1 Beamlin e Day Tal k Presente r Topic Wed 9 th 1 L. Howlett Target Design Status 2 K. Walaron Beamline/Target Diagnostics 3 K. Tilley Status of Muon Beamline design 4 P. Drumm Beamline Engineering MICE Collaboration Meeting, LBNL, Feb2005 Summaries & Action Items

1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

Embed Size (px)

Citation preview

Page 1: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

1

Beamline

Day Talk Presenter Topic

Wed 9th 1 L. Howlett Target Design Status

2 K. Walaron Beamline/Target Diagnostics

3 K. Tilley Status of Muon Beamline design

4 P. Drumm Beamline Engineering

MICE Collaboration Meeting, LBNL, Feb2005

Summaries & Action Items

Page 2: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design
Page 3: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design
Page 4: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design
Page 5: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design
Page 6: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design
Page 7: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design
Page 8: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

Concern over Radiation levels

FIRST assessment of radiation levels.

Using FLUKA code.

800MeV protons, 10x10x1mm3 Ti target.

Flux at 1.4E12

Page 9: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design
Page 10: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design
Page 11: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design
Page 12: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

paul drumm, mutac jan 2003 12

MICE Target work (CB et al)

1. Calculate and review target heating under 1.7x10^12 proton intersections. 1Hz/3Hz.

2. Investigate temperature monitoring schemes for target (thermocouple/IR/IR+modified target topology)

3. Solve position sensing system irregularities

4. Update TRD with current FLUKA radiation level results

5. Continue to assess radiation level & effects on NdFeB / electronics

6. Setup ISIS engineer contact & determine acceptable in-vacuum materials etc.

7. Construct and test full prototype.

Summary• Pre-prototype has been constructed and tested. Experience gained in control electronics, mechanical

mounting & position readout very useful.• First full prototype expected at end of February.• Programme progressing according to Schedule. Problems however with radiation levels, heating &

vacuum conditions remain of concern. Involvement of ISIS engineers essential for tackling some of these.• Some modifications/design iterations expected after prototype constructed.

Actions

Page 13: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

Beamline/Target Diagnostics

Kenny Walaron

University of Glasgow / RAL

Page 14: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

Motivation

• Particle production from target = greatest unknown in experiment (& governs all rates, Good Muons etc)

• Measure proton interceptions / pion&muon production against & up to maximum permissible ISIS beamloss

Page 15: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

Equipment & Position

• Segmented scintillator with double sided read-out to measure dE/dx placed inside ISIS ring

PMTs XP2020 or EM19954

Segmented BC-404

Page 16: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

Simulation: 10m from Target (20m also simulated)

Page 17: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

paul drumm, mutac jan 2003 17

Target Diagnostics (KW et al)

1. Establish if present PMTs are reliable, if not obtain & forward quote for new.

2. Submit experiment proposal to ISIS (PD)

3. Purchase equipment (scintillators…) and construct detectors

4. Source a suitable DAQ system. (basis of a Question to Plenary audience)

5. Mount in position in synchrotron vault - Summer'05 shutdown.

Actions (KW et al)

• Plan drawn up to quantify particle production from target, using dE/dx in scintillator devices.

• Using extension of g4beamline code - proton, (pion/muon) discrimination possible in theory. Actual PID discrimination subject to rates observed, ideas being pursued to handle these.

Summary

Page 18: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

paul drumm, mutac jan 2003 18

Target Diagnostics (KW et al)

1. Establish if present PMTs are reliable, if not obtain & forward quote for new.

2. Submit experiment proposal to ISIS (PD)

3. Purchase equipment (scintillators…) and construct detectors

4. Source a suitable DAQ system.* (basis of a Question to Plenary audience)

5. Mount in position in synchrotron vault - Summer'05 shutdown.

Actions (KW et al)

• Plan drawn up to quantify particle production from target, using dE/dx in scintillator devices.

• Using extension of g4beamline code - proton, (pion/muon) discrimination possible in theory. Actual PID discrimination subject to rates observed, ideas being pursued to handle these.

Summary

"Audience Action"! :-*.(Does any person know of an available DAQ system suitable for this experiment?)

Page 19: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

paul drumm, mutac jan 2003 19

Status of Muon Beamline design work

Kevin Tilley, RAL, 9th Feb

• Including Beamline Materials in new revision

• Reference ('true') momenta/materials effects (g4)

• Fitting TTL representations to 'true' g4 effects.

• Some inclusions in TPT/TTL design codes ….

• The Pb-diffuser position: feasible? / re-examination?

