TO: The Artec Group, Inc.
P.O. Box 50335
Sarasota, FL 34232-0302
DATE: 02/14/2017
JOB NO: 153823
REFERENCE: St. Pete-Clwr. Airport
DESCRIPTION:
ATTN:
Dan Heim, Project Manager
SENT TO YOU VIA: Mail Blueprinter Overnight Delivery (Carrier)
E-Mail Your Pick-Up
Michael Baker Messenger Other Courier
No. of Copies
No. of Originals
DESCRIPTION
1 ASI #013 Documents
SENT FOR YOUR: Approval Review Comments Per Your Request
Files Signature Use Information
REMARKS: Enclosed is ASI#013 with the referenced sketches and drawings all dated 1/31/2017 attached.
BY:
William “Chip” Hayward, Jr. AIA, CSI-
CCCA COPIES TO: Scott Yarley w/1 set (enclosed) Michael Cummings w/1 set (enclosed) Angela Dunkel w/ digital copy Sharepoint w/ enclosed File
Senior Associate/Architect Michael Baker International
ARCHITECT’S SUPPLEMENTAL INSTRUCTIONS PIE Gates 7-10 Phase III Terminal Improvements
Form Dated – July 21, 2016
___________________________________________________________________________________________________ PROJECT (Name and address): St. Petersburg-Clearwater Airport Gates 7-10 Terminal Addition
ARCHITECT’S SUPPLEMENTAL INSTRUCTION NO: 013
OWNER ARCHITECT:
CONSULTANT: OWNER (Name and address): St Pete-Clearwater International Airport 14700 Terminal Blvd Clearwater, FL 33762
DATE OF ISSUANCE: 01/31/2017 CONTRACT FOR: General Construction
CONTRACTOR: FIELD
FROM ARCHITECT (Name and address): Michael Baker, Jr., Inc. 5020 West Linebaugh Avenue, Suite 240 Tampa, FL 33624
CONTRACT DATE: 3/17/2016 OTHER
TO CONTRACTOR (Name and address): The Artec Group, Inc. P.O. Box 50335 Sarasota, FL 34232-0302
ARCHITECT’S PROJECT NUMBER: MBI #153823
___________________________________________________________________________________________________ The Work shall be carried out in accordance with the following supplemental instructions issued in accordance with the Contract Documents without change in Contract Sum or Contract Time. Proceeding with the Work in accordance with these instructions indicates your acknowledgement that there will be no change in the Contract Sum or Contract Time. DESCRIPTION: The enclosed drawings and sketches, all dated January 31, 2017, are listed in the attached narrative summary. Sketches were created for the revised the wall length adjacent to the future kiosk to be extended to align with the ceiling soffit & lower ceiling at light cove (as discussed in the field), an authorized list of sound system integrators. The sound system/speaker drawing (sheet E4.02) was modified to reflect the sound system changes requested by the Airport, and the mechanical drawing (sheet M1.02) was modified to address the conflict with the light cove and the duct work that was identified in the field. The attached narrative summary lists all of the changes to the Contract Documents, pages 1-1 of 1, dated January 31, 2017, outlines the revisions for each sketch and drawing as part of ASI #013.
ATTACHMENTS (Here insert listing of documents that support description): ASI#013 - Narrative Summary of Contract Document Revisions, dated January 31, 2017, page 1 of 1. Revised Drawings as outlined in the Narrative Summary attached. ASI #013 SK 13A – Partial Plan @ Future Kiosk/Lounge Seating ASI #013 SK 13B – Sound System Vendor List (Integrators) ASI #013 SK 13C – Mechanical Duct Work @ Future Kiosk/Lounge Seating E4.02 – Ground Level Gates 7-10 Sound System Plan M1.02 – Mechanical Plan Ground Level Gates 7-10 cc: Scott Yarley w/1 set (enclosed)
Michael Cummings w/1 set (enclosed) John Mcoy w/1set (enclosed) Angela Dunkel w/digital copy SharePoint w/enclosed File
__________________________________________________________________________________________________ ISSUED BY THE ARCHITECT:
_____________________________________________ William A. Hayward, Jr. (Chip) AIA, CSI-CCA, LEED GA (Signature) (Printed name and title)
Page | 1
January 31, 2017 St. Petersburg-Clearwater International Airport Gates 7-10 Terminal Improvements ASI #013 Narrative Summary of Revisions: ARCHITECTURAL ASI 013 SK-13A Partial Ceiling Plan @ Future Kiosk & Lounge Seating
1. Revised to show an extended wall to align with the soffit. 2. Lowered light cove ceiling height to accommodate the duct work at the lounge seating
area. ASI 013 SK-13B Sound System Vendor (Integrator) List
1. Authorized Sound System’s vendors by the Airport. ELECTRICAL E4.02 Ground Level gates 7-10 Sound System Plan
1. Updated Sound System drawings to reflect Airport requirements for the addition of a “homerun” to PA system, and addition of PA systems microphone connections, and temporary provisions until the new IDF room is constructed.
