72
1 D-TAC Testing Batteries, Starters and Charging systems using the D- TAC

1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

Embed Size (px)

Citation preview

Page 1: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

1

D-TACTesting Batteries,

Starters and Charging systems using the D-

TAC

Page 2: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

2

What is a D-TAC machine

• The D-TAC machine is a combination of a hand held battery tester and a battery charger

• The tester and charger are electronically linked.

• This allows the tester to analyze current flow during charging which helps determine the true battery condition

Page 3: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

3

Conductance testing

• The D-TAC is a ‘conductance’ type battery tester

• The tester sends a small A/C current through the battery

• The difference between the A/C signal applied to the battery and that same signal exiting the battery is directly related to the ability of the battery plates to produce electric current

Signal sent into the battery

Signal coming out of the

battery

Page 4: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

4

Load testing vs. conductance testing

• A load test places a very high current load on a battery which puts the battery under extreme stress and can cause damage to the battery

• The D-TAC tester is able to test the battery condition using low current, which puts less strain on the battery and allows the tester to be lightweight and easily portable

Load testing machine [VAT]

Page 5: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

5

Load testing machines

• A load testing machine [VAT] draws several hundred amps from the battery while the technician monitors the voltage level between the terminals.

• Normally a load test is run for 15 seconds

Page 6: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

6

D-TAC / charger interface

• The D-TAC can also interface with a battery charger. This provides the D-TAC with data on the rate at which the battery plates can recharge. When the D-TAC is used with the battery charger a much more accurate picture of battery condition is available.

LEDs indicate charger status

Page 7: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

7

Digital testing

• The D-TAC uses digital technology to analyze the condition of the battery. It may perform several different types of test in a fraction of a second.

Page 8: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

8

D-TAC can test a partially charged battery

• A dead or partially charged battery must be fast charged for 15 to 20 minutes before load testing with a VAT

• The D-TAC can test partially charged batteries• This saves you the wasted time setting up a battery

charger only to find out that the battery is no good.

Page 9: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

9

Basic battery test using the D-TACT

• The basic battery test can be done with or without the D-TAC being connected to the charger unit.

• Connect the low current battery clamps to the battery terminals.

Page 10: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

10

D-TAC controlsLow current battery test cable

Socket for adapter cables

Menu control buttons

Display screen

Select button

Activity LED array

On / Off button

Infrared temperature sensor

Printer

Page 11: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

11

Select battery test from the menu

• Scroll up or down the main menu to find the battery test

• Press the ‘S’ select button to proceed

Measured voltage at

battery clamps

D-TAC internal AA

batteries SOC

Page 12: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

12

Diagnostic charge testing

• If the SOC of the battery is low it is best to select “Diagnostic Charge’ from the main menu

• This will require connecting the hand held D-TAC unit to the charging unit.

• Since you need to charge the battery anyway why not do an advanced battery test that will insure the battery can be returned to service

Page 13: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

13

Identify the test vehicle - optional

• If you plan to save the data from the test you will need to enter the repair order number , customer name or vehicle make and year

Page 14: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

14

Is battery in or out of vehicle

• There may be more line ‘noise’ if the battery is connected to the vehicles electrical system

Page 15: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

15

Top post or side post

• There is generally less resistance between the battery clamps and the terminals on a side post battery

Page 16: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

16

Application

• Marine– Marine batteries may be

deep cycle type batteries that have slightly different conductance properties

• Lawn and garden– Usually deep cycle

• Group 31– One of the largest

automotive batteries group size – often deep cycle

• Commercial 4D/8D– Very large battery used

in golf carts and marine applications – deep cycle type

Page 17: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

17

Battery type

• AGM [Absorbed Glass Mat] batteries have slightly different conductance properties from conventional liquid electrolyte type batteries

• Spiral wound batteries have a larger plate area than flat plate batteries

Page 18: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

18

AGM battery for hybrids

• The function of the 12 volt battery in Toyota hybrids is to provide current for the computer systems, lighting system and accessories

• It does not provide current to start the engine when the ignition is off

Positive terminal has a plastic cover

• AGM batteries are found in Toyota hybrids and motorcycles

Page 19: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

19

Battery type

• AGM Spiral are aftermarket batteries that look like a 6 pack of soda cans wrapped in shrink wrap

Page 20: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

20

Ratting units

• The D-TAC can use other types of battery ratings but the CCA rating is the most common type found on batteries sold in the USA

