TO: The Artec Group, Inc. P.O. Box 50335 Sarasota, FL 34232-0302 DATE: 02/14/2017 JOB NO: 153823 REFERENCE: St. Pete-Clwr. Airport DESCRIPTION: ATTN: Dan Heim, Project Manager SENT TO YOU VIA: Mail Blueprinter Overnight Delivery (Carrier) E-Mail Your Pick-Up Michael Baker Messenger Other Courier No. of Copies No. of Originals DESCRIPTION 1 ASI #013 Documents SENT FOR YOUR: Approval Review Comments Per Your Request Files Signature Use Information REMARKS: Enclosed is ASI#013 with the referenced sketches and drawings all dated 1/31/2017 attached. BY: William “Chip” Hayward, Jr. AIA, CSI- CCCA COPIES TO: Scott Yarley w/1 set (enclosed) Michael Cummings w/1 set (enclosed) Angela Dunkel w/ digital copy Sharepoint w/ enclosed File Senior Associate/Architect Michael Baker International

1 ASI #013 Documents - projects.mbakercorp.com · ASI #013 Narrative Summary of Revisions: ARCHITECTURAL ASI 013 SK-13A Partial Ceiling Plan @ Future Kiosk & Lounge Seating 1. Revised

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: 1 ASI #013 Documents - projects.mbakercorp.com · ASI #013 Narrative Summary of Revisions: ARCHITECTURAL ASI 013 SK-13A Partial Ceiling Plan @ Future Kiosk & Lounge Seating 1. Revised

TO: The Artec Group, Inc.

P.O. Box 50335

Sarasota, FL 34232-0302

DATE: 02/14/2017

JOB NO: 153823

REFERENCE: St. Pete-Clwr. Airport

DESCRIPTION:

ATTN:

Dan Heim, Project Manager

SENT TO YOU VIA: Mail Blueprinter Overnight Delivery (Carrier)

E-Mail Your Pick-Up

Michael Baker Messenger Other Courier

No. of Copies

No. of Originals

DESCRIPTION

1 ASI #013 Documents

SENT FOR YOUR: Approval Review Comments Per Your Request

Files Signature Use Information

REMARKS: Enclosed is ASI#013 with the referenced sketches and drawings all dated 1/31/2017 attached.

BY:

William “Chip” Hayward, Jr. AIA, CSI-

CCCA COPIES TO: Scott Yarley w/1 set (enclosed) Michael Cummings w/1 set (enclosed) Angela Dunkel w/ digital copy Sharepoint w/ enclosed File

Senior Associate/Architect Michael Baker International

Page 2: 1 ASI #013 Documents - projects.mbakercorp.com · ASI #013 Narrative Summary of Revisions: ARCHITECTURAL ASI 013 SK-13A Partial Ceiling Plan @ Future Kiosk & Lounge Seating 1. Revised

ARCHITECT’S SUPPLEMENTAL INSTRUCTIONS PIE Gates 7-10 Phase III Terminal Improvements

Form Dated – July 21, 2016

___________________________________________________________________________________________________ PROJECT (Name and address): St. Petersburg-Clearwater Airport Gates 7-10 Terminal Addition

ARCHITECT’S SUPPLEMENTAL INSTRUCTION NO: 013

OWNER ARCHITECT:

CONSULTANT: OWNER (Name and address): St Pete-Clearwater International Airport 14700 Terminal Blvd Clearwater, FL 33762

DATE OF ISSUANCE: 01/31/2017 CONTRACT FOR: General Construction

CONTRACTOR: FIELD

FROM ARCHITECT (Name and address): Michael Baker, Jr., Inc. 5020 West Linebaugh Avenue, Suite 240 Tampa, FL 33624

CONTRACT DATE: 3/17/2016 OTHER

TO CONTRACTOR (Name and address): The Artec Group, Inc. P.O. Box 50335 Sarasota, FL 34232-0302

