1 Alignment using high Pt tracks 1. Small w.r.t. large barrel chambers 2. BEE w.r.t. EC chambers 3. Endcap – Barrel 4. BIS8 w.r.t. BIS7 5. Inner tracker – Muon spectrometer 6. TGC w.r.t. EC MDT chamber. Not discussed here High p T means: Selected by High p T Level1 trigger + level2 cut p T >20GeV For items 1-4, the target precision transverse to the track direction in the bending plane is of the order 30 m. For item 5, a precision of the order 200m in the toroid bending plane is sufficient. Not discussed here: alignment with field off (or cosmic) straight tracks (considered as an offline “one time” C.Guyot Saclay 30/112005 In parallel (or together) with R-T calibration stream, a track alignment stream has to be setup for the following alignment tasks:

1 Alignment using high Pt tracks 1.Small w.r.t. large barrel chambers 2.BEE w.r.t. EC chambers 3.Endcap – Barrel 4.BIS8 w.r.t. BIS7 5.Inner tracker – Muon

Embed Size (px)

Citation preview

Page 1: 1 Alignment using high Pt tracks 1.Small w.r.t. large barrel chambers 2.BEE w.r.t. EC chambers 3.Endcap – Barrel 4.BIS8 w.r.t. BIS7 5.Inner tracker – Muon

1

Alignment using high Pt tracks

1. Small w.r.t. large barrel chambers

2. BEE w.r.t. EC chambers

3. Endcap – Barrel

4. BIS8 w.r.t. BIS7

5. Inner tracker – Muon spectrometer

6. TGC w.r.t. EC MDT chamber. Not discussed here

High pT means: Selected by High pT Level1 trigger + level2 cut pT>20GeVFor items 1-4, the target precision transverse to the track direction in the bending plane is of the order 30 m.For item 5, a precision of the order 200m in the toroid bending plane is sufficient.Not discussed here: alignment with field off (or cosmic) straight tracks (considered as an offline “one time” task)

C.Guyot Saclay 30/112005

In parallel (or together) with R-T calibration stream, a track alignment stream has to be setup for the following alignment tasks:

Page 2: 1 Alignment using high Pt tracks 1.Small w.r.t. large barrel chambers 2.BEE w.r.t. EC chambers 3.Endcap – Barrel 4.BIS8 w.r.t. BIS7 5.Inner tracker – Muon

2

Small-Large barrel chambers

Track selection at level 2: High Pt muon in full overlap (BIS-BIL-BMS-BMLS-BOS-BOL tracks)Selected tracks rate at L=1033: ~3 Hz (barrel, 200 towers)Frequency : every 2 hours (~100 segments per chamber overlap)CPU requirement: ~ 3 PC (~3 Hz with ~1s per track reconstruction)Comments : optical alignment and track information are correlated in the final fit DCS condition database data have to be available

ASAPoptic

A linesoptic

Track reconstruction

in the large chambers+ Segments in the smallchambers

OverlapTrackdigits

Segments in the small chambers:

Predicted from largeReconstructed in small

ASAP fitteroptic + segments

A linescombined

Optical sensors

data

ATHENA

Page 3: 1 Alignment using high Pt tracks 1.Small w.r.t. large barrel chambers 2.BEE w.r.t. EC chambers 3.Endcap – Barrel 4.BIS8 w.r.t. BIS7 5.Inner tracker – Muon

3

STANDARD BARREL SECTORBARREL FOOT SECTOR

MDT overlap

Trigger zonefor overlapingtracks

Page 4: 1 Alignment using high Pt tracks 1.Small w.r.t. large barrel chambers 2.BEE w.r.t. EC chambers 3.Endcap – Barrel 4.BIS8 w.r.t. BIS7 5.Inner tracker – Muon

4

BEE / EC chambers

Excluded zone

Track selection at level 2: High Pt muons in the overlap EIS-BEE-EMS-EOS Selected tracks rate at L=1033: ~10Hz (1.45<|<1.70, 30% of 2)Frequency : every 2 hours (~1000 segments per BEE in the edge zones)CPU requirement: ~ 3 PC ( ~3Hz with ~1s per track reconstruction)Comments : Only tracks crossing the edges of BEE chambers should be considered

BEE1 BEE2

ARAMYSoptic A lines

optic

Track reconstruction

in EIS-EMS-EOS+ Segments

in BEE

OverlapTrackdigits

Segments in BEE: Predicted from EI-EM-EOReconstructed

Segment fitter:Fit BEE positions

A linesBEE

Optical sensors

data

Edge zone

Page 5: 1 Alignment using high Pt tracks 1.Small w.r.t. large barrel chambers 2.BEE w.r.t. EC chambers 3.Endcap – Barrel 4.BIS8 w.r.t. BIS7 5.Inner tracker – Muon

5

Endcap / Barrel (1)

Track selection at level 2: High Pt muons in the overlap BIL6-EIL4-BML6-BOL6Selected tracks rate at L=1033: ~4Hz (~0.05, ~60% of 2)Frequency : every 2 hours (~1000 segments per EIL4)CPU requirement: ~ 4 PC ( ~4Hz with ~1s per track reconstruction)Comments : The final fit involves both barrel and EC optical data in additions to the segments in EIL4. The fitted objects could be barrel layers + EC bars.With EEL: tracks in the overlap BIL6-EIL4-EEL2-EML5 also possible.

