Addendum 2 Proposal for Sidewalk Gap and Infill Engineering Page 1 of 2 ADDENDUM NO. 2 PROJECT: Proposal for Sidewalk Gap and Infill Engineering PROPOSALS DUE: Friday, July 27, 2018 10:00 am This addendum is issued prior to the receipt of proposals to amend the RFP as follows: 1. BIDDER’S REQUEST FOR INFORMATION Q. Do CAD drawings need to follow Traverse City Engineering CAD standards? A. Not necessarily but the drawings shall be in AutoCAD format with a coherent and intuitive layer scheme. Please do not attach blocks to points. Production line work (lines meant to be printed on a plan) shall be 2D only. Production line work shall not be attached to surfaces (TIN, DTM etc.). Surfaces shall be provided in XML format in addition to the surfaces being in the DWG file. Consultant shall prepare point files (PNEZD comma delimited). DWG file shall not contain exploded blocks or points. XREF’s and shortcuts shall be kept to a minimum. Provide plot style tables and line type files for printing. Q. We were finalizing our numbers and see that item 6 under “Submittal of Proposals” states: “All proposals submitted must also include a separate cost breakdown by Hours and Cost for each location.” If this is required, what locations is the City referring to? Each sidewalk location? Or each work block such as “TCAPS Traverse Heights School District”, “East Front Indian Neighborhood” and South Garfield Avenue”? A. As a minimum provide cost breakdowns per scope item listed in the RFP. Q. How many hours per day do you expect the consultant to be onsite during construction? A. The City has had success in minimizing our time onsite on other projects by providing the Contractor with clear and concise direction as far as where the sidewalk should be constructed and staking the ROW and good communication with adjacent property owners. We’ve attached plans and sketches we’ve used in the past for areas where AutoCAD designs and constructing staking were not needed. During construction the Consultant should plan on at least one site visit per work day to answer any questions the Contractor may have and to prepare an Inspection Daily Report with pay items.

1. BIDDER’S REQUEST FOR INFORMATION

  • Upload
    others

  • View
    4

  • Download
    0

Embed Size (px)

Citation preview

Addendum 2 Proposal for Sidewalk Gap and Infill Engineering Page 1 of 2

ADDENDUM NO. 2 PROJECT: Proposal for Sidewalk Gap and Infill Engineering PROPOSALS DUE: Friday, July 27, 2018 10:00 am This addendum is issued prior to the receipt of proposals to amend the RFP as follows:

1. BIDDER’S REQUEST FOR INFORMATION

Q. Do CAD drawings need to follow Traverse City Engineering CAD standards? A. Not necessarily but the drawings shall be in AutoCAD format with a coherent and

intuitive layer scheme. Please do not attach blocks to points. Production line work (lines meant to be printed on a plan) shall be 2D only. Production line work shall not be attached to surfaces (TIN, DTM etc.). Surfaces shall be provided in XML format in addition to the surfaces being in the DWG file. Consultant shall prepare point files (PNEZD comma delimited). DWG file shall not contain exploded blocks or points. XREF’s and shortcuts shall be kept to a minimum. Provide plot style tables and line type files for printing.

Q. We were finalizing our numbers and see that item 6 under “Submittal of

Proposals” states: “All proposals submitted must also include a separate cost breakdown by Hours and Cost for each location.” If this is required, what locations is the City referring to? Each sidewalk location? Or each work block such as “TCAPS Traverse Heights School District”, “East Front Indian Neighborhood” and South Garfield Avenue”?

A. As a minimum provide cost breakdowns per scope item listed in the RFP. Q. How many hours per day do you expect the consultant to be onsite during

construction? A. The City has had success in minimizing our time onsite on other projects by

providing the Contractor with clear and concise direction as far as where the sidewalk should be constructed and staking the ROW and good communication with adjacent property owners. We’ve attached plans and sketches we’ve used in the past for areas where AutoCAD designs and constructing staking were not needed. During construction the Consultant should plan on at least one site visit per work day to answer any questions the Contractor may have and to prepare an Inspection Daily Report with pay items.

Addendum 2 Proposal for Sidewalk Gap and Infill Engineering Page 2 of 2

Q. If the sidewalk is only on one side of the road is mapping from the center line over to the row on that side acceptable?

A. Yes

All other conditions of this Request for Proposals remain the same. Bidders must acknowledge receipt of this addendum. Acknowledgement must be shown in the spaces provided herein and must be received with the bid, Friday, July 27, 2018 10:00 AM., local time, at the place of bid opening at the office of The City Engineer, 400 Boardman Avenue, Traverse City, MI. 49684. FAILURE TO ACKNOWLEDGE RECEIPT OF THIS ADDENDUM WILL CAUSE REJECTION OF BID. Sincerely,

Dated: ____________________ Timothy J. Lodge, P.E. City Engineer ACKNOWLEDGED: Bidder: _______________________ By: _______________________ Title: _______________________

7/27/2017This map is based on digital databases

from the City of Traverse City.Traverse City cannot accept any responsbility for errors,

ommissions or positional accuracy.There are no warranties expressed or implied.