Japan

Germany

Other European countries

Page 21: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

21

CCA Rating

• The CCA rating is usually found on the battery information placard on the top of the battery

Page 22: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

22

Enter the CCA rating

• Use the up and down arrows to change the CCA rating

Page 23: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

23

Measure battery temperature

• The temperature of the battery has a major effect on it’s conductance

• Battery temperature must be entered to achieve accurate test results

Page 24: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

24

Measure battery temperature

• Hold the D-TAC in a vertical position directly over the battery case

• Bring the D-TAC to about 2 inches above the battery and press the right arrow button to record the temperature

Page 25: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

25

Battery test results

• The battery test takes just a few seconds• If the battery passes the test the test result

can be printed out or saved to a PC

Page 26: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

26Printout

• The internal printer uses thermal printing paper – no ink is required

Page 27: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

27

Battery needs to be recharged

• This battery was essentially dead.• The test indicates that the battery is safe to be

recharged • The battery should be recharged in diagnostic mode

using the D-TAC and D-TAC charger

Page 28: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

28

Recharging required

• In some cases the low SOC of the battery will require recharging before diagnosis can be completed

Page 29: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

29

Warning message

• If the D-TAC is detached from the charging unit you will receive this warning message

Page 30: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

30

Mount the D-TAC to the charger unit

• The D-TAC unit must be mounted to the charging unit.

Page 31: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

31

Connect the high current battery clamps

• The charger unit has a set of high current battery clamps that need to be connected to the battery for advances diagnostic testing

• The D-TAC low current clamps are not needed during the charging test

Low current clamps

High current clamps

Page 32: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

32

Charger on / off switch

• The charger unit has an on/off switch located on the rear panel of the charger

• When the charger is plugged in and the switch is turned on the bottom green LED on top of the charger unit will be illuminated

Page 33: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

33

Connect charger clamps to the battery • The high current

battery clamps should be attached to battery terminal

• The D-TAC will measure battery voltage through the charger clamps during diagnostic mode charging

Low current clamps do

not need to be connected

Page 34: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

34

Out of car charging

• Charging can be done with the battery in or out of the car.

• The low current battery clamps do not need to be connected to the battery

Page 35: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

35

Remove cell covers

• The cell covers should be removed during charging

• Any hydrogen gas that is generated during charging must be allowed to dissipate

Page 36: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

36

Charger unit LEDs

• There are four LEDs on the top of the charger unit:– Power– Charging – Fault– Communication

• The ‘Fault’ led illuminates if a shorted battery cell is detected

• The ‘Comm’ light flashes when data is being transferred between the D-TAC and charger unit

Page 37: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

37

Select ‘Diagnostic Charge’ from the menu

• If your starting from scratch you will need to select the diagnostic test from the main menu

Page 38: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

38

Select Diagnostic charging test

• Select ‘diagnostic charge’• Follow the menu prompts to identify the

vehicle and battery parameters

Page 39: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

39

Diagnostic charging

• During diagnostic charging the charging voltage is varied by the D-TAC while the charging current is monitored

• Initial charging may be done at a relative high voltage level to see how easily the battery accepts a charge

Number of charging hours multiplied by charging current

Estimated time to complete charge

Page 40: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

40

Diagnostic charging

• As charging continues the charging voltage will be reduced with a corresponding reduction of charging current

• If an AGM type battery was specified the charging voltage would be limited to 14.4 volts

Page 41: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

41

Battery fault detected

• If a shorted cell is detected the charging test will abort and the fault indicator LED will illuminate

‘Fault’ indicator

Page 42: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

42

Battery failed charging diagnostic test

• The D-TAC measures how many amps pass through the battery at different charging voltage and the increase in voltage after charging for a short time. If the rates are too low the test will return a failure message

• A heavily sulfated battery will not accept a charge

Page 43: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

43

Diagnostic charge test report

• The report shows the SOC voltage and measured CCA after the recharge process was completed.

• Additional information on charge time and the number of amp/hours accepted

Page 44: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

44

Battery, Starting and Charging system test

• The ‘Complete System Test’ exams the battery, starting system and charging system in one test.

