DØ Grid PP Plans –SAM, Grid, Ceiling Wax and Things

Iain Bertram

Lancaster University

Monday 5 November 2001

Page 2: 1 DØ Grid PP Plans – SAM, Grid, Ceiling Wax and Things Iain Bertram Lancaster University Monday 5 November 2001

5/11/2001 Iain A Bertram - Lancaster 2

SAM, DØ, and the Grid

DØ BasicsWhat is SAM?

HistoryCurrent DeploymentCollaborators

SAM, Grid and Future DevelopmentsOverview of PlansUK PlansCDF and SAM

Page 3: 1 DØ Grid PP Plans – SAM, Grid, Ceiling Wax and Things Iain Bertram Lancaster University Monday 5 November 2001

5/11/2001 Iain A Bertram - Lancaster 3

The DØ Experiment

Detector Data 1,000,000 Channels Event size 250KB Event rate ~50 Hz On-line Data Rate

12 MBps Est. 2 year totals (incl

Processing and analysis):

1 x 109 events ~0.5 PB

Monte Carlo Data 5 remote processing

centers Estimate ~300 TB in 2

years.

Page 4: 1 DØ Grid PP Plans – SAM, Grid, Ceiling Wax and Things Iain Bertram Lancaster University Monday 5 November 2001

5/11/2001 Iain A Bertram - Lancaster 4

Collaboration

~500 Physicists 72 institutions 18 Countries

Page 5: 1 DØ Grid PP Plans – SAM, Grid, Ceiling Wax and Things Iain Bertram Lancaster University Monday 5 November 2001

5/11/2001 Iain A Bertram - Lancaster 5

Page 6: 1 DØ Grid PP Plans – SAM, Grid, Ceiling Wax and Things Iain Bertram Lancaster University Monday 5 November 2001

5/11/2001 Iain A Bertram - Lancaster 6

SAM (DØ & FNAL Project)

SAM is Sequential Access to data via Meta-data Project started in 1997 to handle DØ ’s needs for Run

II data system. SAM is a data-grid

No fully functional Grid currently exists SAM does have many GRID functionalities

Stations – logical collection of computers, networks, storage

Transparent access and transport of data between stations Data Cataloguing – Replica Management Fabric management Job Submission on Local Station Only

http://d0db.fnal.gov/sam

Page 7: 1 DØ Grid PP Plans – SAM, Grid, Ceiling Wax and Things Iain Bertram Lancaster University Monday 5 November 2001

5/11/2001 Iain A Bertram - Lancaster 7

Deployment

Page 8: 1 DØ Grid PP Plans – SAM, Grid, Ceiling Wax and Things Iain Bertram Lancaster University Monday 5 November 2001

5/11/2001 Iain A Bertram - Lancaster 8

Deployment II

CentralAnalysis

Interconnected network of primary cache stationsCommunicating and replicating data where it is needed.

MSS MSS

MSS

WAN

Stations at FNALCurrent active stations •FNAL (several)•Lyon FR (IN2P3), •Amsterdam NL (NIKHEF)•Lancaster UK•Imperial College UK•Others in US

Datalogger

Reco-farm

ClueD0

LAN

(Others)

Page 9: 1 DØ Grid PP Plans – SAM, Grid, Ceiling Wax and Things Iain Bertram Lancaster University Monday 5 November 2001

5/11/2001 Iain A Bertram - Lancaster 9

Statistics

Number of registered users: 360Data in the system: 25 TB

160k filesAcessing > 3 TB

a dayGoal 13 TB/day

Fully integrated into DØ Analysis Framewrok

25TB

Page 10: 1 DØ Grid PP Plans – SAM, Grid, Ceiling Wax and Things Iain Bertram Lancaster University Monday 5 November 2001

5/11/2001 Iain A Bertram - Lancaster 10

SAM Collaborators

PPDG - Particle Physics Data GridDØ Participation

Condor Globus Fermilab CMS Computing Group iVDGL International Virtual Data-Grid

Laboratory.

IGMB – InterGrid Management Board

Page 11: 1 DØ Grid PP Plans – SAM, Grid, Ceiling Wax and Things Iain Bertram Lancaster University Monday 5 November 2001

5/11/2001 Iain A Bertram - Lancaster 11

Future Plans

SAM is an operational GRID Ideal platform for demonstrating Grid

technologies on the time scale of 2 years

Modular design allows integration of modern Grid Tools

Ideal Testing Ground for LHC scale experiments Full Scale Test of Grid Middleware

Page 12: 1 DØ Grid PP Plans – SAM, Grid, Ceiling Wax and Things Iain Bertram Lancaster University Monday 5 November 2001

5/11/2001 Iain A Bertram - Lancaster 12

DØ Goals

DØ is fully committed to making SAM a fully functional GRID on the timescale of 2 years.

DØ is committed to using standard GRID tools wherever possible.

DØ has/is committing significant resources to the GRID.