2. Clarify the location of ambient noise sensors. 3. Added the third party vendor (integrator) requirements & testing of the complete system.
MECHANICAL ASI 013 SK-13C Mechanical Duct Work @ Future Kiosk & Lounge Seating
1. Updated duct work drawings to address duct work modifications required due to conflicts with the lounge seating light cove and the duct work.
M1.02 Mechanical Plan Ground Level Gates 7-10
1. Updated duct work drawings to address duct work modifications required due to conflicts with the lounge seating light cove and the duct work. The ceiling height of the light cove will be adjusted to accommodate the bottom elevation of the revised duct work, as noted on SK-13A attached.
End of summary of revisions.
101
PLAY ZONE
KIDS
102
AREA
LOUNGE
103
KIOSK
FUTURE
104
STOR.
107
MEN
E128
COMM
EXIST
B
ROOM
GB114
20 SFX' x Y'
s
EL = 8'-3" AFF
LINE OF COVE LIGHT
1'-6" (TYP)
EL = 12'-4" AFF
EL = 11'-0" AFF
EL = 11'-6" AFF
OVERHEAD
MOUNTED TVS
FOLDING GRILLE
TRACK (ALT)
1'-6"
1'-6"
(T
YP
)
1'-6"
7'-4"
8'-3
1
4
"
1'-11
1
2
"
1'-6"
1'-6"
1'-6"
17'-1
1
4
"
2'-3"
1'-6"
1'-6"(T
YP
)
35'-0
11
16
"
1'-8
5
8
"
EL = 7'-11" AFF
PLAN NORTH
SCALE:
PARTIAL CEILING PLAN @ FUTURE KIOSK/LOUNGE SEATING1
N.T.S.
ASI #013 SK#13A
Jan. 31 2017
ALIGN
EXTEND
WALL
LOWER LIGHT COVE
CEILING ELEVATION TO
ACCOMMODATE DUCT
WORK CROSSING
LIGHT COVE CEILING IN
THIS AREA TO BE AT A
CONSTANT ELEVATION
GC TO
COORDINATE
WITH DUCT WORK
ASI #13 SK 13B – APPROVED SOUND SYSTEM VENDOR (INTEGRATOR) LIST
JANUARY 31, 2017
PLAN NORTH
SCALE:
MECHANICAL DUCT WORK @ FUTURE KIOSK/LOUNGE SEATING1
N.T.S.
ASI #013 SK#13C
Jan. 31 2017
FEC
FE
STOR.
S2
AH
U
2-1
-1
AHU
2-1-2
AHU
2-1-3
AHU
2-1-4
TICKETING "B" BAGGAGE MAKE UP
130
QUEUE
SCREENING
100
GATES 7-10
HOLD ROOM
100
GATES 7-10
HOLD ROOM
101
PLAY ZONE
KIDS
102
AREA
LOUNGE
103
KIOSK
FUTURE
104
STOR.
105
JAN.
106
VESTIBULE
108
R.R.
FAMILY
107
MEN
109
CHASE
110
WOMEN
112
STOR
111
STOR
116
RECOVERY ROOM
PASSENGER
115
STOR.
