23
1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department of Environmental Management

1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

Embed Size (px)

Citation preview

Page 1: 1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

1

Administrative Rules Oversight Committee

IDEM Approval of BP’s NPDES PermitAugust 22, 2007

Thomas W. Easterly, P.E., DEE, QEP Commissioner

IN Department of Environmental Management

Page 2: 1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

2

IDEM’s Mission

IDEM is responsible for protecting human health and the environment while providing for safe industrial, agricultural, commercial and governmental operations vital to a prosperous economy.

Page 3: 1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

3

How Does IDEM Protect the Environment?

Measure the air, water and land to determine the existing state of the environmentCompare the measured values to levels that protect human health and the environment Ambient Air Quality Standards Water Quality Standards Remediation of contaminated sites

Use modeling to determine how much of a substance can be safely added to the environment

Page 4: 1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

4

How Does IDEM Protect the Environment?

Develop regulations and issue permits to restrict discharges to the environment to safe levelsInspect and monitor permitted facilities to ensure compliance with the permitsEnforce against people who exceed their permit levels or violate regulationsEducate people on their environmental responsibilities

Page 5: 1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

5

Need for a Permit

Every facility that discharges into surface waters is required to obtain a National Pollutant Discharge Elimination System (NPDES) permit.

Page 6: 1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

6

Priorities Used to Grant the Permit

Issuance of the BP permit was part of an ongoing process to renew and update all NPDES permits to meet new, more stringent state and federal requirements.

In BP’s case, the company also asked to modify its permit to accommodate the planned expansion to refine crude oil from Canada.

Page 7: 1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

7

Permit Limits, Requirements

Permit limits are set to meet:Water quality standards to protect aquatic life,

drinking water and recreationTechnology standards consistently applied each

type of industry

Permits also contain requirements such as:Whole effluent toxicity testing

If the applicant meets all legal and regulatory requirements, the permit must be issued.

Page 8: 1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

8

BP NPDES PermitNo exceptions were made with BP’s wastewater permit which is protective of drinking water, recreation and aquatic life in Lake Michigan

BP’s permitted discharge levels are established at or below current stringent water quality standards.

With the new permit, BP will be able to process Canadian Heavy Crude derived from tar sands.

Page 9: 1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

9

Public Outreach

IDEM considers all stakeholders when making a permit decision. We respond to all comments received and include the responses in the fact sheet before making the final permit decision.

In January, 2007, IDEM, EPA and BP commenced an extraordinary outreach to and consultation with the Northwest Indiana environmental community during the development of the final draft permit

Page 10: 1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

10

Public Outreach

A public comment period on the draft permit was offered from March 16 to May 11, 2007.A public meeting held in Whiting on April 26, 2007—attended by BP representatives, the environmental community and one citizen.IDEM received and responded to comments from 46 people before issuing the final permit on June 21, 2007.

Page 11: 1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

11

Public Outreach

IDEM coordinated with EPA to ensure compliance with the Clean Water Act. On April 5, 2007, EPA issued a written notice of no objection concerning the BP Permit.

The 18-day appeal period for the permit ended on July 9, 2007 and no appeal was filed within that period. The permit effective date is August 1, 2007 and the permit expires July 31, 2012.

Page 12: 1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

12

BP’s Wastewater Treatment Process

All wastewater is fully treated in a complex treatment plant with 7 separate treatment stages before being released 3,500 feet from shoreline

BP discharges 21.4 million gallons of treated wastewater per day

Page 13: 1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

BA

R S

CR

EE

N

GR

IT C

HA

MB

ER

API SEPERATOR

(#7 SEP)27 BAY

2 STAGE(24 IN USE)

SURGETANK5050

EQL.TANK5051

REFINERYWASTEWATER

DISOLVEDAIR

FLOATATIONUNIT7 BAY

2 STAGE

STAGE 1AERATION

TANK5001

STAGE 2AERATION

TANK5002

SPLITTERBOX5003

CLARIFIER5004

CLARIFIER5005

FIN

AL

FIL

TE

RS

(8 T

OT

AL

)

FIRE WATERAND

COOLINGTOWER

MAKE-UPWATER

EFFLUENTTO THELAKE

BP Amoco WhitingWastewater Treatment Plant

Page 14: 1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

14

Putting the numbers in perspective

Water and wastewater standards are typically expressed in milligrams per liter (mg/l).

Wastewater with 1 mg/l of material left in it is 99.9999% pure water

1 mg/l is 1 part per million (ppm).

1 ppm equates to about 6 people of the state’s 6.2 million population

Mercury limits are much lower—1.3 millionth of a part per million (parts per trillion) or less than one hundredth of a person on earth.

Page 15: 1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

15

BP NPDES Permit--TSSTotal Suspended Solids (TSS) are not sludge.

BP’s TSS discharge is comparable to the TSS discharge of a small city

There are no other technologies known to further remove TSS

Page 16: 1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

16

BP NPDES Permit--TSS

The new permit allows an increase in TSS from the existing limit of 3,646 lbs/day to 4,925 lbs/day

At this level, the discharge will contain 27.6 mg/l of TSS, less than the typical 30 mg/l limit imposed on many municipal treatment plants.

Page 17: 1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

17

BP NPDES Permit--AmmoniaThe new permit allows an increase in ammonia from the existing limit of 1,030 lbs/day up to 1,584 lbs/day.

The new permitted level is half of permissible maximums (technology-based effluent limit is 3,358 lbs/day, water quality based effluent limit is 3,215 lbs/day.)

The calculated concentration of ammonia in the lake at the discharge is 0.28 mg/l, which is well below the lowest permissible effluent limit of 0.48 mg/l

Page 18: 1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

18

Comparison to Recently Proposed Illinois Refinery Permit

Illinois Proposal

BP Permit

AMMONIA (lb/thousand barrels/day)

5.47 3.77

TSS (mg/l) 34.1 27.6

Page 19: 1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

19

BP NPDES Permit -- MercuryThe permit restricts BP’s discharge to the Great Lakes Water Quality Limit of 1.3 parts per trillion.

As allowed by law, BP has up to five years to meet this standard.

BP will not discharge more mercury when it reconfigures the refinery.

Page 20: 1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

20

Drinking WaterThere is no drinking water standard for ammonia. There is a total nitrogen (N) standard for Nitrate plus Nitrite of 10 mg/l and a Nitrite standard of 1 mg/l. The BP permit restricts the ammonia N to 0.28 mg/l in the lake (including a background value of 0.05 mg/l).

Chlorination, which is required for drinking water supplied from surface water, destroys ammonia.

There is no drinking water standard for total suspended solids—surface water is filtered.

Page 21: 1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

21

Recreational Use

Beach closings and swimming advisories are caused by high levels of bacteria in the water. The high levels are normally caused by discharges of untreated sewage, typically during periods of high rain fall.

The BP facility does not discharge bacteria.

Page 22: 1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

22

Aquatic Life

Aquatic life, including fish, is fully protected by the permit limits on ammonia and mercury.

Page 23: 1 Administrative Rules Oversight Committee IDEM Approval of BP’s NPDES Permit August 22, 2007 Thomas W. Easterly, P.E., DEE, QEP Commissioner IN Department

23

Thank You—Questions

Tom Easterly

100 N. Senate Ave. IGCN 1301

Indianapolis, IN 46204

(317) 232-8611

Fax (317) 233-6647

[email protected]