ARCHITECT’S PROJECT NUMBER: MBI #153823

___________________________________________________________________________________________________ The Work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract Documents without change in Contract Sum or Contract Time. Proceeding with the Work in accordance with these instructions indicates your acknowledgement that there will be no change in the Contract Sum or Contract Time. DESCRIPTION: The enclosed drawings and sketches, all dated January 31, 2017, are listed in the attached narrative summary. Sketches were created for the revised the wall length adjacent to the future kiosk to be extended to align with the ceiling soffit & lower ceiling at light cove (as discussed in the field), an authorized list of sound system integrators. The sound system/speaker drawing (sheet E4.02) was modified to reflect the sound system changes requested by the Airport, and the mechanical drawing (sheet M1.02) was modified to address the conflict with the light cove and the duct work that was identified in the field. The attached narrative summary lists all of the changes to the Contract Documents, pages 1-1 of 1, dated January 31, 2017, outlines the revisions for each sketch and drawing as part of ASI #013.

ATTACHMENTS (Here insert listing of documents that support description): ASI#013 - Narrative Summary of Contract Document Revisions, dated January 31, 2017, page 1 of 1. Revised Drawings as outlined in the Narrative Summary attached. ASI #013 SK 13A – Partial Plan @ Future Kiosk/Lounge Seating ASI #013 SK 13B – Sound System Vendor List (Integrators) ASI #013 SK 13C – Mechanical Duct Work @ Future Kiosk/Lounge Seating E4.02 – Ground Level Gates 7-10 Sound System Plan M1.02 – Mechanical Plan Ground Level Gates 7-10 cc: Scott Yarley w/1 set (enclosed)

Michael Cummings w/1 set (enclosed) John Mcoy w/1set (enclosed) Angela Dunkel w/digital copy SharePoint w/enclosed File

__________________________________________________________________________________________________ ISSUED BY THE ARCHITECT:

_____________________________________________ William A. Hayward, Jr. (Chip) AIA, CSI-CCA, LEED GA (Signature) (Printed name and title)

Page 3: 1 ASI #013 Documents - projects.mbakercorp.com · ASI #013 Narrative Summary of Revisions: ARCHITECTURAL ASI 013 SK-13A Partial Ceiling Plan @ Future Kiosk & Lounge Seating 1. Revised

Page | 1

January 31, 2017 St. Petersburg-Clearwater International Airport Gates 7-10 Terminal Improvements ASI #013 Narrative Summary of Revisions: ARCHITECTURAL ASI 013 SK-13A Partial Ceiling Plan @ Future Kiosk & Lounge Seating

1. Revised to show an extended wall to align with the soffit. 2. Lowered light cove ceiling height to accommodate the duct work at the lounge seating

area. ASI 013 SK-13B Sound System Vendor (Integrator) List

1. Authorized Sound System’s vendors by the Airport. ELECTRICAL E4.02 Ground Level gates 7-10 Sound System Plan

1. Updated Sound System drawings to reflect Airport requirements for the addition of a “homerun” to PA system, and addition of PA systems microphone connections, and temporary provisions until the new IDF room is constructed.

2. Clarify the location of ambient noise sensors. 3. Added the third party vendor (integrator) requirements & testing of the complete system.

MECHANICAL ASI 013 SK-13C Mechanical Duct Work @ Future Kiosk & Lounge Seating

1. Updated duct work drawings to address duct work modifications required due to conflicts with the lounge seating light cove and the duct work.

M1.02 Mechanical Plan Ground Level Gates 7-10

1. Updated duct work drawings to address duct work modifications required due to conflicts with the lounge seating light cove and the duct work. The ceiling height of the light cove will be adjusted to accommodate the bottom elevation of the revised duct work, as noted on SK-13A attached.

End of summary of revisions.

Page 4: 1 ASI #013 Documents - projects.mbakercorp.com · ASI #013 Narrative Summary of Revisions: ARCHITECTURAL ASI 013 SK-13A Partial Ceiling Plan @ Future Kiosk & Lounge Seating 1. Revised

101

PLAY ZONE

KIDS

102

AREA

LOUNGE

103

KIOSK

FUTURE

104

STOR.