Page 45: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

45

Inductive

Amp clamp

• For this series of tests you will need to connect the inductive ‘Amp’ clamp to the accessory socket on the left side of the D-TAC

AMP clamp

Page 46: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

46

Inductive clamp orientation arrow

• The arrow on the inductive clamp normally faces in the direction of current flow

• The inductive clamps measures the strength of the magnetic field surrounding a conductor

• It is important that the clamp jaws are in firm contact with each other

Page 47: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

47

Setup for system test

• The inductive clamps is installed surrounding the battery negative cable

• The D-TAC will measure the current flowing between battery and starter motor during the cranking test and between the battery and alternator during the charging system test

Inductive amp clamp

Page 48: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

48

System test – main menu

• Begin the system test by scrolling down using the arrow buttons

Page 49: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

49

Zero inductive clamp before installing

• Do not connect the amps clamp to the ground cable before the D-TAC completes calibration [zeroing]

• Also, make sure the amp clamp is completely closed – so the ends of the clamp are in firm contact

• As soon as you begin the system test the zeroing procedure will run

Page 50: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

50

Install inductive clamp

• After this screen is displayed you can install the inductive clamp around the ground cable

• The clamp should surround the cable and the ends should snap tightly together

Page 51: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

51

Inductive clamp installed on neg cable• The low current battery clamps are installed

on the battery terminals• The inductive clamp is installed around the

ground cable

Page 52: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

52

Inductive clamp orientation

• The arrow on the inductive clamp normally points in the direction of current flow

• Since the test will measure charging and starting current it doesn't make any difference which way the arrow faces

Page 53: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

53

Enter battery specifications

• Identifying the vehicle and entering battery parameters is done the same ways as for basic battery testing

Page 54: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

54

Jump start post

• One difference in the battery parameters is that for the system test they add a selection for a ‘jump start’ post

Page 55: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

55

Jump start post • On some vehicles the battery is located in the trunk or under the rear seat.

• To facilitate jump starting a terminal is located under the hood – usually next to the fuse box – that connects directly to the battery positive post

• The negative cable is connected to a good engine ground

Page 56: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

56

Negative cable

• Any clean, unpainted surface on the engine block, cylinder head or transmission can be used to connect the D-TAC to battery negative.

Note: Battery charger cables – not D-TAC cables

Page 57: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

57

Battery test

• After inputting the basic battery parameters a regular battery test will run

• If battery SOC is low the D-TAC will request a diagnostic charge test

• After the battery test the starting system test

Page 58: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

58

Starting system test

• After the battery test the starting system test is run• Unlike starter testing using a VAT the D-TAC does not

require that the ignition of fuel system be disabled

Page 59: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

59

Results of Starter test

• The D-DAC can measure the amount of current drawn by the starter in a few milliseconds

• The test here took less than one second

Page 60: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

60

Starter current graph

• The starter draw can also be displayed as a graph

• The graph here shows the voltage level while the engine was cranked by the starter

Page 61: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

61

Charging system test

• The charging system is tested next

Page 62: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

62

Baseline voltage and current

• The D-TAC starts by measuring charging voltage and current at idle with no loads turned on

Page 63: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

63

Increase engine speed to about 1500 rpm

• Once the D-TAC reads the voltage and current it wants to see what happens when the rpm is near cruise speed rpm

Page 64: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

64

Open the throttle • If the throttle is mechanically controlled you can increase the engine rpm by manually operating the throttle linkage

• If the throttle is electronically controlled you will need to operate the gas pedal from inside the car

Page 65: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

65

Testing at idle with loads turned on

• Now the D-TAC wants to see how much current the alternator can produce at idle with about 30 amps of loads turned on

Page 66: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

66Increase engine speed again

• Rev the engine to about 1500 rpm for a second time to allow the D-TAC to record alternator voltage and current output at cruise speed with accessory loads turned on

Page 67: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

67Return engine to idle

• The D-TAC does a final measurement of voltage and current at idle before test is finished

Page 68: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

68

Final analysis

• Once all the system measurements are made the D-TAC records all the data for uploading and printing

Page 69: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

69

Turn off engine

• The engine can now be shut down while the D-TAC finalizes the data

Page 70: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

70

Printout

• The printout shows the data for all three test

Page 71: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

71

Ripple current

• Ripple is the small amount of AC current produced by the alternator that doesn’t get converted to DC

• The D-TAC uses this current to determine engine rpm increase/decrease

• Excess ripple current indicates a defective diode or stator winding in the alternator

Page 72: 1 D-TAC Testing Batteries, Starters and Charging systems using the D-TAC

72

Advanced D-TAC tests

• See the ‘Advanced D-TAC testing’ presentation for information on:

– Voltage drop testing– Multimeter functions– Inductive ammeter functions– Lab Scope functions– Temperature probe [contact and immersion]

temperature measurement– Infrared temperature measurement