick green belt will be developed in the periphery of the

facility.

1.3.4 Water Environment

No withdrawal of groundwater is proposed in the project. Hence, surface and ground water will not be

impacted.

Following mitigation measures will be implemented to minimize the impact on the water environment:

During construction phase, sewage will be disposed into soak pit and septic tank. Regular cleaning will be

carried out.

There will be separate process and storm water drains.

Properly designed effluent drains with side barriers will be provided & inflow will be diverted to individual

ETP for necessary treatment to achieve Marine discharge norms.

Maximum recycle and reuse will be done to reduce the fresh water consumption.

Leakage of water at various source will be avoided.

Process, chemical fuel storage and handling area will have proper bunds and dyke walls so that

contaminated run-off cannot meet the storm-water line.

Rainwater harvesting will be done only in the admin building and from roof top of control rooms.

Domestic waste water will be treated in STP and treated water will be used for gardening purpose.

Use of drip irrigation system for greenbelt development which will reduce the overall water demand

Proper O&M of effluent treatment plants will be done to ensure meeting specified standards

During the heavy rainfall, water through internal storm water drains will meet nearest storm water drain made

by GIDC, leading to Estuary which is approximately 2.8 Km in S direction from the project site.

1.3.5 Land Environment

Based on mutually agreed terms and conditions, land was acquired from various land owners by GIDC. Plot

was allotted to GACL in year 2009 by GIDC. Change in the land use, currently from barren (scrub land) to

industrial use is envisaged.

Following mitigation measures will be implemented to minimize the impact on the land environment:

Page 20: 1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

M/S. GACL IN JV

WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC

ORGANIC CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC, DAHEJ EXECUTIVE SUMMARY

KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 20

Storage areas for hazardous waste, fuel & raw material will be stored on impervious/RCC floor to prevent

leachate penetration;

Generated hazardous wastes during project operation will be transported to an authorized TSDF operator

and incineration;

Secured Landfill Facility will be provided to store Brine sludge within plant premises.

1.3.6 Ecological & Biological Environment

Removal of common site specific floral species from barren land of project site will not have significant or

permanent impact on the habitat structure of associated faunal diversity.

As the emissions from the plant are regulated and minimal with respect to the specified norms, and with a very

healthy greenbelt will be developed at the site in the form of several species, it then follows that the biological

environment will be protected.

Every year survival rate of the plantation within project site as well as other plantation carried out in the LIZ

area will be monitored. Conservation plan will be prepared to enhance the population status of this Schedule

species as well as overall improvement of biodiversity which will be implemented in consultation of local forest

department.

Greenbelt Development

Within the project site, greenbelt will be developed in 2,51,000 m2 (33% of total plot area). Considering 16 m2

(4x4) for one tree, project area will have plantation of 15,700 plants of suggested species. Plantation will be

carried out around periphery, near / around built-up areas and along internal roads of the project area.

Additional plantation for green belt development will be carried out in the various places (around nearby 5

water bodies, in school and temple premises) of LIZ to improve habitat status of the project area.

Greenbelt Maintenance

Plantations will be managed by regular watering, soil enrichment work, applying manure, weeding and provide

proper protection. Replacement of sapling (replanting) will be done whenever mortality occurs in the plantation

during the growth stage. After care for a period of minimum five years will be done till the saplings attain

matured tree stage will be done. Any damage to the developed greenbelt due to any natural or unforeseen

activities will be attended by redeveloping and maintained it.

1.3.7 Socio-Economic Environment

While assessing the socio-economic and sociological impact including health impacts to surrounding population,

the upcoming project will bring job opportunities for the local people.

1.4 Environmental Monitoring Program

Expenditure to be incurred by GACL on environmental monitoring and management shall include capital cost of

~ INR 50.85 Crore and ~ INR 2.14 Crore recurring cost (annually). Once, Environmental Clearance is obtained

and plant is in operation phase, various environmental parameters as tabulated in Table 1-8 will be

monitored.

Table 1-8: Post EC - Environmental Monitoring Plan

Page 21: 1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

M/S. GACL IN JV

WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC

ORGANIC CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC, DAHEJ EXECUTIVE SUMMARY

KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 21

S.