107

MEN

E128

COMM

EXIST

B

ROOM

GB114

20 SFX' x Y'

s

EL = 8'-3" AFF

LINE OF COVE LIGHT

1'-6" (TYP)

EL = 12'-4" AFF

EL = 11'-0" AFF

EL = 11'-6" AFF

OVERHEAD

MOUNTED TVS

FOLDING GRILLE

TRACK (ALT)

1'-6"

1'-6"

(T

YP

)

1'-6"

7'-4"

8'-3

1

4

"

1'-11

1

2

"

1'-6"

1'-6"

1'-6"

17'-1

1

4

"

2'-3"

1'-6"

1'-6"(T

YP

)

35'-0

11

16

"

1'-8

5

8

"

EL = 7'-11" AFF

PLAN NORTH

SCALE:

PARTIAL CEILING PLAN @ FUTURE KIOSK/LOUNGE SEATING1

N.T.S.

ASI #013 SK#13A

Jan. 31 2017

ALIGN

EXTEND

WALL

LOWER LIGHT COVE

CEILING ELEVATION TO

ACCOMMODATE DUCT

WORK CROSSING

LIGHT COVE CEILING IN

THIS AREA TO BE AT A

CONSTANT ELEVATION

GC TO

COORDINATE

WITH DUCT WORK

Page 5: 1 ASI #013 Documents - projects.mbakercorp.com · ASI #013 Narrative Summary of Revisions: ARCHITECTURAL ASI 013 SK-13A Partial Ceiling Plan @ Future Kiosk & Lounge Seating 1. Revised

ASI #13 SK 13B – APPROVED SOUND SYSTEM VENDOR (INTEGRATOR) LIST

JANUARY 31, 2017

Page 6: 1 ASI #013 Documents - projects.mbakercorp.com · ASI #013 Narrative Summary of Revisions: ARCHITECTURAL ASI 013 SK-13A Partial Ceiling Plan @ Future Kiosk & Lounge Seating 1. Revised

PLAN NORTH

SCALE:

MECHANICAL DUCT WORK @ FUTURE KIOSK/LOUNGE SEATING1

N.T.S.

ASI #013 SK#13C

Jan. 31 2017

Page 7: 1 ASI #013 Documents - projects.mbakercorp.com · ASI #013 Narrative Summary of Revisions: ARCHITECTURAL ASI 013 SK-13A Partial Ceiling Plan @ Future Kiosk & Lounge Seating 1. Revised

FEC

FE

STOR.

S2

AH

U

2-1

-1

AHU

2-1-2

AHU

2-1-3

AHU

2-1-4

TICKETING "B" BAGGAGE MAKE UP

130

QUEUE

SCREENING

100

GATES 7-10

HOLD ROOM

100

GATES 7-10

HOLD ROOM

101

PLAY ZONE

KIDS

102

AREA

LOUNGE

103

KIOSK

FUTURE

104

STOR.

105

JAN.

106

VESTIBULE

108

R.R.

FAMILY

107

MEN

109

CHASE

110

WOMEN

112

STOR

111

STOR

116

RECOVERY ROOM

PASSENGER

115

STOR.

113

STOR

119

AREA

VENDING

118

ELECT. ROOM

120

SCREENING "B"

121

OFFICE

122B

STOR

123

COMP

124

PANTRY

FUTURE

125

FOOD PREP

FUTURE

126

DINING AREA

FUTURE

127

BAR

FUTURE

129

STAIRS

FUTURE

128

W.I. COOLER

FUTURE

131

STOR

132

STOR

133

OFFICE

135

ROOM

134

VESTIBULE

E132

STOR

E133

MECH

EXIST

E129

CORRIDOR

EXISTING

E131

ROOM

E126

STOR

EXIST

E122

EXIT

114

DATA / IT

AIRPORT

E124

MECH

E125

MECH

E127

ELEC

EXIST

E128

COMM

EXIST

136

TICKETING "B"

