32
1 AN ARMY FORWARD ODCSENG, USAREUR/7A HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is: UNCLASSIFIED HQ USAREUR Responsive And Professional ANY MISSION, ANYWHERE Geospatial Information and Services (GI&S) 3May06 Dr. Michael Thomas & Ed Riegelman

1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

  • View
    215

  • Download
    2

Embed Size (px)

Citation preview

Page 1: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

1AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 1

HQ USAREUR Office Of The Deputy Chief Of

Staff, Engineer

This briefing is: UNCLASSIFIED

HQ USAREUR Responsive And Professional ANY MISSION, ANYWHERE

Geospatial Information and Services (GI&S)

3May06

Dr. Michael Thomas

&Ed

Riegelman

Page 2: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

2AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 2

Army Mission Area/Domain Structure

InformationAssurance

Army Lead: CIO/G-6(GA&CKO)

Enterprise Information Environment Mission Area (EIEMA)Army Lead: CIO/G-6 (GA&CKO)

Governance

Business Mission Area (BMA)Army Lead: DUSA

Ac

qu

isit

ion

Arm

y Le

ad:

AS

A(A

LT)

Fin

an

cia

l M

an

ag

em

en

tA

rmy

Lead

: A

SA

(FM

&C

)

Hu

man

Res

ou

rce

Man

agem

ent

Arm

y Le

ad:

AS

A(M

&R

A)

Lo

gis

tic

sA

rmy

Lead

: A

SA

(ALT

) R

OS

Ins

tall

ati

on

s &

En

vir

on

me

nt

Arm

y Le

ad:

AC

SIM

Civ

il W

ork

sA

rmy

Ow

ner:

A

SA

(CW

)

Governance

Warfighting Mission Area (WMA)Army Lead: G-3/5/7

CommunicationsArmy Lead: CIO/G-6

(AONS)

ComputingInfrastructureArmy Lead: CIO/G-6

(AONS)

Core Enterprise Services

Army Lead: CIO/G-6(GA&CKO)

Governance

Defense Intelligence Mission Area (DIMA)

Army Lead: G-2

Army Alignment with GIG ES Governance

4 Mission Areas: - 18 Domains

Ba

ttle

sp

ac

e A

wa

ren

es

sA

rmy

Lead

: G-2

Ne

t-C

en

tric

Arm

y Le

ad: C

IO/G

-6

Fo

cu

se

d L

og

isti

cs

Arm

y Le

ad: G

-4

Fo

rce

Pro

tec

tio

nA

rmy

Lead

: G-8

Fo

rce

Ap

pli

ca

tio

nA

rmy

Lead

: G-8

Tra

inin

gA

rmy

Lead

: G-3

/5/7

/TR

Co

mm

an

d &

Co

ntr

ol

Arm

y Le

ad: G

-3/5

/7/S

B L

ead

Fo

rce

Ma

na

ge

me

nt

Arm

y Le

ad: G

-3/5

/7/F

M

Governance

Domains TBD

Geospatial Foundation Requirements – All Mission Areas Draw From the Same GIS Foundation Data

Page 3: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

3AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 3

Standards and DoctrineThe Key to Interoperability

Interoperability Core Standards - C/JMTK - DFDD

GovernanceGovernance

GovernanceGovernance

Business Mission Area-Acquisition-Financial Management-HR Management-others

Defense Intelligence Mission Area -TBD

Warfighting Mission Area -Focused Logistics-Battlespace Awareness-Force Application-Others

Enterprise InformationMission Area -Communications-Computing Infrastructure-Info Assurance-Core Enterprise Services

Governance

Governance

Governance

Governance

TGD provides an interim enterprise solution for “operationalizing” FIE data: - Standardized data model with metadata (FACC and SDS-based [interim to DFDD])- Standardized software tools (C/JMTK-based)- Standardized hardware (DTSS-based)- Standardized procedures/governance (Configuration Control Board)

4 Mission Areas 18 Domains

Page 4: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

4AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 4

Ramstein AFB example of Cross Domain Users

Ramstein ARCIMS Web Server Users

11

12

20

20

30

50

50

50

75

125

125

150

300

0 50 100 150 200 250 300 350

Air Operations Center

Construction Training Squadron

Combat Support Wing

Services

Intel

Medical

Maintenance

Logistics

Security Forces

Misc.

