1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

Embed Size (px)

Citation preview

Page 1: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

1

Chapter 6: Material Management

Helmut Steiner

Ulrich Priesmeyer

Kernkraftwerk Gundremmingen GmbH

Priesmeyer, KRB A, 6. Material Management

Page 2: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

2

Material Management

Page 3: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

3

Expected Volume of Radioaktive Waste

• type and quality of construction materials

• quality of the used nuclear fuel

• age of the plant

• operational history

• availability of clearance levels for materials

... is in general determinded by

Page 4: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

4

Volumes of LLW and ILW from Reactor Operations and Decommissioning in m³

Page 5: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

5

Major Primary Waste Stream

Burnable wastes (protective clothing, wood from ventilated hoods, laboratory furniture...) Low to High level massive metallic wastes (reactor internals, reactor pressure vessel, primary pumps, reservoirs, valves, structural materials...) Low to High level super-compactable metallic wastes (same sources as above plus e.g. electric cables, light supports, instrumentation...) Massive concrete wastes from slightly activated or contaminated slabs, floors, shielding walls, room walls... Concrete and bricks super-compactable rubble from demolition activities of activated or contaminated materials. Sludges from deposits in reservoirs and liquid sumps. Light non metallic super-compactable materials (isolation, asbestos...) Special waste such as contaminated lead bricks and shielding.

Page 6: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

6

Radiological Characterisation

• Protection of workers, public, environment

• classification of operations

• waste processing

• costs

Page 7: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

7

Important Factors for Decommissioning

• existence of a waste repository or at least

• defined acceptance criteria for radioactive waste

• criteria or clearance levels for unrestricted release of material

Page 8: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

8

Ways of disposal

Residuals and Removed Parts of the Plant

Non-hazardous Re-use

Melting

Deconta-mination

Re-use

Release for Conventional

Dump

Refuse Disposal Site

Conditioning

Final Repository

Radioactive Waste

Page 9: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

9

Structure for material flow

f in a l d isp o sa lin g e o lo g ica l

s tru c tu res

a s ra d io a c tiv w a s te

d o m e s tic w a s ted u m p

b u ild in g w a s ted u m p

w a s tein c in e ra tion

o th e r typ e o fd isp o s it ion

co n ve n tio n a l

d isp o sa l

b u ild in g s

co m p on e n ts

re u se

u n re s tric tedre cyc lin g

re cyc lin gw ith in the

n u c le a r f ie ld

co n tro lledre cyc lin g

re cyc lin g

n o n -d e trim e n ta l reu se a n d re cyc ling

re u sa b le m a te ria ls,co m p on e n ts

Page 10: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

10

Definitions and working steps duringtreatment of material

material arising during decommissioning

checking if reuse or recycling is possible

raw waste

pretreatment: incineration, shredding, evaporation, etc.

interim product

treatment: drying, compaction,cementation, pouring, etc.

waste product

packaging

waste package

yes reuse

no

container

conditioning

interim storage final disposal

Page 11: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

11

Decontamination measures forpossible waste streams

negative

contaminated pieceof material

measurement or calculation of the contamination

decontamination for the purpose of reuse

measurement of decontamination success

material can be reused ?

decontamination for the purpose of recycling

measurement of decontamination success

material can be reused ?

economical investigation

1. cost / benefit-analyses

2. risk / benefit-analyses

3. conditioning / storage-analyses

choice of the appropiate decontamination process

decontamination for the purpose of segmentation

measurement of decontamination success

Conditioning and packaging

reuse recycling disposal as conventional

waste

final disposal

Above release limit

positive

lower than

release limit

no no

yes yes

Page 12: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

12

Example: KRB A

Page 13: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

13

Initial Status

Page 14: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

14

Mass Flow of contaminated andactivated Material at KRB A

Page 15: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

15

Material Balance at KRB A

7,075 Mg

5,348 Mg

1,708 Mg

Status: 30.06.02

Page 16: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

16

Material Flow during Decommissioning

systems + components

operating material tools

post-dismantling

decontamination

free release recycling waste

Page 17: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

17

Turbine Hall at KRB A

Page 18: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

18

Factors for Material Management

Page 19: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

19

Disposal or Recycling ?

Page 20: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

20

Example for contaminated material:Ice-Sawing of a Steam Generator

Page 21: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

21

Ice-Sawing of a Steam Generator

Page 22: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

22

Material Balance of a Steam Generator

Page 23: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

23

Recycling Campagne for Electric Cables

Page 24: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

24

Separation of Insulation and Copper

Page 25: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

25

Recycling Campagne for Electric Cables

Page 26: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

26

View into the Rector Pressure Vessel

Page 27: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

27

Example for activated Material:Dismantling of RPV Internals

Page 28: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

28

Container for Final Storage

Page 29: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

29

MOSAIK - Container

Page 30: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

30

Classification of RPV Material

Page 31: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

31

New Waste Container

Page 32: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

32

Onion Cast Container (Monolith)

Page 33: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

33

Prototype of a Onion Cast Container

Page 34: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

34

Technical Measures and Methods for Conditioning of Radioactive Waste

Liquid Waste

- Incineration

- Fixation

- Filtration, Decantation

- Evaporation

Solid Waste

- Direct packaging

- Compaction

- Super-Compaction

- Incineration with super-compaction of ashes)

Page 35: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

35

Waste Conditioning Methods

Material Possible Treatment Internal Packagingand Transportation

External Packagingand Transportation

mixed material,

e.g cable, electriccomponents, smallparts

(super-) compaction pellets

container for pellets(suitable for finaldisposal)

measurements forunrestricted release

decontamination

small containers(boxes) Container

melting 200-1 drums

metallic components

final disposal small containers(boxes)

container for finaldisposal

isolation material (super-) compaction pellets container for pellets(suitable

for final disposal)

decontamination

release

concrete:blocks, debris

final disposal

small container container (suitable forfinal disposal)

secondary wastes:protection cloths, foils,etc.

incineration or similarprocesses

bags container for finaldisposal (after super-compaction of ashes)

Page 36: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

36

In-drum Compactor

Page 37: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

37

Burnable Waste Compactor

Page 38: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

38

FAKIR - Supercompactor

Page 39: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

39

FAKIR - Supercompactor

Page 40: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

40

FAKIR - Supercompactor

Page 41: 1 Chapter 6: Material Management Helmut Steiner Ulrich Priesmeyer Kernkraftwerk Gundremmingen GmbH Priesmeyer, KRB A, 6. Material Management

41

PETRA - Pellet Drying Plant