Page 20: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

paul drumm, mutac jan 2003 20

Statement of Problem:SEPT04 & Beamline Materials

SEPT04 Beamline optics & initial momenta designed w/o taking into account effect of materials ie. Vacuum windows, PIDs etc, on beam.

μ+ central momentum in Tracker1 – design 206 MeV/c

μ+ central momentum in Tracker1 – achieved (g4bl) 183 MeV/c

hence:-

+ exist probable further differences ie. MATCHING ('Good Muons'), EMITTANCE etc between design goal & g4bl evaln.

Page 21: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

paul drumm, mutac jan 2003 21

Deduction of correct 'Reference' Initial Momenta's/Material Effects

(Thks to KW, using g4bl/g4)

Aimed @ 207.31 after 2x Tkr Planes, for p-ref=200MeV/c

Q1'

Q2'

Q3'

B1

DecS

Q4

Q5

Q6

Q7

Q8

Q9

ECSS

Arrive @ Muon source momentum.

Page 22: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

paul drumm, mutac jan 2003 22

Element Momentum Before (MeV/c) Momentum After (MeV/c) momDiff g4 √θ2 (mrad)

TrackerPlanesX2 208.05 207.31 0.74 5.97TrackerWindow 208.566 208.05 0.516 8.12AIRDiffuser_trackerWindow 208.582 208.566 0.016 0.71Diffuser 219.862 208.582 11.28 86.68AIRTOF1_diffuser 220.012 219.862 0.15 2.59TOF1 232.162 220.012 12.15 24.76AirCkov1_TOF1 233.832 232.162 1.67 11.47Ckov1 241.812 233.832 7.98 23.60AirTOF0_Ckov1 242.252 241.812 0.44 3.95TOF0 253.892 242.252 11.64 22.11AIRprotAbs_TOF0 255.422 253.892 1.53 6.72ProtAbs 265.832 255.422 10.41 18.98AIRdecSolWin_ProtAbs 265.952 265.832 0.12 1.82DecSolWinDS 266.2 265.952 0.248 3.82

Hence…Ref set of Beamline Muon Momentas & 2

Page 23: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

paul drumm, mutac jan 2003 23

Element Momentum Before (MeV/c) Momentum After (MeV/c) momDiff g4 √θ2 (mrad)

TrackerPlanesX2 208.05 207.31 0.74 5.97TrackerWindow 208.566 208.05 0.516 8.12AIRDiffuser_trackerWindow 208.582 208.566 0.016 0.71Diffuser 219.862 208.582 11.28 86.68AIRTOF1_diffuser 220.012 219.862 0.15 2.59TOF1 232.162 220.012 12.15 24.76AirCkov1_TOF1 233.832 232.162 1.67 11.47Ckov1 241.812 233.832 7.98 23.60AirTOF0_Ckov1 242.252 241.812 0.44 3.95TOF0 253.892 242.252 11.64 22.11AIRprotAbs_TOF0 255.422 253.892 1.53 6.72ProtAbs 265.832 255.422 10.41 18.98AIRdecSolWin_ProtAbs 265.952 265.832 0.12 1.82DecSolWinDS 266.2 265.952 0.248 3.82

Hence…Ref set of Beamline Muon Momentas & 2

…. pion channel in progress …

Page 24: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

paul drumm, mutac jan 2003 24

TTL Model Fitting:- Example - 2" TOF0

Fitted TTL model. Choose to prioritise fit to delta-p, vary density --> & find density 0.892

ie. Now p-totout = 242.252MeV/c. ~ 16.9 mrad (cf. g4bl 22.1mrad)2

INPUT:

OUTPUT:

p-tot X'

√θ2TTL ~ 0.76.√θ2

g4bl

Basic TTL model does not give same p-totout, or ,so,2

Page 25: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

paul drumm, mutac jan 2003 25

Hence…table of ready TTL/TPT materials-fit data

Element Momentum Before (MeV/c) Momentum After (MeV/c) momDiff TTL/TPT √θ2 (mrad) g4 √θ2 (mrad)

TrackerPlanesX2TrackerWindowAIRDiffuser_trackerWindowDiffuserAIRTOF1_diffuser 220.012 219.862 0.15 2.06 2.59TOF1 232.162 220.012 12.15 20.66 24.76AirCkov1_TOF1 233.832 232.162 1.67 7.596 11.47Ckov1 241.812 233.832 7.98 19.836 23.60AirTOF0_Ckov1 242.252 241.812 0.44 3.5 3.95TOF0 253.892 242.252 11.64 16.91 22.11AIRprotAbs_TOF0 255.422 253.892 1.53 6.357 6.72ProtAbs 265.832 255.422 10.41 14.68 18.98AIRdecSolWin_ProtAbs 265.952 265.832 0.12 1.22 1.82DecSolWinDS 266.2 265.952 0.248 3.42 3.82

Page 26: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

paul drumm, mutac jan 2003 26

Illustration of some of the Muon channel materials in TPT:-

Q4

Q5

Q6

Q7

Q8

Q9

TOF0

AT0C

CKV1

TOF1

Q4

Q5

Q6

Q7

Q8

Q9

Page 27: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

paul drumm, mutac jan 2003 27

The Pb-position: Feasible? / Re-examine?