100C

CHECK-IN

PASSENGER

100B

CHECK-IN

PASSENGER

100A

CHECK-IN

PASSENGER

E135

ROOM

EXIST

E136

MECH

EXIST

E134

STOR

EXIST

E123

CORRIDOR

EXIT

A

B

122A

OFFICE

SPSPSPSPSPSPSPSP

SP

SPSP

(R)

(E)

(R)

(E)(E)

(E)(E)

(E)

(E) (E)(E)

SP

(R)

SP

(R)

SP

(R)

SP

(R)

SP

(R)

SP

(R)

SP

(R)

SP

(R)

SP

(R)

SP

(R)

SP

(R)

SP SP

(R)

(R)

SP SP

(R)

(R)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

SP

(N)

1

1

1

1

1

1

1

9

9

1

1

1

1

1

1

1

1

2

22

2

2

2

2

2

2

4

3

3

3

3

3

3

3

3

3

3

4

(N)

4

4

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

3

33

SP

(E)

2

SP

(E)

2

SP

(R)

1

SP

(R)

1

SP

(R)

1

SP

(R)

1

SP

(N)

3

SP

(N)

3

SP

(N)

3

SP

(N)

3

SP

(N)

5

SP

(N)

5

SP

(N)

5

SP

(N)

5

SP

(N)

6

7

4

4

J J J

8 88

SP

(N)

3

SP

(N)

3

SP

(N)

3

7

NS

10

NS

10

NS

10

NS

10

NS

10

NS

10

NS

10

NS

10

NS

10

NS

10

NS

10

NS

10

NS

10

NS

10

11

12

12

12

12

13

ELECTRICAL NOTES

GENERAL NOTES

1. RELOCATE EXISTING SPEAKER MADE AVAILABLE BY DEMOLITION.

EXTEND/SHORTEN EXISTING SPEAKER WIRING (18/2 NON-SHIELDED) AS REQUIRED.

2. EXISTING SPEAKERS TO REMAIN AS IS.

3. PROVIDE NEW CEILING MOUNTED SPEAKER AND ALL ASSOCIATED MOUNTING

BRACKETS ETC. AS REQUIRED. NEW SPEAKERS SHALL BE ATLAS SOUND #

FAP8CXT AND SHALL MATCH EXISTING STYLE, WATTAGE AND COLOR.

4. EXTEND EXISTING SPEAKER CABLING TO NEW SPEAKERS AS INDICATED. NEW

SPEAKER CABLING TO BE 18/2 NON-SHIELDED PLENUM RATED CABLING.

5. PROVIDE NEW SOFFIT MOUNTED SPEAKER WITH INDEPENDENT VOLUME CONTROL

AND ALL ASSOCIATED MOUNTING BRACKETS ETC. AS REQUIRED. NEW SPEAKERS

SHALL MATCH EXISTING STYLE, WATTAGE AND COLOR.

6. PROVIDE NEW CEILING MOUNTED SPEAKER WITH INDEPENDENT VOLUME

CONTROL AND ALL ASSOCIATED MOUNTING BRACKETS ETC. AS REQUIRED. NEW

SPEAKERS SHALL MATCH EXISTING STYLE, WATTAGE AND COLOR.

7. PROVIDE NEW “HOMERUN” TO PA SYSTEM HEAD END AS REQUIRED TO PROVIDE A

SEPARATE ZONE IN THIS AREA. EXISTING PA SYSTEM HEAD END LOCATED IN

EXIST. AIRPORT CENTRAL NETWORKS LOWER TERMINAL ROOM 119-D.

CONTRACTOR SHALL ALLOW SUFFICIENT SLACK IN NEW “HOMERUN” TO ALLOW

FOR THE RELOCATION OF EXISTING PA SYSTEM HEAD END TO NEW AIRPORT

DATA/IT ROOM 114. COORDINATE EXACT LOCATION WITH OWNER PRIOR TO

ROUGH-IN.PA SYSTEM HEAD END TO BE LOCATED IN AIRPORT DATA/IT ROOM 114.

COORDINATE EXACT LOCATION WITH OWNER PRIOR TO ROUGH-IN.