113
STOR
119
AREA
VENDING
118
ELECT. ROOM
120
SCREENING "B"
121
OFFICE
122B
STOR
123
COMP
124
PANTRY
FUTURE
125
FOOD PREP
FUTURE
126
DINING AREA
FUTURE
127
BAR
FUTURE
129
STAIRS
FUTURE
128
W.I. COOLER
FUTURE
131
STOR
132
STOR
133
OFFICE
135
ROOM
134
VESTIBULE
E132
STOR
E133
MECH
EXIST
E129
CORRIDOR
EXISTING
E131
ROOM
E126
STOR
EXIST
E122
EXIT
114
DATA / IT
AIRPORT
E124
MECH
E125
MECH
E127
ELEC
EXIST
E128
COMM
EXIST
136
TICKETING "B"
100C
CHECK-IN
PASSENGER
100B
CHECK-IN
PASSENGER
100A
CHECK-IN
PASSENGER
E135
ROOM
EXIST
E136
MECH
EXIST
E134
STOR
EXIST
E123
CORRIDOR
EXIT
A
B
122A
OFFICE
SPSPSPSPSPSPSPSP
SP
SPSP
(R)
(E)
(R)
(E)(E)
(E)(E)
(E)
(E) (E)(E)
SP
(R)
SP
(R)
SP
(R)
SP
(R)
SP
(R)
SP
(R)
SP
(R)
SP
(R)
SP
(R)
SP
(R)
SP
(R)
SP SP
(R)
(R)
SP SP
(R)
(R)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
SP
(N)
1
1
1
1
1
1
1
9
9
1
1
1
1
1
1
1
1
2
22
2
2
2
2
2
2
4
3
3
3
3
3
3
3
3
3
3
4
(N)
4
4
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
3
33
SP
(E)
2
SP
(E)
2
SP
(R)
1
SP
(R)
1
SP
(R)
1
SP
(R)
1
SP
(N)
3
SP
(N)
3
SP
(N)
3
SP
(N)
3
SP
(N)
5
SP
(N)
5
SP
(N)
5
SP
(N)
5
SP
(N)
6
7
4
4
J J J
8 88
SP
(N)
3
SP
(N)
3
SP
(N)
3
7
NS
10
NS
10
NS
10
NS
10
NS
10
NS
10
NS
10
NS
10
NS
10
NS
10
NS
10
NS
10
NS
10
NS
10
11
12
12
12
12
13
ELECTRICAL NOTES
GENERAL NOTES
1. RELOCATE EXISTING SPEAKER MADE AVAILABLE BY DEMOLITION.
EXTEND/SHORTEN EXISTING SPEAKER WIRING (18/2 NON-SHIELDED) AS REQUIRED.
2. EXISTING SPEAKERS TO REMAIN AS IS.
3. PROVIDE NEW CEILING MOUNTED SPEAKER AND ALL ASSOCIATED MOUNTING
BRACKETS ETC. AS REQUIRED. NEW SPEAKERS SHALL BE ATLAS SOUND #
FAP8CXT AND SHALL MATCH EXISTING STYLE, WATTAGE AND COLOR.
4. EXTEND EXISTING SPEAKER CABLING TO NEW SPEAKERS AS INDICATED. NEW
SPEAKER CABLING TO BE 18/2 NON-SHIELDED PLENUM RATED CABLING.
5. PROVIDE NEW SOFFIT MOUNTED SPEAKER WITH INDEPENDENT VOLUME CONTROL
AND ALL ASSOCIATED MOUNTING BRACKETS ETC. AS REQUIRED. NEW SPEAKERS
SHALL MATCH EXISTING STYLE, WATTAGE AND COLOR.
6. PROVIDE NEW CEILING MOUNTED SPEAKER WITH INDEPENDENT VOLUME
CONTROL AND ALL ASSOCIATED MOUNTING BRACKETS ETC. AS REQUIRED. NEW
SPEAKERS SHALL MATCH EXISTING STYLE, WATTAGE AND COLOR.
7. PROVIDE NEW “HOMERUN” TO PA SYSTEM HEAD END AS REQUIRED TO PROVIDE A
SEPARATE ZONE IN THIS AREA. EXISTING PA SYSTEM HEAD END LOCATED IN
EXIST. AIRPORT CENTRAL NETWORKS LOWER TERMINAL ROOM 119-D.