Warfighting/HQs (USAFE-WPC-AFEUR)

Communications

Civil Engineers

Number of Users

Page 5: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

5AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 5

DoD Architecture Framework Summary

Source: DoD Architecture Framework Version 1.0, Volume 1 Definitions and Guidelines, 15 August 2003

Page 6: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

6AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 6

Geospatial Information Technology: Computers, ancillary equipment, software, firmware and similar procedures,

services (including support services), and related resources.

Geospatial Information Resources:Geospatial information itself and related resources, such as personnel, hardware,

software, funds, and technology.

Geospatial InformationTechnology

GeospatialGeospatial Information Resources

Geospatial Information

- Analog/Digital-CADD/GIS/GPS/Imagery

-Implicit/Explicit

Personnel

Processes

Funds

Page 7: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

7AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 7

Two Types of GISTwo Types of GIS

“Standalone”• Stovepipe data• Single

discipline/business area• Not networked• Easy to get started• Oversight -- limited• Access Control – Easy • Limited impact on

operation – difficult to discern

Enterprise• Integrated data• All business areas• Networked • Requires

planning/coordination• Oversight -- critical• Access Control -

complex• Becomes a vital “utility”

– major impact on business processes

Page 8: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

8AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 8

Nima Topo Products 1:250K

Older than 20 years

10 to 20 years old

Less Than 10 years old

N

2000 0 2000 4000 KilometersNIMA Topographic SeriesEdition Date Ages 1:250,000Source: DLA Catalog of NIMA ProductsE-Catalog, May 2003

Note: Red > 20 yrs, Yellow 10-20 yrs, Green < 10 yrs (1:250k)

Page 9: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

9AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 9

The World ExtentNational Geospatial-Intelligence Agency

The Installation & Environment ExtentDefense Installation Spatial Data Infrastructure

The Facility ExtentA Role for BIM and CONOPS GIS

Know the Facility…Know the Facility…Know the Installation…Know the Installation…Know the World…Know the World…

Organizing Defense Business GI&S: Organizing Defense Business GI&S: Credibility Through Mission ContextCredibility Through Mission Context

Page 10: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

10AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 10

Page 11: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

11AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 11

Mission Specific Data Level-5 (MSD-5) is essential for information-based expeditionary operations in urban environments, but very little exists in the EUCOM AOR.

Info

rmat

ion

Co

nte

nt

Fid

elit

y

Co

st a

nd

Tim

e to

Pro

du

ce

MSD-11:250K (JOG)

MSD-31:50K (TLM 50)

MSD-5 1:15K (City Graphic)

Mission Specific Data (Urban)

Scale/Product

MSD-21:100K (TLM 100)

NO BRIDGE INFORMATION

BRIDGEBridge Ref. No. = 2342656Use = Road BridgeNo. of Spans = 2Width = 20MLength = 300MOverhead Clearance = 10MUnderBridge Clearance = 40M Load Class = 60 Short Tons

LOW

HIGH

Data Problem Definition (1 of 3)

Page 12: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

12AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 12

The future of urban operations, adding intelligence to data

High resolution imagery providesan important spatial foundation for geospatial operations.

The addition of feature and attributedata provides the ability to perform essential geospatial and intelligence analysis.

The addition of elevation data provides the ability to perform More in-depth geospatial and intelligence analysis.

TIM

E/C

OS

T

LOW

HIGH

FEATURE AND ATTRBUTE DENSITY = INFORMATION SUPERIORITY

Data Problem Definition (2 of 3)

HIGH

Page 13: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

13AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 13

Current elevation data does not meet urban data requirements.Current elevation data does not meet urban data requirements.