No. Environmental Component / Parameter

Frequency of

monitoring Location

1 CEMS Sensors (HCl & Cl2). Online On stack attached with hypo scrubber.

2 HCl & Cl2 in stacks Monthly HCl unit stack vent, Hypo Stack Vent,

Chlorotoluenes, Chloromethanes & ECH Plant’s Stack Vent.

3 PM, SO2, NOx in stack. Online Boiler Stack.

Monthly Boiler Stack & DG Set Stacks

4 PM10, PM2.5, SO2, NOx, HCl & Cl2 in ambient

air.

Twice in a month at site & once in a

season at Villages

1) 3 Locations in site

2) Rahiyad Village

3) Atali Village

5 WPM for HCl & Cl2. As per Factories

Rules At 5 locations within site and at Rahiyad &

Atali Village

6 Noise levels Monthly Main Plants and Utilities Area

7 Water consumed in various activities and

waste water generated from various areas of plants

Daily Main intake, plant wise water supply line

& effluent diversion line to ETPs.

8 Monitoring of wastewater inlet and outlet at ETP plants for the principal parameters (such

as pH, SS, TDS, COD). Daily Stream wise inlet & outlet of ETPs

9 Monitoring of domestic wastewater inlet and

outlet at STP for the principal parameters (such as pH, SS, BOD).

Daily Inlet & Outlet of STP

10 Monitoring of wastewater at Final Factory drain outlet for the parameters that will be

provided by GPCB. Daily Factory outlet drain

11 Surface water samples at nearby area.

Parameters are essential parameters as per IS: 10500:2012.

Once in a Season 1) Rahiyad Village Pond

2) Atali Village Pond

12 Quantity of Fly Ash Generated Daily Ash Silo

13 Quantity of Brine Sludge Generated Daily Captive Secured Landfill Site

14 Soil analysis for EC, pH, permeability and ESP

Pre & post monsoon / in the

event of accidental spillage

At Site

1.5 ADDITIONAL STUDIES

1.5.1 Risk & Hazards

During operation of the proposed caustic chlorine, synthetic organic units & power plant, following activities

can pose hazards and risk to human and surrounding environment:

Storage of Chlorine, Methanol, Toluene & Epichlorohydrin;

Pipeline transfer of Chlorine & Methane gas;

Loading and unloading hazardous waste - mechanical movements;

Contact with hazardous chemicals;

Storage of Incinerable Waste.

On the basis of chemical properties like flash point, phase of chemical, operating conditions and total inventory

etc of the above mentioned chemicals, the study have been conducted to carry out consequence analysis.

Page 22: 1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

M/S. GACL IN JV

WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC

ORGANIC CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC, DAHEJ EXECUTIVE SUMMARY

KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 22

Major failures selected for the analysis are 10 mm & 25mm leak as maximum credible scenario and

catastrophic rupture as worst case.

The results of analysis are as follows:

In case of Methanol, Toluene, & Epichlorohydrin storage tanks, the effect of pool (dyke) fire at radiation level

37.5 kW/m2 is not going out of the plant boundary.

For Chlorine tanks & pipeline, the toxic dispersion at 10 ppm slightly coming out of the plant boundary

Mitigation Measures

Medical checkup would be carried out at an regular intervals

During site preparation proper care would be taken by GACL, appropriate PPEs will be provided to site

workers and staff members

Appropriate personnel protective clothing to be used to prevent skin contact.

Safety Goggles will be used to prevent eye contact.

Hand gloves of natural rubber, neoprene, and polyvinyl chloride will be used as and when required

Acoustic enclosures will be provided to DG sets and other noise generating equipment

GACL will develop and implement a spill management plan to prevent risk of spill which may cause health

problem.

GACL will develop emergency management system (off-site & onsite emergency plan) to tackle any

emergency situation for proposed facilities.

1.5.2 Socio Economic Development Activities

Based on the need of the community, GACL will do socio-economic development activities towards community

welfare in the field of Health & Hygiene, Safe Drinking Water facilities, Educational Activities, Sanitation &

Drainage System, Skill Development/Training Program Infrastructure Facilities in the study area.

