8
1 8 8 th th Global Standards Global Standards Collaboration Collaboration Ottawa, 27 April – 1 May 2003 Ottawa, 27 April – 1 May 2003 Progress report on 3GPP Progress report on 3GPP Asok Chatterjee Asok Chatterjee Ericsson, Inc. Ericsson, Inc. Chairman, 3GPP Project Co-ordination Group Chairman, 3GPP Project Co-ordination Group April 2003

1 8 th Global Standards Collaboration Ottawa, 27 April – 1 May 2003 Progress report on 3GPP Asok Chatterjee Ericsson, Inc. Chairman, 3GPP Project Co-ordination

Embed Size (px)

Citation preview

Page 1: 1 8 th Global Standards Collaboration Ottawa, 27 April – 1 May 2003 Progress report on 3GPP Asok Chatterjee Ericsson, Inc. Chairman, 3GPP Project Co-ordination

1

88thth Global Standards Collaboration Global Standards Collaboration Ottawa, 27 April – 1 May 2003Ottawa, 27 April – 1 May 2003

Progress report on 3GPPProgress report on 3GPP

Asok ChatterjeeAsok ChatterjeeEricsson, Inc.Ericsson, Inc.

Chairman, 3GPP Project Co-ordination GroupChairman, 3GPP Project Co-ordination Group

April 2003

Page 2: 1 8 th Global Standards Collaboration Ottawa, 27 April – 1 May 2003 Progress report on 3GPP Asok Chatterjee Ericsson, Inc. Chairman, 3GPP Project Co-ordination

2

What's happened since GSC-7 ?What's happened since GSC-7 ?Release 5 - Release 5 - March 2002March 2002• Main features:Main features:

– IMS - IP-based Multimedia ServicesIMS - IP-based Multimedia Services• All the core network elements for multimedia servicesAll the core network elements for multimedia services• Based on SIP (from IETF) and PS bearersBased on SIP (from IETF) and PS bearers

– HSDPA - High Speed HSDPA - High Speed Downlink Packet AccessDownlink Packet Access

• Data only, downlink speeds of up to 10Mbit/sData only, downlink speeds of up to 10Mbit/s

• Included in latest ITU-R update of M.1457Included in latest ITU-R update of M.1457– And much more!And much more!

• Wideband AMR codecWideband AMR codec• End-to-end QoSEnd-to-end QoS• Enhancements to messaging, security, etc…Enhancements to messaging, security, etc…

Mic

roso

ft

Page 3: 1 8 th Global Standards Collaboration Ottawa, 27 April – 1 May 2003 Progress report on 3GPP Asok Chatterjee Ericsson, Inc. Chairman, 3GPP Project Co-ordination

3

Harmonization actions (1)Harmonization actions (1)3GPP – 3GPP23GPP – 3GPP2• Joint meetings since 1999 addressing interoperability, Joint meetings since 1999 addressing interoperability,

roaming and harmonization needs, centred on:roaming and harmonization needs, centred on:– Radio accessRadio access– Terminal designTerminal design– Core networkCore network

• Results:Results:– Joint studies on radio matters such as spacial Channel modelling, Joint studies on radio matters such as spacial Channel modelling,

common User Equipment requirements, etccommon User Equipment requirements, etc– IMS adopted by 3GPP2IMS adopted by 3GPP2– Potential barriers to interworking and roaming between 3GPP and Potential barriers to interworking and roaming between 3GPP and

3GPP2 systems being resolved in Release 63GPP2 systems being resolved in Release 6

Mic

roso

ft

Page 4: 1 8 th Global Standards Collaboration Ottawa, 27 April – 1 May 2003 Progress report on 3GPP Asok Chatterjee Ericsson, Inc. Chairman, 3GPP Project Co-ordination

4

Harmonization actions (2)Harmonization actions (2)

3GPP – ITU3GPP – ITU

• ITU - RITU - R – Regular updates submitted to ITU-R Recommendation M.1457Regular updates submitted to ITU-R Recommendation M.1457

