18
1 CTS 2 Status Harmonization Update Oxford Harmonization Meeting OMG Technical Meeting HL7 Working Group Meeting CTS 2 Submission Team March 17, 2011

1 CTS 2 Status Harmonization Update Oxford Harmonization Meeting OMG Technical Meeting HL7 Working Group Meeting CTS 2 Submission Team March 17, 2011

Embed Size (px)

Citation preview

Page 1: 1 CTS 2 Status Harmonization Update Oxford Harmonization Meeting OMG Technical Meeting HL7 Working Group Meeting CTS 2 Submission Team March 17, 2011

1

CTS 2 Status Harmonization

Update

Oxford Harmonization Meeting

OMG Technical Meeting

HL7 Working Group Meeting

CTS 2 Submission Team

March 17, 2011

Page 2: 1 CTS 2 Status Harmonization Update Oxford Harmonization Meeting OMG Technical Meeting HL7 Working Group Meeting CTS 2 Submission Team March 17, 2011

Agenda

• Harmonization Meeting Updates

• Oxford Harmonization Meeting

• OMG Technical Meeting

• HL7 Working Group Meeting

• Current Status

• OMG Submission Timeline

• Resources

Page 3: 1 CTS 2 Status Harmonization Update Oxford Harmonization Meeting OMG Technical Meeting HL7 Working Group Meeting CTS 2 Submission Team March 17, 2011

Oxford Harmonization Meeting

Held in Oxford, UK from November 29 to December 3, 2010

Attendees: Harold Solbrig, Russ Hamm

• Representatives from:

• Apelon, Inc.

• Codicies

• IHTSDO

• Oxford University

• Mayo Clinic

• UK National Health Service (NHS)

3

Page 4: 1 CTS 2 Status Harmonization Update Oxford Harmonization Meeting OMG Technical Meeting HL7 Working Group Meeting CTS 2 Submission Team March 17, 2011

Oxford Harmonization Meeting

• Monday-Tuesday

• Met with Jim Davies and Charles Crichton and reviewed various aspects of the model, including the representation of cardinality, the designation and use of optional parameters in method calls and the aggregation of methods into services. Dr. Davies indicated that the underlying approach was valid and requested that Oxford be included as a supporter on the final document.

• Wednesday

• Met with Fernando Gallo (Codicies), Ann Wrightson (NHS Wales), Russ Hamm and John Carter (Apelon), Jim Davies and Charles Crichton (Oxford) and Sarah Ryan (Ockam). The meeting focused on the update and authoring portions of the model and we received a lot of input on how the information needs to be modeled and presented for the final document.

4

Page 5: 1 CTS 2 Status Harmonization Update Oxford Harmonization Meeting OMG Technical Meeting HL7 Working Group Meeting CTS 2 Submission Team March 17, 2011

Oxford Harmonization Meeting

• Thursday

• Discussion on the current state of the CTS 2 specification with respect to SNOMED-CT and IHTSDO

• The structure, philosophy and approach being taken

• Met with John Guttai, David Markwell and Ann Wrightson (NHS Wales), Fernando Gallo (Codicies) Russ Hamm, Jim Davies, Charles Crichton (Oxford) and Sarah Ryan (Ockam).

• Discussed IHTSDO's take on authoring (they were of the opinion that it was not well enough understood to standardize) and the IHTSDO Release Format 2 model.

5

Page 6: 1 CTS 2 Status Harmonization Update Oxford Harmonization Meeting OMG Technical Meeting HL7 Working Group Meeting CTS 2 Submission Team March 17, 2011

Oxford Harmonization Meeting

• Thursday (continued)

• Discussed work that David Markwell has been doing regarding post-coordinated value sets, agreeing that that portion of the project was not sufficiently mature to include in CTS2.

• Received guidance about restructuring the submission and what it needed to do in order to receive IHTSDO approval.

• Discussions:• Representation, selection and application of constraints including:

• Search constraints by reference sets

• Extension and intensional

• Static and dynamic (i.e. pre-declared and on-the-fly)

• Post-coordinated expressions constraints

• Semantic expression constraints

• Literal expression constraints 6

Page 7: 1 CTS 2 Status Harmonization Update Oxford Harmonization Meeting OMG Technical Meeting HL7 Working Group Meeting CTS 2 Submission Team March 17, 2011

Oxford Harmonization Meeting

• Thursday (continued)

• Discussions:• Classifier integration and related functionality • CTS 2 support for SNOMED Release Format 2 (RF2)• Significant discussion surrounding the update model for CTS 2

• Need to ensure that workflow and business process pertaining to terminology management is not mandated by CTS 2

• Need to demonstrate RF2 support• Contents of RF2 is the complete content of SNOMED since 2002, managed via

active/inactive flags

• Received a IHTSDO commitment to endorse all sections of the specification except authoring conditional on the discussed changes being met.

