Page 1: 1 Air Quality Issues New State Implementation Plan Seyed Sadredin Executive Director/APCO San Joaquin Valley Air Pollution Control District

1

Air Quality IssuesAir Quality IssuesNew State Implementation PlanNew State Implementation Plan

Seyed SadredinSeyed SadredinExecutive Director/APCOExecutive Director/APCO

San Joaquin Valley Air Pollution Control District

Page 2: 1 Air Quality Issues New State Implementation Plan Seyed Sadredin Executive Director/APCO San Joaquin Valley Air Pollution Control District

2

Valley’s challenges are unmatched by any other region in the nation.

Valley’s geography and meteorology are ideal for forming and trapping smog.

Page 3: 1 Air Quality Issues New State Implementation Plan Seyed Sadredin Executive Director/APCO San Joaquin Valley Air Pollution Control District

3

Pollution DensityPollution Density

Page 4: 1 Air Quality Issues New State Implementation Plan Seyed Sadredin Executive Director/APCO San Joaquin Valley Air Pollution Control District

4

Percent Decrease, NOxSource: Based on ARB's 2006 Almanac

-45.0%

-40.0%

-35.0%

-30.0%

-25.0%

-20.0%

-15.0%

-10.0%

-5.0%

0.0%

1990 1995 2000 2005

year

percent decrease South Coast

San Joaquin

Past Efforts to Reduce Air Pollution by Region

Page 5: 1 Air Quality Issues New State Implementation Plan Seyed Sadredin Executive Director/APCO San Joaquin Valley Air Pollution Control District

5

Much progress has been made, but the remaining Much progress has been made, but the remaining challenges are dauntingchallenges are daunting

Federal Standards Pass Fail Comments

Ozone: Smog in Summer

One-hour N/A Smog cut by half before standard was revoked

Eight-hour EPA compliance by 2012. Plan due in 2007.

PM-10: Dust, soot in fall

24-hour Annual

PM-2.5: smallest particulates in winter

24-hour New standard released 9/21/06.

Annual EPA Compliance by 2015. Plan due in 2008.

Page 6: 1 Air Quality Issues New State Implementation Plan Seyed Sadredin Executive Director/APCO San Joaquin Valley Air Pollution Control District

6

How much more reductions is How much more reductions is needed for 8-hr ozone attainment?needed for 8-hr ozone attainment?

• An additional 60% reductions in emissions needed to meet the new smog standard

• 480 tons per day of reductions are needed

Page 7: 1 Air Quality Issues New State Implementation Plan Seyed Sadredin Executive Director/APCO San Joaquin Valley Air Pollution Control District

7

0

200

400

600

800

1000

2005EmissionsInventory

2015 2015 w/o 2015 w/o 2015 w/o 2015 w/o 2015 w/o

Tons Per Day

NOx

ROG

60% Reduction in Emissions:60% Reduction in Emissions:How Difficult?How Difficult?

“Carrying Capacity”

Mobile Sources

Stationary Sources

Light Duty Vehicles

Diesel Trucks

AgricultureEmissions Inventory

Page 8: 1 Air Quality Issues New State Implementation Plan Seyed Sadredin Executive Director/APCO San Joaquin Valley Air Pollution Control District

8

2007 Ozone Plan2007 Ozone Plan4-Faceted Control Strategy4-Faceted Control Strategy

• Regulatory component (District rules)

• Incentive-based strategies

• Alternative compliance

• Local, state, and federal sources/partnerships

Page 9: 1 Air Quality Issues New State Implementation Plan Seyed Sadredin Executive Director/APCO San Joaquin Valley Air Pollution Control District

9

Current District Control MeasuresCurrent District Control Measures

• 41 Stationary & area source measuresCurrent rulemaking projects (10) – affecting 20 current rules, Proposed CMs (17), Further Study CMs (14)

• 7 Mobile & Indirect Measures:Trip Reduction, Accelerated Fleet Rule, ISR Enhancement, Green Contracting, Expanded Spare the Air, Heat Island Mitigation, Alternative Energy & Energy Conservation

• Incentive Programs- for faster fleet turnover of diesel trucks, off-road equipment, farm equipment, light/medium duty vehicles)

Page 10: 1 Air Quality Issues New State Implementation Plan Seyed Sadredin Executive Director/APCO San Joaquin Valley Air Pollution Control District