CONTRACTOR SHALL ALLOW SUFFICIENT SLACK IN NEW “HOMERUN” TO ALLOW
FOR THE RELOCATION OF EXISTING PA SYSTEM HEAD END TO NEW AIRPORT
DATA/IT ROOM 114. COORDINATE EXACT LOCATION WITH OWNER PRIOR TO
ROUGH-IN.PA SYSTEM HEAD END TO BE LOCATED IN AIRPORT DATA/IT ROOM 114.
COORDINATE EXACT LOCATION WITH OWNER PRIOR TO ROUGH-IN.
8. PROVIDE PA SYSTEM MICROPHONE CONNECTIONS IN PASSENGER CHECK-IN
KIOSK. PA SYSTEM MICROPHONE CONNECTIONS TO ALLOW FOR LOCAL
ANNOUNCEMENTS THROUGH PA SYSTEM SPEAKERS IN GATES 7-10 AREA.
9. CONNECT RELOCATED CEILING MOUNTED SPEAKER TO NEW PA SYSTEM ZONE AS
INDICATED.
10. PROVIDE NEW AMBIENT NOISE SENSOR. AMBIENT NOISE SENSOR TO BE BY
INNOVATIVE ELECTRONIC DESIGN MODEL #IED0540S-2. NO SUBSTITUTIONS
ALLOWED.
11. PROVIDE AN ADDITIONAL “HOMERUN” TO EXISTING PA SYSTEM CONTROLS. NEW
PA SYSTEM CONTROL CABLING TO BE 18/2 NON-SHIELDED CABLE. EXISTING PA
SYSTEM CONTROLS LOCATED IN NEW ELEC. RM E118. CONTRACTOR SHALL
ALLOW SUFFICIENT SLACK IN NEW “HOMERUN” TO ALLOW FOR THE RELOCATION
OF EXISTING PA SYSTEM HEAD END TO NEW AIRPORT DATA/IT ROOM 114.
COORDINATE EXACT LOCATION WITH OWNER PRIOR TO ROUGH-IN.
12. PROVIDE AN ADDITIONAL 18/2 NON-SHIELDED CABLE FOR INDEPENDENT VOLUME
CONTROLS FOR SPEAKERS INDICATED.
13. PROVIDE NEW “HOMERUN” TO EXISTING AMBIENT NOISE COLLECTOR AS
REQUIRED FOR AMBIENT NOISE SENSORS. EXISTING AMBIENT NOISE COLLECTOR
LOCATED IN NEW ELEC. RM 118. CONTRACTOR SHALL PROVIDE NEW AMBIENT
NOISE COLLECTORS AS REQUIRED FOR NEW AMBIENT NOISE SYSTEM.
CONTRACTOR SHALL ALLOW SUFFICIENT SLACK IN NEW “HOMERUN” TO ALLOW
FOR THE RELOCATION OF EXISTING PA SYSTEM HEAD END TO NEW AIRPORT
DATA/IT ROOM 114. COORDINATE EXACT LOCATION WITH OWNER PRIOR TO
ROUGH-IN.
1. ELECTRICIAN SHALL PERFORM A SITE VISIT TO VERIFY EXISTING SYSTEMS AND
CONDITIONS PRIOR TO SUBMITTING BID.
2. CONTRACTOR SHALL VERIFY THAT THE EXISTING PA SYSTEM HAS THE CAPACITY
FOR THE ADDED SPEAKERS. CONTRACTOR SHALL PROVIDE ALL NECESSARY
HARDWARE INCLUDING BUT NOT LIMITED TO RACK MOUNTED AMPS, ZONE PAGING
RELAYS, ETC. FOR A COMPLETE OPERATING SYSTEM. EXISTING PA SYSTEMS
“HEAD-END” IS LOCATED IN AIRPORT CENTRAL NETWORKS LOWER TERMINAL ROOM
119-D. REFER TO SHEET E1.03 FOR ROOM LOCATION.
3. ALL WORK ASSOCIATED WITH THE PA SOUND SYSTEM SHALL BE COORDINATED
THROUGH THE OWNERS VENDOR OR AN I.E.D AND AIRPORT APPROVED THIRD
PARTY VENDOR. FOR OWNERS VENDOR, CONTACT KEN CHRISMAN OF I.E.D. AT
1-678-533-4005 OR 1-678-533-4979.