8. PROVIDE PA SYSTEM MICROPHONE CONNECTIONS IN PASSENGER CHECK-IN

KIOSK. PA SYSTEM MICROPHONE CONNECTIONS TO ALLOW FOR LOCAL

ANNOUNCEMENTS THROUGH PA SYSTEM SPEAKERS IN GATES 7-10 AREA.

9. CONNECT RELOCATED CEILING MOUNTED SPEAKER TO NEW PA SYSTEM ZONE AS

INDICATED.

10. PROVIDE NEW AMBIENT NOISE SENSOR. AMBIENT NOISE SENSOR TO BE BY

INNOVATIVE ELECTRONIC DESIGN MODEL #IED0540S-2. NO SUBSTITUTIONS

ALLOWED.

11. PROVIDE AN ADDITIONAL “HOMERUN” TO EXISTING PA SYSTEM CONTROLS. NEW

PA SYSTEM CONTROL CABLING TO BE 18/2 NON-SHIELDED CABLE. EXISTING PA

SYSTEM CONTROLS LOCATED IN NEW ELEC. RM E118. CONTRACTOR SHALL

ALLOW SUFFICIENT SLACK IN NEW “HOMERUN” TO ALLOW FOR THE RELOCATION

OF EXISTING PA SYSTEM HEAD END TO NEW AIRPORT DATA/IT ROOM 114.

COORDINATE EXACT LOCATION WITH OWNER PRIOR TO ROUGH-IN.

12. PROVIDE AN ADDITIONAL 18/2 NON-SHIELDED CABLE FOR INDEPENDENT VOLUME

CONTROLS FOR SPEAKERS INDICATED.

13. PROVIDE NEW “HOMERUN” TO EXISTING AMBIENT NOISE COLLECTOR AS

REQUIRED FOR AMBIENT NOISE SENSORS. EXISTING AMBIENT NOISE COLLECTOR

LOCATED IN NEW ELEC. RM 118. CONTRACTOR SHALL PROVIDE NEW AMBIENT

NOISE COLLECTORS AS REQUIRED FOR NEW AMBIENT NOISE SYSTEM.

CONTRACTOR SHALL ALLOW SUFFICIENT SLACK IN NEW “HOMERUN” TO ALLOW

FOR THE RELOCATION OF EXISTING PA SYSTEM HEAD END TO NEW AIRPORT

DATA/IT ROOM 114. COORDINATE EXACT LOCATION WITH OWNER PRIOR TO

ROUGH-IN.

1. ELECTRICIAN SHALL PERFORM A SITE VISIT TO VERIFY EXISTING SYSTEMS AND

CONDITIONS PRIOR TO SUBMITTING BID.

2. CONTRACTOR SHALL VERIFY THAT THE EXISTING PA SYSTEM HAS THE CAPACITY

FOR THE ADDED SPEAKERS. CONTRACTOR SHALL PROVIDE ALL NECESSARY

HARDWARE INCLUDING BUT NOT LIMITED TO RACK MOUNTED AMPS, ZONE PAGING

RELAYS, ETC. FOR A COMPLETE OPERATING SYSTEM. EXISTING PA SYSTEMS

“HEAD-END” IS LOCATED IN AIRPORT CENTRAL NETWORKS LOWER TERMINAL ROOM

119-D. REFER TO SHEET E1.03 FOR ROOM LOCATION.

3. ALL WORK ASSOCIATED WITH THE PA SOUND SYSTEM SHALL BE COORDINATED

THROUGH THE OWNERS VENDOR OR AN I.E.D AND AIRPORT APPROVED THIRD

PARTY VENDOR. FOR OWNERS VENDOR, CONTACT KEN CHRISMAN OF I.E.D. AT

1-678-533-4005 OR 1-678-533-4979.

4. SOUND SYSTEM TO BE INTEGRATED BY I.E.D. OR AN I.E.D AND AIRPORT APPROVED

THIRD PARTY VENDOR. CONTRACTOR SHALL CARRY COST OF INTERGRATION BY

I.E.D. OR THE APPROVED THIRD PARTY VENDOR IN BASE BID.