IBMG

"?B"?B

"?B

"?B

"?B

"?B

"?B

"?B

"?B

"?B

!!2

!!2

!!2

!!2!!2

!!2

!!2

! (

! (

! (

! (

! (

! (

! (

! (

! (

! (

! (

! (

! (

! (

G!.

G!.

G!.

!!2

!!2

!!2!!2

CENTRE

WOOD

MERE

BARL

OW

851

849

740

878

880

710

907

City of Traverse CityDepartment of Engineering

1 inch = 40 feet

LegendSidewalks

4 inch6 inch9 inch

Sanitary Manholes!!2 Access!2! Inspection

Water HydrantsG!. Active

Water System Valves&É Butterfly, No&É( Butterfly, Yes

! (h( Check, No

! (h(( Check, Yes

! ( Gate, No! (( Gate, Yes!= Plug, No

Water Curb Stop Valves!Uq Water Curb Stop Valves

Storm Treatment System!. Storm Treatment System

Storm Manholes!!2 Storm Manholes

Storm Inlets"?B Catchbasin

ParcelsParcels

2017

Side

walk

Repla

ceme

nt an

d Gap

Infill

Proje

ct-Lo

catio

n #2

Centr

e St.

Wood

mere

to Ba

rlow

Ce ntre : W ood m e re to Barlow (Location #2)Est. Qty. Unit De scription of Ite m s166.66 SYD Pavt, Re m , S pe cial2 EA S tructure / Casting Ad just using Ex. Casting1590 SFT Concre te S id e w alk, 4 inch1405 S FT Concre te S id e w alk/Drive /Ram p, 6 inch240 S FT Concre te S id e w alk/Drive /Ram p, 9 inch24 FT Detectable W arning, Cast in Place, Re placeable , Brick Re d , 24” W id e4.4 TON Hand Patch ing, HMA, 13A (330#/SYD.)300 FT Site Pre paration / Cle an Up / Re storation

Remove & replace existing ramp

Remove & replace existing ramp

Connect to existing(not shown on aerial image)

Reconstruct alley approach with 9" conc.

Provide supplemental gravel, paid as site preparation/clean up/restoration

Connect to existing ramp

Reconstruct drive approach with 6" conc.Reconstruct drive approach with 6" conc.

Connect to existing sidewalk

Driveway to be closed on a Thursday,removed/cast in full width,and reopened by the following Monday

Driveway to be removed/cast in part width

7/27/2017This map is based on digital databases

from the City of Traverse City.Traverse City cannot accept any responsbility for errors,

ommissions or positional accuracy.There are no warranties expressed or implied.

IBMG

"?B"?B

"?B

"?B "?B

"?B "?B

"?B "?B

"?B

"?B

!!2

!!2

!!2

!!2

!!2

!!2 ! (

! (

! (

! (

! (

! (

! (

! (

! (

G!.

G!.

!!2

!!2

!!2

!!2

!!2

GRAN

T

CENTRE

BARL

OW879

840

913

878

875

817

832

810 814

828820

880

811883

City of Traverse CityDepartment of Engineering

1 inch = 40 feet

LegendSidewalks

4 inch6 inch9 inch

Sanitary Manholes!!2 Access!2! Inspection

Water HydrantsG!. Active

Water System Valves&É Butterfly, No&É( Butterfly, Yes

! (h( Check, No

! (h(( Check, Yes

! ( Gate, No! (( Gate, Yes!= Plug, No

Water Curb Stop Valves!Uq Water Curb Stop Valves

Storm Treatment System!. Storm Treatment System

Storm Manholes!!2 Storm Manholes

Storm Inlets"?B Catchbasin

ParcelsParcels

2017

Side

walk

Repla

ceme

nt an

d Gap

Infill

Proje

ct-Lo

catio

n #2

Centr

e St.