• A scheme had been drawn for supporting the Pb. diffuser in its present position.

Geoffs plot /

• We have a prescription, using a number of codes (G4MICE/BL & TPT/TTL) to re-examine this position if necessary.

0.76cm Pb.

1.2245 m

(Upstream) EndCoil

Pb.

Q9 Downstream Mirror Plate

Q9 Body

Tracker.

0.76cm Pb.

1.2245 m

(Upstream) EndCoil

Pb.

Q9 Downstream Mirror Plate

Q9 Body

Tracker.

Page 28: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

paul drumm, mutac jan 2003 28

Re-examining the Pb-position: 'How-to'

• Can make crude re-est. again in TPT/TTL - checking matched εn for different d

• But to do properly, use G4MICE/G4BL as well as TPT/TTL :-

– New factors (since CERN CM: March'04) :-

• Better comprehension of εn !

• The presence of the upstream iron detector shield.

– The procedure:-

• Work backwards from matched εn=10π (or other max) beam with certain preferred Pb position 'p'. Also choose detector shield position as a variable 'd'? Use G4MICE/G4BL.

• Q: Can beamline supply this beam ? (Use TPT/TTL for quick answer)

• Re-run above test with different detector shield positions 'd' if needed.

• If beamline cannot supply beam, bring Pb position 'p' closer to solenoid & repeat until beamline can supply beam. Finish with the

Page 29: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

paul drumm, mutac jan 2003 29

Beamline design & evaluation

1. Complete geant4 materials reference table. (KW)

2. Complete TTL fitting to materials (KT)

3 Complete MICE-note of above materials modelling work (KT/KW)

4 Produce new beamline design & evaluate (KT/KW)

5. Establish if present Pb-position feasible & proposed mounting (GB/PD/KT)

6. Evaluate impact of chromatic abberations / off-momentum matching (KT)

7. Re-examine beam matching under detector shielding environment (if time) (KT/KW/…?)

Actions

Summary • Progress made modelling beamline materials, and including first few into

TPT/TTL. Progress towards new revision however slower than hoped.• Mechanical support scheme for present Pb position available. Procedure for re-

examining position exists (using G4MICE/BL & TPT/TTL) if so needed.

Page 30: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

paul drumm, mutac jan 2003 30

Beamline engineering talk

P. Drumm, RAL, 9th Feb

Page 31: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

paul drumm, mutac jan 2003 31

Beamline Engineering

Discussion Items • Beamline vacuum system outlined:

– ISIS Vacuum, Air-gap, Beamline Vacuum, Decay Solenoid Vacuum. UHV?– No vacuum system in Muon Channel (Air only, He?)

• Beamline magnet mounting & alignment– Quad Triplets aligned together, girder, away from beamline.– Mounting stands need to be designed

• Radiation shielding concept:– Light concrete wall partitioning off entry area of beamline into MICE-Hall– Steel only in direct line of sight from MICE-Hall to synchrotron RF cavity. (protecting from fast neutrons)– Work ongoing with MCNPX

• Coordinate systems:– Number of coordinate system, potentially confusing (TPT system, MICE-centre)

Page 32: 1 Beamline DayTalkPresenterTopic Wed 9 th 1L. HowlettTarget Design Status 2K. WalaronBeamline/Target Diagnostics 3K. TilleyStatus of Muon Beamline design

paul drumm, mutac jan 2003 32

Beamline Engineering

Actions

Summary • Number of beamline engineering issues presented: vacuum system concept,

magnet mounting, hall radiation shielding (using MCNPX).• Point raised about existence of number of different (& therefore potentially

confusing?) coordinate systems. (TPT system, MICE-centre…)

1. Estimate physical space/mounting needed for beamline diagnostic devices (KW/KT)

2. Identify Target monitoring, controls & services needs. Determine physical location & possible commonalities eg. with other control equipment. (CB/PD)

3 Resolve radiation shielding needs (PD)

4. Provide TRD subsection explaining relation of TPT coordinate system to MICE coordinate system. (example=Pb position) (KT)

5. Ensure beamline engineering update at June Collaboration meeting (some topics = stands, alignment, target, cyro, quad-refurbishment…) (PD)