1
Beam test at DESY
Date: 01/12 – 19/12Place: DESY, Testbeam area 24
Time schedule and more information available:http://desyntwww.desy.de/~testbeam
2
Test beam area 24
movabletable fixture for
scintillatorsmagnet(not used)
Good conditionsin test beam area- plenty of space- no problem with usage of gas-comfortable counting room
3
Detectors and services4 Warsaw modules are shipped from Nikhef toHeidelberg this week.
Mechanical support and gas system can be provided by Heidelberg.
Most effort still necessary for electronics(see next slides). available manpower is limited!
4
Necessary Equipment (Hardware)
4 front end boxes missing
1 distribution box (including I²C) missing
TTC-system : TTCvi + TTCvx available
1 OrxCard + 12 LVDS Adapter available
2 Stratix Boards + Adapter available
5
Necessary Equipment (Hardware)
Power supplies : missing
± 5V / 50A
2.5V / 5A
3.3V /10A
3 PCs available
2 Scintillator + Nim crate available
Cooling missing
(Peltier element + CPU cooler )
6
Necessary Equipment (Software)
Stratix board code for 6 links available
in Dortmund??
Readout software for the available
Stratix Board via PCI-Bus
DAQ monitoring missing
I²C control available
TTC control available