33
1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

Embed Size (px)

Citation preview

Page 1: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

1Eighth Western Rivers 2013 Operations Workshop

8WR OPS Workshop 2013

8WR OPS Workshop 2013

Page 2: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

AUX Damage Claim ProcessAUX Damage Claim Process

Claims submitted to CO SUMR via ASC < $750 ASC review & approve to SUMR Response Dept. to

DIRAUX for payment >$750 Investigator assigned

Damage Normal Ops - Approval/Disapproval to SUMR to DIRAUX

Abnormal Ops - Stand down of vessel and crew with investigation

Gross Negligence Determination - Yes - Claim denied; DIRAUX may take disciplinary action No – Investigation endorsed for payment

Eighth Western Rivers 2013 Operations Workshop

2

Page 3: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

AUX Communications on Patrol

AUX Communications on Patrol

Facility must have 2 Way CommsCG Unit, ACOE, Police, Fire Dept, Marina

relay btw facility & USCGOPS & POSN – 30 mins SUMR, 60 mins SLMRComms lost– Terminate PatrolSafe haven until comms is re-established

Eighth Western Rivers 2013 Operations Workshop

3

Page 4: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

AUX Incident Notification AUX Incident Notification

Report Incidents Up the Chain AUX report to SUMR Command Center

Incidents- Incidents affecting flow of commerce Major/Serious marine casualty Major pollution incident Actionable intelligence Terrorist attack

Eighth Western Rivers 2013 Operations Workshop

4

Page 5: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

Aux Incident Notification Aux Incident Notification

Incidents Significant injury to member Personnel casualty/Imminent

death of SUMR personnel/family member

Civil disasters Incident w/high media interest SAR case in uncertain or

distress phase Any commercial shipboard

death or serious illness

Eighth Western Rivers 2013 Operations Workshop

5

Page 6: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

SUMR AUX Cell Phone Possession -- EmbarkedSUMR AUX Cell Phone

Possession -- EmbarkedDo not carry on person, except PWO for

COMMSPlace on-board in dry & secure areaReason - damage and property lossConsideration - Cell phones required for

communications in some limited VHF coverage areas

Eighth Western Rivers 2013 Operations Workshop

6

Page 7: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

Important ReminderImportant Reminder

Eighth Western Rivers 2013 Operations Workshop

7

Gary Taylor
I would reference the ALCOAST Number and only put the action line as a bullet - it will be easier to read.
Page 8: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

SUMR AUX Embarkation of Non-Aux Personnel

SUMR AUX Embarkation of Non-Aux Personnel

Non-Coast Guard on AUX Facilities No non–AUX guests or passengers (including family) on

facilities unless: Order Issuing Authority (OIA) authorizes for event or patrol

Process- Request 2 weeks in advance in writing Through ASC to Chief of Response, SUMR, INFO to SO-OP Approval by e-mail to Coxswain or Pilot If approval not received then assume non-approval

Eighth Western Rivers 2013 Operations Workshop

8

Page 9: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

SUMR AUX Embarkation of Non-Aux Personnel

SUMR AUX Embarkation of Non-Aux Personnel

Process (continued) Approval can be granted for all patrol types

Training patrols receive greater scrutiny due to inherent risks If patrol becomes operational mission

Coxswain must advise SUMR of non-AUX personnel Non-AUX personnel may remain Coxswain must perform Operational Risk Assessment in

coordination with SUMR and Chief of ResponseCoxswains should act first if lives are in immediate dangerBrief SUMR once the situation has stabilized

Eighth Western Rivers 2013 Operations Workshop

9

Page 10: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

SUMR Marine Assistance Request Broadcast (MARB)

SUMR Marine Assistance Request Broadcast (MARB)

SUMR Policy SUMR Cmd Ctr broadcasts MARB for non-distress cases

If AUX responds or it was a “happen-upon” no need to do MARB AUX may request MARB from SUMR Cmd Ctr

MARB effectiveness may be spotty due to gaps in radio coverage areas & lack of commercial tow operators in SUMR AOR

Eighth Western Rivers 2013 Operations Workshop

10

Page 11: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

SLMR AUX Cell Phone Possession -- Embarked

SLMR AUX Cell Phone Possession -- Embarked

SLMR does not have a specific policy regarding cell phones when embarked

Reasonable care should be exercised at all times

Eighth Western Rivers 2013 Operations Workshop

11

Page 12: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

SLMR AUX Embarkation of Non-Aux Personnel

SLMR AUX Embarkation of Non-Aux Personnel

Eighth Western Rivers 2013 Operations Workshop

12

Page 13: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

Safety is Priority One!Safety is Priority One!

• Remember safety of the crew, the public, and the vessel take priority over the mission

• Personal Locator Beacon (PLB) – Key piece of safety equipment– Issued to Coxswains and PWOs– Have it on board– Check the battery expiration date – Keep it registered with NOAA

Eighth Western Rivers 2013 Operations Workshop

13

Page 14: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

HAZMATHAZMAT

Eighth Western Rivers 2013 Operations Workshop

14

Page 15: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

Promoting SafetyPromoting Safety

• Wear PPE correctly• Ensure facility is properly equipped• Operate vessel safely• Comply with Navigation Rules• Observe no wake zones

Demonstrate Professionalism!