4. SOUND SYSTEM TO BE INTEGRATED BY I.E.D. OR AN I.E.D AND AIRPORT APPROVED
THIRD PARTY VENDOR. CONTRACTOR SHALL CARRY COST OF INTERGRATION BY
I.E.D. OR THE APPROVED THIRD PARTY VENDOR IN BASE BID.
5. AFTER SOUND SYSTEM IS COMPLETELY INSTALLED, CONTRACTOR SHALL PROVIDE
AMBIENT NOISE TESTING IN GATES 7-10 TO ENSURE THAT THE NEW AMBIENT NOISE
SENSORS ARE FULLY FUNCTIONING. AIRPORT PERSONNEL SHALL BE PRESENT AT
THE TIME OF TESTING. THE TEST PROCEEDURES SHALL INCLUDE SIMULATED
CROWD NOISE AND THE TESTING SHALL BE CONDUCTED BY AN INDEPENDENT
TESTING AGENCY AND THE VOLUME OF THE PA ANNOUNCEMENTS SHALL BE
TESTED WITH AND WITHOUT THE SIMULATED CROWD NOISE, AND A REPORT
GENERATED TO CERTIFIY COMPLIANCE WITH THE INTEGRATED DESIGN
REQUIREMENTS.
WILLIAM RITOLA, P.E.
FLORIDA LICENSE
# PE-59480
Ground Level
Gates 7-10 Reflected
Ceiling Plan
A1.05
Electrical
KCW KCW WR
D
1 2 3 4 5
CB
A
1 2 3 4 5
DC
BA
Project Name:
Drawing Name:
Project Number:
Date:
Drawing Number:
Division :
Designed by:Drawn by: Checked by:
DateNo. Description By
REVISIONS
ST. PETE - CLEARWATER
INTERNATIONAL AIRPORT
#140743
MICHAEL BAKER INTERNATIONAL
5020 WEST LINEBAUGH AVE., SUITE 240
TAMPA, FL 33624
PHONE 813-889-3892 ● FAX 813-889-3893
FLORIDA LICENSE # AA 00003054
Z:\14
000 A
SE JO
BS\14
010 S
T PE
TE-C
LEAR
WAT
ER A
IRPO
RT\14
010.0
1 PIE
-TER
MINA
L ADD
ITIO
N-GA
TES
7-10
\AUT
OCAD
\4 - E
LECT
\1401
0.01 E
4.02 S
OUND
SYS
PLA
N GA
TES
7-10
.DW
GPl
otted
by: K
EN W
ALKE
R on
1/31
/2017
4:03
:10 P
M
Key Plan:
William Ritola
PE-59480
Project Engineer
CA-8468
CADD:
Manager:
Job No.
Advanced Systems Engineering, Inc.
13555 Automobile Boulevard, Suite 330, Clearwater, FL 33762 ▪ Office: 727.540.9396 ▪ Facsimile: 727.540.9376
Copyright 2010 - all rights reserved. No part of this document may be reproduced without the permission of ASE.
14010.01
KCW
KCW
NOVEMBER 24, 2015
ISSUED FOR
PERMITTING
TERMINAL AREA IMPROVEMENTS
PHASE III
GATES 7-10 TERMINAL ADDITION
WR11/24/2015
KCW01/20/2016
01/26/2016 VTK
CONFORMED DOCUMENTS
ISSUED FOR CONSTRUCTION
03-31-2016
05/27/2016 KCW
Ground Level Gates
7-10 Sound System
Plan
E4.02
PLAN NORTH
SCALE:
GATES 7-10 SOUND SYSTEM PLAN1
3/32" = 1'-0"
GROUND LEVEL
01/31/2017 KCW
Z:\14000 A
SE Jo
bs\14010 St P
ete-C
learw
ater A
irp
ort\14010.01 P
IE-Term
in
al A
dd
itio
n-G
ates 7-10\A
uto
CA
D\4 - Elect\14010.01 E4.02 SO
UN
D SY
S P
LA
N G
ATES 7-10.d
wg
, 1/31/2017 4:03:01 P
M, D
WG
To
P
DF.p
c3,
KEN
W