• On December 15, 2010 the IHTSDO Workbench voted to formally support CTS 2, with the exception of the update model.

7

Page 8: 1 CTS 2 Status Harmonization Update Oxford Harmonization Meeting OMG Technical Meeting HL7 Working Group Meeting CTS 2 Submission Team March 17, 2011

Object Management Group Meeting

Held in Santa Clara, CA from December 6 – 10, 2010

Attendees: Harold Solbrig, Craig Stancl

• Met with the Healthcare group to present an outline of the submission.

• Met with the Ontology PSIG to review what we were doing on the model and presented the issues we were facing.

• Fed CTS2 requirements into the API4KB project, which is attempting to standardize the RDF/OWL API, which currently has multiple implementations (Jena, Protégé 3, Manchester API and others).

• CTS2 requirements dovetailed well with other groups and also provided possible solutions to some of the issues.

8

Page 9: 1 CTS 2 Status Harmonization Update Oxford Harmonization Meeting OMG Technical Meeting HL7 Working Group Meeting CTS 2 Submission Team March 17, 2011

Object Management Group Meeting

• Discussed Ontology identity vs. reasoning engines - whether the identity of an ontology changes after a particular reasoner has been applied. Feedback was incorporated into CTS2 specification.

• Both of these meetings (Healthcare and Ontology) provided significant feedback that led to a wholesale restructuring of the submission document as well as significant changes in how it was represented.

9

Page 10: 1 CTS 2 Status Harmonization Update Oxford Harmonization Meeting OMG Technical Meeting HL7 Working Group Meeting CTS 2 Submission Team March 17, 2011

Object Management Group Meeting

Deliverables:

• Presentation to the Healthcare Domain Task Force on Wednesday, December 8, 2010

• https://cabig-kc.nci.nih.gov/Vocab/uploaded_files/2/2f/OMG_CTS2.pptx

• Presentation to the Ontology PSIG on Thursday, December 9, 2010

• https://cabig-kc.nci.nih.gov/Vocab/uploaded_files/e/ed/OMG_OPSIG.pptx

10

Page 11: 1 CTS 2 Status Harmonization Update Oxford Harmonization Meeting OMG Technical Meeting HL7 Working Group Meeting CTS 2 Submission Team March 17, 2011

HL7 Working Group Meeting

Held in Sydney, Australia from January 9 – 14, 2011

Attendees: Harold Solbrig, Russ Hamm, Craig Stancl

• Presented outline of submission to Vocabulary working group and participated in a series of related discussions.

• Met with Lloyd McKenzie to begin education and harmonization alignment steps for MIF and other HL7 models.

• Met with the HL7 SOA working group and presented the work being done and got advice on how to organize and structure the submission.

• Presented to the "SOA in Healthcare Day" on CTS2 and its content and got significant buy-in from the community.

11

Page 12: 1 CTS 2 Status Harmonization Update Oxford Harmonization Meeting OMG Technical Meeting HL7 Working Group Meeting CTS 2 Submission Team March 17, 2011

HL7 Working Group Meeting

• Met with ONC where it was agreed that a one cycle submission delay would be acceptable and committed to having the ONC developers look at and work with the specification prior to submission. This decision partially resulted in a request to move the OMG submission deadline to move from February 21, 2011 to May 23, 2011.

12

Page 13: 1 CTS 2 Status Harmonization Update Oxford Harmonization Meeting OMG Technical Meeting HL7 Working Group Meeting CTS 2 Submission Team March 17, 2011

HL7 Working Group Meeting

Deliverables

• Presentation to the HL7 Vocabulary Working Group on Jan 11, 2011.

• https://cabig-kc.nci.nih.gov/Vocab/uploaded_files/8/82/HL7_CTS2.pptx

13

Page 14: 1 CTS 2 Status Harmonization Update Oxford Harmonization Meeting OMG Technical Meeting HL7 Working Group Meeting CTS 2 Submission Team March 17, 2011

Current Status

• “Status Report” (current draft submission) submitted to OMG ADTF on Feb 21, 2011 in place of original final submission (anticipated May 23).