1m3m10m30m100mPOST SPACING

0.196 MB

SRTM DTED 2

26.3 MB

HRTe 3

291.8 MB

HRTe 4

FILE SIZE (28km x 24km)

2,626.2 MB0.021 MB

HRTe 5DTED 1

COST $UAV

* LIDAR

Availablefrom

NGA…

Availablefrom

NGA…What we need!!

What we need!!

DTED 1 SRTM2 HRTe3 HRTe4 HRTe5

Data Problem Definition (3 of 3)

Page 14: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

14AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 14

Google Earth – Network PerformancePerformance benchmark for “User Expectation Management”

Site Example Bandwidth Latency Performance *

Sahara Desert1

Denver, CO2

Boston, MA w/ 3D Buildings3

INMARSAT 128Kb 1200ms 1 min 45 sec 50 sec 2 min 29 sec

JFAIRS-II 512Kb 600ms 55 sec 1 min 43 sec 1 min 29 sec

Random 1Mb 600ms 52 sec 1 min 30 sec 1 min 06 sec

NIC-P 2Mb 100ms 17 sec 26 sec 26 sec

* Performance Testing – Time required for 100% data download over region after initial free-text search & zoom

1. City over Sahara Desert 15m imagery

2. Denver, CO 1 ft imagery

3. Boston, MA w/ 3D Buildings 1 ft imagery with 3D stood-up buildings

Page 15: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

15AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 15

Vision Drives Where we’re going…

GIS with Shared Data

• Authoritative data sources/catalog

• Capture and maintain data once. Eliminate redundancy

• Use available technology & Web Services for decision and mission support

Page 16: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

16AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 16

WarfighterNeed

Objective Met

GISStrat Plans

USAREUR Mission

Objectives

Mission Metrics

Goal ReportingFeedback to

Customer

Management Priorities

Policy

RequirementsDocument (ICD)

ContainsBusiness Rules

StandardsData Model

Architectural Review

Document ArchitectureImplementationGeo-Enabled

IT System

G Staff Participation and Concurrence

Strategic

Operational

Tactical

Links Between GIS IT Investment and Architecture

Page 17: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

17AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 17

AGDIMP

Architectural Review of TGD

EGDC Plan (65%)

EUCOM Google Earth Implementation Plan

USAREUR GIS STRATPLAN EUCOM GIS STRATPLAN

ICD for TGD

HQ USAREUR GIS Implementation Plan

60th Det OIs

OCP Plan

NGA/TEC ICD for JGES

EGDC Plan (95%)

Page 18: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

18AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 18

Urban

USA USAF USN

GeoBase

GeoReachITAM

IMA-E

Different Levels Have Different GIS Needs….

TGD Means to Fill in the Holes Left By Existing Data Suppliers...

Geo Readiness

CJMTK provides common tools across the DoD

DGInet provides connectivity between Data Sources

GLIDE

FOS GIS

USMC

GeoFidelis

Global

Strategic

Theater

Page 19: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

19AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 19

Generic TGD Architecture

DisseminationServer

TGD Production Server

DGInet Node

DGInet Node

Deployed

Uni ts

SIPRNETSIPRNET

SIPRNET LAN

Thick Users: Direct datadownload or disconnected editing by deploying units using DTSS/TGD.