10

Reductions from Control Reductions from Control MeasuresMeasures

• New reductions from recent District rules (not yet in inventory) = 72 tons/day by 2012

• Reductions from new District rules & programs = 46 tons/day by 2012

• Reductions from state & federal mobile source emissions = 80 tons/day by 2014

• Reductions from known District incentive funding = 12 tons/day by 2012

Page 11: 1 Air Quality Issues New State Implementation Plan Seyed Sadredin Executive Director/APCO San Joaquin Valley Air Pollution Control District

11

2012 Attainment “Gap”2012 Attainment “Gap”

300

400

500

600

700

800

900

1000

2005 2007 2009 2011 2013 2015 2017 2019 2021 2023

Year

VOC+NOx emissions, tpd

Baseline

w/Recent District Rules

w/Proposed District &ARB Controls

Carrying Capacity -Arvin

Carrying Capacities derived from ARB photochemical modeling

300 t/d

Page 12: 1 Air Quality Issues New State Implementation Plan Seyed Sadredin Executive Director/APCO San Joaquin Valley Air Pollution Control District

12

Regulations vs. IncentivesRegulations vs. Incentives

2012 Attainment

2023 Attainment

$7.5 Billion Incentives

$2.9 Billion Incentives

$2.1 Billion Incentives

Recent Local RulesNew Local RegulationsFleet TurnoverNew State MeasuresIncentives

2020 Attainment

Page 13: 1 Air Quality Issues New State Implementation Plan Seyed Sadredin Executive Director/APCO San Joaquin Valley Air Pollution Control District

13

Incentives StrategyIncentives Strategy

• “Air Quality Empowerment Zones”

• Tax incentives for plan/fleet modernization

• Fair share of air quality funds from the state transportation bond

• $200 million/year cash incentives for 10-12 year (50/50 state and federal match)

Page 14: 1 Air Quality Issues New State Implementation Plan Seyed Sadredin Executive Director/APCO San Joaquin Valley Air Pollution Control District

14

When Will the Valley Attain?When Will the Valley Attain?• Attainment is possible with this Plan

• Attainment will “phase in” over time

– Some areas are currently in attainment

– Others will attain as emissions are reduced

• Attainment in Parlier/Edison…

– Requires 35%-40% reduction from 2012 baseline

– Means attainment for all SJV metro areas

– Will be achieved by 2019 with proposed controls

• Over 90% of the Valley population will be in attainment by 2019

• Arvin’s low carrying capacity defines the strategy

Page 15: 1 Air Quality Issues New State Implementation Plan Seyed Sadredin Executive Director/APCO San Joaquin Valley Air Pollution Control District

15

EdisonOildale/

Bakersfield

MaricopaArvin

Shafter

Ash Mtn.Lookout Pt.

Lower Kaweah

Visalia

ParlierFresno

Clovis

Turlock

Merced

Tracy

Stockton

Modesto

Madera

Hanford

20053-yr Avg of 4th highest measurement

Page 16: 1 Air Quality Issues New State Implementation Plan Seyed Sadredin Executive Director/APCO San Joaquin Valley Air Pollution Control District

16

EdisonOildale/

Bakersfield

MaricopaArvin

Shafter

Ash Mtn.Lookout Pt.

Lower Kaweah

Visalia

ParlierFresno

Clovis

Turlock

Merced

Tracy

Stockton

Modesto

Madera

Hanford

2012w/Proposed Controls

Page 17: 1 Air Quality Issues New State Implementation Plan Seyed Sadredin Executive Director/APCO San Joaquin Valley Air Pollution Control District

17

EdisonOildale/

Bakersfield

MaricopaArvin

Shafter

Ash Mtn.Lookout Pt.

Lower Kaweah

Visalia

ParlierFresno

Clovis

Turlock

Merced

Tracy

Stockton

Modesto

Madera

Hanford

2014w/Proposed Controls

Page 18: 1 Air Quality Issues New State Implementation Plan Seyed Sadredin Executive Director/APCO San Joaquin Valley Air Pollution Control District

18

EdisonOildale/

Bakersfield

MaricopaArvin

Shafter

Ash Mtn.Lookout Pt.

Lower Kaweah

Visalia

ParlierFresno

Clovis

Turlock

Merced

Tracy

Stockton

Modesto

Madera

Hanford

2019w/Proposed Controls