Page 13: 1 DØ Grid PP Plans – SAM, Grid, Ceiling Wax and Things Iain Bertram Lancaster University Monday 5 November 2001

5/11/2001 Iain A Bertram - Lancaster 13

General Goals

1. Use of standard middleware to promote interoperability1. Globus Security infrastructure, Interoperability

with Fermilab Kerberos security infrastructure 2. GridFTP as one of the supported file transfer

protocols3. Globus job submission.4. Condor and extensions job submission5. Publish availability and status of SAM station

resources 6. Publish catalog of data files and their replicas

using standard or standards emerging from PPDG and DataGrid

Page 14: 1 DØ Grid PP Plans – SAM, Grid, Ceiling Wax and Things Iain Bertram Lancaster University Monday 5 November 2001

5/11/2001 Iain A Bertram - Lancaster 14

General Goals II

2. Additional Grid functionality for Job specification, submission and tracking.1. Use of full Condor services for migration and

checkpointing of jobs – as much as is possible with DØ software and the DØ software framework. This may require work on both Condor software to achieve full functionality

2. Building incrementally enhanced Job specification language and job submission services that ensure co-location of job execution and data files and reliably execute a chain of job processing, with dependencies between job steps. The first step in this is expected to be work in conjunction with the Condor team to provide for specification and execution of a Directed Acyclic Graph of jobs using an extended version of the DAGMAN product that CMS is testing for their MC job execution.

Page 15: 1 DØ Grid PP Plans – SAM, Grid, Ceiling Wax and Things Iain Bertram Lancaster University Monday 5 November 2001

5/11/2001 Iain A Bertram - Lancaster 15

General Goals III

3. Enhancing Monitoring and Diagnostic capabilities1. Extensions to existing system of logging

all activities in the system to both local and central log files - as demanded by robustness and increased use of system.

2. Incorporation of emerging Grid Monitoring Architecture and monitoring tools. Little exists on this at this point and this work will involve working with other Grid projects and participating in Global Grid Forum working groups

Page 16: 1 DØ Grid PP Plans – SAM, Grid, Ceiling Wax and Things Iain Bertram Lancaster University Monday 5 November 2001

5/11/2001 Iain A Bertram - Lancaster 16

Proposed Applications

Monte Carlo Production SystemTo upgrade the distributed Monte Carlo

production system as a short term use case for demonstrating, in an incremental fashion, essential components of the Grid. In particular this involves demonstrating transparent job submission to a number of DØ processing centres (SAM stations), reliable execution of jobs, transparent data access and data storage and an interface for users to understand and monitor the state of their MC requests and the resultant MC jobs and data that satisfy their requests

Page 17: 1 DØ Grid PP Plans – SAM, Grid, Ceiling Wax and Things Iain Bertram Lancaster University Monday 5 November 2001

5/11/2001 Iain A Bertram - Lancaster 17

Proposed Applications

General User ApplicationsTo demonstrate analysis of data products

(both MC and Detector Data) on desktop systems in the UK, using an enhanced version of the DØ SAM Grid system that incrementally incorporates Grid middleware components. This will not only demonstrate active use of a Grid for analysis but will also eventually demonstrate interoperability between the DØ Grid and other emerging Grid testbeds.

Page 18: 1 DØ Grid PP Plans – SAM, Grid, Ceiling Wax and Things Iain Bertram Lancaster University Monday 5 November 2001

5/11/2001 Iain A Bertram - Lancaster 18

MilestonesMonth 6 Integration of Globus Security infrastructure and GridFTP

into SAM and deployment at several UK stations interoperating with Fermilab and other SAM stations.

First demonstration of MC production system using Request interface and automated job submission to one SAM station with limited intelligence in job distribution and load balancing.

Month 12 Fully commissioned MC Production System with reliable execution of jobs, splitting into sub-jobs as necessary, intelligent job distribution and load balancing, taking into account the economics of data movement versus job movement.

Month 24 A fully robust production quality system, excellent monitoring and interoperability with other Grid projects and EU DataGrid with sharing of some resources. Updated Fabric capable of handing the data on each experiment.

Page 19: 1 DØ Grid PP Plans – SAM, Grid, Ceiling Wax and Things Iain Bertram Lancaster University Monday 5 November 2001

5/11/2001 Iain A Bertram - Lancaster 19

CDF and SAM

Rick St Denis TalkCDF to use SAM for data accessUK setting up test facilitiesCombined DØ and CDF Proposal

Page 20: 1 DØ Grid PP Plans – SAM, Grid, Ceiling Wax and Things Iain Bertram Lancaster University Monday 5 November 2001

5/11/2001 Iain A Bertram - Lancaster 20

Proposal

Request 6 FTEsFour of the additional FTEs will work on

integrating CORE Grid functionality into SAM (this talk)

One FTE for DØ applications (MC and Analysis)

One FTE integrate CDF software with SAM

Page 21: 1 DØ Grid PP Plans – SAM, Grid, Ceiling Wax and Things Iain Bertram Lancaster University Monday 5 November 2001

5/11/2001 Iain A Bertram - Lancaster 21

Conclusions

SAM is an operational GRID

Offers great opportunity for testing GRID Middleware

Goal: Fully functional test-bed in two years.