60th Eng Det (Rear)

Page 20: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

20AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 20

TGD System Architecture

TGD Tools

DTSS- ArcGIS 8.3- ERDAS

- Windows 2000 - SQL Server- ArcSDE 8.3 - ERDAS Imagine- ArcGIS/PLTS/JTX - SocetSet

DGInet 3.0.1JIVA-V

(ArcIMS 4.0.1)

ArcSDE 8.3 (SQL Server)

ArcGIS 8.3

PLTS 3.1JTX

Hardcopy“Maps onDemand”

(TBD)

Vector Products (e.g. VITD)

Raster Products (e.g. DTED)

Data Ingest

Data & Product Output

Data Editing & Maintenance Data Dissemination Server

Data Analysis(External to TGD Development)

Production Data(reduced schema) Metadata (ICML format)

Tactical Decision Aids (TDAs)

Reference Data (DGInet Raster)

Reference DataVITD, VMap, DNC,

LWD, UVMap, EUVMap

Digital VectorProduct Data

DTED, CADRG, CIB

Digital RasterProduct Data

Imagery

HardcopyMap Sources

Product Data(raster, vector, flat files)

Metadata

Production Database- Global- Strategic - Tactical- Urban

MetadataTool

AdminTool

Distributed Editing

Hardcopy Map Products

(TBD)

TGD Data Model

Data-centricTactics,

Techniquesand

Procedures

Page 21: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

21AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 21

•SDE•SQL SERVER•WIN SERVER•ARC GIS 9.X

LWN-C (SIPRNet) LWN-U (NIPRNet)

AIR

GA

PNGADATA

TGD (S)GOLD

SERVER

TGD (S)SILVER

PRODUCTIONSERVER

TGD(S) GISPRODUCTIONLAB

DataPromotion

TGD (S)WEB SITESERVER

TGD 3.0FACC

TGD (U)GOLD

SERVER

TGD (U)WEB SITESERVER

3rd PARTYDATA

TGD 3.0FACC

TGD 3.0FACC

GOLDTGD DATABASE

De-ClassificationProcedure

US

AR

EU

R T

GD

SIT

E

US

AR

EU

R T

GD

SIT

E

EX

TE

RN

AL

SIT

EIT

AM

/ I

MA

/ I

TS

AT

BD

CO

NO

PS

GIS

SIT

ES

CONOPS DATA

•IMS•WEB SITE

•IMS•WEB SITE

•SDE•SQL SERVER•WIN SERVER

•SDE•SQL SERVER•WIN SERVER

CONOPSSITESBondsteelMontieth

EETAFSITESGIS Teams

HANDHELDDATA

COLLECTS

FORWARD SITEDATA BASES

CONOPS GIS DATA DICTONARY 1.0SDS-FIE SUBSET

WEBDEVELOPER

WEBSITE

TGD 3.0FACC

1:1 Data Im

port

Using FA

CC

Starte

r Da

ta for

Are

a o

f Op

eratio

ns

<SDS-FIE FACC>MAPPING

SDS-FIE

Page 22: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

22AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 22

CONOPS GIS Data Flows

ITAM

EGDC

IMA-ESDSFIE

OtherExisting

Data

TGDServer(s)

NIPR usersSIPR users

NIPR Server

GIS-RPossible

SDSFIE to FACCX

Page 23: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

23AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 23

United States Army Europe

-Expeditionary Geospatial

Data Collection (EGDC)

Overview

Page 24: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

24AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 24

Part II - Presentation Overview

• Overall Expeditionary Geospatial Data

Collection (EGDC) Workflow

– Data Discovery Process

– Build Baseline Dataset Process

– Data Collection Plan Process

– Prepare Equipment Process

– Collect Data Process

– Process Data Process

Page 25: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

25AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 25

Overall Expeditionary Geospatial Data Collection (EGDC) Workflow

ValidateRequest

Request Data

Execute EGDC

TGD/U

TGD/C

SRP Mapper

Further Information Needed

Data Does Not Meet Needs

DataDiscovery

Process

BuildBaselineDataset

Process

Customer

DataCollection

Plan

Process

ValidateReq’ts

PlanLogistics

CollectData

Process

ProcessData

Process

Distribute

Sensitive ButUnclassified (SBU) ?

Releasible ?

SupportsTraining ?

PrepareEquipment

Process

Travel toSite

Returnfrom Site

Data Meets Needs

Page 26: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

26AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 26

Data Discovery ProcessValidateRequest

NOExecuteEGDC

MeetsNeeds ?