Barlo

w to

Gran

t

Ce ntre : Barlow to Gra nt (Loca tion #2)Est. Qty. Unit De scription of Ite m s64.67 SYD P avt, Re m , Spe cia l6 EA Structure / Casting Adjust using Ex. Casting45 FT Concre te Curb a nd Gutte r Re place m e nt4002 SFT Concre te Side wa lk, 4 inch683 SFT Concre te Side wa lk/Drive /Ram p, 6 inch416 SFT Concre te Side wa lk/Drive /Ram p, 9 inch18 FT De te cta b le Wa rning , Cast in P lace , Re place a b le , Brick Re d, 24” Wide4.45 TON Hand P a tching , HMA, 13A (330#/SYD.)730 FT Site P re pa ra tion / Cle a n Up / Re stora tion

Connect to existing ramp

Connect to existing rampReconstruct alley approach with 9" conc. Remove & replace curb,

construct new 6" conc. ramps

Remove & replace curb, construct new 6" conc. ramp

Close full width of driveway when completing removals/concrete casting

Close full width of driveway when completing removals/concrete casting

7/27/2017This map is based on digital databases

from the City of Traverse City.Traverse City cannot accept any responsbility for errors,

ommissions or positional accuracy.There are no warranties expressed or implied.

IBMG

"?B "?B

"?B "?B

"?B "?B

"?B"?B

!!2

!!2

!!2

!!2

! (

! (

! (

! (

! (

! (

! (

G!.

G!.

!!2!!2

!!2

!!2

!!2

!!2

!!2

GRAN

T

BATE

S

CENTRE

854

837

847840

842

828835

872

840

841

832833

845

828862

858

City of Traverse CityDepartment of Engineering

1 inch = 40 feet

LegendSidewalks

4 inch6 inch9 inch

Sanitary Manholes!!2 Access!2! Inspection

Water HydrantsG!. Active

Water System Valves&É Butterfly, No&É( Butterfly, Yes

! (h( Check, No

! (h(( Check, Yes

! ( Gate, No! (( Gate, Yes!= Plug, No

Water Curb Stop Valves!Uq Water Curb Stop Valves

Storm Treatment System

!. Storm Treatment SystemStorm Manholes!!2 Storm Manholes

Storm Inlets"?B Catchbasin

ParcelsParcels

2017

Side

walk

Repla

ceme

nt an

d Gap

Infill

Proje

ct-Lo

catio

n #2

Centr

e St.

Gran

t to Ba

tes

Remove & replace curb, construct new 6" conc. ramps Remove & replace curb,

construct new 6" conc. rampsReconstruct driveway See Plan and Profile

Dated 7/20/2017

Remove & replace curb, construct new 6" conc. ramp

Reconstruct alley approach with 9" conc.

Reconstruct driveway See Plan and Profile

Dated 7/20/2017

Remove & replace curb, construct new 6" conc. ramps

Remove trees in this area as directed by engineer

Remove trees in this area as directed by engineer

Shared use Path, GradingSee Plan and Profile

Dated 7/20/2017

Shared use Path, GradingSee Plan and Profile

Dated 7/20/2017

Ce ntre : Grant to Bate s (Location #2)Est. Qty. U nit De sc ription of Ite m s124.67 SYD Pavt, Re m , Spe c ial7 EA Tre e , Re m , 13 inc h to 24 inc h1 EA Tre e , Re m , 25 inc h to 36 inc h4 EA Stum p, Re m , 6 inc h to 12 inc h1 EA Stum p, Re m , 13 inc h to 24 inc h397 FT Share d use Path, Grad ing2 EA W ate r Shutoff, Re c onst, Case 22 EA W ate r Se rv, Conflict2 EA Mailbox, Ad j2 EA Structure / Casting Ad just using Ex. Casting145 FT Conc re te Curb and Gutte r Re plac e m e nt3811 SFT Conc re te Sid e walk, 4 inc h1518 SFT Conc re te Sid e walk/Drive /Ram p, 6 inc h416 SFT Conc re te Sid e walk/Drive /Ram p, 9 inc h36 FT De te ctable W arning, Cast in Plac e , Re plac e able , Bric k Re d , 24” W id e6.4 TON Hand Patching, HMA, 13A (330#/SYD.)365.5 FT Site Pre paration / Cle an U p / Re storation1087 SYD 4 inc h Sc re e ne d Topsoil, Se e d , Fe rtilize r, Mulc h397 FT Alternate-Se gm e nte d Masonry Re taining W all, 0' to 3' High, with Cap

Construct driveway See Plan and Profile

Dated 7/20/2017Construct driveway See Plan and Profile

Dated 7/20/2017

Close full width of drivewaywhen completing removals/concrete casting

7/27/2017This map is based on digital databases

from the City of Traverse City.Traverse City cannot accept any responsbility for errors,

ommissions or positional accuracy.There are no warranties expressed or implied.

IBMG

"?B

"?B"?B

"?B

"?B

"?B"?B

!!2

!!2

!!2

! (

! (

! (

! (

! (

! (

! (

G!.

G!.