The proposed budget for Enterprise Social Commitment (ESC) will be allocated for the ten years / life span of

project. The project proponent has earmarked ~ INR 4.95 Crore per year with 10% increase in the amount

each year towards community development program in the study area. Thus, a budget of ~ INR 78.8 Crore

(2.5% of total project cost) is earmarked to be spent on ESC/CSR Activities based on the yearly need based

assessment. The monitoring and evaluation of CSR activities shall be conducted by a reputed institution /

organization every year in compliance with the Clause 135 of Companies Act 2013.

The new project shall provide employment to nearly 500 people during construction phase and more than 750

during operation phase. The urban and rural settlements would enjoy the provision of better service roads,

education, health facilities, drinking water and sanitation system. The surrounding areas will be developed

through the CSR/Community Development Programme every year. The beneficiaries of these activities will be

the population of all the villages falling in the study area of the proposed project. The efforts will be put to

provide sufficient quantity of potable water, construction/renovation of toilets and supporting programmes

related to education and skill development.

1.6 PROJECT BENEFITS

Due to establishment of the proposed project following benefits are envisaged for the locals and country:

Project will encourage industrial growth due to the availability of finished products;

The company will have market growth of its own brands name in various overseas countries;

Page 23: 1 EXECUTIVE SUMMARY · PDF file · 2017-10-11During manufacturing of process of caustic soda, Hydrogen and ... The turbine is mechanically coupled with alternator ... Wastewater will

M/S. GACL IN JV

WITH NALCO DRAFT EIA FOR PROPOSED NEW CHLOR-ALKALI PLANT, CPP & SYNTHETIC

ORGANIC CHEMICAL UNITS AT PLOT NO.: D II/9, GIDC, DAHEJ EXECUTIVE SUMMARY

KADAM ENVIRONMENTAL CONSULTANTS | SEPTEMBER 2017 23

The company will carter needs of the domestic market and will reduce import of caustic soda;

Employment potential for semi-skilled and unskilled workers will be generated during the construction

phase and for skilled and semi-skilled during the operational phase;

Other tangible benefits include development of various ancillary activities which shall generate indirect

employment to the locals;

Many of proposed products have got very good export potential which can lead to forex revenues for the

country.

1.7 ENVIRONMENT MANAGEMENT PLAN

Environmental Monitoring Plan for suggested mitigation measures and monitoring plan will include:

Provision of SOPs and Emergency Response Procedures to each plant will be ensured;

Deploying experienced EHS head who will directly provide the status report to director on daily basis;

Proper inventory accounting & monthly review of non-compliances by plant head;

Monitoring for compliance of statutory conditions by EHS head;

Internal audit of hazardous waste storage area as per ISO system;

Timely submission of Form 5, Environment Audit Report, Hazardous waste manifest, Compliance of show

cause / closure notice issued by regulatory authorities, etc.

Sufficient funds towards capital cost and recurring cost per annum will be provided. The funds so

earmarked for environment management/ pollution control measures shall not be diverted for any other

purpose.

An Environmental Management Cell with adequate professional expertise and resources shall be established to

discharge responsibilities related to environmental management including statutory compliance, pollution

prevention, environmental monitoring, etc.

1.8 CONCLUSION

Based on the EIA study conducted in Post Monsoon Season from 20th October, 2016 to 31st December, 2016,

as per terms of reference given by SEAC dated 14th September, 2016 and TOR Amendment dated 29th April,

2017, the following highlight emerges:

Project has various locational benefits like availability of common salt, coal from nearby region;

Site is well connected with ports, highway and railway;

There is no applicability of General Conditions, as per EIA Notification, to the project;

The proposed project, when established, shall fetch foreign exchange for the country as there is huge

demand of chlorine based products in the international market;

Strict adherence to all the applicable regulatory requirements will be complied with;

Safety and environmental norms will be followed;

Recycle & Reuse scheme will be implemented to reduce water consumption;

Provision of air pollution control equipment, management of hazardous waste, will lead to minimum

adverse environmental impacts;

The project shall generate employment potential for skilled, semiskilled, unskilled people during