Page 6: 1 Alignment using high Pt tracks 1.Small w.r.t. large barrel chambers 2.BEE w.r.t. EC chambers 3.Endcap – Barrel 4.BIS8 w.r.t. BIS7 5.Inner tracker – Muon

6

Endcap / Barrel (2)

ASAPoptic

A linesoptic

Track reconstruction

in the barrel+ Segments

in EIL4

OverlapTrackdigits

Segments in EIL4:Predicted from Barrel trackReconstructed from digits

Global fitteroptic + segments

A linescombinedOptical

sensors data ARAMYS

optic

Page 7: 1 Alignment using high Pt tracks 1.Small w.r.t. large barrel chambers 2.BEE w.r.t. EC chambers 3.Endcap – Barrel 4.BIS8 w.r.t. BIS7 5.Inner tracker – Muon

7

BIS8 / BIS7

Segments Reconstruction

In BIS7 and BIS8

OverlapTracksdigits

Segments in BIS7 and BIS8

A linesof BIS8

Fit of BIS8 position

w.r.t. BIS7

Track selection at level 2: High Pt muons in the overlap BIS7-BIS8Selected tracks rate at L=1033: ~1Hz (~0.05, ~20% of 2)Frequency : every 4 hours (~1000 segments per BIS8)CPU requirement: ~ 1 PC ( ~1Hz with ~1s per segment reconstruction)Comments : The segments could the same as those used for R-T calibration

BIS7

BIS8

A linesof BIS7

Page 8: 1 Alignment using high Pt tracks 1.Small w.r.t. large barrel chambers 2.BEE w.r.t. EC chambers 3.Endcap – Barrel 4.BIS8 w.r.t. BIS7 5.Inner tracker – Muon

8

Muon spectrometer w.r.t. inner detector

Stand alonetrack recons

In the spectro

Digits in Muon

spectroSegments in BI/EI

Event selection at level 2: Event with a very high Pt muons (e.g. > 50 GeV) both in ID and muon spectroSelected event rate at L=1033: >10Hz (from W/Z events) + pre-selectionFrequency : every 6 hours (~10000 tracks required to achieve the precision)CPU requirement: ~ 5 PC ( ~0.5 Hz with ~1s per track reconstruction)Comments : The final fit involves both barrel and EC optical data in additions to the segments in BI/EI. The fitted objects could be barrel layers + EC bars.

Digits in ID

ASAPoptic

A linesoptic

Optical sensors

dataARAMYS

optic

Track reconsin the ID

+ extrapolation to BI/EI

Extapolatedsegments in

BI/EI Global fitteroptic + segments

NewA lines

Page 9: 1 Alignment using high Pt tracks 1.Small w.r.t. large barrel chambers 2.BEE w.r.t. EC chambers 3.Endcap – Barrel 4.BIS8 w.r.t. BIS7 5.Inner tracker – Muon

9

Conclusions/comments

• At lower luminosity (or if a detailed analysis shows tat the rates are much lower than anticipated), tracks selected at level2 with a lower pT cut (e.g. >10GeV) can be used.•Total rate of selected events for alignment with tracks should be ~ 20Hz (L=1033)•CPU time is dominated by the full track reconstruction: ~20-30 PC are required (<10% of calibration load)• As expressed in the updated LOI, these alignment tasks would be worked out in tier-2 calibration centers.•The various tasks could be split as follow:

Optical alignment (ASAP/ARAMYS) : at ATLAS Point1 Track + segment reconstruction: in Tier2 Combined fits using segments + optical information : Tier2

• DC3/CSC simulation data with in a step first ideal detector geometry and later with “as built” detector geometry should be used as a starting point. Realistic rates and efficiencies have to be worked out.• EDM should be updated to include the notion of extrapolated segment

• Alignment specific developments will start at MPI Munich tier2. A collaboration with Saclay has been started to cover the issues of trigger rates in the alignment stream (detailed study with full MC simulations), specific track/segment reconstruction, combined track/optical sensors fits,…