!!2

!!2

!!2 !!2

!!2 !!2!!2

!!2!!2

ROSE

BATE

S

CENTRE

830

878

885

872888 906

840

892

841

879

876

833

836

897

862

877

City of Traverse CityDepartment of Engineering

1 inch = 40 feet

LegendSidewalks

4 inch6 inch9 inch

Sanitary Manholes!!2 Access!2! Inspection

Water HydrantsG!. Active

Water System Valves&É Butterfly, No&É( Butterfly, Yes

! (h( Check, No

! (h(( Check, Yes

! ( Gate, No! (( Gate, Yes!= Plug, No

Water Curb Stop Valves!Uq Water Curb Stop Valves

Storm Treatment System

!. Storm Treatment SystemStorm Manholes!!2 Storm Manholes

Storm Inlets"?B Catchbasin

ParcelsParcels

2017

Side

walk

Repla

ceme

nt an

d Gap

Infill

Proje

ct-Lo

catio

n #2

Centr

e St.

Bates

to R

ose

Ce ntre : Ba te s to Rose (Loca tion #2)Est. Qty. Unit De scription of Ite m s154 SYD P avt, Re m , Spe cia l1 EA Sig n, Type IIIB, Re m5 EA Structure / Casting Adjust using Ex. Casting88 FT Concre te Curb a nd Gutte r Re place m e nt2371 SFT Concre te Side wa lk, 4 inch1154 SFT Concre te Side wa lk/Drive /Ram p, 6 inch416 SFT Concre te Side wa lk/Drive /Ram p, 9 inch48 FT De te cta b le Wa rning , Cast in P lace , Re place a b le , Brick Re d, 24” Wide4.2 TON Hand P a tching , HMA, 13A (330#/SYD.)537 FT Site P re pa ra tion / Cle a n Up / Re stora tion14 FT P ost, Ste e l, 3 pound (14’ Le ng th)1 EA Sig n, Type IIIB, Ere ct, Sa lv

Remove & replace curb, construct new 6" conc. ramps

Remove & replace curb, construct new 6" conc. ramps

Remove & replace curb, construct new 6" conc. ramps

Remove & replace curb, construct new 6" conc. ramps

Relocate existing street name sign on new 3lb post

Remove & replace approx. 150' of damaged sidewalk on south side of Centre St. between Bates & Rose

Provide supplemental gravel, paid as site preparation/clean up/restoration

Provide supplemental gravel, paid as site preparation/clean up/restoration

Approach to be placed with HMA

7/27/2017This map is based on digital databases

from the City of Traverse City.Traverse City cannot accept any responsbility for errors,

ommissions or positional accuracy.There are no warranties expressed or implied.

IBMG

"?B

"?B"?B

"?B

"?B

"?B

"?B

"?B

"?B!!2

!!2

!!2

!!2

! (

! (

! (

! (

! (

! (

! (

! (

! (

! (

! (

G!.

G!.

G!.

G!.

!!2!!2

!!2

!!2!!2

!!2!!2

!!2

!!2

ROSE

FERN

CENTRE

KELLEY

938 942

842

932

924

915 925

928

919 931 937

926

905

837

833

829City of Traverse CityDepartment of Engineering

1 inch = 50 feet

LegendSidewalks

4 inch6 inch9 inch

Sanitary Manholes!!2 Access!2! Inspection

Water HydrantsG!. Active

Water System Valves&É Butterfly, No&É( Butterfly, Yes

! (h( Check, No

! (h(( Check, Yes

! ( Gate, No! (( Gate, Yes!= Plug, No

Water Curb Stop Valves!Uq Water Curb Stop Valves

Storm Treatment System!. Storm Treatment System

Storm Manholes!!2 Storm Manholes

Storm Inlets"?B Catchbasin

ParcelsParcels

2017

Side

walk

Repla

ceme

nt an

d Gap

Infill

Proje

ct-Lo

catio

n #2

Centr

e St.

Rose

to Fe

rn

Ce ntre : Rose to Fe rn (Loca tion #2)Est. Qty. Unit De scription of Ite m s182 SYD P avt, Re m , Spe cia l7 EA Structure / Casting Adjust using Ex. Casting140 FT Concre te Curb a nd Gutte r Re place m e nt6162 SFT Concre te Side wa lk, 4 inch1652 SFT Concre te Side wa lk/Drive /Ram p, 6 inch48 FT De te cta b le Wa rning , Cast in P lace , Re place a b le , Brick Re d, 24” Wide13 TON Hand P a tching , HMA, 13A (330#/SYD.)1179 FT Site P re pa ra tion / Cle a n Up / Re stora tion

Remove & replace curb, construct new 6" conc. ramps

Remove & replace curb, construct new 6" conc. ramps

Remove & replace curb, construct new 6" conc. ramps

Remove & replace curb, construct new 6" conc. ramps,connect to existing paved trail