1

CDM 2015 (Consultation)

CDM 2007 2015Principal Designer

Evolution or Revolution

2

CDM 2015 (Consultation)

Topics

•Current Definition of ‘designer’

•Intentions of the TMCS Directive

•Intentions of CDM 2007/2015

•Headline Changes in CDM 2015

•The role of ‘Principal Designer’

•Active Management of Risk

3

CDM 2015 (Consultation)

Designer (ACOP 2007)

115Designers are those who have a trade or a business which involves them in:

(a) preparing designs for construction work, including variations. This includes preparing drawings, design details, specifications, bills of quantities and the specification (or prohibition) of articles and substances, as well as all the related analysis, calculations, and preparatory work; or

(b) arranging for their employees or other people under their control to prepare designs relating to a structure or part of a structure.

4

CDM 2015 (Consultation)

116 Designers therefore include:

(a) architects, civil and structural engineers, building surveyors, landscape architects, other consultants, manufacturers and design practices (of whatever discipline) contributing to, or having overall responsibility for, any part of the design, for example drainage engineers designing the drainage for a new development;

(b) anyone who specifies or alters a design, or who specifies the use of a particular method of work or material, such as a design manager, quantity surveyor who insists on specific material or a client who stipulates a particular layout for a new building;

Contd……

5

CDM 2015 (Consultation)

(c) building service designers, engineering practices or others designing plant which forms part of the permanent structure (including lifts, heating, ventilation and electrical systems), for example a specialist provider of permanent fire extinguishing installations;

(d) those purchasing materials where the choice has been left open, for example those purchasing building blocks and so deciding the weights that bricklayers must handle;

(e) contractors carrying out design work as part of their contribution to a project, such as an engineering contractor providing design, procurement and construction management services;

Cont’d….

6

CDM 2015 (Consultation)

(f) temporary works engineers, including those designing auxiliary structures, such as formwork, falsework, façade retention schemes, scaffolding, and sheet piling;

(g) interior designers, including shopfitters who also develop the design;

(h) heritage organisations who specify how work is to be done in detail, for example providing detailed requirements to stabilise existing structures; and

(i) those determining how buildings and structures are altered, for example during refurbishment, where this has the potential for partial or complete collapse.

7

CDM 2015 (Consultation)

HSE Consultation

Consultation Document CD261 issued March 2014 with Responses submitted by 6th June 2014

1427 Responses received by HSE (considered good)400 responses were from Entertainments Sector Campaign524 responses were from CDM Co-ordinatorsOthers included clients, contractors, etc

Only 162 responses from designers

There are 39000 Architects on the ARB Register aloneadd IStructE, ICE, CIBSE, RICS, CABE, CIOB takes the tally to several 100,000 designers in construction.

In this context 162 seems to indicate a lack on interest/engagement with CDM.

8

CDM 2015 (Consultation)

Implementation Date

6th April 2015

9

CDM 2015 (Consultation)

Headlines

This is not a full explanation of the CDM Regulations

it is purely to highlight the proposed changes

10

CDM 2015 (Consultation)

European Directive - Infractions

• Exclusion of domestic clients• Threshold of applicability

11

CDM 2015 (Consultation)

CDM Co-ordinator - 2007

CDM Co-ordinators need a sound understanding of:

• health and safety in construction work;• the design process;• the importance of co-ordination of the

design process;• an ability to identify information which

others will need to know about the design in order to carry out their work safely.

12

CDM 2015 (Consultation)

Andy Jobling - Technical Manager, Levitt Bernstein

MaPS 1999

RMaPS 2007

ARB1982

RIBA 1982

Architect / CDM Co-ordinator

13

CDM 2015 (Consultation)

Notification

Notification •Is now an independent requirement.•does NOT trigger CDM duties•Client to submit F10

14

CDM 2015 (Consultation)

Notification

Projects are NOTIFIABLE to HSE if:

More than 30 days duration on siteandMore than 20 operatives on site

orMore than 500 mandays of construction work

 

15

CDM 2015 (Consultation)

Applicability

Construction Work… …not cleaning

Definition largely unchanged, except….

…or other maintenance (including cleaning which involves the use of water or an abrasive at high pressure or the use or corrosive or toxic substances)

16

CDM 2015 (Consultation)

Applicability

• All ‘Construction’ Projects

• All ‘Clients’ including domestic

• All ‘Designers’

• Co-ordination Duties kick in where likely to be 2 or more contractors on site (as EC Directive)

• Co-ordination of Pre-Construction Phase byPrincipal Designer

• Co-ordination of Construction Phase byPrincipal Contractor

17

CDM 2015 (Consultation)

Duty Holders

1994 Regulations 2007 Regulations 2015 Regulations

Client Client Client

Client’s Agent (None) Principal Contractor

(Domestic - default)

Principal Designer

(Domestic - Appt)

Designer Designer Designer

Planning Supervisor CDM Co-ordinator Principal Designer

Principal Contractor Principal Contractor Principal Contractor

Contractor Contractor Contractor

Integration of H&SCo-ordination into Design Team

18

CDM 2015 (Consultation)

Principal Designer

Who ?

