Sunrise States: Realizing the growth
potential of North-East
Team
Abhi
AbhiShas
Hars
Anku
Presented by :AASHA
7/29/2019 1-aasha-1378406414-130906034451-
2/11
Why the theme?Being the students of IIT Guwahati for more than 2 years now, hailing from distinct lIndia, we realized there is a fundamental difference in government actions, infrastr
public sentiments of North-East and rest of India.
Even having vast natural resources, apt human resources and more than enough fucenter (highest per capita investment by the Centre, averaging INR 2,574.98, againsaverage of INR 683.95) there is still need to realize the true potential of North-East wverified by statistics shown in following slides.
Rampant power cuts, poor transportation and connectivity with the rest of India, unstates having more than 80% literacy rates, lack of faith in govt. and prevalent feelincutting across all sections of society, make us believe that this theme deserves the mattention among the 14 national challenges raised in the competition.
Skill Development Biomass Power AdveFields Of
Focus
7/29/2019 1-aasha-1378406414-130906034451-
3/11
Problem:
Supplementing deficienciesin machinery, equipment &
furniture
Mowean
Construction of hostels,boundary wall and
maintenance of old ITIs
campus.
Lo
cra
B. Supplementing d
infrastructure in 28 eITIs by providing m
infrastructure, propecurriculum
Skill Development and Employment
Imparting of knowledgethat will be directly
applicable to industriesand work places.
Skills like Englishproficiency, hospitalitytraining, computer andprogramming training,manufacturing skills.
Teaching preference,location , area of interestof the volunteer will be
considered at the time ofregistration.
Volunteers would receivean opportunity to build
their resumes, extra softskills, recognition and
network building.
A. Setting up of skill development traininginstitute maintained at center and statelevel volunteered by service professionals
graduate students, local volunteer
problem
The region will generate 2.6 million jobs, but the manpower supply will be16.8 million persons. So there is a need for a twin approach for developingskills for both local employment and for those who seek to migrate
7/29/2019 1-aasha-1378406414-130906034451-
4/11
Employm-ent areas
fortrainedpeople
Growth in tourismfollowed by
Hospitality of tourists
Labor force in manyhydro power plant,
solar plant, andindustries planned to
come up.
Will indulge in skilledand improved
agricultural andproduction practices
raising the totalagricultural output.
Local handloombusinesses, painting,craftsmanship, etc.
will boom up
Trained peophelp in tec
advancemenby indulging
sector, devesector and
government
The scheme is funded by state and central government on 50
skilldevelopmen
t
trainingcenter
cheif director
(1*6 lpa)
Central team consisting ofrecruitment, media, execution
team (30*4 lpa)
Regional controller
(30*4 lpa)
Establishment, Transportation,Technical cost = INR 1cr pa
INR2.5
cr.
INR
1 cr.
Improvement
ofITIs
Supplementing machEquipment
Construction of hostefencing on governm
premises
7/29/2019 1-aasha-1378406414-130906034451-
5/11
Biomass
Power Reason : With rice and maize being the principle food gra
north east and bamboo found in abundance, there is a suwaste, energy crops (like bamboo), agricultural waste (likagro-industrial units (like pulp waste from food processin
Solutions:
Hydro Power
Solar Power
Biomass Power
Implementations:
Ongoing projects :
157 central hydro power schemes (installed c
8 solar cities planned in North East region by
Problem Massive power shortage in north east (11.3%) with peak shortage of 10
(Country average expected at 6.7%, with peak shortage at 2.3%)
Total hydro-power potential in the NER including Sikkim is 63,257 MW.Presently, only 3% of the assessed potential has been developed in N.E. Regio
POWER
7/29/2019 1-aasha-1378406414-130906034451-
6/11
Cost
Capital cost of in
crore/MW depressure and cap
hydro power gen
crores/MW), costs
Rs. 3.50 to
The project size
(biomass) availa
location. For a ca
for a biomass fu
calorific value of3fuel requirement
annum. The cobiomass is the c
biomass pr
Renewable form of energy.
Incentives
Capital Subsidy, Exemption from Payment ofExcise Duty on machineries and equipmentspurchased for initial setting up of a power plantare available. Apart from this CDM Benefits onReduction of CERs and Preferential tariff forpower exported to grid are also available.
7/29/2019 1-aasha-1378406414-130906034451-
7/11
ProposedSolution
Mountaineering
Aero Sports
Eco tourism
Water Sports
SCOPENorth-East India has thepotential to become one
of the best sportingdestinations although
most of the part still has to
be discovered
The Long StretchedHimalayan range
contrasted with the vastriver valleys landscape can
offer wide scopes foradventurous activities
Given apt infrastructure, qualified instructors and more liberal regulations North-East is equip
opportunity to host extreme tourism which can generate huge revenue, local employment, gro
Development of Extreme SportsNorthEast India, a paradise for Tourists f
7/29/2019 1-aasha-1378406414-130906034451-
8/11
Under Govt. scheme of NEATO, there will be private sector companieventure who can setup their offices in different states of north east wcan be done. For this NEATO can invite various sectors to invest in noropportunities for adventure sports.
Govt. can release tender notices to take an adventure activity bycompanies who are qualified nodal and have an established instithem certification, license by charging them the appropriate am
For the agencies located in the North Eastern region, remote and rube a minimum of two qualified staff out of which one should have a DTourism & Travel Management from a recognized University, IITTM orby AICTE. The owner of the firm would be included as one of the qua
North East
Adventure
Tour
Operator
(NEATO)
7/29/2019 1-aasha-1378406414-130906034451-
9/11
Diving : 1crore
Paragliding:3-5 lakh
Raft boat:60-70
thousand
Investment inequipment:
Rs.3crorefor owning
property:Rs.1crore
for officeequipment:
Rs.50lakh
COST
Marketingand publicity
strategies
10-20 lakh
Adventure sports
market in India:
Rs.400-500 crore
Choosing location
and property
charges
7/29/2019 1-aasha-1378406414-130906034451-
10/11
Other possible areas of focus
Boom of border trade with South-East Asian countries and other states of Indi
Better road connectivity and physical infrastructure to improve trade.
Better MNREGA implementation at grass-root level.
Development of local businesses, like handloom, bamboo, craft, which can genlocal jobs.
More opportunities for investment in agriculture and food processing.
7/29/2019 1-aasha-1378406414-130906034451-
11/11
References:
Report by ICC on Indias North-East diversifying growth opportu
Report on Development of power sector in North-Eastern regioplan.
Implementation manual for centrally sponsored scheme on EnSkill Development infrastructure in NE states and Sikkim.
IDSA paper on India's north east 2020: Four Alternatives Future
Ministry of Development of North-Eastern region: www.mdoner
Report by Ministry of Tourism on Guidelines for recognition as a
approved Adventure Tour Operator(ATO).
Report of the Special group on Targeting 10 million opportunitiPlanning Commission India 2002.
Report of the Task Force on Employment opportunities, PlanninCommission India, 2001.
http://www.mdoner.gov.in/http://www.mdoner.gov.in/