• https://cabig-kc.nci.nih.gov/Vocab/uploaded_files/b/bb/OMG_20110221_CTS_2_Submission.pdf

• UML model is approaching a steady state

• Fundamental Model and Functionality remains consistent with first submission(s)

• Work continues on:• Refactoring and refinement: each community has its own needs and “non-

negotiables”• Naming: each community has its own names• Formal semantics: a precise specification is a lot of work• Exception handling

• Scheduled for submission to OMG on May 23, 2011 for June meeting.14

Page 15: 1 CTS 2 Status Harmonization Update Oxford Harmonization Meeting OMG Technical Meeting HL7 Working Group Meeting CTS 2 Submission Team March 17, 2011

CTS 2 Timeline

Event or Activity Date Purpose

OMG Technical Meeting (Arlington, VA)

March 21-25, 2011

Update Healthcare DTF and Ontology PSIG and request submission extension.

 

Update Healthcare DTF Provide updates to the working group. Review specification and solicit feedback.Update Ontology PSIG

Attend ADTF present current status and request change of date for revised submission

March 23, 2011

Make a motion to request change for revised submission date.

CTS 2 Community Support Session (Rockville, MD) March 28-29, 2011

Review CTS 2 spec with interested groups.

CTS 2 Peer Review Sessions (NCI, VKC, HL7, IHTSDO, Codices, etc)

  April 2011 Review CTS 2 spec with community groups.

On-going CTS 2 specification updates based on accepted feedback from community.

  current - May 2011

Finalize submission content.

HL7 Working Group Meeting (Lake Buena Vista, FL)

May 15-20, 2011

Vocab and SOA Work Group meetings for PIM finalization.

 

Update Vocabulary Working Group

Update SOA Working Group

Revised Submissions Due (new) May 23, 2011

New date if approved by the ADTF. Submit final submission.

Page 16: 1 CTS 2 Status Harmonization Update Oxford Harmonization Meeting OMG Technical Meeting HL7 Working Group Meeting CTS 2 Submission Team March 17, 2011

CTS 2 Timeline (Continued)

Event or Activity Date Purpose

OMG Technical Meeting (Salt Lake City, UT) June 20-24, 2011 To present final revised submission to OMG and numerous votes.

 

Revised Submission Presentation June 20-24, 2011 Present CTS 2 final submission.

Final evaluation and selection by TF / Recommendation to AB and TC

June 20 and 23, 2011 OMG Process

TC Vote to recommend specification June 20, 2011 OMG Process

[Anticipated] Approval of recommendation by Architecture Board / Review by TC

June 23, 2011 OMG Process

Platform Technical Committee Adoption Vote

June 24, 2011

OMG Process

Charter Finalization Task Force Following the passing of the spec, a finalization task force is chartered (FTF) to address technical issues that arise from implementation feedback based upon the publicly available spec.

Publication of Beta Specification to OMG website July 2011 Specification available for implementers.

OMG Technical Meeting (Cambridge, MA) June 18-22, 2012 FTF Report.

  Finalization Task Force Report to AB June 18-22, 2012 The FTF produces a report and a set of deltas to the specification that are defended to the AB. Following a successful AB vote, an implementation questionnaire must be completed by two business entities indicating that the spec has been implemented. That is the precondition to the BoD vote.

OMG Technical Meeting (Jacksonville, FL) September 10-14, 2012

Attend Healthcare DTF and Ontology PSIG meetings. Attend final vote.

  BoD Vote to adopt specification September 10-14, 2012

Vote to adopt specification.

Page 17: 1 CTS 2 Status Harmonization Update Oxford Harmonization Meeting OMG Technical Meeting HL7 Working Group Meeting CTS 2 Submission Team March 17, 2011

Resources

• CTS 2 Submission Wiki• http://informatics.mayo.edu/cts2/index.php/Main_Page

• HL7 CTS 2 SFM (DSTU)• http://www.hl7.org/documentcenter/ballots/2009may/downloads/V3_CTS_R2_DST

U_2009OCT.pdf

• OMG RFP for CTS 2• http://www.omg.org/cgi-bin/doc?ad/2009-9-17

• CTS 2 Submission Team• Harold Solbrig ([email protected])• Russ Hamm ([email protected])• Rick Kiefer ([email protected])• Craig Stancl ([email protected])

17

Page 18: 1 CTS 2 Status Harmonization Update Oxford Harmonization Meeting OMG Technical Meeting HL7 Working Group Meeting CTS 2 Submission Team March 17, 2011

Questions?

18