Upload
homer-phillips
View
220
Download
0
Tags:
Embed Size (px)
Citation preview
DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
1
FUTURE SPECTRUM NEEDS SUPPORTING A DIGITAL TRANSITION (FROM A BROADCAST
SIGNAL DISTRIBUTION PERSPECTIVE)
ITU TELECOM WORLD 2009, GENEVA, SWITZERLAND
Date: 7 October 2009Presented by: Dr. Sebiletso Mokone-Matabane, Chief Executive Officer
2DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
SENTECH TOWER JOHANNESBURG
3DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
OVERVIEW
SENTECH TOWER
WHO IS SENTECH?
SENTECH BROADCASTING SIGNAL DISTRIBUTION INFRASTRUCTURE
TERRESTIAL NETWORK: TRANSMITTING STATIONS
SATELLITE DISTRIBUTION
SENTECH’S TELEPORT
TELECOMMUNICATIONS
OTHER SERVICES
TRANSMISSION PLANNING
GIS PLANNING
MEASUREMENTS
SIGNAL DISTRIBUTION TRAINING
KEY PROJECTS
DIGITAL TERRESTRIAL TELEVISION (DTT)
DTT: SOUTH AFRICAN PERSPECTIVE
CHALLENGES FOR DIGITAL DIVIDEND TO BE USED FOR BROADCASTING SERVICE CHANNELS
DTT IMPLEMENTATION IN SOUTH AFRICA
4DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
WHO IS SENTECH?
SENTECH is:
A commercially run, 100% owned by the State of the South Africa,
whose business is in electronic communications.
5DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
Sentech Business:
• Broadcasting Signal Distribution• Telecommunications
• Other services
6DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
SIGNAL DISTRIBUTION NETWORKS
Television FM (Frequency Modulation)
SW (Short Wave) MW (Medium Wave)
Ku-Band Direct-to-Home Satellite C-Band Satellite
MMDS
BROADCAST BACKBONE
Satellite distribution (C-Band Point-to-Point)
Terrestrial Linking
Satellite Contribution
BROADCASTING SIGNAL DISTRIBUTION
7DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
VALUE ADDED SERVICES
Network splitting Paging, RDS,(Radio data services), VBI
(Vertical blanking interval)
Television Nicam Stereo FM Stereo
VIVID DTH PLATFORM
Free to air Future subscription services
SenCom
BUSINESS TV and BUSINESS RADIO
Sen TV Sen Radio
Sen Data Sen Educate
BROACASTING SIGNAL DISTRIBUTION cont.
8DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
• Satellite Teleports (STP)
• 15 Transmitter Control Centers (TCC)
• Transmitter Stations
• V Transmitters
• FM Transmitters
• Medium-Wave Transmitters
• Short-wave Transmitter Station – 500Kw, 250Kw & 100Kw
transmitters
• C-band and Ku-band Satellite Uplink Facilities
BROADCASTING SIGNAL DISTRIBUTION INFRASTRUCTURE
9DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
TERRESTRIAL NETWORK: TRANSMITTING STATIONS
10DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
SATELLITE DISTRIBUTION
11DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
SENTECH’S TELEPORT
12DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
• Voice - International Voice Traffic (in-bound and out-bound)
• Data - VSAT
TELECOMMUNICATIONS
13DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
Consulting Engineering
Project Management Training
Technical Auditing Spectrum Monitoring
Refurbishment Maintenance
SERVICES
OTHER SERVICES
HIGH SITE ACCOMMODATION (FACILITY RENTAL)
Mast Building
Site Road
Emergency Power
14DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
TRANSMISSION PLANNING
Technical regulatory assistance
Radio propagation planning
Regulatory / Technical data management
Geographical Information System Analyses
Site selection
In-flight and Terrestrial measurement
Desktop Publishing / Graphics
Geographical Information Systems
15DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
GIS PLANNING
16DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
TRANSMISSION PLANNING
17DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
MEASUREMENTS
• Verify faultfinder and research
• Horizontal Radiation Pattern (H.R.P)• Vertical Radiation Pattern (V.R.P)• Effective Radiation Power (E.R.P)• Correct tilt of transmitting antennae• Correct null tilt• Correct orientation of transmitting antennaes • Frequency compatibility
18DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
SIGNAL DISTRIBUTION TRAINING
• Sentech has conducted professional signal distribution and broadcast training in:
• Namibia
• Ghana
• Nigeria
• Botswana
• Madagascar
• As well as various Broadcasters in South Africa
19DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
DIGITAL TERRESTRIAL TELEVISION (DTT)
• Upgrade analogue transmitters site to enable DTT transmission
• Set Top Box integration
• Spectrum utilization during dual illumination
• Installing the multiplexers
• Training
• Regulatory policies
20DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
KEY PROJECTS
• DTT: migration of analogue terrestrial television infrastructure to digital.
• 2009 Confederations Cup and 2010 FIFA World Cup Soccer:
- Sentech successfully provided backup satellite infrastructure (local feed) for the 2009 Confederations Cup.
- On a commercial basis, Sentech successfully provided FIFA with the international feed and back-up linking from its teleport (STP).
21DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
DIGITAL TERRESTRIAL TELEVISION (DTT)
22DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
• The purpose of the project is to migrate all Sentech analogue TV services operating on VHF and UHF from a PAL-I protocol to an MPEG-4 digital TV platform.
