Page 1: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

1

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

KEN DAYKEN DAY

ConsultantConsultant

Command Alkon Inc.Command Alkon Inc.

Page 2: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

2

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

The title is not strictly correct, because all the types of control presented are in use today.

Page 3: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

3

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

The categories are not separated according to geographical location, per capita income, expenditure on plant, knowledge of concrete properties, or even computer literacy. They are also not necessarily in time sequence. Basic division is on the grounds of philosophical concept.

Page 4: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

4

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

The stages of philosophical development are seen as

follows:

1) Prescription specification

directly supervised

by the engineer or owner.

Page 5: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

5

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

2)2)Strength specification but

hedged in by limits on cement

content and enforced by

minimum strength on an

individual truck basis.

Page 6: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

6

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

3) 3) Recognition that, at a given

strength, high water content is

more deleterious than low cement

content, - leading to total

abandonment of minimum cement

content specification.

Page 7: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

7

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

4) 4) Reluctant permission to use

a limited proportion of flyash,

slag etc.

Page 8: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

8

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

5) Requirement that pozzolanic materials be used to reduce heat generation.

Page 9: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

9

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

6) Reluctant permission to use admixtures (following decades of successful but unauthorised use).

Page 10: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

10

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

7) ) Requirement that admixtures be used to retard set, reduce water content, shrinkage, heat generation etc.

Page 11: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

11

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

8 ) )Recognition of statistical variation and the importance of low variability, leading to use of a target strength incorporating standard deviation.

Page 12: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

12

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

9 ) ) Recognition that variability cannot be assessed from a very limited number of results.

Page 13: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

13

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

10 ) ) Recognition of testing

error, leading to discarding of

low result from widely

separated pairs rather than

penalisation for such a result.

Page 14: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

14

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

11) ) Recognition that it is far

more efficient to ensure that

no unsatisfactory concrete is

produced rather than to try

to detect individual

unsatisfactory truckloads.

Page 15: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

15

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

12) ) Recognition that the concrete

supplier is in a far better position

to control his concrete than the

purchaser, leading to ISO

certification of suppliers instead of

control of supplied concrete by

purchaser.

Page 16: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

16

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

13) ) Availability of batching

equipment and software which can

record full details of every truck,

and even predict its strength as it

leaves the concrete plant, at

almost zero cost.

Page 17: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

17

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

14) ) Availability of truck-

mounted workability monitoring

and control gear (“to close the

last loophole”)

Page 18: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

18

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

15) ) Recognition that low variability

is an important goal, and that it

depends on continuous

adjustment of mix proportions as

materials properties vary, rather

than rigid adherence to approved

proportions.

Page 19: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

19

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

16) ) Recognition that mix

adjustment based on

production test data is much

more accurate than trial mixes.

Page 20: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

20

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

17) ) Recognition that cusum (cumulative

sum) analysis enables test results (strength,

density, slump, temperature and dozens of

others) from any number of widely different

mixes to be plotted on the same graph,

removing the need to concentrate testing on

a “control mix” and giving much faster

detection of change.

Page 21: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

21

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

18) ) Recognition that pro-active

adjustment for material variability

can reduce variability, even though

less accurate than reactive

adjustment and so not replacing

the latter.

Page 22: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

22

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

19) ) Availability of software that

can instantaneously calculate

the revised proportions

necessary to compensate for a

change of sand or coarse

aggregate.

Page 23: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

23

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

20) ) Availability of software that

can optimise a whole range of

hundreds of mixes in a few

minutes

Page 24: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

24

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

(optimise meaning automatically select

the most economical aggregate

proportions which will provide the

nominated fresh concrete properties

and accompany this with the precise

cement content required to achieve the

specified strength taking into account

current early age test data).

Page 25: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

25

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

21) ) Availability of software that can

proportion the next truck of

concrete in a few seconds, taking

into account desired fresh and

hardened properties, current test

data, temperature and haulage

time/distance.

Page 26: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

26

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

22) ) Availability of software and

facilities that will automatically

email nominated individuals if any

truck is dispatched bearing

concrete likely to be unsatisfactory

for almost any reason.

Page 27: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

27

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

23) ) Availability of hardware and

software enabling concrete test

specimens to be weighed, measured

and compression tested automatically

with the results being automatically

entered in the control system,

assessed, and reported by email

where appropriate.

Page 28: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

28

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

24) ) Availability of hardware and

software enabling the current

strength of concrete in any part of

a newly cast structural element to

be read, and the future strength

growth to be predicted.

Page 29: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

29

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

We have reached a stage where the production of low variability concrete of almost any reasonably desired strength (ie w/c ratio) can be achieved almost totally automatically.

Page 30: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

30

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

The inhibiting factor is that purchasers, structural designers and other specifiers often do not understand the situation or are inhibited by out-of-date regulations, textbooks, or other sources of advice.

Page 31: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

31

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

The best control is being achieved where suppliers receive encouragement to control, and are allowed to profit by the attainment of such control.

Page 32: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

32

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

Where a supplier is inhibited by minimum cement content specifications or not allowed to design and adjust his mixes freely, he is essentially denied the possibility of making additional profit through using good materials, good plant, or knowing or caring anything about mix design or quality control.

Page 33: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

33

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

Under these circumstances the worst suppliers are the most competitive and control technology develops slowly if at all.

Page 34: 1 CONTROLLING CONCRETE QUALITY: Yesterday, Today, and Tomorrow KEN DAY Consultant Command Alkon Inc

34

CONTROLLING CONCRETE QUALITY:Yesterday, Today, and Tomorrow

The presented list should enable specifiers, controllers, and producers to see where they are on the time scale of development and to consider where they would like to be.