Eighth Western Rivers 2013 Operations Workshop

15

Page 16: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

Operational Risk Management (ORM)

Operational Risk Management (ORM)

Eighth Western Rivers 2013 Operations Workshop

16

Page 17: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

Operational Risk Management GAR Model

Operational Risk Management GAR Model

Eighth Western Rivers 2013 Operations Workshop

17

GGreenreen – – AAmbermber – – RReded• Any category above a 3 needs to be

mitigated• There should be NO zero (no risk) scores • GAR is ongoing during mission• Both SUMR and SLMR require a GAR

score before an Auxiliary patrol gets underway

Page 18: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

Operational Risk Management GAR Model

Operational Risk Management GAR Model

Eighth Western Rivers 2013 Operations Workshop

18

GGreenreen – – AAmbermber – – RReded

• 8WR Boat Crews will use the standard GAR worksheet

• Worksheet (see next slide) and descriptive instructions are available on the 8WR website http://www.trlmo.com/cgaux8wr/pws/ops/aux_gar_model_surface_ops.pdf

Page 19: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

Operational Risk Management GAR Model

Operational Risk Management GAR Model

Eighth Western Rivers 2013 Operations Workshop

19

Page 20: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

MISHAP ReportingMISHAP Reporting

• Any event that results in . . .– Death of Auxiliary member– Injury of Auxiliary member– Damage to Auxiliary owned or personal

property

• Must be under orders

• Report immediately to OIA & DIRAUX

Eighth Western Rivers 2013 Operations Workshop

20

Page 21: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

Navigation RulesNavigation Rules

• Inland Rules applicable in all 8WR waters

• Coxswains responsible for compliance

• Be wary of “local practices”

Eighth Western Rivers 2013 Operations Workshop

21

Page 22: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

NavRul Test CompletionNavRul Test Completion

• Initial closed book test must be taken on-line– Proctor required– Proctor must be a QE or AUXOP– Paper tests no longer available

• Open book test taken on-line– No proctor required

• Test site: http://ntc.cgaux.org/ • Open book test is due 5 years from the date of

the last test not 31 Dec of year 5

Eighth Western Rivers 2013 Operations Workshop

22

Page 23: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

Operating in Reduced VisibilityOperating in Reduced Visibility

NAVRUL - Rule 19

Procedures for Reduced Visibility– Maintain a lookout as far forward as possible– Reduce speed– Proper sound signals– Navigation lights on– Radar on and monitored if you have it on your vessel– Avoid course alterations to port for vessels ahead

Eighth Western Rivers 2013 Operations Workshop

23

Page 24: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

Eighth Western Rivers 2013 Operations Workshop

24

• Navigation lights on• Depth perception

affected• Reduce speed• Night vision (30 min)• Inherently riskier;

update GAR often• Consider extra

lookouts

NIGHT OPSNIGHT OPS

Page 25: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

LiabilityLiability

• Orders do not guarantee liability coverage• Legal process bases coverage on a review of

the circumstances and facts involved• Your actions -

– Must be within your qualifications and training– May not exceed the facility capabilities– Must not go beyond the scope of the Auxiliary duties – Coverage may be denied by the Coast Guard if you

are operating out of bounds

Eighth Western Rivers 2013 Operations Workshop

25

Page 26: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

Operational GuidelinesOperational Guidelines

• Remember, we are prohibited from:– Boardings for law enforcement purposes– Investigating complaints of negligent

operation– Violating any navigational rules– Creating any situation that would place any

vessel in navigational extremes

Eighth Western Rivers 2013 Operations Workshop

26

Page 27: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

Radio CommunicationsRadio Communications

• Maintain high professional standards– Use appropriate pro-words– Use phonetic alphabet properly– Use appropriate channels– NEVER use . . .

• “10 codes”• Unauthorized prowords, abbreviations and procedures• Chummy language• Personally identifying information

– Review Boat Crew Seamanship Manual, Chapter 11, paragraph D.2.

Eighth Western Rivers 2013 Operations Workshop

27

Page 28: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

Operational Photos and VideoOperational Photos and Video• Coast Guard Policy

– ALL photographs and video taken aboard Coast Guard Auxiliary Facilities under orders, including those taken with personal cameras, are government property and subject to screening prior to release

Eighth Western Rivers 2013 Operations Workshop

28

Page 29: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

After The Patrol . . .After The Patrol . . .

• District Post Patrol Policy– Update 5132 in AOM– 7030 is completed in AOM– original gas receipts are scanned into AOM

• 30 days must be in DIRAUX hands

29Eighth Western Rivers 2013 Operations Workshop

Page 30: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

After The Patrol . . .After The Patrol . . .

Eighth Western Rivers 2013 Operations Workshop

30

• After Action Report when required

• Maintain proper radio and deck log book

Page 31: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

After The Patrol . . .After The Patrol . . .

• Members submitting a claim when trailering are authorized to document both mileage and fuel costs on the CG-5132 (AUXMAN 9.C.2.b.)

• FINCEN will pay the greater of the two amounts– One or the other – NOT both

• Submit scanned original receipts as usual

31Eighth Western Rivers 2013 Operations Workshop

Page 32: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

??? QUESTIONS ?????? QUESTIONS ???

• Contact any of these OPS Reps– Your SO-OP– DSO-OP, COMO Jack Gumb [email protected]– DDC-R, COMO Robert Smekta

[email protected]

• If they don’t have the answer at hand, they have the resources and network to get the answer for you

Eighth Western Rivers 2013 Operations Workshop

32

Page 33: 1 Eighth Western Rivers 2013 Operations Workshop 8WR OPS Workshop 2013

8WR OPS Workshop 2013

8WR OPS Workshop 2013

33Eighth Western Rivers 2013 Operations Workshop