DIGITAL TERRESTRIAL TELEVISION (DTT)
23DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
DTT: SOUTH AFRICAN PERSPECTIVE
• As far back as 2000 South Africa acknowledged that migration from analogue to digital terrestrial television is inevitable. Sentech conducted T-DAB transmission test in Pretoria and digital terrestrial television transmission in Johannesburg (Source: Notice of publication of Terrestrial Broadcasting Frequency Plan 2003, Government Gazette No.25786 of 28 November 2003, General Notice Number 3365).
• The Independent Communications Authority of South Africa (ICASA) followed the work of the ITU leading to the Regional Radio Conference (RRC) concerning the introduction of digital broadcasting (Source: Notice of publication of Final Terrestrial Broadcasting Frequency Plan, 2004, Government Gazette No. 28299 of 5 December 2005, General Notice Number 1513).
24DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
DTT: SOUTH AFRICAN PERSPECTIVE cont.
• South Africa participated in RRC-06 and is signatory to the Final Acts. The Government of the Republic of South Africa under the Department of Communications (DoC) established an industry Digital Migration Working Group (DMWG). The DMWG comprised of broadcasting signal distribution, broadcasters, consumer groups and set-top-boxes manufacturers.
• The purpose of the industry migration working forum was among others to share ideas on how South Africa can migrate from analogue to digital, explore possible standards for transmission and set-top-boxes and to prepare a report for submission to the Minister of Communications in order to formulate a broadcasting digital migration policy.
25DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
DTT: SOUTH AFRICAN PERSPECTIVE cont.
• The Digital Migration Working Group report was submitted to Minister of Communications in 2006. The Minister of Communications established an advisory council known as the Digital Dzonga (South). The purpose of the Digital Dzonga is to advise an oversee the implementation of the migration process. Sentech is represented in Digital Dzonga (South) Council and is the Chair of the Broadcast Infrastructure Working Group.
• On 8 September 2008, the Minister of Communciations published Broadcasting Digital Migration Policy in Government Gazette No.31408.
26DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
• On 21st February 2007 the South African cabinet decided as follows:
i. Digital TV signals will be switched on as of 1 November 2008 and the analogue TV signal switched off on 1 November 2011
ii. Sufficient frequency spectrum must be retained for digital broadcasting migration.
DTT: SOUTH AFRICAN PERSPECTIVE cont.
27DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
DTT: SOUTH AFRICAN PERSPECTIVE cont.
ONE OF THE BENEFITS OF DTT:
• Spectrum Efficiency
• Spectrum a finite national resource
• Digital makes far more efficient use of the available spectrum
• Allows for expansion and new services
28DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
Analogue TV Analogue TV
• 8 MHz Spectrum8 MHz Spectrum
• One ServiceOne Service
• New Frequency per siteNew Frequency per site
Digital TV Digital TV
• 8 MHz Spectrum8 MHz Spectrum
• 6 or more Services6 or more Services
• Same frequency re-used in Single Same frequency re-used in Single
Frequency NetworksFrequency Networks
ANALOGUE ANALOGUE DIGITALDIGITAL
Reg 1 TV
Reg 2 TV
DTT: SOUTH AFRICAN PERSPECTIVE cont.
29DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
DTT: SOUTH AFRICAN PERSPECTIVE cont.
Opportunities of DTT for South Africa as a developmental State committed to the creation of an information society, the main aspects are: -
• multiple channels with a broader array of programmes and
services including more social economic and political programme content.
• Public Interest services: e-government, e-health, e-medicine, e-learning, telecentres and community centres.
• a greater programme choice for the viewer.
• opportunity to develop the television industry.
30DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
CHALLENGES FOR DIGITAL DIVIDEND TO BE USED FOR BROADCASTING SERVICE CHANNELS
• An appropriate frequency spectrum plan that will show a systematic switch off of analogue broadcasting services. The spectrum from analogue switch off would then go towards the dividend.
• There are currently broadcasting and non-broadcasting services operating in the spectrum 790 – 862.
• The position of television broadcasters is that ICASA should not make further assignments to non-broadcasting services in this band 790 – 862.
• However, the position of communication service providers in South Africa is that ICASA should migrate all broadcasting services from frequencies 790 – 862 so that the band can be used exclusive for telecommunications services.
31DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
• Sentech commenced the migration process from 1 April 2006.
• Currently the project is in phase 4 providing population coverage of 33.3%. The objective is to achieve 63,3% population coverage by 31 March 2010. Subject to timeous finalisation of the DTT spectrum plan and policy implementation.
• Sentech switched digital signals on 30 October 2008, two days before the deadline at the ITU, World Telecommunications Standardisation Assembly (WTSA).
DTT IMPLEMENTATION IN SOUTH AFRICA
32DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
DTT IMPLEMENTATION IN SOUTH AFRICA cont.
33DD/krs/CEO presentation to ITU Telecom World 2009 FINAL
Chief Executive Officer: Dr. Sebiletso Mokone-MatabaneTel: +27 11 691-7069Fax: +27 11 691-7118email: [email protected]
Sentech LimitedPrivate Bag X06HONEYDEW2040REPUBLIC OF SOUTH AFRICA
THANK YOU