…‘designer’ in control of the Pre-Construction Phase of the project.

Doing what ?

…to plan, manage, monitor, co-ordinate the Pre-Construction Phase

19

CDM 2015 (Consultation)

Principal Designer

‘Ensure’ …other duty holders

•No contractual relationship

•Not insurable

Health and Safety File… …subsequent appropriate revision from time to time…

•Responsibility in perpetuity ?

•No handover

20

CDM 2015 (Consultation)

Principal Designer

21

CDM 2015 (Consultation)

Client (except Domestic)

the Principal Designer and the Principal Contractor

….until the client appoints someone else !

Client is deemed to be

22

CDM 2015 (Consultation)

Domestic Client

the Client can pass their duties to Principal Designer…

….or the Principal Contractor gets these by default !

Client Duties (None)

23

CDM 2015 (Consultation)

Projects for Domestic Client

1st Appointed Designer = Principal Designer

1st Appointed Contractor = Principal Contractor

Defaults

24

CDM 2015 (Consultation)

Construction Phase

Status Quo

Schedule 2 – Welfare Facilities retained

Construction Phase Plan – required on all projects but not reviewed or approved.

25

CDM 2015 (Consultation)

Health & Safety on Construction Sites

Regulation 17(3)No timber or other material with projecting nails (or similar sharpobject) shall—(a) be used in any work; or(b) be allowed to remain in any place,if the nails (or similar sharp object) may be a source of danger to any person.

26

CDM 2015 (Consultation)

Competence

ACOP – Appendix 4 dropped

Reliance on Management of Health & Safety Regulations – implicit requirement to employ competent company/individuals.

Emphasis on information, instruction, training and supervision. (Reg 8)

27

CDM 2015 (Consultation)

ACOP

Mini-ACOPAutumn 2015

28

CDM 2015 (Consultation)

Industry Guidance

HSE have left Construction Industry (CONIAC) to produce its own guidance documents

These are being written now in advance of the regs so could be at variance with final Regs

Legal status unsure ?

29

CDM 2015 (Consultation)

Transitional Arrangements – CDM Co-ordinator

The new regulations require clients to appoint the Principal Designer as soon as practicable.

So what happens to existing CDM-C Appointments …. ?

HSE have indicated there will be a 6 month Transition Period (for projects in the Construction Phase).

30

CDM 2015 (Consultation)

Principal Designer

Co-ordination of Health and Safety through the Pre-Construction Phase

31

CDM 2015 (Consultation)

Designers’ Risk Assessment (DRA)

‘It is pointless to complete the

design first, then try to address the

risks which the design has

introduced.’ACOP Para 126

32

CDM 2015 (Consultation)

Hazard Identification and Risk Management

Eliminate

Reduce

Inform

Control

http://www.hse.gov.uk/construction/designers/content/residualhazardlist.htm

active management of risk

33

CDM 2015 (Consultation)

Hazard Identification and Risk Management

Eliminate

Reduce

Inform

Control

Reduce paperwork going forward

Project specific information

ask yourself ‘does it reduce risk ?’

34

CDM 2015 (Consultation)

Active Management of Risk

Identify Hazard

What is Risk

What are Consequences

Who is affected

Allocate Risk Owner

35

CDM 2015 (Consultation)

Active Management of Risk

Plan successive actions to reduce risk

Regularly review actions taken

Record actions taken

36

CDM 2015 (Consultation)

Active Management of Risk

If Hazard cannot be eliminated through design state why.

37

CDM 2015 (Consultation)

Active Management of Risk

State Information needed by Principal Contractor to Manage risk during Construction Phase

38

CDM 2015 (Consultation)

Active Management of Risk

State Information needed by Client to manage any residual risk

39

CDM 2015 (Consultation)

Active Management of Risk

Combined into Risk Management Log with Summary at beginning

40

CDM 2015 (Consultation)

Active Management of Risk

…and Issue Log at the end.

41

CDM 2015 (Consultation)

Communication

Communicate effectively:

notes on drawings

written information provided with the design

suggested construction sequences

42

CDM 2015 (Consultation)

Communication - Symbols

43

CDM 2015 (Consultation)

Communication - Symbols

44

CDM 2015 (Consultation)

Designers’ Initiative on Health & Safety (DIOHAS)

Dissemination of best practice.

www.diohas.org.uk

45

CDM 2015 (Consultation)

•Competence

•Sub-Consultancy and Criminal Law

•Professional Indemnity

•Fees

Possible Issues - Discuss

46

CDM 2015 (Consultation)

Individual Responsibility

Do not be distracted by a few irresponsible operatives….

….designers can make a difference to the safety and health of building workers.

47

CDM 2015 (Consultation)

Individual Responsibility

taking construction in its widest sense to include all those who build, clean, repair, maintain, demolish and now also use our buildings as a workplace - we may touch the lives of many thousands of people.

We have a duty to all of those.