• High level description of IMT-2000 air interfacesHigh level description of IMT-2000 air interfaces

• ITU - TITU - T– Collaboration with ITU-T Special Study Group on "IMT-2000 Collaboration with ITU-T Special Study Group on "IMT-2000

and beyond"and beyond"– Regular updates submitted to ITU-R Recommendation Regular updates submitted to ITU-R Recommendation Q.1701Q.1701

• Framework for IMT-2000 networksFramework for IMT-2000 networks

Page 5: 1 8 th Global Standards Collaboration Ottawa, 27 April – 1 May 2003 Progress report on 3GPP Asok Chatterjee Ericsson, Inc. Chairman, 3GPP Project Co-ordination

5

Harmonization actions (3)Harmonization actions (3)3GPP – IETF3GPP – IETF

• Harmonization also being enhanced Harmonization also being enhanced by adoption of external common specificationsby adoption of external common specifications– Notably, IETF RFCs (approx. 40)Notably, IETF RFCs (approx. 40)– RFC 3113 defines basis of co-operation between 3GPP & IETFRFC 3113 defines basis of co-operation between 3GPP & IETF– IMS based on SIP, defined by IETF…IMS based on SIP, defined by IETF…

• SIP in original form not adequate for 3GPPSIP in original form not adequate for 3GPP– signalling, voice and radio efficiency issuessignalling, voice and radio efficiency issues

• But 3GPP did not want a 3GPP specific version of SIPBut 3GPP did not want a 3GPP specific version of SIP– would prevent interworkingwould prevent interworking

• 3GPP-IETF collaboration has provided required SIP extensions and IETF 3GPP-IETF collaboration has provided required SIP extensions and IETF interoperability changesinteroperability changes

• Collaboration continues…Collaboration continues…

Page 6: 1 8 th Global Standards Collaboration Ottawa, 27 April – 1 May 2003 Progress report on 3GPP Asok Chatterjee Ericsson, Inc. Chairman, 3GPP Project Co-ordination

6

What's next ?What's next ?Release 6 – Release 6 – end 2003end 2003• May include:May include:

• IMS "Phase 2", Presence, WLAN/UMTS interworking, Identity Portability, IMS "Phase 2", Presence, WLAN/UMTS interworking, Identity Portability, Radio optimisation, Multimedia Broadcast/Multicast Service (MBMS), Radio optimisation, Multimedia Broadcast/Multicast Service (MBMS), Network sharing, Speech recognition and speech enabled services, etc…Network sharing, Speech recognition and speech enabled services, etc…

Evolution activityEvolution activity• Developing the position on 3GPP's long term futureDeveloping the position on 3GPP's long term future

• Preparing Technical Report as Roadmap (June 2003)Preparing Technical Report as Roadmap (June 2003)– Foresees long-term evolution of 3G towards future generationsForesees long-term evolution of 3G towards future generations– Foresees continued major role for 3GPP well into the futureForesees continued major role for 3GPP well into the future– Foresees continued/expanded collaboration with other bodiesForesees continued/expanded collaboration with other bodies

Page 7: 1 8 th Global Standards Collaboration Ottawa, 27 April – 1 May 2003 Progress report on 3GPP Asok Chatterjee Ericsson, Inc. Chairman, 3GPP Project Co-ordination

7

ConclusionConclusion

Joe Girard, “The Worlds Greatest Salesman”Joe Girard, “The Worlds Greatest Salesman”

““The elevator to success The elevator to success is out of order. You’ll have is out of order. You’ll have to use the stairs, one step to use the stairs, one step at a time!”at a time!”

Page 8: 1 8 th Global Standards Collaboration Ottawa, 27 April – 1 May 2003 Progress report on 3GPP Asok Chatterjee Ericsson, Inc. Chairman, 3GPP Project Co-ordination

8

and finally….and finally….

Thank you for your attentionThank you for your attention

For more information please visitFor more information please visit

http://www.3gpp.orghttp://www.3gpp.org

Or contactOr contact

[email protected]@ericsson.com