Exists ?

InitiateSearch

Data Discovery Process

Exists ?

Exists ?

Exists ?IMA-E

YES

YES

YES

YES

NO

NO

NO

Direct Requestto IMA-E

Review Data

NO

YES

Geographic orMetadata Search

Geographic orMetadata Search

Geographic orMetadata Search

TGD/U

TGD/C

SRP Mapper

CompileDatasets

Initial Datasets

Customer

Page 27: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

27AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 27

Build Baseline Dataset Process

ExecuteEGDC

Build Baseline Dataset Process

Register Image(Geographic

WGS84)

Image Geo-referenced? NO

GeographicWGS84?

YES

NO

Re-ProjectImage

(GeographicWGS84)

FeatureExtraction(SDSFIE)

YES

FeatureAttribution(SDSFIE)

Image ControlPoints

Create for fieldverification

Acquire Imagery

Data CollectionPlan Process

Baseline Dataset

Page 28: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

28AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 28

Data Collection Plan Process

DictionaryMatches

Equipment ?

Data Collection Plan Process

YES

NO

Establish a PriorityList of Features for

Collection

BaselineDataset

Created ?

NO

DataDictionaryAvailable ?

YES

NO

Develop DataDictionary(SDSFIE)

Create ProperDictionary File

YES

Print Map Book

Customer

ValidateReq’ts

Divide the CollectionEffort into LogicalAreas or Feature

Groups

Create a Site Mapwith Collection Areas

to Track Activities

Build BaselineDataset Process

PrepareEquipment

Process

Priority List,Map Book andData Dictionary

Page 29: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

29AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 29

Prepare Equipment Process

Prepare Equipment Process

BaselineDataset Exist?

YES

NOConvertBaseline

Dataset for GPS

InventoryEquipment

Package forTransport

LoadBackground

Image on GPS

Load BaselineDataset on GPS

for Editing

Load DataDictionary on

GPS Unit

GPS Equipment - data collector - spare batteries - battery charger - power supplyLaser Distance MeterDigital Camera - spare batteriesLaptop Computer - external harddrive - spare batteries - power supplyTape and CompassField Notebooks

Data CollectionPlan Process

Collect DataProcess

Load BaselineDataset onComputer

Page 30: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

30AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 30

Collect Data Process

Collect Data Process

DoesData Collection Plan

Match Needs ?YES

NO

Download Datato Laptop andBackup Drive

Collect Data

Refine DataCollection Plan

Verify CollectedData Against

Plan

CoordinateActivities w/

Local Host, ifNecessary

Prepare for NextDay Collection

Activities

GPS Data Files

Daily Activity

Process DataProcess

PrepareEquipment

Process

Page 31: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

31AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 31

Process Data Process

Process Data Process

BaselineDatasetUsed ?

YES

NO

Verify CollectedControl Points with

Imagery Control

ConsolidateData Files

Verify Attributionis Complete,Correct if not

Export GPSData to GIS

Format

DocumentMetadata

Post ProcessGPS Data

(if possible)

GPS Data Files

Register Imageand Baseline

Dataset to NewControl

Produce DataControl OK ?

YES

NO

GIS, Metadataand ImageryData Files

Collect DataProcess

Distribute

Page 32: 1 AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A 21 June 2015 1 HQ USAREUR Office Of The Deputy Chief Of Staff, Engineer This briefing is:

32AN ARMY FORWARD ANY MISSION, ANYWHERE! ODCSENG, USAREUR/7A

April 18, 2023 32

Conclusions

• GI&S is working TGD efforts to optimize GIS tasks within the current and future USAREUR architecture in collaboration with G6.

• The data requirements are orders of magnitude beyond what we currently have today – or have planned.

• Working to insure that TGD is a flexible, expandable architecture that can provide the beginnings of the data acquisition that is going to be demanded in the future.