5. AFTER SOUND SYSTEM IS COMPLETELY INSTALLED, CONTRACTOR SHALL PROVIDE

AMBIENT NOISE TESTING IN GATES 7-10 TO ENSURE THAT THE NEW AMBIENT NOISE

SENSORS ARE FULLY FUNCTIONING. AIRPORT PERSONNEL SHALL BE PRESENT AT

THE TIME OF TESTING. THE TEST PROCEEDURES SHALL INCLUDE SIMULATED

CROWD NOISE AND THE TESTING SHALL BE CONDUCTED BY AN INDEPENDENT

TESTING AGENCY AND THE VOLUME OF THE PA ANNOUNCEMENTS SHALL BE

TESTED WITH AND WITHOUT THE SIMULATED CROWD NOISE, AND A REPORT

GENERATED TO CERTIFIY COMPLIANCE WITH THE INTEGRATED DESIGN

REQUIREMENTS.

WILLIAM RITOLA, P.E.

FLORIDA LICENSE

# PE-59480

Ground Level

Gates 7-10 Reflected

Ceiling Plan

A1.05

Electrical

KCW KCW WR

D

1 2 3 4 5

CB

A

1 2 3 4 5

DC

BA

Project Name:

Drawing Name:

Project Number:

Date:

Drawing Number:

Division :

Designed by:Drawn by: Checked by:

DateNo. Description By

REVISIONS

ST. PETE - CLEARWATER

INTERNATIONAL AIRPORT

#140743

MICHAEL BAKER INTERNATIONAL

5020 WEST LINEBAUGH AVE., SUITE 240

TAMPA, FL 33624

PHONE 813-889-3892 ● FAX 813-889-3893

FLORIDA LICENSE # AA 00003054

Z:\14

000 A

SE JO

BS\14

010 S

T PE

TE-C

LEAR

WAT

ER A

IRPO

RT\14

010.0

1 PIE

-TER

MINA

L ADD

ITIO

N-GA

TES

7-10

\AUT

OCAD

\4 - E

LECT

\1401

0.01 E

4.02 S

OUND

SYS

PLA

N GA

TES

7-10

.DW

GPl

otted

by: K

EN W

ALKE

R on

1/31

/2017

4:03

:10 P

M

Key Plan:

William Ritola

PE-59480

Project Engineer

CA-8468

CADD:

Manager:

Job No.

Advanced Systems Engineering, Inc.

13555 Automobile Boulevard, Suite 330, Clearwater, FL 33762 ▪ Office: 727.540.9396 ▪ Facsimile: 727.540.9376

Copyright 2010 - all rights reserved. No part of this document may be reproduced without the permission of ASE.

14010.01

KCW

KCW

NOVEMBER 24, 2015

ISSUED FOR

PERMITTING

TERMINAL AREA IMPROVEMENTS

PHASE III

GATES 7-10 TERMINAL ADDITION

WR11/24/2015

KCW01/20/2016

01/26/2016 VTK

CONFORMED DOCUMENTS

ISSUED FOR CONSTRUCTION

03-31-2016

05/27/2016 KCW

Ground Level Gates

7-10 Sound System

Plan

E4.02

PLAN NORTH

SCALE:

GATES 7-10 SOUND SYSTEM PLAN1

3/32" = 1'-0"

GROUND LEVEL

01/31/2017 KCW

Z:\14000 A

SE Jo

bs\14010 St P

ete-C

learw

ater A

irp

ort\14010.01 P

IE-Term

in

al A

dd

itio

n-G

ates 7-10\A

uto

CA

D\4 - Elect\14010.01 E4.02 SO

UN

D SY

S P

LA

N G

ATES 7-10.d

wg

, 1/31/2017 4:03:01 P

M, D

WG

To

P

DF.p

c3,

KEN

W

Page 8: 1 ASI #013 Documents - projects.mbakercorp.com · ASI #013 Narrative Summary of Revisions: ARCHITECTURAL ASI 013 SK-13A Partial Ceiling Plan @ Future Kiosk & Lounge Seating 1. Revised